Checklist for relocations, and fitouts for new business premises.

TRANSCRIPT

Page 1: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

BUILDINGS AND FACILITIES FIT OUT.AUDIO VISUAL AND

FACILITIES SPECIALIST.BUSINESS RELOCATIONS.

Robert James MorrisonExperienced ICT Project Manager

Page 2: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

ICT Project Management for Buildings, Audio Visual, Facilities and New Fitouts.

Planning. Cabling design for server room, audio visual and cabling to desk/

location.

Networking upgrades and networks redundancy.

Supervision of and facilitation of ICT Systems Design for the new location.

Cabling design to new site floor plan, and leads requirement for desktop. Architecture review and timing of cabling activities.

Cost reduction thru server virtualization.

Stakeholder liaison and reporting. Expectations management.

Communications.

Training.

Determine budget provision for fit-out and relocation.

Page 3: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

ICT Project Management. Tendering.

Works tender management and tender evaluation management.

Tender preparation for the provision of ICT and audio visual services. Board or senior management approval.

Quote comparison for transportation.

Tender evaluation and comparison.

Vendor engagement.

Page 4: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Audio Visual Facilities Installation.

Audio Visual installation. Review and selection of tenderers for audio visual facilities. Working with and direct trades staff. Builders and architects. Hosting of building and works progress meetings. Server room and facilities design. Cabling to screen. (HDMI/ Cat6) Cabling latency (distance, especially from IT servers,

outputting signal to LCD TV screens in general work area). Install and testing of screens. Removal of cardboard boxes and packing materials. Positioning of TV screens, and access to cabling trays and

facilities. Ceiling fixtures for attachment of LED TV screens to ceiling.

Page 5: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Power installation and general cabling.

Audit and assessment of power needs. UPS Selection and Installation.

Power requirement and current/ BTU draw for server rooms.

Power cabling and outlets for work areas and server rooms. (Orange Plugs)

Ampage assessment.

Power cabling design and estimation.

Page 6: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Environmental

‘Green’ building requirements and compliance by hardware.

Engage specialist consultant to ensure compliance.

Energy star rating by LED TVs, equipment, etc.

Floor temperature controls and air-conditioning.

Page 7: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Data Networking

MPLS/ VPLS assessment and quotation. Documented networking design. IP addressing schema. Provider Lead time for cabling and install. Commissioning of link. Server room Patch panelling and design. Cabling to desks. Outlets. Testing of connectivities. Cable labelling from server room to

desk. Connectivity testing. End user application and internet access testing prior to

relocation. Test server installation. User signoff for networking and apps

/ services connectivity/ functionality.

Page 8: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Public Areas and Reception.

Facilities for reception areas.

Displays.

Desks, seating, EFTPOS facilities.

Audio visual, telephony.

Artwork and signage needs.

Printing access.

Page 9: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Audio Visual Installation Management

Installation of audio visual facilities for meeting rooms, executive facilities and training rooms.

Arrangement for cabling rough-ins. Installation of Teleconferencing facilities. Including

videoconferencing. Installation of IP telephony facilities and servers. Training for IP

telephony, co-ordination. Wallboards and call functionality for call centers. Wallboard

software installation and testing. MS Office / Meeting Room bookings display. Procurement of flat screens and cabling, cabling ‘rough-in’

supervision in accordance with architect requirements. Training and user acclimatization for AV. User documentation supervision.

Page 10: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Printers and fax.

Utility areas design and printer installation.

Documents and consumables storage.

Printer drivers installation.

Print queues creation.

Printer and fax testing.

Page 11: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Telephony.

IP telephony and IP server rollouts.

IP telephony ordering and handsets laying.

Cabling and workstation socket panels.

Call diversion, call routing and IVR. Test of A/H call diversion facilities.

Diversion of phone numbers (if required).

Voicemail. Message retention and replay.

Connectivity to wallboards and call stats.

Specialist telephony support from provider. Testing.

Page 12: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Training Rooms.

Audio visual needs assessment for training rooms.

Access to network from training seats.

Placement of screens and/ or projection facilities.

Audio and speakers placement.

Page 13: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Tea Rooms and Kitchen facilities.

Tea rooms and Kitchen facilities.

Microwaves.

Provision of storage space and power facilities.

Procurement or transportation of refrigeration, microwaves and ovens.

Jugs and kitchen utensils.

Furniture and furnishings.

Page 14: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Teleconferencing.

Determine requirement for teleconferencing facilities (Polycom units).

Procurement, cabling and installation.

Microphones.

Ipad control.

Test.

Documentation/ guidecards.

Page 15: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Broadcast messaging to call center staff via TV.

Ability to message from central (supervisor) location to call center staff.

User interface.

Messaging software.

Install and test.

Page 16: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Wireless and Communications.

Wireless networks. Instal and configuration.

WAP (Wireless Access Point) placement for optimal floor wireless coverage.

Testing.

Access to passwords.

Security.

Support documentation and training.

Support for WAP system.

Page 17: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

OH and S Certification for employees and trades staff.

White card compliance and site inductions for technical staff. (Building site)

Site inductions esp for hazardous locations.

Site hazards.

Compliance with site access requirements (i.e. signing the floor register).

Insurance coverage over personnel attending site.

Page 18: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

FOXTEL installation for Meeting and Board Rooms, and communal areas.

Site expectation.

Building cable riser access from FOXTEL access point to floor(s).

Cabling from floor access point to TVs.

Control unit install and test.

Remote control.

Page 19: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Post installation warranties and support for AV equipment. Training. BAU handover.

Retain all AV support documentation, and support contacts, email addresses and phone numbers.

Help/ support desk handover from vendors.

Conduct hands-on staff training for AV and communications equipment.

Budget provision for annual hardware support (as required).

I-pad programming. I-pad control, custody and supervision (where AV is controlled via I-pad.)

Page 20: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Planning. Slide 1 Information Gathering

Obtain Floor plans and Churn/ User/ Staffing information

Churn sheet detailing where personnel are currently located, and where they will be located in new premises.

Individual identifier for each relocatee.

Phone number audit.

Share with transport group.

Network drive mappings for documents, MS Exchange and archived documents.

Special access requirements or needs, for disabled staff.

Page 21: Robert James Morrison Ict Project Management For Buildings, Audio Visual, Facilities And New Fitouts

Planning. Slide 2 Relocation and Transition

Relocation Transition Plan Considerations.

Pre-site inspections by transportation company, for servers, IT, desktops and ‘personal effects’. Provision of trollies and suitable protective materials (i.e. bubble wrap).

Floor locations for each staff member (WS1, WS2, etc) on floor plan. Appoint senior relocate as co-ordinator. Building access after hours. Block off elevators. Protective coverings for carpeting, walls, and lift lobbies and elevators. Labelling of items for relocation. Provision of boxes for personal effects. Walkthrus with relocation contractors and key relocatee staff. Business cards. Stationery. Transport arrangements for new staff (i.e. bus timetables, trains, etc) Parking for eligible staff, arrangements. Access to lifts for relocation. Prompt and early booking of transportation company. Provision for transportation of IT equipment. Timing to avoid peak hour, etc. Loading dock access. First day support. Security key access, after hours, for elevator access to floor. Elevator swipe key. Formal approval by building management, to access building after hours. Issue timeline to staff and vendors. Provision for relocation of telephony equipment. Servers shutdown and restart. Testing of networking connectivity and new location. Can users access systems and applications? Access to floor keys, by business staff.