Page 1: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

1

Page 2: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

2

Page 3: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

3

ROAD SECTOR MASTER PLAN(2007-2027)

MINISTRY OF WORKS & HUMAN SETTLEMENTROYAL GOVERNMENT OF BHUTAN

MAY 2006

Page 4: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

4

Page 5: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

5

MINISTERIntroduction

The Road Sector Master Plan (RSMP) is a 20-year programme (2007-2027) that includes road network expansion, road realignment,tunneling, roads for inter-dzongkhag connectivity and the second East-West highway. The RSMP is intended to be an initial screening ofpotential road projects at a level of detail that is appropriate tostrategic planning. Detailed feasibility studies would be required infuture to demonstrate economic viability and to determine exactalignments before individual projects can be implemented. Althoughnot explicitly highlighted in the RSMP, options are open for constructionof ropeways in any of the dzongkhags depending on its feasibility.Gasa is one of the dzongkhags where ropeways might be feasible.

The RSMP, which is proposed for implementation starting the 10th FiveYear Plan, was prepared in close consultation with the 20 dzongkhags.To the extent possible, lengths of the feeder roads were verified throughdesk-top studies using topographic maps of 1:50,000 scale to ensurethat the road lengths reflected in the RSMP are accurate. Wherefeasible, care was also exercised to ensure that feeder roads proposedin the RSMP did not conflict with the farm/power tiller roadsprogramme of the Ministry of Agriculture (MoA). Where conflict withfarm/power tiller road programmes of MoA was anticipated, feederroads were dropped from the RSMP to avoid duplication of efforts.

About 132 new feeder roads with a total length of 2,654.4 km estimatedat over Nu.13, 800 million have been prioritized for the master planperiod from 2007 to 2027, which would benefit a total of 20,893households excluding indirect beneficiary households.

The abstracts of feeder roads and priority ranking are shown in Annex-1 and Annex-3. Dzongkhag-wise feeder roads with correspondingpriority rankings are shown in Annex-2. About 794 km of roads, whichform a part of the proposed second East-West highway are shown inAnnex-4. About 537 km of national highways proposed for providinginterconnectivity among the Dzongkhags are shown in Annex-5. Majorroad realignments and tunnels proposed for shortening travel distancesto save travel time and vehicle operating costs are shown in Annex-6 and Annex-7.

Page 6: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

6

The RSMP does not reflect the roads that are either under constructionor are proposed for construction during the 9th Plan on the assumptionthat such roads would automatically spillover to the 10th Plan if theirconstructions are not completed in the 9th Plan.

Priority ranking of feeder roads

Four priority rankings of A, B, C, D and cost per household (cphh)were used as the basis to rank feeder roads included in the RSMPsince cphh was the most reasonable indicator of cost-effectivenessof a road. Cphh of an individual feeder road was computed bydividing the estimated cost of the road by the number of directhousehold beneficiaries served by the road. A unit cost of Nu. 5.21million per km, derived from the ongoing World Bank-assisted RuralAccess Project, was adopted for computing the costs of feeder roads.Although a particular road would benefit additional households withinits influence area, indirect household beneficiaries were not takeninto account for simplicity. The ranges of cphh used in determiningthe priority ranking of feeder roads is shown in Table 1.

Table 1. Criteria adopted for Priority Ranking of Feeder Roadsin RSMP

Priority Ranking Range of cphh (Nu.) millionA < 0.5B 0.6 –0.9C 1.0 – 1.5D > 1.5

Cphh range of less than 0.5 million for priority ranking A was basedon the assumption that improved accessibility would accelerateeconomic activities of the beneficiary households and enhance cashincomes of up to Nu.0.5 million per annum towards the end of roadlife, which is estimated at 15-20 years. Roads for which priority rankingbased on cphh could not be determined because of non-availabilityof information on beneficiary households, was assigned a priorityranking D.

MINISTER

Page 7: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

7

Out of the 2,654.4 km of feeder roads proposed in the RSMP,prioritization exercise has resulted in the rankings shown below:

Priority A - 515.8 kmPriority B - 978.8 kmPriority C - 595.5 kmPriority D - 564.3 km

Explanatory remarks

The cphh used in the RSMP is just one option available for determiningranking of a road based on cost-effectiveness and therefore shouldnot be considered as the only basis of prioritization. Otherconsiderations (social, economic, political and security) might dictatechanges in the priority rankings of feeder roads. The priority rankingssuggested in the RSMP is provided for guidance of planners undernormal planning circumstances. Even designation of roads suggestedin the RSMP such as national highway, district road and feeder roadetc. might need to be changed appropriately in future to match rapidsocio-economic development and expansion of road network in thecountry. If need arises, roads can be re-designated from feeder roadto district road or as national highway. Similarly, a national highwayor a district road could be re-designated as a feeder road. The RSMP,therefore, should be considered as a dynamic document, which couldbe updated from time to time, to keep pace with the socio-economicdevelopment of the country.

Zhabtog Lyonpo Thimphu, May, 2006

MINISTER

Page 8: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

8

Page 9: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

9

ROAD SECTOR MASTER PLAN (2007-2027)ABSTRACT OF FEEDER ROADS

SL. DZONGKHAG LENGTH COST TOTAL %NO (KM) (Nu.) HH SERVED ROAD

MILLION (DIRECT) LENGTH

1 BUMTHANG 23.5 122.435 229 0.89

2 CHHUKHA 143.5 747.635 952 5.41

3 DAGANA 137.5 716.375 1084 5.18

4 GASA 19.0 98.990 11 0.72

5 HAA 141.5 737.215 173 5.33

6 LHUENTSE 128.5 669.485 1181 4.84

7 MONGAR 211.5 1101.915 2298 7.97

8 PARO 41.0 213.610 235 1.54

9 PEMAGATSHEL 140.0 729.400 1657 5.27

10 PUNAKHA 68.8 358.448 740 2.59

11 SAMTSE 174.3 908.103 1761 6.57

12 SAMDRUPJONGKHAR 179.5 935.195 1011 6.76

13 SARPANG 106.0 552.260 870 3.99

14 THIMPHU 115.0 599.150 132 4.33

15 TRASHIGANG 326.5 1701.065 3864 12.30

16 TRASHIYANGTSE 116.0 604.360 1435 4.37

17 TRONGSA 131.0 682.510 504 4.94

18 TSIRANG 100.5 523.605 697 3.79

19 WANGDUEPHODRANG 163.8 853.398 1109 6.17

20 ZHEMGANG 187.0 974.270 950 7.04

Total 2654.4 13829.424 20893 100

Annex-1P-1 of 1

______________________________________________________________________________________________________________

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

______________________________________________________________________________________________________________

Page 10: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

10

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

BUM

THA

NG

Tokt

o Za

mN

asph

e10

.052

.100

144

0.4

A

Pral

ang

Ugye

nchh

olin

g6.

031

.260

420.

7B

Che

nrez

igth

ang

Chu

ngph

el7.

539

.075

430.

9B

(Na

nga

r-U

ra H

-wa

y)(C

omm

unity

sch

ool)

Tota

l23

.512

2.43

522

9

Annex-2P-1 of 20

Page 11: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

11

Annex-2P-2 of 20

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

To

Leng

th(k

m)

(Nu.

) M

illio

nSe

rved

HHRa

ting

(Nu.

) M

ilion

(A, B

, C, D

)

CHH

UKHA

Mer

itsem

oBo

ngo

17.5

91.1

7516

10.

6B

Bong

oG

etan

a42

.522

1.42

525

50.

9B

Doy

agao

nLo

kchi

na18

.596

.385

115

0.8

B(e

xistin

gsu

spen

sion

brid

ge)

Lokc

hina

Dun

gna

20.0

104.

200

124

0.8

B

Dun

gna

Met

akha

7.0

36.4

7065

0.6

B

Lokc

hina

Chi

mun

a18

.093

.780

981.

0C

Chi

mun

aM

alba

sey

20.0

104.

200

134

0.8

B

Tota

l14

3.5

747.

635

952

Page 12: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

12

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

DAG

AN

AD

ruje

ygan

gLh

alin

g30

.015

6.30

040

30.

4A

Gas

erlin

gN

imto

la10

.052

.100

680.

8B

Nim

tola

Sam

a D

hoba

n30

.015

6.30

057

2.7

D

Nim

tola

Bang

Gal

e25

.013

0.25

089

1.5

C

Dru

jeyg

ang

Balu

ng42

.522

1.42

546

70.

5A

Tota

l13

7.5

716.

375

1084

Annex-2P-3 of 20

Page 13: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

13

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

GA

SAD

am

jiSa

mec

hu12

.062

.520

78.

9D

Barsh

aPa

niko

ng7.

036

.470

49.

1D

Tota

l19

.098

.990

11

Annex-2P- 4 of 20

Page 14: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

14

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

HAA

Yaba

Som

bayk

ha24

.512

7.64

510

61.

2C

Haa

Som

bayk

ha11

7.0

609.

570

679.

1D

Tota

l14

1.5

737.

215

173

Annex-2P- 5 of 20

Page 15: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

15

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

LHUE

NTS

EA

utsh

oG

umbr

ang

19.0

98.9

9041

10.

2A

Aut

sho

Yum

chey

18.5

96.3

8517

00.

6B

Gor

gan

Unga

r20

.010

4.20

018

40.

6B

Khom

a B

ridge

Tsik

ang

30.0

156.

300

117

1.3

C

Khom

aG

ang

la K

hem

a21

.010

9.41

015

60.

7B

Thrim

a (R

otpa

)Sh

awa

10.0

52.1

0054

1.0

C

Linga

bee

Ney

10.0

52.1

0089

0.6

B

Tota

l12

8.5

669.

485

1181

Annex-2P-6 of 20

Page 16: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

16

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

MO

NG

AR

Dra

met

seM

uhun

g18

.093

.780

320

0.3

AD

ram

etse

Nar

ang

7.0

36.4

7023

50.

2A

Nar

ang

Khal

ong

4.5

23.4

4534

0.7

BKh

alo

ngG

ongt

hung

14.0

72.9

4025

2.9

DJu

nme

Keng

khar

9.0

46.8

9045

70.

1A

Gor

bakt

ang

Gum

bran

g37

.019

2.77

047

10.

4A

Khen

g Ya

ngba

riPe

mag

atsh

el2.

010

.420

540.

2A

bord

er

Mon

gar D

zong

Dre

pong

23.0

119.

830

196

0.6

BKh

eng

Yang

bari

Dak

sa26

.013

5.46

090

1.5

CD

aksa

Wirr

ingl

a14

.072

.940

860.

8B

Wirr

ingl

aN

ago

r7.

036

.470

124

0.3

AN

ago

rSi

lam

bi

26.0

135.

460

153

0.9

BG

yelp

oshi

ngRe

sa24

.012

5.04

053

2.4

D

Tota

l21

1.5

1101

.915

2298

Annex-2P-7 of 20

Page 17: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

17

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

PARO

Pang

besa

Nab

esa

4.0

20.8

4050

0.4

A

Tsen

to S

hari

Gun

itsa

wa

20.0

104.

200

115

0.9

B

Lhaz

ugkh

aJi

llikha

8.0

41.6

8045

0.9

B

Rash

igan

gTs

hege

n9.

046

.890

251.

9D

Tota

l41

.021

3.61

023

5

Annex-2P-8 of 20

Page 18: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

18

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

P/G

ATS

HEL

P/G

atsh

el b

ord

erSh

inch

ungr

i5

26.0

5D

Shin

chun

gri

Miku

ri-Ts

ebar

61.0

317.

810

453

0.7

B

Tseb

arKh

ar-K

hoth

akpa

10.0

52.1

0035

00.

1A

Tseb

arYu

rung

15.0

78.1

5054

60.

1A

Yuru

ngN

yask

har

45.0

234.

450

198

1.2

C

Laba

rKh

engz

or4.

020

.840

110

0.2

A

Tota

l14

0.0

729.

400

1657

Annex-2P-9 of 20

Page 19: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

19

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

PUN

AKH

AD

aw

akh

aTa

med

amch

u11

.358

.873

186

0.3

A

Sirig

ang

Tong

shun

a13

.570

.335

220

0.3

A

Yung

uPh

ulum

sum

4.0

20.8

4055

0.4

A

Sam

din

gkha

Seul

a15

.078

.150

691.

1C

Tash

ithan

gG

oen

Shar

i9.

046

.890

550.

9B

Tash

itha

ng D

am

jiG

oen

Nub

ri8.

041

.680

450.

9B

Tsho

Cha

gsa

Limuk

ha4.

020

.840

830.

3A

Tsho

Cha

gsa

Om

tekh

a4.

020

.840

270.

8B

Tota

l68

.835

8.44

874

0

Annex-2P-10 of 20

Page 20: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

20

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

SAM

TSE

Halh

alay

Dor

okha

23.0

119.

830

961.

2C

Dor

okha

Rang

tse

40.0

208.

400

258

0.8

B

Rang

tse

Yaba

11.3

58.8

7320

2.9

D

Dor

okha

Seng

dhen

30.0

156.

300

811.

9D

Peljo

relin

gLa

hirin

i25

.013

0.25

045

40.

3A

Tend

ruBa

ra16

.083

.360

690

0.1

A

Panb

ari

Gom

tu29

.015

1.09

016

20.

9B

Tota

l17

4.3

908.

103

1761

Annex-2P-11 of 20

Page 21: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

21

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

S/JO

NG

KHA

RTo

karo

ngSa

md

rup

Cho

elin

g79

.041

1.59

027

21.

5C

(Rai

tar)

Jom

otsa

ngkh

aLa

uri

65.0

338.

650

437

0.8

B(D

aiph

am)

Men

jiwoo

ngM

onm

ola

(Ser

thi)

22.0

114.

620

178

0.6

B

Jom

paZa

ngth

i13

.570

.335

124

0.6

B

Tota

l17

9.5

935.

195

1011

Annex-2P-12 of 20

Page 22: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

22

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

SARP

AN

GKe

raba

riSa

ma

Dho

ban

20.0

104.

200

176

0.6

B

Taja

ytha

ng (T

akla

i)D

alim

25.0

130.

250

230

0.6

B

Dek

iling

(Leo

pani

)Pa

ngkh

ey61

.031

7.81

046

40.

7B

via

Kha

rpa

ni

Tota

l10

6.0

552.

260

870

Annex-2P-13 of 20

Page 23: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

23

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

THIM

PHU

Gen

ekha

Tsho

chek

ha10

.052

.100

531.

0C

Dod

ena

Lingz

hi10

5.0

547.

050

796.

9D

Tota

l11

5.0

599.

150

132

Annex-2P-14 of 20

Page 24: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

24

Annex-2P-15 of 20

ROAD SECTOR MASTER PLAN (2007-2027)FEEDER ROADS

Feeder Roads Cost HH Cost per PriorityDzongkhag From To Length(km) (Nu.) Million Served HH Rating

(Nu.) Milion (A, B, C, D)

TRASHIGANG Thrimshing Thungkhar 8.0 41.680 231 0.2 A(Phegpari) via Ramchongma

Kharungla Kangpara 28.0 145.880 249 0.6 B

Kangpara Ramchongma 15.5 80.755 256 0.3 A

Kangpara Mankhar 20.0 104.200 D

Kangpara Chema 15.0 78.150 30 2.6 D

Ngangshing Yechen 15.0 78.150 96 0.8 B(NH)

Yechen Tshatse 23.5 122.435 254 0.5 A

Tshatse Kurchilo 15.0 78.150 297 0.3 A

km 67.5 Berdungma 9.5 49.495 115 0.4 A(S/Jongkhar-T/gangHighway)

Dawzor Jeri-Lemi 5.0 26.050 200 0.1 A(Khaling)

Bidung Yabrang/ 10.0 52.100 210 0.2 APhinsum

Yabrang/ Thongrong 5.0 26.050 200 0.1 APhinsum

Yonphupam Benshingmo- 6.0 31.260 201 0.2 AJomtshang

Chaling Mendrulla 5.0 26.050 310 0.1 A

Mendrulla Merak 27.0 140.670 329 0.4 A

Merak Sakteng 40.0 208.400 260 0.8 B

Bidung Rangjung 22.0 114.620 94 1.2 C

Rangjung Joenkhar 20.0 104.200 359 0.3 A

Joenkhar Sakteng 37.0 192.770 173 1.1 C

Total 326.5 1701.065 3864

Page 25: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

25

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

T/YA

NG

TSE

Bum

delin

gTo

bran

g27

.014

0.67

013

21.

1C

Tong

shan

gTo

kaph

u10

.052

.100

282

0.2

A

Bayl

ing

Wom

ana

ng12

.062

.520

200

0.3

A(D

eche

npho

dran

g)

Wom

ana

ngRi

gsum

Goe

mp

a12

.062

.520

441.

4C

Toka

phu

Zhad

i28

.014

5.88

018

70.

8B

Ram

jar

Phun

gyan

g11

.057

.310

348

0.2

A

Jam

khar

Larja

b16

.083

.360

242

0.3

A

Tota

l11

6.0

604.

360

1435

Annex-2P-16 of 20

Page 26: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

26

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

TRO

NG

SAKa

kelin

gSin

phu

12.0

62.5

2057

1.1

C

Sinph

uBe

mji

10.0

52.1

0063

0.8

B

Bem

jiTh

risip

ang

6.0

31.2

6014

2.2

D

Tron

gsa

Jong

than

g27

.514

3.27

555

2.6

D

Refe

Kela

7.5

39.0

7540

1.0

C

Nim

shon

gPh

umzo

r18

.093

.780

137.

2D

Berte

Korp

hu30

.015

6.30

079

2.0

D

Korp

huN

ab

ji5.

026

.050

530.

5A

Korp

huRe

ti15

.078

.150

130

0.6

B

Tota

l13

1.0

682.

510

504

Annex-2P-17 of 20

Page 27: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

27

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

TSIR

AN

GBu

richu

Pata

le11

.057

.310

760.

8B

Pata

leKe

reni

13.0

67.7

3022

3.1

D

Dun

gleg

ang

Katik

e14

.072

.940

371

0.2

A

Pata

leTs

irang

Dan

gra

Buric

hu35

.018

2.35

012

91.

4C

Scho

ol**

Men

dega

ngBa

rshon

g17

.591

.175

501.

8D

(Lam

idar

a)(G

airig

aon)

Bant

auli

Jaub

ari

10.0

52.1

0049

1.1

C(B

etin

igao

n)

Tota

l10

0.5

523.

605

697

Annex-2P-18 of 20

Page 28: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

28

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Feed

er R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

From

T

oLe

ngth

(km

)(N

u.)

Mill

ion

Serv

edHH

Ratin

g(N

u.)

Mili

on(A

, B, C

, D)

WA

NG

DUE

Tikiza

mTr

ashi

la26

.513

8.06

515

80.

9B

Phob

jikha

Zizig

omp

a12

.062

.520

511.

2C

Rikh

eyza

mG

oenk

har

14.0

72.9

4080

0.9

BN

obd

ing

Chu

ba

r cho

rten

19.3

100.

553

168

0.6

B(J

angc

huch

olin

g)Ta

ksha

chu

Silli

18.0

93.7

8061

1.5

CBe

ychu

Umak

hato

e8.

041

.680

630.

7B

Taks

hach

uPe

mith

ang

18.0

93.7

8015

20.

6B

Khot

okha

Gog

ona

10.0

52.1

0010

70.

5A

Busa

Sch

ool

Lub

zizur

8.0

41.6

8041

1.0

CN

enze

rgan

gTil

ekha

6.0

31.2

6055

0.6

BSh

emin

aC

hang

chey

8.0

41.6

8040

1.0

CKo

trana

Kom

ath

ang

7.0

36.4

7060

0.6

BKo

tana

(on

way

Pang

kha

9.0

46.8

9073

0.6

Bto

Bay

Lang

dra)

Tota

l16

3.8

853.

398

1109

Annex-2P-19 of 20

Page 29: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

29

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

FEED

ER R

OA

DS

Fee

der R

oads

Cos

tHH

Cos

t per

Prio

rity

Dzon

gkha

g

Fr

om

To

Leng

th(k

m)

(Nu.

) M

illio

nSe

rved

HHRa

ting

(Nu.

) M

ilion

(A, B

, C, D

)

ZHEM

GA

NG

Gom

phu

Edhi

20.0

104.

200

101

1.0

C

Pang

khar

Bjok

a61

.532

0.41

528

21.

1C

Buli

Bard

o vi

a N

imsh

ong

52.5

273.

525

406

0.7

B

Buli

Dig

ala

44.0

229.

240

140

1.6

D

Tingt

ibi

Berte

9.0

46.8

9021

2.2

D

Tota

l18

7.0

974.

270

950

Annex-2P-20 of 20

Page 30: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

30

ROAD SECTOR MASTER PLAN (2007-2027)ABSTRACT OF PRIORITIZED FEEDER ROADS

SL. DZONGKHAG LENGTH (KM)No. PRIORITY PRIORITY PRIORITY PRIORITY

A B C D1 BUMTHANG 10.0 13.5 0.0 0.0

2 CHHUKHA 0.0 125.5 18.0 0.0

3 DAGANA 72.5 10.0 25.0 30.0

4 GASA 0.0 0.0 0.0 19.0

5 HAA 0.0 0.0 24.5 117.0

6 LHUENTSE 19.0 69.5 40.0 0.0

7 MONGAR 80.0 67.5 26.0 38.0

8 PUNAKHA 32.8 21.0 15.0 0.0

9 PEMAGATSHEL 29.0 61.0 45.0 5.0

10 PARO 4.0 28.0 0.0 9.0

11 SAMTSE 41.0 69.0 23.0 41.3

12 SARPANG 0.0 106.0 0.0 0.0

13 S/JONGKHAR 0 100.5 79.0 0.0

14 TRONGSA 5.0 25.0 19.5 81.5

15 THIMPHU 0.0 0.0 10.0 105.0

16 TSIRANG 14.0 11.0 45.0 30.5

17 TRASHIGANG 149.5 83.0 59.0 35.0

18 T/YANGTSE 49.0 28.0 39.0 0.0

19 WANGDUE 10 107.8 46.0 0.0

20 ZHEMGANG 0.0 52.5 81.5 53.0

Total 515.8 978.8 595.5 564.3

Total of all Dzongkhags 2654.4 km

Annex-3P-1 of 1

Page 31: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

31

ROAD SECTOR MASTER PLAN (2007-2027)SECOND EAST-WEST HIGHWAY

Sl. FROM TO LENGTH STATUS PRIORITY *No. (km) RANKING

1 Sipsoo Samtse 49 Upgradation

2 Samtse Phuentsholing 69 New construction 13 Phuentsholing Raidak 88 Upgradation

4 Raidak Kalikhola 23 New construction 85 Kalikhola Kerabari 15 Upgradation

6 Kerabari Phipsoo 65 New construction 77 Phipsoo Sarpang 35 Upgradation

8 Sarpang Gelephu 30 Upgradation

9 Gelephu Gelezam 9 Upgradation

10 Gelezam Umling (Lalai) 12 Upgradation

11 Umling (Lalai) Panbang 85 New construction 512 Panbang Amshingwoong 35 New construction 313 Amshingwoong Nganglam 14 New construction 4

(part of Gyalposhing-Nganglam road)

14 Nganglam Dewathang 105 New construction 215 Dewathang Samdrupcholing 50 Upgradation

(Bhangtar)

16 Samdrupcholing Jomotshangkha 110 New construction 6(Bhangtar) (Daipham)

Total 794

*: Based on strategic importance and National Assembly decisions

Annex-4P-1 of 1

Page 32: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

32

Annex—5P-1 of 1

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

HIG

HWA

YS FO

R IN

TER-

DZO

NG

KHA

G C

ON

NEC

TIVITY

Sl.

FRO

M

T

OLE

NG

TH

S

TATU

SPR

IORI

TYN

O.

(km

)RA

NKI

NG

*

1G

omph

u (Z

hem

gang

)Th

ida

ngbi

(Mon

gar)

via

162

New

con

stru

ctio

n4

Shin

gkha

r (Zh

emga

ng)

2Sh

ingk

har (

Zhem

gang

)Ur

a (B

umth

ang)

49N

ew c

onst

ruct

ion

1

3Sh

ingk

har (

Bum

than

g)Un

gar (

Lhue

ntse

) via

Sin

gmal

a76

New

con

stru

ctio

n2

4D

aga

Dzo

ng (D

agan

a)G

enek

ha (T

him

phu)

123

New

con

stru

ctio

n3

5M

inja

y (L

huen

tse)

Don

gla

(bor

der

T/Ya

ngts

e)67

New

con

stru

ctio

n5

6D

ongl

aD

ongd

e D

zong

(T/Y

angt

se)

60N

ew c

onst

ruct

ion

6

Tota

l53

7

*: B

ased

on

stra

tegi

c im

porta

nce

and

Nat

iona

l Ass

embl

y d

ecisi

ons

Page 33: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

33

Annex-6P- 1 of 1

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

MA

JOR

REA

LIG

NM

ENTS

Slno

.N

ame

of ro

adEx

istin

g ro

adLe

ngth

of

Redu

ctio

n in

road

Prio

rity*

*re

alig

nmen

tle

ngth

(km

)re

alig

nmen

t (km

)le

ngth

(km

)Ra

nkin

g

1Se

rpan

g-Se

ngor

186.

1411

.86

3(E

ast-W

est H

ighw

ay)

2Re

ffe-K

hosa

la29

1712

5(T

rong

sa-G

elep

hu H

ighw

ay)

3D

amch

u-C

hukh

a48

2325

1(P

/ling

-Thi

mph

u Hi

ghw

ay)

4W

angd

igan

g-M

angd

ichu

55.3

1639

.32

(Tro

ngsa

-Gel

ephu

Hig

hway

)

5Ya

di-T

rash

igan

g C

haza

mtb

d*

tbd

*tb

d*

4(E

ast-W

est H

ighw

ay)

tbd

* : t

o be

det

erm

ined

**: B

ase

d o

n st

rate

gic

impo

rtanc

e a

nd N

atio

nal A

ssem

bly

dec

ision

s

Page 34: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

34

Annex-7P- 1 of 1

ROA

D SE

CTO

R M

AST

ER P

LAN

(200

7-20

27)

TUN

NEL

S

Tunn

els B

etw

een

Nam

e of

exi

stin

g ro

adPr

iorit

y Ra

nkin

g**

Thim

phu

and

Par

otb

d*

2

Thim

phu

and

Wan

gdue

East

-Wes

t hig

hway

3

Ged

u a

nd G

ang

lakh

aTh

imph

u-Ph

uent

shol

ing

high

wa

y1

Nob

din

g an

d C

hend

ebji

East

-Wes

t hig

hway

4

Dor

ji Goe

npa

and

Gey

tsa

East

-Wes

t hig

hway

5

Gay

zam

chu

and

Seng

orEa

st-W

est h

ighw

ay6

Kilik

har a

nd N

inga

laEa

st-W

est h

ighw

ay

7

Tam

a an

d Su

rey

Tron

gsa-

Gel

ephu

hig

hway

8

Sunk

osh

and

Sa

rpa

ngW

angd

ue-S

arpa

ng h

ighw

ay9

Tra

shig

ang

and

S/J

ongk

har

T/G

ang-

S/Jo

ngkh

ar h

ighw

ay10

tbd

* : t

o be

det

erm

ined

**: B

ased

on

stra

tegi

c im

porta

nce

and

Nat

iona

l Ass

embl

y d

ecisi

ons

Page 35: ROAD SECTOR MASTER PLAN · 2015. 5. 8. · Tokto Zam Nasphe 10.0 52.100 144 0.4 A Pralang Ugyenchholing 6.0 31.260 42 0.7 B Chenrezigthang Chungphel 7.5 39.075 43 0.9 (Nangar-Ura

35