rock river water reclamation district · 38 alignment f cross sections 2 39 alignment g cross...

42
Rock River Water Reclamation District BOARD OF TRUSTEES RICHARD POLLACK JOHN SWEENEY BEN BERNSTEN DONALD MASSIER ELMER JONES PRESIDENT VICE-PRESIDENT CLERK/TREASURER TRUSTEE TRUSTEE OFFICIALS TIMOTHY S. HANSON CHRISTOPHER T. BAER, PE EXECUTIVE DIRECTOR DIRECTOR OF ENGINEERING ROCK RIVER WATER RECLAMATION DISTRICT PLANT ROADWAY IMPROVEMENTS 2020 CAPITAL PROJECT #2106 plot date: 8/3/2020 file: I:\District Projects\Clow Building 2157\01 Design\Drawings\Clow Building-Standard Sheets.dwg sheet set: PLANT ROADWAY IMPROVEMENTS 2020 SHEET SET PROJECT SITE US 20 BYPASS IL 251 11th ST. KISHWAUKEE ST. SANDY HOLLOW RD. HARRISON AVE. SPRINGFIELD AVE. MONTAGUE RD. IL 2 S. MAIN ST. ROCK RIVER WINNEBAGO COUNTY, ILLINOIS FOR BID INDEX OF SHEETS 1 COVER 2 LEGEND, GENERAL NOTES, & SUMMARY OF QUANTITIES 3 ALIGNMENTS, TIES, & BENCHMARKS - SOUTH SITE 4 ALIGNMENTS, TIES, & BENCHMARKS - NORTH SITE 5 TYPICAL SECTIONS - ALIGNMENT A 6 TYPICAL SECTIONS - ALIGNMENT B 7 TYPICAL SECTIONS - ALIGNMENT C 8 TYPICAL SECTIONS - ALIGNMENT D 9 TYPICAL SECTIONS ALIGNMENT G -1 10 TYPICAL SECTIONS ALIGNMENT G -2 11 TYPICAL SECTIONS ALIGNMENT F -1 12 TYPICAL SECTIONS ALIGNMENT F -2 13 TEMPORARY EROSION CONTROL DETAILS 14 TEMPORARY EROSION CONTROL PLAN - SOUTH SITE 15 TEMPORARY EROSION CONTROL PLAN - NORTH SITE 16 REMOVALS - SOUTH SITE 17 REMOVALS - NORTH SITE 18 SITE PLAN - SOUTH SITE 19 SITE PLAN - NORTH SITE 20 SITE LAYOUT - SOUTH SITE 21 SITE LAYOUT - NORTH SITE 22 ALIGNMENT A PLAN & PROFILE 23 ALIGNMENT B & C PLAN & PROFILE 24 ALIGNMENT D PLAN & PROFILE 25 ALIGNMENT F & G PLAN & PROFILE 26 PCC PAVEMENT JOINTING PLAN & ELEVATIONS - SOUTH SITE 1 27 PCC PAVEMENT JOINTING PLAN & ELEVATIONS - SOUTH SITE 2 28 ALIGNMENT A CROSS SECTIONS 1 29 ALIGNMENT A CROSS SECTIONS 2 30 ALIGNMENT B CROSS SECTIONS 1 31 ALIGNMENT B CROSS SECTIONS 2 32 ALIGNMENT C CROSS SECTIONS 33 ALIGNMENT D CROSS SECTIONS 1 34 ALIGNMENT D CROSS SECTIONS 2 35 ALIGNMENT D CROSS SECTIONS 3 36 ALIGNMENT D CROSS SECTIONS 4 37 ALIGNMENT F CROSS SECTIONS 1 38 ALIGNMENT F CROSS SECTIONS 2 39 ALIGNMENT G CROSS SECTIONS 1 40 ALIGNMENT G CROSS SECTIONS 2 41 PROJECT DETAILS (1) 42 PROJECT DETAILS (2) Not to be used for bidding purposes

Upload: others

Post on 08-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Rock RiverWater

    ReclamationDistrict

    BOARD OF TRUSTEES

    RICHARD POLLACK

    JOHN SWEENEY

    BEN BERNSTEN

    DONALD MASSIER

    ELMER JONES

    PRESIDENT

    VICE-PRESIDENT

    CLERK/TREASURER

    TRUSTEE

    TRUSTEE

    OFFICIALS

    TIMOTHY S. HANSON

    CHRISTOPHER T. BAER, PE

    EXECUTIVE DIRECTOR

    DIRECTOR OF ENGINEERING

    ROCK RIVER WATER RECLAMATION DISTRICT

    PLANT ROADWAY IMPROVEMENTS 2020

    CAPITAL PROJECT #2106

    plot date: 8/3/2020

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-S

    tandard S

    heets.dw

    g

    sheet set: P

    LA

    NT

    R

    OA

    DW

    AY

    IM

    PR

    OV

    EM

    EN

    TS

    2020 S

    HE

    ET

    S

    ET

    PROJECT SITE

    US 20 BYPASS

    IL 251

    11th S

    T.

    KIS

    HW

    AU

    KE

    E S

    T.

    SANDY HOLLOW RD.

    HARRISON AVE.

    S

    P

    R

    I

    N

    G

    F

    I

    E

    L

    D

    A

    V

    E

    .

    M

    O

    N

    T

    A

    G

    U

    E

    R

    D

    .

    IL 2

    S. M

    AIN

    S

    T.

    R

    O

    C

    K

    R

    I

    V

    E

    R

    WINNEBAGO COUNTY, ILLINOIS

    FOR BID

    INDEX OF SHEETS

    1 COVER

    2LEGEND, GENERAL NOTES, & SUMMARY OF QUANTITIES

    3ALIGNMENTS, TIES, & BENCHMARKS - SOUTH SITE

    4ALIGNMENTS, TIES, & BENCHMARKS - NORTH SITE

    5 TYPICAL SECTIONS - ALIGNMENT A

    6 TYPICAL SECTIONS - ALIGNMENT B

    7 TYPICAL SECTIONS - ALIGNMENT C

    8 TYPICAL SECTIONS - ALIGNMENT D

    9 TYPICAL SECTIONS ALIGNMENT G -1

    10 TYPICAL SECTIONS ALIGNMENT G -2

    11 TYPICAL SECTIONS ALIGNMENT F -1

    12 TYPICAL SECTIONS ALIGNMENT F -2

    13 TEMPORARY EROSION CONTROL DETAILS

    14 TEMPORARY EROSION CONTROL PLAN - SOUTH SITE

    15 TEMPORARY EROSION CONTROL PLAN - NORTH SITE

    16 REMOVALS - SOUTH SITE

    17 REMOVALS - NORTH SITE

    18 SITE PLAN - SOUTH SITE

    19 SITE PLAN - NORTH SITE

    20 SITE LAYOUT - SOUTH SITE

    21 SITE LAYOUT - NORTH SITE

    22 ALIGNMENT A PLAN & PROFILE

    23 ALIGNMENT B & C PLAN & PROFILE

    24 ALIGNMENT D PLAN & PROFILE

    25 ALIGNMENT F & G PLAN & PROFILE

    26 PCC PAVEMENT JOINTING PLAN & ELEVATIONS - SOUTH SITE 1

    27 PCC PAVEMENT JOINTING PLAN & ELEVATIONS - SOUTH SITE 2

    28 ALIGNMENT A CROSS SECTIONS 1

    29 ALIGNMENT A CROSS SECTIONS 2

    30 ALIGNMENT B CROSS SECTIONS 1

    31 ALIGNMENT B CROSS SECTIONS 2

    32 ALIGNMENT C CROSS SECTIONS

    33 ALIGNMENT D CROSS SECTIONS 1

    34 ALIGNMENT D CROSS SECTIONS 2

    35 ALIGNMENT D CROSS SECTIONS 3

    36 ALIGNMENT D CROSS SECTIONS 4

    37 ALIGNMENT F CROSS SECTIONS 1

    38 ALIGNMENT F CROSS SECTIONS 2

    39 ALIGNMENT G CROSS SECTIONS 1

    40 ALIGNMENT G CROSS SECTIONS 2

    41

    PROJECT DETAILS (1)

    42

    PROJECT DETAILS (2)

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    LEGEND, GENERAL NOTES, & SUMMARY OF QUANTITIES

    Sheet No.

    // //

    X X

    G

    OC

    UC

    OE

    UE

    FO

    OT

    FM

    W

    HMAAGG.

    CONC. TURF

    XXX.XX XXX.XX

    TV E HHT

    WS

    No. DATE REVISION INT.

    Date

    LEGEND

    EXISTING PROPOSED

    X X

    FM

    W

    WS

    COCO

    RIGHT OF WAY LINE

    PROPERTY LINE

    EASEMENT - PERMANENT SANITARY

    EASEMENT - TEMPORARY

    CONSTRUCTION

    VEGETATION / TREE LINE

    FENCE

    TREE DRIPLINE

    FENCE - SILT

    (PERIMETER EROSION BARRIER)

    FENCE - TEMPORARY

    CONSTRUCTION

    ROADWAY CENTERLINE

    EDGE OF PAVEMENT

    CURB & GUTTER

    CABLE - OVERHEAD

    CABLE - UNDERGROUND

    ELECTRIC - OVERHEAD

    ELECTRIC - UNDERGROUND

    FIBER OPTIC

    GAS LINE

    TELEPHONE - OVERHEAD

    TELEPHONE - UNDERGROUND

    PEDESTALS (CATV, ELEC, TELE),

    HANDHOLE, GAS METER, ELEC METER

    SANITARY SEWER SERVICE &

    CLEANOUT

    SANITARY FORCEMAIN

    STORM SEWER

    STORM MANHOLE, CATCH BASIN,

    CURB INLET, INLET SPECIAL

    DRAINAGE CULVERT, WITH END

    SECTION

    WATER MAIN

    WATER SERVICE & WATER SERVICE

    VALVE

    FIRE HYDRANT

    BENCHMARK & CONTROL POINT

    MAILBOX

    UTILITY POLE W/ GUY WIRE &

    MAST ARM LIGHT POLE

    TREE (DECIDUOUS & CONIFEROUS)

    BUSH & SHRUB

    SPOT ELEVATION

    SF

    [ ] [ ] [ ]

    SF

    [ ] [ ] [ ]

    FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    2 OF 42

    / / / / / / / / / / / / / / / / / /

    BUILDING

    WATER EDGE

    ~~

    ~

    ~

    ~ ~

    ~

    8/3/2020

    UT

    CONTOUR - MAJOR

    CONTOUR - MINOR

    || || || ||

    GUARD RAIL

    | | | |

    RAILROAD TRACKS

    SANITARY MANHOLE & SANITARY

    SEWER

    WATER MAIN VALVE

    WATER MAIN VALVE WITH BOX

    WATER MAIN VALVE WITH VAULT

    WATER MAIN REDUCER

    GM EM

    LEGEND

    EXISTING PROPOSED

    CAPITAL PROJECT #2106

    ABBREVIATIONS

    ABANDON(ED)

    CORRUGATED METAL PIPE

    CLEAN OUT

    CONTROL

    CUBIC YARD(S)

    DUCTILE IRON

    EACH

    ELEVATION

    EROSION

    EXISTING

    FLARED END SECTION

    FORCE MAIN

    FEET

    INVERT

    LINEAR FEET

    LINED WITH CURED IN PLACE PIPE

    ABD =

    CMP =

    CO =

    CTRL=

    CY =

    DI =

    EA =

    EL =

    EROS =

    EX =

    FES =

    FM =

    FT =

    INV =

    LF =

    LINCIPP =

    LUMP SUM

    MANHOLE

    PAVEMENT

    PRECAST REINFORCED CONCRETE

    PROPOSED

    REINFORCED CONCRETE PIPE

    REMOVE(D)

    REPLACE(D)

    REMOVE & REPLACE

    SANITARY

    SERVICE

    SQUARE YARD(S)

    TYPE

    UNKNOWN

    VITRIFIED CLAY PIPE

    WATER MAIN

    LS =

    MH =

    PVMNT =

    PRC =

    PR =

    RCP =

    REM =

    REPL =

    R/R =

    SAN =

    SVC =

    SY =

    TY =

    UNK =

    VCP =

    WM =

    DITCH CHECK

    INLET OR PIPE PROTECTION

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-S

    tandard S

    heets.dw

    g

    SB 1

    PROJECT LOCATION & ACCESS MAP

    SANDY HOLLOW RD

    KIS

    HW

    AU

    KE

    E S

    T

    RRWRD TREATMENT

    PLANT MAIN ENTRANCE

    3333 KISHWAUKEE ST.

    CONTRACTOR STAGING AREA

    SOUTH SITE

    ALT. ENTRANCE

    FROM BROOKE RD.

    PAVEMENT REPLACEMENT

    AGGREGATE REPLACEMENT

    RIP RAP

    STABILIZED CONSTRUCTION

    ENTRANCE

    EROSION CONTROL BLANKET

    SEEDING AREA, CLASS 1

    HEAVY DUTY EROSION

    CONTROL BLANKET

    SEEDING AREA, CLASS 4

    DRIVEWAY REPLACEMENT

    GROUND / LANDSCAPE LIGHT

    ELECTRIC MANHOLE

    E

    BM# 1 CP# 1

    SH SVSPRINKLER HEAD & SPRINKLER

    VALVE

    SVSH

    GENERAL NOTES

    1. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE

    EXECUTION OF WORK TO THE LINES AND GRADES SHOWN ON

    THE PLANS. CONSTRUCTION SHALL NOT VARY FROM THE

    PLANS WITHOUT PRIOR APPROVAL FROM THE ROCK RIVER

    WATER RECLAMATION DISTRICT (DISTRICT).

    2. FOR UTILITY LOCATES WITHIN PLANT BOUNDARIES, THE

    CONTRACTOR SHALL CONTACT DISTRICT PLANT OPERATIONS

    MAINTENANCE DIVISION MANAGER, MICHAEL CHRISTENSEN

    AT 815-262-5858, 48 HOURS, MINIMUM, PRIOR TO START OF

    CONSTRUCTION, TO ARRANGE FOR THE LOCATION OF PLANT

    INFRASTRUCTURE.

    3. FOR UTILITY LOCATES OUTSIDE OF PLANT BOUNDARIES, THE

    CONTRACTOR SHALL IDENTIFY ALL UTILITY LOCATIONS IN THE

    FIELD BY CONTACTING J.U.L.I.E. AT 811 OR 1-800-892-0123 AND

    ALL UTILITIES NOT ON THE J.U.L.I.E. NETWORK 48 HOURS,

    MINIMUM, PRIOR TO START OF CONSTRUCTION.

    4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD

    VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND

    SHALL IMMEDIATELY NOTIFY THE PROJECT MANAGER OF ANY

    DISCREPANCIES WITH THE PROJECT PLANS OR

    SPECIFICATIONS.

    5. ALL WORK ON DISTRICT PLANT GROUNDS MUST BE

    PERFORMED DURING NORMAL CONTRACTOR WORKING

    HOURS, FROM 6:00 AM TO 5:00 PM, M-F, EXCLUDING

    WEEKENDS AND DISTRICT-OBSERVED HOLIDAYS. THE

    CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER 24

    HOURS, MINIMUM, PRIOR TO PERFORMING WORK OUTSIDE OF

    THESE HOURS AND SHALL PROVIDE A LIST OF ALL

    EMPLOYEES, INCLUDING PRIMARY CONTACT(S), WHO WILL BE

    PRESENT FOR THE OFF-HOUR WORK.

    6. ALL MANHOLE CASTINGS SHALL BE EXPOSED AND SET TO

    FINAL GRADE PER DISTRICT REQUIREMENTS UNLESS

    OTHERWISE NOTED IN THE PROJECT PLANS OR

    SPECIFICATIONS.

    7. ALL ROADWAY CONSTRUCTION SHALL BE IN ACCORDANCE

    WITH THE IDOT STANDARD SPECIFICATIONS FOR ROAD AND

    BRIDGE CONSTRUCTION IN ILLINOIS, LATEST EDITION, AND

    THE ROCK RIVER WATER RECLAMATION DISTRICT.

    8. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS

    OF THE IEPA NPDES PERMIT AND THE ILLINOIS URBAN MANUAL

    FOR SOIL EROSION AND SEDIMENT CONTROL.

    EXISTING SURFACE TYPE

    (HOT-MIX ASPHALT, AGGREGATE, CONCRETE, TURF)

    TEMPORARY EROSION

    CONTROL SEEDING

    SOIL BORING

    NORTH SITE

    SUMMARY OF QUANTITIES

    Item

    No.

    Item Description

    Unit

    South Site Qty. North Site Qty. Total Quantity

    1

    Clearing & Grubbing/Tree Removal

    LS 1.0 1.0

    2 Earth Excavation CY 521.0

    1,080.0 1,601.0

    3

    Removal & Disposal of Unsuitable Material

    CY 250.0 250.0 500.0

    4 Furnished Excavation CY 341.0 341.0

    5

    Grading & Shaping Ditches

    LF 50.0 86.0 136.0

    6 Erosion Control Blanket SY

    1,363.0 1,699.0 3,062.0

    7 Perimeter Erosion Barrier Foot 819.0 819.0

    8

    Inlet & Pipe Protection

    EACH 1.0 1.0

    9

    Temporary Erosion Control Seeding

    POUND 55.0 0.0 55.0

    10

    Temporary Ditch Checks

    LF 20.0 20.0

    11 Stabilized Construction Entrance SY 50.0 45.0 95.0

    12

    Stone Rip Rap, RR-5, 30"

    SY 31.0 31.0

    13 Filter Fabric SY 31.0 31.0

    14

    Aggregate Base Course, Ty. B

    TON 920.0

    1,096.0 2,016.0

    15

    Aggregate Subgrade Improvement

    CY 200.0 500.0 700.0

    16 Pavement Removal SY

    1,803.0 1,446.0 3,249.0

    17

    Hot-Mix Asphalt Binder Course, IL-19.0, N50

    TON 368.0 368.0

    18

    Hot-Mix Asphalt Surface Course, IL-9.5, Mix "C", N50

    TON 8.0 187.0 195.0

    19

    Portland Cement Concrete Pavement, 10" (Jointed)

    SY

    2,346.0 2,346.0

    20 Winter Protection of Concrete SY

    2,346.0 2,346.0

    21

    Portland Cement Concrete Sidewalk, 6"

    SF

    3,021.0 3,021.0

    22

    Portland Cement Concrete Sleeper Slab

    SY 19.0 19.0

    23 Combination Curb & Gutter Removal LF 676.0 789.0

    1,465.0

    24

    Combination Curb & Gutter Ty. M6.18 (Modified)

    LF

    1,244.0 1,545.0 2,789.0

    25

    Class SI Concrete (Outlet)

    CY 1.0 1.0 2.0

    26

    Pipe Culverts Removal

    LF 36.0 160.0 196.0

    27

    Pipe Culverts, Class D, Type 1, 12"

    LF 77.0 77.0

    28

    Metal Flared End Section, 12"

    EACH 4.0 4.0

    29

    Removing Catch Basins

    EACH 1.0 2.0 3.0

    30

    Fire Hydrants To Be Adjusted

    EACH 1.0 1.0

    31

    Manholes To Be Adjusted

    EACH 7.0 7.0

    32

    Valve Box To Be Adjusted

    EACH 1.0 18.0 19.0

    33 Chain Link Fence Removal LF 355.0 355.0

    34

    Chain Link Fence, 6', Special

    LF 355.0 355.0

    35

    Temporary Fence

    LF 360.0 360.0

    36

    Remove Existing Concrete Foundation

    EACH 3.0 3.0

    37

    Traffic Control & Protection, Complete

    LS 0.5 0.5 1.0

    38

    Landscape Grading & Restoration

    LS 1.0 1.0

    39

    Topsoil Furnish & Place, 6"

    SY

    1,363.0 1,699.0 3,062.0

    40

    Seeding Class 1 & Fertilizing

    SY

    1,313.0 1,699.0 3,012.0

    41

    Seeding Class 4A & Fertilizing

    SY 50.0 50.0

    42

    Construction Layout

    LS 0.5 0.5 1.0

    Not to be used for bidding purposes

  • 107+06

    1

    0

    0

    +

    0

    0

    101+00

    1

    0

    2

    +

    0

    0

    103+00

    10

    4+

    00

    10

    5+

    00

    10

    6+

    00

    10

    7+

    00

    203+79

    200+00

    2

    0

    1

    +

    0

    0

    2

    0

    2

    +

    0

    0

    203+

    00

    302+25

    300+00301+00302+00

    L1

    L2

    C1

    C2

    L3

    L4

    C3

    L5

    STA 203+79.18

    STA 301+77.49

    STA 102+09.52

    STA 200+00.00

    STA 104+95.00

    STA 300+00.00

    ROADWAY ALIGNMENT LINE TABLE

    LINE #

    L1

    L2

    L3

    L4

    L5

    LENGTH

    (FT)

    115.40

    410.09

    212.10

    110.57

    225.00

    DIRECTION

    BEARING

    N31° 01' 27.66"W

    N00° 30' 16.23"W

    N54° 48' 21.48"W

    N02° 23' 46.02"W

    N90° 00' 00.00"W

    START STATION

    STA. 101+00.67

    N: 2025573.9993

    E: 2586745.2365

    STA. 102+95.97

    N: 2025748.8808

    E: 2586664.3073

    STA. 200+00.00

    N: 2025667.2855

    E: 2586689.1305

    STA. 202+68.61

    N: 2025837.4322

    E: 2586489.6840

    STA. 300+00.00

    N: 2025947.9045

    E: 2586662.5547

    END STATION

    STA. 102+16.07

    N: 2025672.8909

    E: 2586685.7592

    STA. 107+06.06

    N: 2026158.9547

    E: 2586660.6963

    STA. 202+12.10

    N: 2025789.5269

    E: 2586515.8039

    STA. 203+79.18

    N: 2025947.9045

    E: 2586485.0613

    STA. 302+25.00

    N: 2025947.9045

    E: 2586437.5547

    ROADWAY ALIGNMENT CURVE TABLE

    CURVE #

    C1

    C2

    C3

    DELTA

    047°21'06.78"

    038°11'49.87"

    092°44'21.13"

    RADIUS

    (FT)

    121.00

    150.00

    61.78

    LENGTH

    (FT)

    100.666

    79.901

    56.513

    TANGENT

    (FT)

    53.45

    40.92

    30.41

    CHORD

    BEARING

    N54°51'28.52"W

    N15°45'51.68"W

    N28°36'03.75"W

    CHORD DIST.

    (FT)

    97.79

    78.96

    54.56

    CONTROL POINT TABLE

    CP#

    3

    4

    8

    13

    14

    ELEVATION

    700.93

    699.34

    699.16

    703.33

    699.14

    NORTHING

    2026208.72

    2026117.26

    2025537.12

    2025934.50

    2025882.35

    EASTING

    2586622.30

    2586566.03

    2586849.15

    2586690.21

    2586432.44

    DESCRIPTION

    CP CUT X

    CP CUT X

    CP CUT X

    CP CUT X

    CP CUT X

    ALIGNMENT - A

    ALIGNMENT - B

    ALIGNMENT - C

    CP# 2

    CP# 3

    CP# 4

    CP# 13

    CP# 14

    CP# 8

    BM# 360

    BENCHMARK TABLE

    BM#

    360

    ELEVATION

    698.62

    NORTHING

    2026022

    EASTING

    2586424

    DESCRIPTION

    CHIS SQ SW EOC

    PI STA=102+56.99

    Δ 030°31'12"

    R=150.00

    L=79.90

    T=40.92

    CHD=78.96

    N15°45'51.68"W

    PI STA=202+42.50

    Δ 052°24'35"

    R=61.78

    L=56.51

    T=30.41

    CHD=54.56

    N28°36'03.75"W

    PI STA=100+53.45

    Δ 047°40'02"

    R=121.00

    L=100.67

    T=53.45

    CHD=97.79

    N54°51'28.52"W

    P

    T

    :

    1

    0

    1

    +

    0

    0

    .

    6

    7

    P

    C

    :

    1

    0

    2

    +

    1

    6

    .

    0

    7

    PT: 102+95.97P

    C

    :

    2

    0

    2

    +

    1

    2

    .

    1

    0

    PT: 2

    02+6

    8.61

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    3 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-A

    lignm

    ent, T

    ies, &

    B

    enchm

    arks.dw

    g

    ALIGNMENTS, TIES, & BENCHMARKS - SOUTH SITE

    Not to be used for bidding purposes

  • CP# 55

    CP# 56

    CP# 57

    BM# 352

    BM# 353

    BM# 356

    BM# 357

    BM# 358

    BM# 359

    BM# 361

    BM# 362

    BM# 363

    BM# 365

    BM# 366

    BENCHMARK TABLE

    BM#

    352

    353

    356

    357

    358

    359

    361

    362

    363

    365

    366

    ELEVATION

    700.86

    699.90

    699.94

    699.91

    699.91

    699.87

    699.89

    699.91

    700.94

    699.89

    700.82

    NORTHING

    2026592

    2026607

    2026602

    2026452

    2026333

    2026182

    2026339

    2026188

    2026207

    2026456

    2026607

    EASTING

    2586622

    2586523

    2586269

    2586275

    2586278

    2586277

    2586534

    2586533

    2586621

    2586531

    2586613

    DESCRIPTION

    BM CITY OF ROCKFORD DISC

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    BM CHISELED SQUARE

    CONTROL POINT TABLE

    CP#

    55

    56

    57

    ELEVATION

    699.86

    699.89

    699.84

    NORTHING

    2026444.70

    2026348.52

    2026593.53

    EASTING

    2586529.47

    2586530.68

    2586271.02

    DESCRIPTION

    CP CUTX

    CP CUTX

    CP CUTX

    1104+02

    1100+

    00

    1101+

    00

    1102+

    00

    1103+

    00

    1104+

    00

    1200+

    00

    1201+

    00

    1202+

    00

    1203+

    00

    1203+

    45

    1303+08

    1300+00

    1301+00

    1302+0

    0

    1303+00

    1403+08

    1400+00

    1401+00

    1402+00

    1403+00

    L1

    L2

    L3

    L4

    ROADWAY ALIGNMENT LINE TABLE

    LINE #

    L1

    L2

    L3

    L4

    LENGTH

    (FT)

    402.41

    344.58

    307.89

    308.21

    DIRECTION

    BEARING

    N01° 24' 15.43"W

    N01° 06' 44.06"W

    N88° 50' 07.37"E

    N88° 50' 07.37"E

    START STATION

    STA. 1100+00.00

    N: 2026181.9013

    E: 2586256.7742

    STA. 1200+00.00

    N: 2026212.6610

    E: 2586563.2141

    STA. 1300+00.00

    N: 2026360.2130

    E: 2586252.4030

    STA. 1400+00.00

    N: 2026423.1855

    E: 2586250.8593

    END STATION

    STA. 1104+02.41

    N: 2026584.1878

    E: 2586246.9124

    STA. 1203+44.58

    N: 2026557.1806

    E: 2586556.5254

    STA. 1303+07.89

    N: 2026366.4709

    E: 2586560.2279

    STA. 1403+08.21

    N: 2026429.4498

    E: 2586559.0052

    ALIGNMENT - D

    ALIGNMENT - F

    ALIGNMENT - G

    ALIGNMENT - E

    STA 1101+78.37

    STA 1300+00.00

    STA 1201+53.84

    STA 1303+07.89

    STA 1202+16.83

    STA 1403+08.21

    STA 1102+41.36

    STA 1400+00.00

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    4 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - A

    lignm

    ent T

    ies &

    B

    enchm

    arks.dw

    g

    ALIGNMENTS, TIES, & BENCHMARKS - NORTH SITE

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS - ALIGNMENT A

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    5 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-T

    ypical S

    ections.dw

    g

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 8"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    B

    C

    D

    E

    F

    STA 101+08.00

    STA 101+08.00 TO STA 101+79.13

    STA 101+83.00 TO STA 102+58.00

    STA 102+58.00

    STA 102+58.00 TO 103+45.45

    STA 103+45.45 TO 104+44.65

    STA 104+44.65

    STA 101+79.13 TO STA 101+83.00

    9.0'9.0'

    ±2% (MATCH EX)

    ±-2% (MATCH EX)

    VARIABLE

    (-2% TO 1.5%)

    9.0'9.0'

    9.0'9.0'

    9.0'9.0'

    VARIABLE

    (2% TO -1.5%)

    VARIABLE

    (-2% TO 1.5%)

    VARIABLE

    (2% TO -1.5%)

    VARIABLE

    (-2% TO 1.5%)

    VARIABLE

    (2% TO -1.5%)

    TIP-OUT

    VARIABLE

    VARIABLE

    9.0'9.0'

    1.5%

    -1.5%

    TIP-OUT

    VARIABLE

    -1.5%

    9.0'9.0'

    1.5%

    -1.5%

    TIP-OUT

    VARIABLE

    -1.5%

    9.0'9.0'

    1.5%

    -1.5%

    TIP-OUT

    9.0'9.0'

    ±1.5% (MATCH EX)

    ±-1.5% (MATCH EX)

    TIP-OUT

    A

    CB

    E

    E

    A

    C

    B

    E

    E

    D *

    1.0' TYP.

    MATCH EX

    TYP.

    MATCH EX

    TYP.

    VARIABLE

    TYP.

    * AGGREGATE SUBGRADE IMPROVEMENT SHOWN

    THIS TYPICAL SECTION ONLY. ACTUAL LOCATIONS

    SHALL BE AS DIRECTED BY THE ENGINEER.

    CB

    CB

    CB

    CB

    CB

    CB

    A

    E

    E

    A

    E

    E

    A

    E

    E

    A

    E

    E

    A

    EE

    A

    E

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    F

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS - ALIGNMENT B

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    6 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-T

    ypical S

    ections.dw

    g

    STA 200+00.00 TO 200+40.00

    STA 200+40.00 TO 201+70.76

    STA 201+00.00

    STA 201+70.76 TO 202+12.10

    STA 203+38.39 TO 203+61.59

    STA 202+90.75 TO 203+38.39

    STA 202+12.10 TO 202+90.75

    VARIABLE12.0'

    -1.5%

    1.5%

    12.0'12.0'

    -1.5%

    1.5%

    VARIABLE

    12.0'12.0'

    -1.5%

    1.5%

    VARIABLE

    -1.5%

    12.0'12.0'

    VARIABLE

    -1.5% TO 2%

    1.5%

    12.0'

    VARIABLE

    -1.5% TO 2%

    12.0'12.0'

    VARIABLE

    -1.5% TO 2%

    VARIABLE

    1.5% TO -2%

    12.0'

    VARIABLE

    -1.5% TO 2%

    TIP-OUT

    TIP-OUT

    TIP-OUT

    TIP-OUT

    TIP-OUT

    TIP-OUT

    B

    C

    * AGGREGATE SUBGRADE IMPROVEMENT SHOWN

    THIS TYPICAL SECTION ONLY. ACTUAL LOCATIONS

    SHALL BE AS DIRECTED BY THE ENGINEER.

    MATCH EX

    TYP.

    1.0'

    D *

    B

    C

    B

    C

    B

    C

    B

    C

    B

    C

    B

    C

    A

    A

    A

    A

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    E

    12.0'12.0'

    -1.5%

    1.5%

    VARIABLE

    E

    F

    F

    F

    F

    F

    F

    12.0'12.0'

    -1.5%

    1.5%

    VARIABLE

    (CURB RETURN)

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 8"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    B

    C

    D

    E

    F

    G

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS - ALIGNMENT C

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    7 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-T

    ypical S

    ections.dw

    g

    STA 301+27.39

    STA 301+27.39 TO 301+39.39

    STA 301+39.39 TO 301+63.80

    STA 301+63.80 TO 302+00.74

    STA 302+11.39

    9.0'9.0'

    ±1.5% (MATCH EX)

    ±1.5% (MATCH EX)

    TIP-OUT

    TIP-OUT

    DEPRESSED

    (MATCH EX)

    TIP-OUT

    TIP-OUT

    DEPRESSED

    (MATCH EX)

    9.0'9.0'

    1.5%

    1.5%

    9.0'9.0'

    1.5%

    1.5%

    9.0'9.0'

    1.5%

    1.5%

    9.0'9.0'

    1.5%

    1.5%

    1.0' TYP.

    VARIABLE

    (CURB RETURN)

    TIP-OUT

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 8"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    HMA SURFACE COURSE IL-9.5, MIX "C", N50

    2" THICK

    B

    C

    D

    E

    F

    G

    D *

    A

    B

    B

    B

    B

    B

    C

    C

    C

    C

    C

    A

    A

    A

    A

    * AGGREGATE SUBGRADE IMPROVEMENT SHOWN

    THIS TYPICAL SECTION ONLY. ACTUAL LOCATIONS

    SHALL BE AS DIRECTED BY THE ENGINEER.

    E

    E

    E

    E

    EE

    MATCH EX

    TYP.

    MATCH EX

    TYP.

    MATCH EX

    TYP.

    G

    H

    H

    8.0'

    H

    6.8'

    A

    A

    A

    H

    FURN EXC UP TO 6" BELOW FINISH GRADE

    FINISH GRADE SHOWN

    (OMIT TOPSOIL)

    F

    G

    HOT-MIX ASPHALT MIXTURE

    REQUIREMENTS

    MIXTURE USE(S)

    SURFACE COURSE BINDER COURSE

    PG: PG 64-22 PG 64-22

    DESIGN AIR VOIDS

    4.0 @ N50 4.0 @ N50

    MIXTURE COMPOSITION

    (GRADATION MIXTURE)

    IL 9.5 IL 19.0

    FRICTION AGGREGATE MIX "C" N/A

    MIX UNIT WEIGHT

    112 lbs/sy/in 112 lbs/sy/in

    THESE MIXTURE REQUIREMENTS ARE APPLICABLE FOR THIS PROJECT

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS - ALIGNMENT D

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    8 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - T

    ypical S

    ections.dw

    g

    10.0'VARIABLE

    VARIABLE

    (MATCH EX AT 1101+21.24)

    TIP-OUT

    VARIABLE

    (MATCH EX AT 1101+21.24)

    F

    A

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 8"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    HMA SURFACE COURSE IL-9.5, MIX "C", N50

    2" THICK

    HMA BINDER COURSE IL-19.0, N50

    4" THICK

    B

    C

    D

    E

    F

    G

    H

    I

    B

    I

    H

    10.0'10.0'

    -1.5% 1.5%

    FA

    B

    I

    H

    E

    E

    HMA OR TOPSOIL & SEEDING

    SEE PLANS

    10.0'10.0'

    VARIABLE

    (MATCH EX AT 1103+26.50)

    VARIABLE

    (MATCH EX AT 1103+26.50)

    F

    A

    B

    I

    H

    MATCH EXISTING

    STA 1101+21.24 TO STA 1101+52.24

    HMA TRANSITION

    STA 1101+52.24 TO STA 1103+39.50

    HMA PAVEMENT

    STA 1103+39.50 TO STA 1103+59.50

    HMA TRANSITION

    * AGGREGATE SUBGRADE IMPROVEMENT SHOWN

    THIS TYPICAL SECTION ONLY. ACTUAL LOCATIONS

    SHALL BE AS DIRECTED BY THE ENGINEER.

    D *

    MATCH EX EQUIPMENT PAD

    HOT-MIX ASPHALT MIXTURE

    REQUIREMENTS

    MIXTURE USE(S)

    SURFACE COURSE BINDER COURSE

    PG: PG 64-22 PG 64-22

    DESIGN AIR VOIDS

    4.0 @ N50 4.0 @ N50

    MIXTURE COMPOSITION

    (GRADATION MIXTURE)

    IL 9.5 IL 19.0

    FRICTION AGGREGATE MIX "C" N/A

    MIX UNIT WEIGHT

    112 lbs/sy/in 112 lbs/sy/in

    THESE MIXTURE REQUIREMENTS ARE APPLICABLE FOR THIS PROJECT

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS ALIGNMENT G -1

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    9 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - T

    ypical S

    ections.dw

    g

    TIP-OUT

    10.0'10.0'

    -1.5%

    1.5%

    A

    B

    I

    H

    EE

    J

    0.5%

    F

    STA 1400+30.11 TO STA 1400+65.02

    STA 1400+73.01 TO STA 1401+49.58

    STA 1401+57.62 TO STA 1401+92.58

    TIP-OUT

    10.0'10.0'

    -1.5%

    1.5%

    A

    B

    I

    H

    E

    E

    F

    STA 1400+65.02 TO STA 1400+73.01

    STA 1401+49.58 TO STA 1401+57.62

    (AT TANK CHAMBER BUMP OUTS)

    0.5%

    0.5%

    TIP-OUT

    10.0'10.0'

    -1.5%

    1.5%

    A

    BI

    H

    J

    E

    J

    E

    STA 1401+92.58 TO STA 1402+25.00

    STA 1402+25.00 TO STA 1402+33.00

    0.5%

    0.5%

    TIP-OUT

    10.0'10.0'

    VARIABLE

    (-1.5% TO ±0.22%)

    VARIABLE

    (1.5% TO ±-0.22%)

    A

    BI

    H

    J

    E

    J

    E

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 12"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    HMA SURFACE COURSE IL-9.5, MIX "C", N50

    2" THICK

    HMA BINDER COURSE IL-19.0, N50

    4" THICK

    PCC SIDEWALK 6" THICK

    AGGREGATE BASE COURSE, TY. B, 2"

    B

    C

    D

    E

    F

    G

    H

    I

    J

    D ** AGGREGATE SUBGRADE IMPROVEMENT SHOWN

    THIS TYPICAL SECTION ONLY. ACTUAL LOCATIONS

    SHALL BE AS DIRECTED BY THE ENGINEER.

    HOT-MIX ASPHALT MIXTURE

    REQUIREMENTS

    MIXTURE USE(S)

    SURFACE COURSE BINDER COURSE

    PG: PG 64-22 PG 64-22

    DESIGN AIR VOIDS

    4.0 @ N50 4.0 @ N50

    MIXTURE COMPOSITION

    (GRADATION MIXTURE)

    IL 9.5 IL 19.0

    FRICTION AGGREGATE MIX "C" N/A

    MIX UNIT WEIGHT

    112 lbs/sy/in 112 lbs/sy/in

    THESE MIXTURE REQUIREMENTS ARE APPLICABLE FOR THIS PROJECT

    K

    K

    K

    K K

    K

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS ALIGNMENT G -2

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    10 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - T

    ypical S

    ections.dw

    g

    STA 1402+34.25 TO STA 1402+42.13

    (AT TANK CHAMBER BUMP OUT)

    TIP-OUT

    10.0'10.0' A

    B

    I

    H

    E

    E

    VARIABLE

    (-1.5% TO ±0.22%)

    VARIABLE

    (1.5% TO ±-0.22%)

    STA 1402+42.13 TO STA 1402+81.06

    AT CURB RETURNS AT ALIGNMENT E

    10.0'10.0'

    A

    B

    I

    H

    EE

    J

    0.5%

    VARIABLE

    (-1.5% TO ±0.22%)

    VARIABLE

    (1.5% TO ±-0.22%)

    VARIABLEVARIABLE

    A

    B

    I

    H

    E E

    F

    VARIABLE

    (-1.5% TO ±0.22%)

    VARIABLE

    (1.5% TO ±-0.22%)

    TIP-OUT

    MATCH CROSS SLOPE OF EX EDGE OF

    PAVEMENT

    LANDSCAPE GRADING & RESTORATION

    LANDSCAPE GRADING & RESTORATION

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 12"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    HMA SURFACE COURSE IL-9.5, MIX "C", N50

    2" THICK

    HMA BINDER COURSE IL-19.0, N50

    4" THICK

    PCC SIDEWALK 6" THICK

    AGGREGATE BASE COURSE, TY. B, 2"

    B

    C

    D

    E

    F

    G

    H

    I

    J

    HOT-MIX ASPHALT MIXTURE

    REQUIREMENTS

    MIXTURE USE(S)

    SURFACE COURSE BINDER COURSE

    PG: PG 64-22 PG 64-22

    DESIGN AIR VOIDS

    4.0 @ N50 4.0 @ N50

    MIXTURE COMPOSITION

    (GRADATION MIXTURE)

    IL 9.5 IL 19.0

    FRICTION AGGREGATE MIX "C" N/A

    MIX UNIT WEIGHT

    112 lbs/sy/in 112 lbs/sy/in

    THESE MIXTURE REQUIREMENTS ARE APPLICABLE FOR THIS PROJECT

    K

    K

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS ALIGNMENT F -1

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    11 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - T

    ypical S

    ections.dw

    g

    STA 1300+30.11 TO STA 1300+64.58

    STA 1300+72.46 TO STA 1301+49.39

    STA 1301+57.25 TO STA 1301+92.25

    STA 1302+19.21 TO STA 1302+25.00

    STA 1300+64.58 TO STA 1300+72.46

    STA 1301+49.39 TO STA 1301+57.25

    (AT TANK CHAMBER BUMP OUTS)

    STA 1301+92.25 TO STA 1302+19.21

    STA 1302+25.00 TO STA 1302+33.82

    TIP-OUT

    10.0'10.0'

    -1.5%

    1.5%

    A

    B

    I

    H

    E

    E

    D *

    F

    J

    0.5%

    * AGGREGATE SUBGRADE IMPROVEMENT SHOWN

    THIS TYPICAL SECTION ONLY. ACTUAL LOCATIONS

    SHALL BE AS DIRECTED BY THE ENGINEER.

    TIP-OUT

    10.0'10.0'

    -1.5%

    1.5%

    A

    B

    I

    H

    E

    E

    F

    TIP-OUT

    10.0'10.0'

    -1.5%

    1.5%

    A

    B

    I

    H

    J

    E

    J

    0.5%

    0.5%

    E

    10.0'10.0'

    A

    B

    I

    H

    EE

    J

    VARIABLE

    (-1.5% TO ±0.36%)

    VARIABLE

    (1.5% TO ±-0.36%)

    LANDSCAPE GRADING & RESTORATION

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 12"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    HMA SURFACE COURSE IL-9.5, MIX "C", N50

    2" THICK

    HMA BINDER COURSE IL-19.0, N50

    4" THICK

    PCC SIDEWALK 6" THICK

    AGGREGATE BASE COURSE, TY. B, 2"

    B

    C

    D

    E

    F

    G

    H

    I

    J

    HOT-MIX ASPHALT MIXTURE

    REQUIREMENTS

    MIXTURE USE(S)

    SURFACE COURSE BINDER COURSE

    PG: PG 64-22 PG 64-22

    DESIGN AIR VOIDS

    4.0 @ N50 4.0 @ N50

    MIXTURE COMPOSITION

    (GRADATION MIXTURE)

    IL 9.5 IL 19.0

    FRICTION AGGREGATE MIX "C" N/A

    MIX UNIT WEIGHT

    112 lbs/sy/in 112 lbs/sy/in

    THESE MIXTURE REQUIREMENTS ARE APPLICABLE FOR THIS PROJECT

    K

    K

    K

    K

    K

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TYPICAL SECTIONS ALIGNMENT F -2

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    12 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - T

    ypical S

    ections.dw

    g

    STA 1302+33.82 TO STA 1302+41.72

    (AT TANK CHAMBER BUMP OUT)

    STA 1302+41.72 TO STA 1302+80.99

    AT CURB RETURNS AT ALIGNMENT E

    TIP-OUT

    10.0'10.0' A

    B

    I

    H

    E

    E

    VARIABLE

    (-1.5% TO ±0.22%)

    VARIABLE

    (1.5% TO ±-0.22%)

    LANDSCAPE GRADING & RESTORATION

    10.0'10.0'

    A

    B

    I

    H

    E

    E

    J

    0.5%

    VARIABLE

    (-1.5% TO ±0.22%)

    VARIABLE

    (1.5% TO ±-0.22%)

    LANDSCAPE GRADING & RESTORATION

    LANDSCAPE GRADING & RESTORATION

    VARIABLEVARIABLE

    A

    B

    I

    H

    E E

    F

    VARIABLE

    (-1.5% TO ±0.22%)

    VARIABLE

    (1.5% TO ±-0.22%)

    TIP-OUT

    MATCH CROSS SLOPE OF EX EDGE OF

    PAVEMENT

    LEGEND

    A PAVEMENT REMOVAL (FULL WIDTH)

    AGGREGATE BASE COURSE, TY. B, 12"

    (EXTEND 1.0' BEYOND BACK OF CURB)

    PCC PAVEMENT, 10" (JOINTED)

    AGGREGATE SUBGRADE IMPROVEMENT, AT LOCATIONS &

    DEPTH TO BE DETERMINED BY THE ENGINEER.

    COMBINATION CURB & GUTTER TY. M6.18MOD

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CLASS 1 & FERTILIZING

    EROSION CONTROL BLANKET

    (MATCH EX ELEV AT LOCATION SHOWN ON PLANS)

    FURNISHED EXCAVATION

    HMA SURFACE COURSE IL-9.5, MIX "C", N50

    2" THICK

    HMA BINDER COURSE IL-19.0, N50

    4" THICK

    PCC SIDEWALK 6" THICK

    AGGREGATE BASE COURSE, TY. B, 2"

    B

    C

    D

    E

    F

    G

    H

    I

    J

    HOT-MIX ASPHALT MIXTURE

    REQUIREMENTS

    MIXTURE USE(S)

    SURFACE COURSE BINDER COURSE

    PG: PG 64-22 PG 64-22

    DESIGN AIR VOIDS

    4.0 @ N50 4.0 @ N50

    MIXTURE COMPOSITION

    (GRADATION MIXTURE)

    IL 9.5 IL 19.0

    FRICTION AGGREGATE MIX "C" N/A

    MIX UNIT WEIGHT

    112 lbs/sy/in 112 lbs/sy/in

    THESE MIXTURE REQUIREMENTS ARE APPLICABLE FOR THIS PROJECT

    K

    K

    Not to be used for bidding purposes

  • ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TEMPORARY EROSION CONTROL DETAILS

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    13 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-T

    em

    p E

    rosion control.dw

    g

    S.W.P.P.P. NOTES

    GENERAL NOTES

    THE ESTIMATED AREA OF DISTURBANCE FOR THIS PROJECT EXCEEDS 1 ACRE. A NOTICE OF INTENT (N.O.I) WILL BE FILED. A STORM WATER POLLUTION PREVENTION PLAN

    (S.W.P.P.P.) HAS BEEN PREPARED FOR THIS PROJECT. THE CONTRACTOR SHALL INSTALL A SWPPP MAILBOX IN AN ACCESSIBLE LOCATION ONSITE THAT SHALL CONTAIN THE

    SWPPP PLAN, ANY CHANGES TO THE SWPPP PLAN, INSPECTION REPORTS, AND ALL OTHER RELEVANT DOCUMENTS. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE

    REQUIREMENTS OF THE ILLINOIS URBAN MANUAL, CURRENT EDITION, I.D.O.T. STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, CURRENT EDITION, AND

    THE PROJECT SPECIFICATIONS AND DETAILS.

    THE EROSION CONTROL DEVICES, MATERIALS AND PROCEDURES SHOWN IN THESE PLANS ARE TO BE CONSIDERED A MINIMUM. ADDITIONAL DEVICES OR MATERIALS

    MAY BE REQUIRED BASED ON EXISTING SITE CONDITIONS, AT THE DIRECTION OF THE ENGINEER. ANY DEVICES, MATERIALS, OR PROCEDURES REQUIRED BY THE ENGINEER

    DUE TO THE CONTRACTOR'S ACTIONS OR NEGLIGENCE WILL BE AT NO ADDITIONAL COST TO THE DISTRICT.

    ALL DISTURBED AREAS SHALL BE SEEDED UNLESS AGRICULTURAL OR OTHERWISE NOTED ON THE PLANS. THE CONTRACTOR IS RESTRICTED TO WORK IN TEMPORARY

    EASEMENTS OR WORK AREAS DELINEATED ON PLANS. THE CONTRACTOR SHALL TAKE WHATEVER ACTIONS AND MEASURES ARE DEEMED NECESSARY BY THE DISTRICT OR

    AUTHORIZED AGENCY TO ELIMINATE EXCESSIVE SILTATION OR EROSION AND TO STABILIZE THE PROJECT AREA. DISCHARGE OF HAZARDOUS SUBSTANCES INTO STORM

    WATER IS SUBJECT TO I.E.P.A. REPORTING AND CLEANUP REQUIREMENTS.

    CONTROL MEASURES

    EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE BEFORE CONSTRUCTION IN EACH AREA, AS DETERMINED BY THE ENGINEER, AND SHALL BE

    MAINTAINED THROUGHOUT CONSTRUCTION. CONSTRUCTION ACTIVITIES SHALL ENSURE THAT EXISTING VEGETATION IS PRESERVED WHERE PRACTICAL. THE FOLLOWING

    CONTROLS WILL BE PROVIDED AS A MINIMUM FOR THE DURATION OF THIS PROJECT:

    · SEDIMENT CONTROL SHALL BE PROVIDED DOWNSLOPE OF ALL STOCKPILE AREAS.· STABILIZED CONSTRUCTION ENTRANCES MUST BE INSTALLED AS DETAILED AND WHERE REQUIRED BY THE ROADWAY AUTHORITY OR DISTRICT.· INLET PROTECTION MUST BE INSTALLED FOR ALL INLETS THAT COULD BE SUBJECT TO SILTATION, AS DETERMINED BY THE ENGINEER.· ALL ROADWAYS SHALL BE KEPT CLEAN OF DEBRIS, MUD, SOIL, AND CONSTRUCTION MATERIALS AND SHALL BE INSPECTED AT THE END OF EACH DAY AND CLEANED AS

    NECESSARY.

    · ALL DISTURBED AREAS MUST BE STABILIZED WITHIN 7 DAYS IF THEY ARE TO REMAIN DISTURBED FOR MORE THAN 14 DAYS.

    INSPECTIONS

    INSPECTIONS MUST BE COMPLETED BY A QUALIFIED PERSON EVERY 7 DAYS AND WITHIN 24 HOURS OF EACH RAIN EVENT WITH OVER 0.5" OF RAIN OR SNOWFALL

    EQUIVALENT. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REPAIRED AND MODIFIED AS NEEDED TO BE EFFECTIVE AND TO PREVENT EROSION AND POLLUTANTS

    FROM DISCHARGING FROM SITE. A REPORT SHALL BE COMPLETED WITH EACH INSPECTION, AND SHALL BE KEPT ACCESSIBLE ONSITE WITH THE S.W.P.P.P.

    MAINTENANCE

    CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REPAIR OF ALL EROSION AND SEDIMENT CONTROL DEVICES AND PROTECTIVE MEASURES AS REQUIRED

    TO MAINTAIN THE INTENDED FUNCTION. SEDIMENT COLLECTED FROM THE CONSTRUCTION SITE SHALL BE DISPOSED OF ON THE SITE ON A REGULAR BASIS AS NEEDED. ANY

    DEBRIS OR SILT DEPOSITED IN THE FLOW LINE OF DRAINAGE STRUCTURES, DITCHES, ETC. THAT COULD OBSTRUCT FLOW SHALL BE REMOVED AT THE CLOSE OF EACH

    WORKING DAY. ALL DRAINAGE STRUCTURES SHALL BE FREE OF DIRT AND DEBRIS. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TEMPORARY EROSION CONTROL

    DEVICES WITHIN 30 DAYS OF FINAL SITE STABILIZATION APPROVAL BY THE DISTRICT. THE SITE SHALL HAVE A MIN. OF 70% VEGETATIVE COVER TO BE CONSIDERED STABILIZED.

    OTHER DISCHARGES

    NON STORM WATER DISCHARGES INCLUDING WASHING OF VEHICLES, CONCRETE WASH-OUT, WATER FOR DUST CONTROL, AND TRENCH DEWATERING DISCHARGES

    SHALL BE DIRECTED AWAY FROM UNPROTECTED, BARE, OR UNSTABILIZED SOIL AND APPROPRIATE MEASURES SHALL BE IMPLEMENTED TO PREVENT EROSION OR

    DEGRADATION OF RUNOFF FROM THE SITE. DEWATERING DISCHARGE MUST BE INTO SILT CONTAINMENT BAGS WITH PROPERLY ENGINEERED ANIONIC POLYMER AND FABRIC

    PORE SIZE. UNDER NO CIRCUMSTANCE SHALL DEWATERING DISCHARGE BE ALLOWED TO FLOW DIRECTLY INTO WATERWAYS. A DEWATERING DISCHARGE PLAN SHALL BE

    SUBMITTED TO THE DISTRICT FOR APPROVAL.

    Not to be used for bidding purposes

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    W

    W

    W

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    >

    >

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    7

    0

    0

    6

    9

    8

    6

    9

    9

    7

    0

    1

    702

    7

    0

    0

    7

    0

    1

    7

    0

    2

    6

    9

    8

    6

    9

    0

    6

    9

    5

    6

    9

    1

    6

    9

    2

    6

    9

    3

    6

    9

    4

    6

    9

    6

    6

    9

    7

    6

    9

    8

    6

    9

    9

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    S

    F

    1

    0

    1

    +

    0

    0

    1

    0

    2

    +

    0

    0

    103+00

    104+00

    105+00

    106+00

    2

    0

    0

    +

    0

    0

    2

    0

    1

    +

    0

    0

    2

    0

    2

    +

    0

    0

    203+

    00

    203+

    79

    300+

    00

    301+

    00

    302+

    00

    302+

    25

    STA: 100+98.79

    O/S: 11.37' R

    STA: 101+38.95

    O/S: 24.58' R

    STA: 102+97.89

    O/S: 39.83' R

    STA: 103+82.10

    O/S: 22.87' R

    STA: 104+00.49

    O/S: 22.51' R

    STA: 104+58.90

    O/S: 10.80' R

    STA: 101+00.59

    O/S: 11.70' L

    STA: 101+88.82

    O/S: 16.37' L

    STA: 102+55.11

    O/S: 62.13' L

    STA: 102+51.47

    O/S: 75.90' L

    STA: 102+69.17

    O/S: 98.34' L

    STA: 102+76.86

    O/S: 91.85' L

    STA: 103+26.22

    O/S: 178.63' L

    STA: 103+49.62

    O/S: 199.88' L

    STA: 103+42.17

    O/S: 194.07' L

    STA: 103+62.33

    O/S: 206.94' L

    STA: 103+85.03

    O/S: 215.05' L

    STA: 104+24.14

    O/S: 239.10' L

    STA: 104+41.71

    O/S: 254.58' L

    STA: 104+32.72

    O/S: 253.12' L

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    14 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-T

    em

    p E

    rosion control.dw

    g

    TEMPORARY EROSION CONTROL PLAN - SOUTH SITE

    PERIMETER EROSION BARRIER

    266 FT

    PERIMETER EROSION BARRIER

    60 FT

    PERIMETER EROSION BARRIER

    493 FT

    INLET PROTECTION

    1 EA

    TEMPORARY EROSION CONTROL SEEDING, TYP.

    54 LB TOTAL FOR SOUTH SITE

    STAB CONST ENTRANCE

    50 SY

    25'

    18.0000'

    N

    SCALE IN FEET

    020 20 40

    Not to be used for bidding purposes

  • 1101+

    00

    1102+

    00

    1103+

    00

    1104+

    00

    1200+

    00

    1201+

    00

    1202+

    00

    1203+

    00

    1203+

    45

    1303+081300+00

    1301+00

    1302+00

    1303+00

    1403+08

    1400+00

    1401+00

    1402+00

    1403+00

    E

    HHHH

    HHHH HH

    HH

    HHHHHH

    HH

    HH

    UE

    U

    E

    UE

    >

    >

    7

    0

    0

    7

    0

    1

    6

    9

    7

    697

    6

    9

    8

    69

    8

    699

    699

    6

    9

    9

    699

    6

    9

    8

    698

    6

    9

    8

    6

    9

    8

    6

    9

    9

    699

    699

    699

    6

    9

    9

    6

    9

    9

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    TEMPORARY EROSION CONTROL PLAN - NORTH SITE

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    15 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - T

    em

    porary E

    rosion C

    ontrol.dw

    g

    SCALE IN FEET

    020 20 40

    N

    TEMP DITCH CHECK

    20 FT

    STAB CONST ENTRANCE

    45 SY

    20.0'

    20.0'

    TEMP EROS CTRL SEEDING, TYP

    34 POUNDS TOTAL FOR NORTH SITE

    Not to be used for bidding purposes

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    W

    W

    W

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    1

    0

    1

    +

    0

    0

    1

    0

    2

    +

    0

    0

    103+00

    104+00

    105+00

    106+00

    203+

    79

    200+00

    2

    0

    1

    +

    0

    0

    2

    0

    2

    +

    0

    0

    203+

    00

    300+

    00

    301+

    00

    302+

    00

    302+

    25

    BEGIN ROADWAY IMPROVEMENTS

    STA: 101+08.00

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 104+44.65

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 302+11.39

    O/S: 0.00'

    BEGIN ROADWAY IMPROVEMENTS

    STA: 301+27.39

    O/S: 0.00'

    BEGIN FENCE REM

    STA: 101+88.62

    O/S: 16.62' L

    END FENCE REM

    STA: 203+08.83

    O/S: 63.97' L

    STA: 302+16.39

    O/S: 17.07' R

    STA: 302+16.39

    O/S: 9.54' L

    STA: 301+44.35

    O/S: 17.00' R

    STA: 301+75.40

    O/S: 17.00' R

    STA: 301+75.80

    O/S: 11.32' R

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    16 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-R

    em

    ovals.dw

    g

    REMOVALS - SOUTH SITE

    N

    SCALE IN FEET

    020 20 40

    HMA PAVEMENT REMOVAL

    PCC PAVEMENT REMOVAL

    COMBINATION CURB & GUTTER

    REMOVAL

    LEGEND

    PVMNT REM

    1803 SY TOTAL

    SOUTH SITE

    COMB CURB & GUTTER REM

    331 LF

    COMB CURB & GUTTER REM

    342 LF

    COMB CURB & GUTTER REM

    3 LF

    CHAIN LINK FENCE REM

    354 LF

    PIPE CULVERTS REM

    36 LF

    REMOVE CATCH BASIN

    1 EA

    REM EX CONCRETE FOUNDATION

    OR CUT AT EL 694.8 (2' BELOW SUBGRADE)

    1 EA

    EARTH EXCAVATION

    EARTH EXCAVATION

    521 CY

    CLEARING & GRUBBING/TREE REMOVAL

    6 FEET MIN OUTSIDE OF PROPOSED FENCE

    1 L SUM

    Not to be used for bidding purposes

  • E

    HHHH

    HHHH HH

    HH

    HHHHHH

    HH

    HH

    UE

    U

    E

    UE

    1101+

    00

    1102+

    00

    1103+

    00

    1104+

    00

    1104+

    02

    1300+00

    1301+00

    1302+00

    1303+00

    1400+00

    1401+00

    1402+00

    1403+00

    BEGIN ROADWAY IMPROVEMENTS

    STA: 1101+21.24

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 1103+59.50

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 1402+98.21

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 1302+97.97

    O/S: 0.00'

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    17 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - R

    em

    ovals.dw

    g

    REMOVALS - NORTH SITE

    HMA PAVEMENT REMOVAL

    PCC PAVEMENT REMOVAL

    COMBINATION CURB & GUTTER

    REMOVAL

    LEGEND

    EARTH EXCAVATION

    COMB CURB & GUTTER REM

    396 LF

    COMB CURB & GUTTER REM

    393 LF

    PVMNT REM

    1446 SY TOTAL

    NORTH SITE

    PIPE CULVERTS REM

    40 LF

    REMOVE CATCH BASIN

    1 EA

    PIPE CULVERTS REM

    40 LF

    PIPE CULVERTS REM

    40 LF

    PIPE CULVERTS REM

    40 LF

    REMOVE CATCH BASIN

    1 EA

    EARTH EXCAVATION

    1080 CY TOTAL NORTH SITE

    Not to be used for bidding purposes

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    W

    W

    W

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    2

    0

    0

    +

    0

    0

    2

    0

    1

    +

    0

    0

    2

    0

    2

    +

    0

    0

    203+

    00

    203+

    79

    300+

    00

    301+

    00

    302+

    00

    302+

    25

    1

    0

    1

    +

    0

    0

    1

    0

    2

    +

    0

    0

    103+00

    104+00

    105+00

    106+00

    END ROADWAY IMPROVEMENTS

    STA: 104+44.65

    O/S: 0.00'

    BEGIN

    ROADWAY

    IMPROVEMENTS

    STA: 101+08.00

    O/S: 0.00'

    STA 102+09.52

    STA 200+00.00

    STA 203+79.18

    STA 301+77.49

    END ROADWAY IMPROVEMENTS

    STA: 302+11.39

    O/S: 0.00'

    BEGIN ROADWAY IMPROVEMENTS

    STA: 301+27.39

    O/S: 0.00'

    >

    >

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    ALIGNMENT - A

    ALIGNMENT - B

    ALIGNMENT - C

    7

    0

    0

    6

    9

    8

    6

    9

    9

    7

    0

    1

    702

    7

    0

    0

    7

    0

    1

    7

    0

    2

    6

    9

    8

    6

    9

    0

    6

    9

    5

    6

    9

    1

    6

    9

    2

    6

    9

    3

    6

    9

    4

    6

    9

    6

    6

    9

    7

    6

    9

    8

    6

    9

    9

    END TIP-OUT

    STA: 101+91.89

    O/S: 9.82' L

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    18 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-D

    esign.dw

    g

    SITE PLAN - SOUTH SITE

    N

    SCALE IN FEET

    020 20 40

    PCC PAVEMENT 10" (JOINTED)

    2346 SY

    AGGREGATE BASE COURSE TY B

    (EXTEND 1' BEYOND BACK OF CURB)

    893 TON

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    569 SY

    FURNISHED EXCAVATION, TYP. OF BENEATH TOPSOIL FURNISH & PLACE

    341 CY TOTAL SOUTH SITE

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    160 SY

    FURNISHED EXCAVATION, TYP. OF BENEATH TOPSOIL FURNISH & PLACE

    341 CY TOTAL SOUTH SITE

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    580 SY

    FURNISHED EXCAVATION, TYP. OF BENEATH TOPSOIL FURNISH &

    PLACE

    341 CY TOTAL SOUTH SITE

    GRADING & SHAPING DITCHES

    50 LF

    COMB C&G M6.18MOD

    331 LF

    COMB C&G M6.18MOD

    192 LF

    COMB C&G M6.18MOD

    288 LF

    1

    1FURNISHED EXCAVATION, UP TO 6" OF FINISH GRADE

    (OMIT TOPSOIL)

    TO BE PLACED AROUND PERIMETER OF TANK WALL

    EXTENDED TO BACK OF PROPOSED OR EXISTING CURB

    491 CY TOTAL SOUTH SITE

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 4A & FERTILIZING

    EROSION CONTROL BLANKET

    50 SY

    FILTER FABRIC

    STONE RIPRAP CL A5, 30"

    31 SY

    2

    3

    2FUTURE PCC PAVEMENT BY OTHERS

    3FUTURE PCC PAVEMENT BY OTHERS

    COMB C&G M6.18MOD

    421 LF

    FUTURE SIDEWALK

    BY OTHERS

    COMB C&G M6.18MOD

    12 LF

    HMA SRF CSE IL-9.5 MIX "C" N50

    2" THICK

    8 TON

    CLASS SI CONCRETE (OUTLET)

    1 CY

    CHAIN LINK FENCE, 6', SPECIAL

    355 LF

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    4 SY

    TIP-OUT CURB & GUTTER

    DEPRESSED CURB & GUTTER

    LEGEND

    FUTURE SIDEWALK

    BY OTHERS

    FIRE HYDRANTS TO BE ADJUSTED

    1 EA

    VALVE BOX TO BE ADJUSTED

    1 EA

    PCC SLEEPER SLAB

    19 SY

    6.0'

    FUTURE BUILDING BY

    OTHERS

    Not to be used for bidding purposes

  • 1101+

    00

    1102+

    00

    1103+

    00

    1104+

    00

    1200+

    00

    1201+

    00

    1202+

    00

    1203+

    00

    1203+

    45

    1303+081300+00

    1301+00

    1302+00

    1303+00

    1403+08

    1400+00

    1401+00

    1402+00

    1403+00

    E

    HHHH

    HHHH HH

    HH

    HHHHHH

    HH

    HH

    UE

    U

    E

    UE

    STA 1101+78.37

    STA 1300+00.00

    STA 1102+41.36

    STA 1400+00.00

    BEGIN ROADWAY IMPROVEMENTS

    HMA TRANSITION

    STA: 1101+21.24

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    HMA TRANSITION

    STA: 1103+59.50

    O/S: 0.00'

    BEGIN HMA PAVEMENT

    STA: 1101+52.24

    O/S: 0.00'

    END HMA PAVEMENT

    STA: 1103+39.50

    O/S: 0.00'

    700

    7

    0

    1

    7

    0

    2

    7

    0

    3

    696

    6

    9

    6

    697

    6

    9

    7

    698

    6

    9

    8

    6

    9

    9

    END ROADWAY IMPROVEMENTS

    STA: 1402+98.21

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 1302+97.89

    O/S: 0.00'

    ALIGNMENT - D

    ALIGNMENT - F

    ALIGNMENT - G

    ALIGNMENT - E

    >

    >

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    19 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - D

    esign.dw

    g

    SITE PLAN - NORTH SITE

    LEGEND

    TIP-OUT CURB & GUTTER

    DEPRESSED CURB & GUTTER

    HMA SRF CSE IL-9.5 MIX "C" N50 2" THICK

    145 TON

    HMA BDR CSE IL-19.0 N50 4" THICK

    285 TON

    AGG BASE CSE TY B 8"

    880 TON

    HMA SRF CSE IL-9.5 MIX "C" N50 2" THICK

    6 TON

    HMA BDR CSE IL-19.0 N50 4" THICK

    11 TON

    AGG BASE CSE TY B 8"

    22 TON

    HMA SRF CSE IL-9.5 MIX "C" N50 2" THICK

    9 TON

    HMA BDR CSE IL-19.0 N50 4" THICK

    17 TON

    AGG BASE CSE TY B 8"

    36 TON

    HMA SRF CSE IL-9.5 MIX "C" N50 2" THICK

    12 TON

    HMA BDR CSE IL-19.0 N50 4" THICK

    25 TON

    AGG BASE CSE TY B 8"

    51 TON

    HMA SRF CSE IL-9.5 MIX "C" N50 2" THICK

    15 TON

    HMA BDR CSE IL-19.0 N50 4" THICK

    30 TON

    AGG BASE CSE TY B 8"

    63 TON

    COMB C&G M6.18MOD

    299 LF

    COMB C&G M6.18MOD

    42 LF

    COMB C&G M6.18MOD

    42 LF

    COMB C&G M6.18MOD

    610 LF

    COMB C&G M6.18MOD

    372 LF

    COMB C&G M6.18MOD

    82 LF

    PCC SIDEWALK 6"

    255 SF

    PCC SIDEWALK 6"

    442 SF

    PCC SIDEWALK 6"

    441 SF

    PCC SIDEWALK 6"

    226 SF

    PCC SIDEWALK 6"

    179 SF

    PCC SIDEWALK 6"

    244 SF

    PCC SIDEWALK 6"

    444 SF

    PCC SIDEWALK 6"

    440 SF

    PCC SIDEWALK 6"

    228 SF

    PCC SIDEWALK 6"

    122 SF

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    153 SY

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    107 SY

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    241 SY

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    186 SY

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    61 SY

    TOPSOIL FURNISH & PLACE, 4"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    927 SY

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    12 SY

    TOPSOIL FURNISH & PLACE, 6"

    SEEDING CL 1 & FERTILIZING

    EROSION CONTROL BLANKET

    12 SY

    AGG BASE CSE TY B, VAR DEPTH

    20 TON

    GRADE & SHAPE AS DIRECTED

    GRADING & SHAPING DITCHES

    16 LF

    GRADING & SHAPING DITCHES

    37 LF

    GRADING & SHAPING DITCHES

    33 LF

    CLASS SI CONCRETE (OUTLET)

    1 CY

    LANDSCAPE GRADING & RESTORATION

    1 LS

    PIPE CUL CL D TY 1 12", 42 FT

    METAL FES 12, 2 EA

    PIPE CUL CL D TY 1 12", 35 LF

    METAL FES 12", 2 EA

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    11

    1

    1

    1

    1

    1

    VALVE BOX TO BE ADJUSTED, 1 EA

    MANHOLE TO BE ADJUSTED, 1 EA

    2

    2

    2

    22

    2

    2

    2

    N

    SCALE IN FEET

    020 20 40

    COMB C&G M6.18MOD

    98 LF

    Not to be used for bidding purposes

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    W

    W

    W

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    2

    0

    0

    +

    0

    0

    2

    0

    1

    +

    0

    0

    2

    0

    2

    +

    0

    0

    203+

    00

    203+

    79

    300+

    00

    301+

    00

    302+

    00

    302+

    25

    1

    0

    1

    +

    0

    0

    1

    0

    2

    +

    0

    0

    103+00

    104+00

    105+00

    106+00

    END ROADWAY IMPROVEMENTS

    STA: 104+44.65

    O/S: 0.00'

    BEGIN

    ROADWAY

    IMPROVEMENTS

    STA: 101+08.00

    O/S: 0.00'

    STA 102+09.52

    STA 200+00.00

    STA 203+79.18

    STA 301+77.49

    END ROADWAY IMPROVEMENTS

    STA: 302+11.39

    O/S: 0.00'

    BEGIN ROADWAY IMPROVEMENTS

    STA: 301+27.39

    O/S: 0.00'

    >

    >

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    BEGIN TIP-OUT

    STA: 101+08.00

    O/S: 9.00' L

    STA: 101+08.00

    O/S: 9.00' R

    STA: 101+79.13

    O/S: 9.00' L

    STA: 102+16.07

    O/S: 9.00' R

    STA: 102+95.97

    O/S: 9.00' R

    END TIP-OUT

    STA: 104+44.72

    O/S: 9.00' R

    STA: 104+44.58

    O/S: 9.00' L

    PC: 202+12.10

    PT

    : 202+

    68.61

    ALIGNMENT - A

    ALIGNMENT - B

    ALIGNMENT - C

    STA: 200+16.14

    O/S: 12.00' L

    STA: 202+90.75

    O/S: 24.00' L

    STA: 203+61.59

    O/S: 24.00' L

    STA: 202+13.97

    O/S: 12.00' L

    STA: 201+58.91

    O/S: 15.89' R

    STA: 201+70.76

    O/S: 12.00' R

    END DEPRESSED

    STA: 201+56.11

    O/S: 17.95' R

    BEGIN DEPRESSED

    STA: 201+20.66

    O/S: 44.01' R

    STA: 201+08.99

    O/S: 52.58' R

    BEGIN TIP-OUT

    STA: 103+45.45

    O/S: 9.00' L

    STA: 200+88.60

    O/S: 51.93' L

    STA: 200+88.60

    O/S: 39.74' L

    STA: 201+11.40

    O/S: 38.74' L

    STA: 201+11.40

    O/S: 50.80' L

    STA: 201+11.40

    O/S: 25.03' L

    STA: 200+88.60

    O/S: 25.91' L

    STA: 200+88.60

    O/S: 22.25' L

    STA: 201+11.40

    O/S: 22.25' L

    STA: 202+12.10

    O/S: 12.00' R

    STA: 202+68.61

    O/S: 12.00' R

    STA: 203+38.39

    O/S: 12.00' R

    STA: 301+33.82

    O/S: 9.00' L

    END TIP-OUT

    STA: 301+24.33

    O/S: 11.00' L

    BEGIN TIP-OUT

    BEGIN DEPRESSED

    STA: 301+27.59

    O/S: 9.00' R

    END TIP-OUT

    END DEPRESSED

    STA: 301+39.39

    O/S: 11.19' R

    BEGIN TIP-OUT

    STA: 203+16.00

    O/S: 24.00' L

    END TIP-OUT

    STA: 302+11.39

    O/S: 9.00' L

    BEGIN TIP-OUT

    STA: 101+92.00

    O/S: 9.00' R

    700.62

    700.50

    700.25

    PR GRADE ELEV, TYP.

    700.24

    699.50

    700.62

    700.62

    700.49

    701.10

    701.09

    701.11

    700.50

    700.62

    701.06

    STA: 203+13.97

    O/S: 70.52' L

    STA: 203+09.01

    O/S: 62.48' L

    TIE-IN TO EX FENCE

    STA: 203+08.83

    O/S: 63.97' L

    END GRADING & SHAPING DITCHES

    STA: 202+96.15

    O/S: 55.86' L

    BEGIN GRADING & SHAPING DITCHES

    STA: 203+43.01

    O/S: 38.79' L

    STA: 202+68.95

    O/S: 41.23' L

    STA: 202+56.00

    O/S: 36.42' L

    STA: 202+44.00

    O/S: 33.03' L

    STA: 202+32.00

    O/S: 29.64' L

    FENCE CORNER

    STA: 202+28.85

    O/S: 23.09' L

    STA: 202+12.10

    O/S: 26.78' L

    STA: 201+70.76

    O/S: 25.00' L

    TIE-IN TO EX FENCE

    STA: 101+88.62

    O/S: 16.62' L

    STA: 101+08.15

    O/S: 14.00' L

    STA: 101+88.82

    O/S: 16.37' L

    699.25

    698.60

    7

    0

    0

    6

    9

    8

    6

    9

    9

    7

    0

    1

    702

    7

    0

    0

    7

    0

    1

    7

    0

    2

    6

    9

    8

    6

    9

    0

    6

    9

    5

    6

    9

    1

    6

    9

    2

    6

    9

    3

    6

    9

    4

    6

    9

    6

    6

    9

    7

    6

    9

    8

    6

    9

    9

    PT: 101+00.67

    PC: 102+16.07

    PT

    : 102+

    95.97

    END TIP-OUT

    STA: 101+91.89

    O/S: 9.82' L

    X

    X

    X

    X

    X

    2

    0

    1

    +

    0

    0

    X

    X

    X

    X

    STA: 200+96.00

    O/S: 12.00' L

    STA: 201+04.00

    O/S: 12.00' L

    LOW POINT

    STA: 201+00.00

    O/S: 12.00' L

    STA: 200+98.25

    O/S: 18.25' L

    STA: 201+01.75

    O/S: 18.25' L

    STA: 201+00.00

    O/S: 18.25' L

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    20 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-D

    esign.dw

    g

    SITE LAYOUT - SOUTH SITE

    N

    SCALE IN FEET

    020 20 40

    R141.0'

    R25.0'

    R100.0'

    R20.0'

    R49.8'

    R30.0'

    R10.0'

    R44.0'

    R100.0'

    MATCH EX ELEV

    ±10% SLOPE AWAY FROM BACK OF CURB

    LIMITS OF GRADING

    NOTES:

    1. THE ELEVATIONS SHOWN ARE FINISHED GRADE. FURNISHED EXCAVATION

    AROUND THE SOUTH SITE TANK WALL PERIMETER SHALL BE PLACED FROM THE

    TANK WALL TO THE PROPOSED OR EXISTING CURB, AND SHALL BE PLACED TO 4

    INCHES BELOW FINISHED GRADE, TO ALLOW FOR FUTURE TOPSOIL PLACEMENT

    BY OTHERS.

    2. PROPOSED GRADING ON LEFT SIDE OF ALIGNMENT A FROM 100+00 TO

    BEGINNING OF ALIGNMENT B, AND ON LEFT SIDE OF ALIGNMENT B SHALL BE

    FROM BACK OF CURB TO MATCH EXISTING ELEVATION AT LIMITS SHOWN.

    TIP-OUT CURB & GUTTER

    DEPRESSED CURB & GUTTER

    LEGEND

    R27"

    R27"

    R4.0'

    R4.0'

    SEE DETAIL AT LEFT

    CURB & GUTTER OUTLET, SPECIAL

    OUTSIDE OF EX

    TANK WALL

    FUTURE SIDEWALK

    BY OTHERS

    LIMITS OF GRADING

    Not to be used for bidding purposes

  • >

    >

    1101+

    00

    1102+

    00

    1103+

    00

    1104+

    00

    1104+

    02

    1200+

    00

    1201+

    00

    1202+

    00

    1203+

    00

    1203+

    45

    1300+00

    1301+00

    1302+00

    1303+00

    1400+00

    1401+00

    1402+00

    1403+00

    BEGIN TIP-OUT

    STA: 1101+52.24

    O/S: 10.00' R

    STA: 1101+52.24

    O/S: 10.00' L

    STA: 1102+67.23

    O/S: 10.00' R

    STA: 1300+30.11

    O/S: 6.00' R

    STA: 1300+29.89

    O/S: 6.00' L

    STA: 1302+82.87

    O/S: 6.00' R

    STA: 1302+82.91

    O/S: 6.00' L

    STA: 1201+32.82

    O/S: 10.00' L

    STA: 1201+74.82

    O/S: 10.00' L

    STA: 1201+95.81

    O/S: 10.00' L

    STA: 1202+37.81

    O/S: 10.00' L

    STA: 1402+83.23

    O/S: 6.00' L

    STA: 1402+83.19

    O/S: 6.00' R

    STA: 1400+30.11

    O/S: 6.00' R

    STA: 1400+29.89

    O/S: 6.00' L

    BEGIN HMA PAVEMENT

    STA: 1101+52.24

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    HMA TRANSITION

    STA: 1103+59.50

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 1302+97.89

    O/S: 0.00'

    END ROADWAY IMPROVEMENTS

    STA: 1402+98.21

    O/S: 0.00'

    SEE CURB OUTLET DETAIL

    STA: 1102+54.00

    O/S: 10.00' L

    STA: 1102+04.24

    O/S: 10.00' R

    STA: 1102+15.23

    O/S: 10.00' R

    END HMA PAVEMENT

    STA: 1103+39.50

    O/S: 0.00'

    BEGIN ROADWAY IMPROVEMENTS

    HMA TRANSITION

    STA: 1101+21.24

    O/S: 0.00'

    STA: 1101+21.24

    O/S: 11.44' L

    STA: 1101+21.24

    O/S: 10.00' R

    STA: 1101+52.33

    O/S: 33.92' L

    STA: 1101+74.53

    O/S: 45.69' L

    STA: 1101+92.55

    O/S: 70.41' L

    STA: 1102+77.25

    O/S: 85.28' L

    STA: 1103+14.50

    O/S: 85.28' L

    STA: 1103+14.50

    O/S: 61.14' L

    STA: 1103+30.19

    O/S: 62.73' L

    STA: 1103+30.09

    O/S: 43.93' L

    STA: 1103+40.54

    O/S: 19.67' L

    STA: 1103+59.50

    O/S: 10.00' L

    STA: 1103+59.50

    O/S: 10.00' R

    STA: 1102+77.26

    O/S: 37.00' L

    STA: 1103+14.50

    O/S: 37.00' L

    STA: 1102+77.25

    O/S: 30.00' L

    STA: 1102+77.25

    O/S: 46.22' L

    STA: 1102+57.25

    O/S: 66.22' L

    STA: 1102+51.18

    O/S: 66.22' L

    STA: 1102+31.18

    O/S: 46.22' L

    STA: 1102+31.18

    O/S: 30.00' L

    STA: 1102+31.18

    O/S: 37.00' L

    STA: 1102+02.36

    O/S: 45.79' L

    STA: 1102+02.36

    O/S: 37.00' L

    STA: 1300+21.55

    O/S: 10.17' R

    STA: 1300+21.47

    O/S: 13.80' R

    STA: 1302+80.99

    O/S: 13.80' R

    STA: 1402+81.06

    O/S: 13.80' L

    STA: 1401+92.58

    O/S: 12.64' R

    STA: 1402+32.87

    O/S: 12.25' R

    STA: 1301+92.25

    O/S: 12.57' L

    STA: 1302+19.20

    O/S: 12.51' L

    ALIGNMENT - D

    ALIGNMENT - F

    ALIGNMENT - G

    ALIGNMENT - E

    METAL FES 12", 1 EA

    STA 1101+99.2, 29.5' L

    INV=697.00

    METAL FES 12", 1 EA

    STA 1102+34.1, 29.5' L

    INV=696.88

    METAL FES 12", 1 EA

    STA 1103+17.7, 29.5' L

    INV=696.58

    METAL FES 12", 1 EA

    STA 1102+75.2, 29.5' L

    INV=696.73

    BEGIN TIP-OUT

    STA: 1101+90.13

    O/S: 15.83' R

    BEGIN TIP-OUT

    STA: 1102+53.61

    O/S: 16.32' R

    BEGIN TIP-OUT

    STA: 1402+60.00

    O/S: 6.00' L

    END TIP-OUT

    STA: 1402+60.00

    O/S: 6.00' R

    BEGIN TIP-OUT

    STA: 1302+60.03

    O/S: 6.00' L

    END TIP-OUT

    STA: 1302+60.00

    O/S: 6.00' R

    STA: 1102+52.25

    O/S: 16.25' L

    STA: 1102+55.75

    O/S: 16.25' L

    STA: 1102+52.25

    O/S: 14.25' L

    STA: 1102+55.75

    O/S: 14.25' L

    STA: 1102+58.00

    O/S: 12.00' L

    STA: 1102+50.00

    O/S: 12.00' L

    STA: 1102+54.00

    O/S: 16.25' L

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    Sheet No.

    No. DATE REVISION INT.

    Date

    8/3/2020FOR BID

    PLANT ROADWAY IMPROVEMENTS 2020

    21 OF 42

    CAPITAL PROJECT #2106

    file: I:\D

    istrict P

    rojects\P

    lant R

    oadw

    ay 2020 2106\01 D

    esign\D

    raw

    ings\P

    lant R

    oadw

    ay 2020 - S

    ite Layout.dw

    g

    SITE LAYOUT - NORTH SITE

    TIP-OUT CURB & GUTTER

    DEPRESSED CURB & GUTTER

    LEGEND

    R

    1

    5

    .

    0

    '

    R

    1

    5

    .

    0

    '

    R

    1

    5

    .

    0

    '

    R

    1

    5

    .

    0

    '

    R

    2

    0

    .

    0

    '

    R

    2

    0

    .

    0

    '

    R

    2

    0

    .

    0

    '

    R

    2

    0

    .

    0

    '

    CURB & GUTTER OUTLET, SPECIAL 1102+54.00

    R

    2

    0

    .

    0

    '

    R

    2

    0

    .

    0

    '

    R

    2

    5

    .

    0

    '

    R

    1

    8

    .

    0

    '

    R

    1

    8

    .

    0

    '

    R

    2

    5

    .

    0

    '

    ±5.8'

    12.0'

    12.0'

    ±5.8'

    20.0'

    R

    2

    7

    "

    R

    4

    .

    0

    '

    R

    4

    .

    0

    '

    R

    2

    7

    "

    ALL CURB & GUTTER FOR NORTH SITE IS DEPRESSED.

    LIMITS OF GRADING

    Not to be used for bidding purposes

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    2

    0

    0

    +

    0

    0

    2

    0

    1

    +

    0

    0

    300+

    00

    301+

    00

    1

    0

    1

    +

    0

    0

    1

    0

    2

    +

    0

    0

    103+00

    104+00

    105+00

    106+00

    END ROADWAY IMPROVEMENTS

    STA: 104+44.65

    O/S: 0.00'

    BEGIN

    ROADWAY

    IMPROVEMENTS

    STA: 101+08.00

    O/S: 0.00'

    STA 102+09.52

    STA 200+00.00

    BEGIN ROADWAY IMPROVEMENTS

    STA: 301+27.39

    O/S: 0.00'

    X

    X

    X

    X

    X

    X

    X

    ALIGNMENT - A

    7

    0

    0

    6

    9

    8

    6

    9

    9

    7

    0

    1

    702

    7

    0

    0

    7

    0

    1

    7

    0

    2

    6

    9

    8

    6

    9

    0

    6

    9

    5

    6

    9

    1

    6

    9

    2

    6

    9

    3

    6

    9

    4

    6

    9

    6

    6

    9

    7

    6

    9

    8

    6

    9

    9

    PT: 101+00.67

    PC: 102+16.07

    PT

    : 102+

    95.97

    END TIP-OUT

    STA: 101+91.89

    O/S: 9.82' L

    690

    695

    700

    705

    710

    690

    695

    700

    705

    710

    100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00

    0.52%

    -2.2

    1%

    PVI STA. 103+75.00

    EL = 700.18

    L = 100.00

    K = 36.62

    PV

    C S

    TA

    1

    03

    +2

    5.0

    0

    EL

    =

    6

    99

    .9

    2

    PV

    T S

    TA

    1

    04

    +2

    5.0

    0

    EL

    =

    6

    99

    .0

    8

    ST

    A =

    1

    01

    +0

    8.0

    0

    EL

    =

    6

    98

    .7

    9

    ST

    A =

    1

    04

    +4

    4.6

    5

    EL

    =

    6

    98

    .6

    4

    HIG

    H P

    OIN

    T S

    TA

    1

    03

    +4

    4.0

    9

    EL

    =

    6

    99

    .9

    7

    69

    7.6

    7

    69

    7.7

    1

    69

    8.6

    3

    69

    8.4

    8

    69

    9.0

    1

    69

    7.7

    2

    69

    9.2

    7

    69

    7.8

    9

    69

    9.5

    3

    69

    8.5

    2

    69

    9.7

    9

    69

    8.9

    2

    69

    9.9

    6

    69

    9.1

    9

    69

    9.5

    4

    69

    8.5

    7

    69

    8.2

    0

    69

    8.4

    6

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD, ILLINOIS 61109

    (815) 387-7660

    Rock RiverWater

    ReclamationDistrict

    No. DATE REVISION INT.

    Date

    8/3/2020

    N

    FOR BID

    file: I:\D

    istrict P

    rojects\C

    low

    B

    uilding 2157\01 D

    esign\D

    raw

    ings\C

    low

    B

    uilding-D

    esign.dw

    g

    SCALE IN FEET

    020 20 40

    Sheet No.

    22 OF 42

    PLANT ROADWAY IMPROVEMENTS 2020

    CAPITAL PROJECT #2106

    ALIGNMENT A PLAN & PROFILE

    EX ELEV PR ELEV

    PR ℄ ELEV

    EX ℄ ELEV

    Not to be used for bidding purposes

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    W

    W

    W

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~ ~ ~ ~ ~~ ~ ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~~

    ~~

    ~~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    ~

    2

    0

    0

    +

    0

    0

    2

    0

    1

    +

    0

    0

    2

    0

    2

    +

    0

    0

    2

    0

    3

    +

    0

    0

    2

    0

    3

    +

    7

    9

    3

    0

    1

    +

    0

    0

    3

    0

    2

    +

    0

    0

    3

    0

    2

    +

    2

    5

    1

    0

    1

    +

    0

    0

    1

    0

    2

    +

    0

    0

    103+00

    1

    0

    4

    +

    0

    0

    BEGIN

    ROADWAY

    IMPROVEMENTS

    STA: 101+08.00

    O/S: 0.00'

    STA 102+09.52

    STA 200+00.00

    STA 203+79.18

    STA 301+77.49

    END ROADWAY IMPROVEMENTS

    STA: 302+11.39

    O/S: 0.00'

    BEGIN ROADWAY IMPROVEMENTS

    STA: 301+27.39

    O/S: 0.00'

    >

    >

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    PC: 202+12.10

    P

    T

    :

    2

    0

    2

    +

    6

    8

    .

    6

    1

    ALIGNMENT - A

    ALIGNMENT - B

    ALIGNMENT - C

    7

    0

    0

    6

    9

    8

    6

    9

    9

    7

    0

    1

    7

    0

    2

    6

    9

    0

    6

    9

    5

    6

    9

    1

    6

    9

    2

    6

    9

    3

    6

    9

    4

    6

    9

    6

    6

    9

    7

    6

    9

    8

    6

    9

    9

    PT: 101+00.67

    PC: 102+16.07

    P

    T

    :

    1

    0

    2

    +

    9

    5

    .

    9

    7

    END TIP-OUT

    STA: 101+91.89

    O/S: 9.82' L

    685

    690

    695

    700

    705

    710

    685

    690

    695

    700

    705

    710

    199+75 200+00 200+50 201+00 201+50 202+00 202+50 203+00 203+50 204+00

    69

    7.6

    4

    69

    9.3

    0

    69

    7.9

    5

    69

    9.0

    9

    69

    7.8

    8

    69

    8.7

    3

    69

    7.9

    6

    69

    8.9

    6

    69

    8.1

    8

    69

    9.5

    0

    69

    8.3

    7

    69

    9.8

    6

    69

    8.4

    8

    69

    9.2

    4

    69

    8.0

    5

    69

    8.4

    5

    -0.19%-1.32%

    1.07

    %

    -1.5

    7%

    -1.50%

    PVI STA. 202+50.00

    EL = 700.03

    L = 50.00

    K = 18.93

    PVI STA. 201+00.00

    EL = 698.43

    L = 100.00

    K = 41.85

    PV

    C S

    TA

    2

    00

    +5

    0.0

    0

    EL

    =

    6

    99

    .0

    9

    PV

    T S

    TA

    2

    01

    +5

    0.0

    0

    EL

    =

    6

    98

    .9

    6

    PV

    C S

    TA

    2

    02

    +2

    5.0

    0

    EL

    =

    6

    99

    .7

    6

    PV

    T S

    TA

    2

    02

    +7

    5.0

    0

    EL

    =

    6

    99

    .6

    3

    ST

    A =

    2

    00

    +0

    0.0

    0

    EL

    =

    6

    99

    .3

    0

    ST

    A =

    2

    00

    +3

    9.9

    6

    EL

    =

    6

    99

    .2

    2

    ST

    A =

    2

    03

    +7

    0.1

    7

    EL

    =

    6

    98

    .1

    4

    ST

    A =

    2

    03

    +7

    9.1

    8

    EL

    =

    6

    98

    .0

    0

    HIG

    H P

    OIN

    T S

    TA

    2

    02

    +4

    5.2

    0

    EL

    =

    6

    99

    .8

    7

    LO

    W P

    OIN

    T S

    TA

    2

    01

    +0

    5.3

    5

    EL

    =

    6

    98

    .7

    2

    685

    690

    695

    700

    705

    710

    685

    690

    695

    700

    705

    710

    301+00 301+50 302+00 302+50

    69

    7.0

    9

    69

    7.0

    9

    69

    7.6

    2

    69

    7.6

    2

    69

    8.6

    5

    69

    8.6

    5

    1.17

    %

    1.8

    0%

    ST

    A =

    3

    01

    +2

    7.3

    9

    EL

    =

    6

    97

    .3

    9

    ST

    A =

    3

    01

    +7

    5.0

    0

    EL

    =

    6

    97

    .9

    5

    ST

    A =

    3

    02

    +2

    5.0

    0

    EL

    =

    6

    98

    .8

    5

    ROCK RIVER WATER

    RECLAMATION DISTRICT

    3501 KISHWAUKEE STREET

    ROCKFORD