rocker bearing issues balassone f. - 2010)
TRANSCRIPT
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 1/25
Northeast Bridge
Preservation ConferenceSeptember 28-30, 2010
Hartford, CT
Rocker Bearing IssuesBy
Franco Balassone, P.E.Executive Vice President
HAKS Engineers, P.C.
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 2/25
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 3/25
Rocker Bearing
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 4/25
Wh Discuss Rocker
Bearings?
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 5/25
Bridge Closed, July 28, 2005
Rocker Bearing Failure
Albany, NY (I-787, Exit 3 NB)
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 6/25
Albany, NY (I-787, Exit 3 NB)
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 7/25
Albany, NY (I-787, Exit 3 NB)
Contributing Factors:
• Misaligned / Over-expanded Bearing• Overly Flexible Pier
Source: NYDOT
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 8/25
Pittsburgh, PA (Birmingham Bridge)Bridge Closed February 8, 2008
Rocker Bearing Failure
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 9/25
Pittsburgh, PA (Birmingham Bridge)
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 10/25
Pittsburgh, PA (Birmingham Bridge)
Contributing Factors:
• Misalignment of Bearing• Cumulative Bearing Ratcheting
• Horizontal Force – Deflection of Pier
Source: PennDOT
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 11/25
Pittsburgh, PA (Birmingham Bridge)
Source: PennDOT
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 12/25
Pittsburgh, PA (Birmingham Bridge)
Source: PennDOT
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 13/25
Rocker Bearing Failure
Contributing Factors
• Corrosion (pack rust) below rocker
or pivot point• Section Loss, Debris
– Contracted position in warm
weather, Expanded in cold
• Misalignment, Ratcheting
• Substructure Movement
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 14/25
Suffield Bridge, CT (Route 190)
Consists of 9 spans overConsists of 9 spans over
Connecticut River & AmtrakConnecticut River & AmtrakADT = 26,200ADT = 26,200
Length = 1,345ftLength = 1,345ftDeck Area = 80,344sf Deck Area = 80,344sf
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 15/25
Suffield Bridge, CT (Route 190)
Pack Rust – Displacements
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 16/25
Suffield Bridge, CT (Route 190)
Flattened Rockers – Inhibited Movement
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 17/25
Suffield Bridge, CT (Route 190)
Documentation – Section Loss & Pack Rust
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 18/25
Suffield Bridge, CT (Route 190)
Impacts:
Pack Rust - Displacements• Deferential Displacement
• Racking Floorbeams
• nt es expose• Potential for walking
Flattened Rockers – Inhibited Movement
• Increased stresses on girders
• Lateral loading on substructures
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 19/25
Suffield Bridge, CT (Route 190)
• New Expansion Bearings
- designed by ConnDOT
- On-site
Replacement
Recommended
• Replacement
– October 2010
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 20/25
Suffield Bridge Gold Star
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 21/25
I n f r a s t r u
c t u r e L i n k
Gold Star Bridge, CT (Interstate - 95)
V i t
a l
Largest Complex Bridge in CTLargest Complex Bridge in CT
ADT = 120,000 +ADT = 120,000 +
Length = 6000ftLength = 6000ftDeck Area = 1,000,000sf Deck Area = 1,000,000sf
Main Span: L = 540ftMain Span: L = 540ft
140’ Vertical Clearance140’ Vertical Clearance
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 22/25
Gold Star Bridge, CT (Interstate - 95)
Pack Rust- Bearing Pin / Gusset Plate
Interface
Frozen Rocker Bearings
Span 31 Span 30
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 23/25
Gold Star Bridge, CT (Interstate - 95)
Impacts:Seized Rocker Pin
– No Movement
• Increased stresses - Truss members
• a era oa ng on su s ruc ures
Excessive Wear
– Pin / Gusset Interface
• Non-uniform gaps and
contact area.
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 24/25
Gold Star Bridge, CT (Interstate - 95)
Replacement RecommendedIntermediate Steps:
Determine the urgency of replacement:
- Instrumentation of Truss Members
- Quantify Induced Stresses
-
8/8/2019 Rocker Bearing Issues Balassone F. - 2010)
http://slidepdf.com/reader/full/rocker-bearing-issues-balassone-f-2010 25/25
E TI