rocky hill senior/community center · 4/6/2020  · rocky hill senior/community center addendum #2...

14
Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23, 2020 Rocky Hill Town Managers Office BID FORM Revised per Addenda #1 PRE-BID CONFERENCE The Pre-Bid Conference was 10 am April 3, 2020 Information from the Conference is available. See Attached instructions for retrieval. PRE-BID CONFERENCE The Pre-Bid Conference Attendance list attached ATTENDANCE LIST RFI All questions are to be submitted in WRITING: Rocco Petitto at QA+M Architecture email: [email protected] RFI DEADLINE QA+M will issue any and all addenda per the Instructions. To Bidders. No questions will be taken after 4:00 pm Monday April 13,2020 ELECTRONIC DOCUMENTS All Electronic documents will be available from the: Advanced Reprographics Plan Room. Visit https://www.advancedplanroom.com or p. 860-410-1020. All PDF Documents will be available on the DAS website ** Please note: There are other RFI that have been received that require more information and clarification in drawing formats. These are being worked on and will be made available soon ** Changes to the Drawings REVISED Sheet A-1.1A Floor Plan (Dimensions and Room Number) Attached REVISED Sheets A-3 Series (Elevations Shown without Shading) Attached REVISED Sheet A-10.1A Floor Plan (Finish Clarifications) Attached Changes to the Project Manual MOVE Move Division 2 Sections from the Information to Bidderssections to Division 2 in the specifications 020750 SELECTIVE DEMOLITION FOR HAZARDOUS MATERIALS ABATEMENT

Upload: others

Post on 05-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

Rocky Hill Senior/Community Center Addendum #2

04.06.2020

General/Clarifications

BID DEADLINE The Bid Deadline is 2pm April 23, 2020 Rocky Hill Town Managers Office BID FORM Revised per Addenda #1 PRE-BID CONFERENCE The Pre-Bid Conference was 10 am April 3, 2020

Information from the Conference is available. See Attached instructions for retrieval.

PRE-BID CONFERENCE The Pre-Bid Conference Attendance list attached ATTENDANCE LIST RFI All questions are to be submitted in WRITING:

Rocco Petitto at QA+M Architecture email: [email protected]

RFI DEADLINE QA+M will issue any and all addenda per the Instructions.

To Bidders. No questions will be taken after 4:00 pm Monday April 13,2020

ELECTRONIC DOCUMENTS All Electronic documents will be available from the:

Advanced Reprographics Plan Room. Visit https://www.advancedplanroom.com or p. 860-410-1020. All PDF Documents will be available on the DAS website

** Please note: There are other RFI that have been received that require more information and clarification in drawing formats. These are being worked on and will be made available soon **

Changes to the Drawings REVISED Sheet A-1.1A Floor Plan (Dimensions and Room Number) Attached REVISED Sheets A-3 Series (Elevations Shown without Shading) Attached REVISED Sheet A-10.1A Floor Plan (Finish Clarifications) Attached

Changes to the Project Manual MOVE Move Division 2 Sections from the ‘Information to Bidders’ sections to Division 2 in

the specifications 020750 SELECTIVE DEMOLITION FOR HAZARDOUS MATERIALS ABATEMENT

Page 2: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

020800 ASBESTOS ABATEMENT 020820 UNIVERSAL WASTE RECLAMATION 020900 LEAD PAINT AWARENESS

REVISED Section 084113 Aluminum Framed Entrances and Storefronts (See Clarifications below)

RFI Clarifications Front End and Bid Documents

1. What is the schedule for the project?

The current Construction Schedule is 1 year from Notice to Proceed

RFI Clarifications Drawings and Specifications

1. What is the size of the opening for the Fire Counter Door?

9’-0”Wide x 4’-0”High

2. Drawing S2.1 have a separate column schedule tagged as C1 thru C5; however no

other drawing identify these column with these tag. Please provide drawing with the column location.

Next to the tag (C1-C5) you will find the type of HSS column the tag pertains to. These relate directly to the sizes given in the Expanded Column Schedule where you will find the location for each one. C4 and C5 are the round tube col. At the back entrance, see dwg. S3.0 for Detailed info.

3. Please provide true view elevations in addition to the skewed elevation is the CD set.

Also, please eliminate shading so that we can clearly identify the materials in elevation.

Some additional elevations maybe provided in future addendum. See attached revised elevations without shadows.

4. Reflected Ceiling plan is showing partial exterior soffit. Example - Area around the

Exercise/Dance Room 209. From the sections the soffit goes around the entire area. Can you revise the drawings to at least show a dashed line & note its the soffit above. Other examples - Entry canopy, Multipurpose room roof & A

All overhanging soffits have the wood look metal system.

Page 3: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

5. Please provide Flooring type for Corridors [100], [101], [102] and their Limits on the Drawing

Please refer to revisions on A10.1a. with transitions called out as well.

6. Please provide Flooring type for Vestibule [103] and their Limits on the Drawing

Please refer to revisions on A10.1a. with transitions called out as well.

7. In Finish Plan A10.1B what shall be the floor finish for Alcove Entry of A302 from Corridor A210

That alcove entry will still be the Corridor 210 PTF floor finish, it transitions to Activity/ Arts A302’s LVT finish in the door threshold.

8. What is the existing floor finish of [131] Stage [to repair and refinish] Area

Existing flooring on the stage is a hardwood floor approx. ¾” thick

9. Alternate 3 states to give an alternate for Skyfold in lieu of the manual systems.

The Skyfold Alternate is only for the Main Multi-Purpose rooms 120, 121, &122

10. The question pertains to the flat roof overhang spray foam insulation. It is listed as full

filled with closed cell spray foam (See A5.0,A5.1,A5.7) The closed cell insulation in these areas is a vapor barrier. The steel outriggers are 5” deep, the foam only needs to be 2” and in between the outriggers on the underside of the roof deck.

11. Per drawing S1.1A along Grid line D & Grid line 6 on Section detail F3.5B/S2.4 note

says that Bottom of New Footing Elevation to match bottom of existing footing, Please provide elevation of existing footing.

There is no existing Information for this area, the elevation will need to be verified in the field assume a 5’-0” bottom of footing for pricing.

12. Per Drawing S2.4 section detail of Footing is 26" x 12" while on the drawing S1.1A &

S1.1B Foundation Plan the size of footing is 24" x 12", Please clarify which one to follow.

Use 26”X12”

13. Per drawing A1.1A First Floor Plan on section 1/A5.9 it shows strip footing and foundation wall along Grid line E. While in the Drawing S1.1A Foundation Plan Area A there is no strip footing and foundation wall shown along Grid line E, Please clarify. –

Follow structural plan.

Page 4: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

14. Manufacturer change revised Section as Follows: Section 084113 Aluminum Framed Entrances and Storefronts Revise Paragraph 2.4B and C.1 to read as follows:

A. Basis of Design Product: Subject to compliance with requirements, provide Kawneer; 500T Insulpour Thermal Entrance Door or one of the following: 1. EFCO; D502 ThermaStile. 2. Wausau; Therml-Block.

B. Entrance Doors: Manufacturer's standard glazed entrance doors for manual-swing operation. 1. Door Construction: 2-1/4-inch overall thickness, with minimum 0.125-inch- thick,

extruded-aluminum tubular rail and stile members. Mechanically fasten corners with reinforcing brackets that are deeply penetrated and fillet welded or that incorporate concealed tie rods.

End of Addendum #2

Page 5: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

ME

ET

ING

SIG

N-I

N S

HE

ET

1

Colli

ers

Pro

ject Le

aders

| T

ow

n o

f R

ocky H

ill,

CT

: S

en

ior/

Co

mm

un

ity C

en

ter

Pro

ject

To

wn

of

Ro

cky H

ill, C

T

Senio

r/C

om

munity C

ente

r P

roje

ct

Pre

-Bid

Meeti

ng

Friday, A

pri

l 3,

202

0

Pre

sen

t (X

) N

AM

E

RE

PR

ES

EN

TIN

G

PH

ON

E N

O.

EM

AIL

AD

DR

ES

S

E

Sum

i O

ldm

an

B

anto

n C

onstr

uction

617-9

32-9

265

sold

man

@ba

nto

nconstr

uction.c

om

Vid

eo O

nly

P

ete

r C

ap

pelli

no

J A

Rosa C

onstr

uction

860-6

37-2

936

pete

@ja

rosa.c

om

E

Debra

Sto

ut

Easte

rn E

nerg

y S

erv

ices

860-9

17-1

867

dsto

ut@

easte

rncos.c

om

E

Ken D

zia

dul

Easte

rn E

nerg

y S

erv

ices

860-9

17-5

551

kdzia

du

l@easte

rncos.c

om

E

Him

anshu T

ailo

r N

ew

field

Co

nstr

uctio

n

860-8

19-1

508

him

anshu

tailo

r@new

fie

ldco

nstr

uction.c

om

E

Alli

so

n A

nnu

lli

Orlando

Annu

lli &

Sons

860-6

44-2

427

alli

son

@a

nnu

lli.c

om

Vid

eo O

nly

C

hris C

yr

Dyna E

lectr

ic

860-8

41-8

501

chris@

dyna

ele

ctr

ic.c

om

Vid

eo O

nly

Jacob G

aw

endo

N

utm

eg C

om

panie

s

860-6

25-2

914

ja

cob@

nutm

egcom

pan

ies.c

om

Vid

eo O

nly

M

ike G

arn

eau

W

.J. M

ountf

ord

860-2

91-9

448

m

garn

eau

@w

jmo

untf

ord

.com

E

Jim

DiP

reta

A

AIS

Corp

. 203-6

72-5

734

jd

ipre

ta@

aais

corp

.co

m

E

Christo

pher

Petr

e

Vik

ing C

onstr

uction

203-3

53-0

260

christo

ph

er.

petr

e@

vik

ingco

nstr

uction.n

et

Vid

eo O

nly

Jonath

an P

oirie

r B

-G M

echa

nic

al C

ontr

acto

rs

860-6

45-1

105

JP

oirie

r@b

gm

echan

ical.co

m

E

Anth

ony M

onta

gn

o

Monta

gn

o C

onstr

uctio

n

203-5

97-9

014

am

on

tag

no

@m

onta

gno.c

om

Vid

eo O

nly

D

an L

ow

ell

Mill

eniu

m B

uild

ers

860-8

36-8

989

dlo

well@

mb

ict.com

E

Mark

Folc

ik

Piz

zito

la E

lectr

ic

?

Mark

.f@

piz

z.c

om

E

Gary

Bro

derick

A.S

econd

ino &

So

n

203-4

81-3

496

gbro

derick@

asecon

din

oa

ndson.c

om

E

Roel Le

gaspi

Nosal B

uild

ers

203-4

39-9

320

ro

el@

nosa

lbuild

ers

.com

Page 6: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

ME

ET

ING

SIG

N-I

N S

HE

ET

2

Colli

ers

Pro

ject Le

aders

| T

ow

n o

f R

ocky H

ill,

CT

: S

en

ior/

Co

mm

un

ity C

en

ter

Pro

ject

Pre

sen

t (X

) N

AM

E

RE

PR

ES

EN

TIN

G

PH

ON

E N

O.

EM

AIL

AD

DR

ES

S

E

Om

ar

Tole

ntino

N

osal B

uild

ers

203-4

39-9

320,

Ext.

314

oto

lentino

@n

osalb

uild

ers

.com

E

Ric

hard

Sh

ultz

EN

CO

203-7

54-5

959

richard

shu

ltz@

sbcg

lob

al.n

et

E

Maura

Ric

hard

s

Woh

lsen C

onstr

uction

203-8

26-2

192

m

richard

s@

woh

lsen.c

om

E

Gra

ham

Curt

is

DT

C, In

c.

203-2

39-4

200

G

raham

.curt

is@

team

dtc

.co

m

E

Eric Z

aw

ats

ki

DT

C, In

c.

203-2

39-4

200

E

Am

eili

a T

eap

e

Pro

Shie

ld G

lass T

intin

g

tintw

orld

llc@

gm

ail.

com

E

David

Luchin

i R

Z D

esig

n A

ssocia

tes

dlu

ch

ini@

rzdesig

nassocia

tes.c

om

Vid

eo O

nly

C

hris Z

ajd

a

RZ

Desig

n A

ssocia

tes

Vid

eo O

nly

F

red M

endyk

RZ

Desig

n A

ssocia

tes

E

Mark

Rub

ins

Core

Co

nstr

uctio

n R

eso

urc

es, In

c.

860-6

78-0

663

m

ark

@core

build

s.c

om

E

Joe d

aC

ruz

Core

Co

nstr

uctio

n R

eso

urc

es, In

c.

860-6

78-0

663

jo

e@

core

build

s.c

om

E

Daria

n D

’Am

ato

D

’Am

ato

Co

nstr

uctio

n C

o.,

Inc.

860-5

83-3

489

ddam

ato

@d

am

ato

constr

uction

.com

E

Anth

ony D

’Am

ato

D

’Am

ato

Co

nstr

uctio

n C

o.,

Inc.

860-5

83-3

489

adam

ato

@d

am

ato

constr

uction

.com

E

Edw

ard

D’A

mato

D

’Am

ato

Co

nstr

uctio

n C

o.,

Inc.

860-5

83-3

489

edam

ato

jr@

dam

ato

co

nstr

uction.c

om

E

Tim

Vaill

anco

urt

H

art

ford

Spri

nkle

r

tvaill

anco

urt

@hart

ford

sprin

kle

r.com

E

Dean P

roto

T

he M

erc

ury

Gro

up o

f C

om

pan

ies

203-3

78-9

008,

Ext.

333

D

ean.P

roto

@m

erc

ury

-gro

up.c

om

E

Mic

ha

el F

unaro

T

he M

erc

ury

Gro

up o

f C

om

pan

ies

203-7

27-5

571

M

icha

el.F

unaro

@m

erc

ury

-gro

up.c

om

E

Jesper

Gly

sin

g-J

ense

n

Vik

ing C

onstr

uction, In

c.

203-3

53-0

260

je

sper.

gly

sin

g@

vik

ingco

nstr

uction.n

et

E

Pau

line V

rom

ans

Zlo

tnic

k C

onstr

uction,

Inc.

860-4

56-3

221

P

Vro

mans@

zlo

tnic

kconstr

uction

.com

E

Tom

Pere

ira

Z

lotn

ick C

onstr

uction,

Inc.

860-4

56-3

221

T

Pere

ira@

zlo

tnic

kconstr

uction.c

om

E

Bria

n B

aril

Ente

rprise B

uild

ers

, In

c.

860-7

78-0

910

B

Baril@

ente

rbuild

ers

.com

E

Joe M

art

in

Ric

hard

s C

orp

ora

tion

860-5

83-9

229,

Ext.

124

jm

art

in@

richard

scorp

.co

m

Page 7: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

ME

ET

ING

SIG

N-I

N S

HE

ET

3

Colli

ers

Pro

ject Le

aders

| T

ow

n o

f R

ocky H

ill,

CT

: S

en

ior/

Co

mm

un

ity C

en

ter

Pro

ject

Pre

sen

t (X

) N

AM

E

RE

PR

ES

EN

TIN

G

PH

ON

E N

O.

EM

AIL

AD

DR

ES

S

E

Dan C

za

por

Ric

hard

s C

orp

ora

tion

860-5

83-9

229

dczapor@

rich

ard

scorp

.com

E

Jonath

an S

ygro

ve

S

ara

zin

Gen

era

l C

ontr

acto

rs

860-4

56-4

576

js

ygro

ve@

sara

zin

.com

E

Ray G

alv

in

Sara

zin

Gen

era

l C

ontr

acto

rs

860-4

56-4

576

rg

alv

in@

sara

zin

.com

E

Jim

Pin

o J

r.

Oly

mpus C

onstr

uctio

n

203-2

58-8

341

oly

mp

usjim

@ao

l.com

E

Luis

Rosas

CT

Masonry

LLC

ctm

asonry

luis

@g

ma

il.co

m

E

David

Go

ldfa

rb

SW

I G

lass &

Meta

l 860-5

54-4

125

dgo

ldfa

rb@

sw

igla

ss.c

om

E

Ann

a G

od

den

C

arlin

Co

nstr

uctio

n

agod

den

@carl

inco

nstr

uctio

n.c

om

E

Robert

Pe

pin

N

ew

field

Co

nstr

uctio

n

860-5

09-3

048

ro

bert

pe

pin

@new

fie

ldconstr

uction.c

om

Vid

eo O

nly

M

ike H

am

mon

d

B&

G R

esta

ura

nt

Equ

ipm

en

t &

Sup

plie

s

Vid

eo O

nly

C

oady R

eill

y

Sta

mfo

rd W

reckin

g

E

Joanne

Coto

ia

New

field

Co

nstr

uctio

n

860-5

09-3

042

Vid

eo O

nly

M

att F

rantz

N

ew

Eng

lan

d S

erv

ice &

Co

ntr

ols

Vid

eo O

nly

V

ince

nt

Pare

te

LaR

ose B

uild

ing G

rou

p

203-2

35-1

770

vpare

te@

laro

sabg.c

om

Vid

eo O

nly

A

ttili

o D

iLore

to

Pazz C

onstr

uction

Vid

eo O

nly

T

ony C

hia

ravallo

ti

BR

D B

uild

ers

LLC

tonycbrd

@gm

ail.

com

Vid

eo O

nly

B

ryan A

ddy

Rocky H

ill P

ublic

Build

ing C

om

mis

sio

n

Vid

eo O

nly

K

evin

McD

onne

ll P

AC

Gro

up L

LC

860-4

85-9

363

km

cdonn

ell@

PA

CG

roupL

LC

.com

Vid

eo O

nly

B

edri

ch H

aje

k

Gio

rdan

o C

onstr

uctio

n

203-4

88-7

264

beh

@g

iord

ano.b

uild

Vid

eo O

nly

A

nth

ony P

ort

onova

P

DS

En

gin

eeri

ng &

Constr

uction

a.p

ort

onova

@pdsec.c

om

Vid

eo O

nly

Y

uriy S

toly

ar

??

Vid

eo O

nly

R

ay C

arp

entino

??

Vid

eo O

nly

K

atie S

mith

??

Page 8: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

ME

ET

ING

SIG

N-I

N S

HE

ET

4

Colli

ers

Pro

ject Le

aders

| T

ow

n o

f R

ocky H

ill,

CT

: S

en

ior/

Co

mm

un

ity C

en

ter

Pro

ject

Page 9: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

1

Byrnes-Jacobsen, Matt

From: Byrnes-Jacobsen, Matt

Sent: Monday, April 6, 2020 10:07 AM

To: Matt Byrnes-Jacobsen ([email protected])

Cc: Lavaway, Kurt; Rocco Petitto ([email protected]); John Mehr

Subject: Rocky Hill Senior/Community Center - Pre-Bid Mtg Follow-up

Attachments: 2020 0403_RHSC_Pre-Bid Sign-in_Filled.pdf

Good morning all,

Thank you for joining our Pre-bid meeting this morning for the Rocky Hill Senior/Community Center Project. We

appreciate your patience and adaptability as we navigate current times. I hope all found it useful.

As mentioned during the presentation, all the material presented will be available on the shared OneDrive folder

referenced. This includes a pdf of the presentation and a video file of the presentation. The link to the folder is below.

You should be able to simply click on the link or copy and paste it into your internet browser. If anyone has any issues

accessing the folder, please email me.

Shared OneDrive link:

https://colliers-my.sharepoint.com/personal/matt_byrnes-

jacobsen_colliers_com/_layouts/15/guestaccess.aspx?folderid=06ef46889535d41d2b1ef4f0689685749&authkey=AZYw

Osb8dUeU7yd_eFMG51c&expiration=2020-06-30T04%3A00%3A00.000Z&e=LAYyHg

General Reminders:

- We will do our best to grab all questions from the chat box during the meeting, but please send all RFIs in

writing via email to the Architect, Rocco Pettito ([email protected]) with CC to me, Matt Byrnes-Jacobsen

([email protected]).

- The filled out sign-in sheet from the meeting is attached and will be issued in the next addendum.

o There are multiple attendees who did not provide email confirmation, nor email addresses via the chat

window, so we are unable to send this email to them. We will issue a pdf of this email with the next

addendum as well.

- We strongly encourage all to visit the site on their own

Thanks again and stay healthy!

Thanks,

Matt

Matt Byrnes-Jacobsen RA, LEED AP Project Manager Main +1 860 395 0055 x235 | Mobile +1 860 705 0250 [email protected]

COLLIERS PROJECT LEADERS 135 New Road Madison, CT 06443 www.cplusa.com LinkedIn

Page 10: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

BRICK VENEER WITHMETAL STUD BACKUP

CORRIDOR

210

MENS

119

A6.101

A6.102

A6.103

A6.104

A6.112

A6.113

A6.111

A2

A2

204

A4

SF300b

209

EXIT

139A1

1a310B

A2

a304

1

A2

A2

A2

a305

a310A

A2

a302B

a302A

a306

1

a209B

SF02

SF02

A2

a301

A2A4

SF02

SF02

SF02.5

SF02.5

300B

STORAGE

a303

STORAGE

a301

ACTIVITY/ ARTS

a302

ARTS/ CRAFTS

a310

A2

a303

A2

A2

K

M

8

3

4

J

z1

7

5'

2

a1

a4

a5

a2

aA'

aC'B'

A'

1' - 1

"

14' -

0"

18' -

6"

1' - 1

"

17' -

9"

24' -

8"

6' - 0

"

14' -

3" .

a3

1' - 1"

1' - 1"

2' - 8"

30' - 10"

5' - 8"

1' - 1"

2' - 8"

STORAGE

a304 STORAGE

a305

TLT

a306

GAMES

300

1A4.0

41' - 4"

34' -

8"

62' -

8" +/-

4' - 0

"

4' - 8

"

3' - 4

"

4' - 8

"

3' - 4

"

14' -

8"

4' - 0

"

3' - 4

"

4' - 8

"

3' - 4

"

4' - 8

"

3' - 4

"

4' - 8

"

3' - 4

"

14' -

0"

3' - 4

"

2' - 8

"

3' - 4

"

2' - 8

"

3' - 4

"

2' - 0

" .

5' - 4"3' - 4"

4' - 8"3' - 4"

4' - 8"3' - 4"

4' - 8"3' - 4"

4' - 8"4' - 0"

4' - 0

"

3' - 1

1/2"

3' - 2

1/2"

14' -

3 1/2"

4' - 0

"

3' - 2

1/2"

3' - 1

1/2"

23' -

8"

8' - 7

"

18' -

11"

18' -

5"

7' - 0

"

6' - 3"

6' - 10"

12' - 10"

7' - 8"1' - 10"

4' - 0 1/2"

16' - 10"

14' - 1"

6' - 3

1/2"

12' -

3"

3' - 6

1/2"

5' - 5

"

5' - 4

"

3' - 6

1/2"

9' - 6

"

6' - 6

"

7' - 8

"

a210

1A5.10

L

2A5.10

SFa01

SFa02

SFa03

SF05

SF05

SF05

SF05

SFa03a

SFa03b

SF05

SF05

SF02.5

SF10

6A5.1

MATCH LINE 'B'MATCH LINE 'A'

A6.41

A6.42

A6.44

A6.31

A6.45

A2

A2A2

A2108C

A2 204

SF30

A2

205A

A4

209

A2

310B

310A

311

1

A2

A4

301

302

A2

300B

A1

A1

ENTRY

201

FITNESS

205

THRIFT STORE

117

WOMENS

118 MENS

119

STORAGE

204

EXERCISE/ DANCE

209

HUMAN SERVICES

108

EXIT

139

COAT

203

CORRIDOR

101

LIBRARY

202

LOBBY

200GAMES

300

D

K

M

8

5

E

E

G

3

4

H J

z1

7

6

5'

c1

c2

2

D'

1

1'

4'

3'

2'

C'

A'

cB

cC

20' -

8"

22' -

6"

1' - 1

"

11' -

1"

14' -

3" +/-

B'

29' - 6"

1' - 4"2' - 0"

10.0

1' - 1" 4' - 6" 27' - 0 1/4" 5' - 8" 1' - 1"

15.0

0°5' - 1

1"18

' - 4"

18' -

0"21

' - 4"

15' - 0

"

8"

24.0

0°12

' - 2 1

/2"

1' - 1

"11

' - 1 1

/2"

STOR.

301

203

SF05

SF05

SF02

SF02

SF02

SF04

SF03

SF05

SF05

SF05

1A5.1

3A5.2

1A4.0

1A4.0

2A4.0

2A4.0

1A5.8

3' - 8

"5'

- 4"

3' - 4

"5'

- 4"

3' - 4

"5'

- 4"

3' - 4

"12

' - 7"

1' - 1

"

3' - 8" 5' - 4" 3' - 4" 5' - 4" 3' - 4" 5' - 4" 3' - 4"11' - 0 1/2" +/-

2' - 1

0 1/2"

3' - 4

"2'

- 8"

3' - 4

"2'

- 8"

3' - 4

"2'

- 8"

3' - 4"3' - 7" 3' - 4" 6' - 0" 3' - 4" 6' - 0" 3' - 4" 6' - 0" 4' - 0"+/- .

8' - 0

"3'

- 4"

6' - 0

"3'

- 4"

6' - 0

"3'

- 4"

6' - 0

"3'

- 4"

6' - 0

"4'

- 0"+/

- .

2' - 0

" 3' -

4"3'

- 4"

3' - 4

"3'

- 4"

3' - 4

"6'

- 8" .

25' -

4" .

49' -

6" +/-

3' - 9 1/2" 27' - 4" 3' - 8"2' - 2" .

20' -

3"43

' - 4"

39' - 4"

31' -

8 1/2"

3' - 2

1/2"

17' - 8" +/-

11' - 10"

10' - 9"

8' - 7"

11' -

5"15

' - 0"

8' - 0

"8'

- 4 1/

2 +/-"

5' - 9

" +/-

33' -

6"

8' - 8

"

SF05

SF02

SF02

SF02

3A5.10

1A5.10

E.1 I.1 L

1'-1"

IT

206

MARVIN MULTI-SLIDE GLAZED DOOR SYSTEM WITH FLOOR AND CEILING TRACK

210

CORRIDOR

210

A6.54

A6.53

A6.52

A6.51

1A5.0

201A

SF24

SF25

SF22

SF02

SF02

SF02

SF02

SF02.5

SF02.5

SF21b

SF21a

SF09a

SF09b

SF02.5

SF29

SF300b

SF300a

206

6'-6"

205B

201B

F F.1 I

6'-8

"

10' -

0" .

1'-1 1

/2"

2'-6"

6'-0"

5'-7"

1'-1 1

/2"

105.00°

12'-2"

16'-4

"

5'-4"

13'-9"

135.00°

135.00°

135.

00°

R 10

'-6".

26'-3

"5'

-2"

12'-7

1/2

" .

1' -3

" .

2'-0

"3'

-8"

3'-8

"2'

-0"

A2

2'-0"

8'-0" 8'-0"

EQ EQ

G.5

LOW

MID

HIGH

LOW

MID

HIGH

12' -

0" .

24.00°

35' - 4" +/-

A6.34

Sim

A6.32

ARTS/CRAFTS

310

10.0

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

6/20

20 3

:27:

57 P

M

A1.1B

FIRST FLOOR PLAN - PART B

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"A1.1B1 FIRST FLOOR - PART B ADD ALT

1/8" = 1'-0"A1.1B2 FIRST FLOOR -PART B

Revisions

ADDENDA 2 APRIL 6, 2020

Page 11: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

FIRST FLOOR0"

ARCHITECTURAL BRAKE METAL CLOSURE

SUPPORT BRACKETSMETAL FENCING

4 1/2" ALUMINUM STOREFRONT CLERESTORY

6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP

NEW AWNING

LOWER FACE 4" BRICK VENEER COLOR 'B'

WOOD LOOK RAINSCREEN SYSTEM

SLOPED EPDM ROOF

D K ME G H JBA C

CLERESTORY14' - 4"

METAL PANEL AT CORNER

METAL PANEL AT CENTER

E.1 I.1 L

SF13aSF14aSF15a

127C

SF16

120B 121B 122BSF02SF02SF02

SF19

103

F F.1 IB.5 C.5

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

BULLNOSE BRICK SILL COLOR 'B'

G.5

FIRST FLOOR0"

LOWER FACE 4" BRICK VENEER COLOR 'B'

6" ALUMINUM STOREFRONT SYSTEM (LOWER) , TYP.

EPDM ROOFING BEYOND

ARCHITECTURAL METAL CANOPY STRUCTURE

METAL FASCIA

4 1/2" ALUMINUM STOREFRONT CLEARSTORY

BRICK BASE ARCHITECTURAL PLANTER

PRE- FABRICATED LOUVERED ALUMINUM CANOPY

SLOPED EPDM ROOF

LOWER FACE 4" BRICK VENEER COLOR 'B'

CLERESTORY14' - 4"

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

SF07 SF06

SF05 SF05 SF05

SF09b

SF09a SF05 SF05 SF05

SF21aSF02 SF02 SF02

SF04

SF24

SF26

SF03 SF02 SF02 SF02 SF02 SF02 SF02 SF02 SF02

SF12b

SF01201A

SF27

BULLNOSE BRICK SILL COLOR 'B'

4'-0" HIGH LOUVERED SCREEN WALL

ROOF HATCH

PRE-FABRICATED LOUVERED

CANOPY

FIRST FLOOR0"

TH FIRST FLR1' - 0"

D EBA C

CLERESTORY14' - 4"

METAL WOOD LOOK RAIN SCREEN SYSTEM

NEW PRE FABRICATED ALUMINUM CANOPY SYSTEM (EXTRUDEK OR SIMILAR)

REPAIR OR REPLACE CONCRETE IMPRESSION BOTH DOORS

ALUMINUM EDGE

NEW ALUMINUM WINDOW SYSTEM

NEW ALUMINUM STOREFRONT SYSTEM

E.1

LOWER FACE 4" BRICK VENEER COLOR 'B'

4 1/2" ALUMINUM STOREFRONT CLERESTORY

103

SF19SF02 SF02 SF02

127C

SF16

120B

SF15b

SF15a

B.5 C.5

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

BULLNOSE BRICK SILL COLOR 'B'

BRAKE METAL CLOSURE AT STRUCTURE

NOTES:

• EXPOSED STRUCTURAL STEEL TO BE FINISHED TO AESS LEVEL 3. REFER TO SPECS

• HIGH PERFORMANCE COATING @ ALL EXPOSED STRUCTURE, TYP. REFER TO SPECS

• HIGH PERFORMANCE THERMAL COATING @ ALL THERMAL TRANSITIONS. REFER TO SPECS.

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

3/20

20 1

:52:

44 P

M

A3.1

EXTERIOR ELEVATIONS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"A3.12 OLD MAIN STREET BASE BID

1/8" = 1'-0"A3.13 MAIN ENTRY

1/8" = 1'-0"A3.11 OLD MAIN STREET

Revisions

ADDENDA 2 APRIL 6, 2020

Page 12: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

FIRST FLOOR0"

12 8 5 347 691011 2 113

CLERESTORY14' - 4"

LOWER FACE 4" BRICK VENEER

COLOR 'B'6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP.

EPDM ROOFING BEYOND

ARCHITECTURAL METAL CANOPY STRUCTURE

METAL FASCIA

4 1/2" ALUMINUM STOREFRONT CLERESTORY

BULLNOSE BRICK SILL COLOR 'B'

SLOPED EPDM ROOF

LOWER FACE 4" BRICK VENEER COLOR 'B'

WOOD LOOK RAINSCREEN SYSTEM

6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP.

TOWN HALL BEYOND

SF17125A

SF11 SF11

SF12a

SF10 SF02.5 SF02.5 SF02.5 SF02 SF02

SF28

SF02 SF02SF21b SF02

SF02

SF02

SF21a

SF08SF07

SF05

SF05

SF05

SF09b

SF22

210

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

METAL PANEL

FIRST FLOOR0"

CLERESTORY14' - 4"

LOWER FACE 4" BRICK VENEER COLOR 'B'

ARCHITECTURAL METAL CANOPY STRUCTURE

METAL FASCIA4 1/2" ALUMINUM STOREFRONT @ CLERESTORY

BRICK BASE ARCHITECTURAL PLANTER

BULLNOSE BRICK SILL COLOR 'B'

SLOPED EPDM ROOF

LOWER FACE 4" BRICK VENEER COLOR 'B'WOOD LOOK RAINSCREEN SYSTEM

6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP

SF02SF02SF02SF02SF02SF02SF24

201A

SF26

SF09bSF05SF05SF05

SF07SF08

210

SF22SF02SF02SF02SF21a

SF12a

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

4'-0" HIGH LOUVERED ROOF SCREEN

FIRST FLOOR0"

TH FIRST FLR1' - 0"

DEGH B AC

CLERESTORY14' - 4"

LOWER FACE 4" BRICK VENEER COLOR 'B'

6" ALUMINUM STOREFRONT SYSTEM (LOWER), TYP.

EPDM ROOFING BEYOND ARCHITECTURAL METAL CANOPY STRUCTURE

METAL FASCIA4 1/2" ALUMINUM STOREFRONT CLERESTORY

BRICK BASE ARCHITECTURAL PLANTER

BULLNOSE BRICK SILL COLOR 'B'

PRE-FABRICATED ALUMINUM LOUVERED CANOPY

SLOPED EPDM ROOF

LOWER FACE 4" BRICK VENEER COLOR 'B'

6" ALUMINUM STOREFRONT SYSTEM (LOWER) , TYP.

E.1I.1

100A

SF01

SF02SF02SF02SF02SF02SF02SF02SF02

201A

SF24

SF26SF28

SF04

SF09bSF05SF05SF05

SF07

FF.1I B.5

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

BULLNOSE BRICK SILL COLOR 'B'

PRE-FABRICATED ALUMINUM CANOPY

G.5

NOTES:

• EXPOSED STRUCTURAL STEEL TO BE FINISHED TO AESS LEVEL 3. REFER TO SPECS

• HIGH PERFORMANCE COATING @ ALL EXPOSED STRUCTURE, TYP. REFER TO SPECS

• HIGH PERFORMANCE THERMAL COATING @ ALL THERMAL TRANSITIONS. REFER TO SPECS. 195 Scott Swamp Road

Farmington, CT 06032qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

3/20

20 1

:53:

09 P

M

A3.2

EXTERIOR ELEVATIONS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"A3.23 NORTH ELEVATION

1/8" = 1'-0"A3.22 CHURCH STREET

1/8" = 1'-0"A3.21 CHURCH STREET ENTRY

Revisions

ADDENDA 2 APRIL 6, 2020

Page 13: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

FIRST FLOOR0"

LOWER FACE 4" BRICK VENEER COLOR 'B'

BULLNOSE BRICK SILL COLOR 'B'

SLOPED EPDM ROOF

METAL FASCIA

6" ALUMINUM STOREFRONT SYSTEM,

ALUMINUM STOREFRONT CLERESTORY

LIGHT FIXTURES

CLERESTORY14' - 4"

LOWER FACE 4" BRICK VENEER COLOR 'B'

10' -

8"3'

- 8"

4' - 0

"

SFa05

SFa03a SF05 SF05 SF05 SF05 SFa02

a310B

SF19

SFa04

a210

SF08

SFa01

a209B

SF07

SF05 SF05 SF05 SF09b

SF26

201A

SF02 SF02 SF02 SF02

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

LOWER FACE 4" BRICK VENEER COLOR 'B' LOWER BRICK SHELF TO -48" AT CORNER

FIRST FLOOR0"

12 8 5 347 691011 2 1

CLERESTORY14' - 4"

LOWER FACE 4" BRICK VENEER

COLOR 'B

6" ALUMINUM STOREFRONT SYSTEM, TYP.

EPDM ROOFING BEYOND ARCHITECTURAL METAL CANOPY STRUCTURE

METAL FASCIAALUMINUM STOREFRONT CLEARSTORY

BULLNOSE BRICK SILL COLOR 'B'

SLOPED EPDM ROOF

LOWER FACE 4" BRICK VENEER COLOR 'B

ROOF TOP EQUIPMENT WITH SCREENING

SF07

SF05

SF05

SF05

SF09b

SFa01

SF08 SF06

SF05SF05SF05SF05SFa03aSFa03bSF05SF05

SFa07

SF28

SF02SF02SF02SF02SF02.5SF02.5SF02.5SF10

SF11SF11

SF12a

a209B

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY, TYP.

LOWER FACE 4" BRICK VENEER COLOR 'B' LOWER

BRICK SHELF TO -48" AT THE CORNER

NOTES:

• EXPOSED STRUCTURAL STEEL TO BE FINISHED TO AESS LEVEL 3. REFER TO SPECS

• HIGH PERFORMANCE COATING @ ALL EXPOSED STRUCTURE, TYP. REFER TO SPECS

• HIGH PERFORMANCE THERMAL COATING @ ALL THERMAL TRANSITIONS. REFER TO SPECS. 195 Scott Swamp Road

Farmington, CT 06032qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

3/20

20 1

:53:

22 P

M

A3.5

EXTERIOR ELEVATIONS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"A3.51 ART/FITNESS ADD ALTERNATE

1/8" = 1'-0"A3.52 NORTH ELEVATION w/ALTERNATE

Revisions

ADDENDA 2 APRIL 6, 2020

Page 14: Rocky Hill Senior/Community Center · 4/6/2020  · Rocky Hill Senior/Community Center Addendum #2 04.06.2020 General/Clarifications BID DEADLINE The Bid Deadline is 2pm April 23,

DN

UP

UPUP

DN

FR FR RF

A7.31

A7.0

6

16

1121A7.0 12

7

22

17

MATCH LINE 'B'MATCH LINE 'A'

STAGE

131

GYMNASIUM

130

OFFICE

110

MECH

136

KITCHEN

127

STOR.

116

WOMENS

137

ENTRY

201

STOR.

123

CUST. LCKR

135

KITCHEN STOR.

128

ELEC.

138

THRIFT STORE

117WOMENS

118

MENS

119

OFFICE

115

OFFICE

112

OFFICE

111

MENS

107

OFFICE

109

CORR.

102

PATIO

MULTI PURPOSE A

120

MULTIPURPOSE C

122MULTIPURPOSE B

121

EXIT

139

COAT

203CORRIDOR

210

CORRIDOR

101CORRIDOR

100

LIBRARY

202

LOBBY

200

MULTI-PURPOSE

125

GAMES

300

TLT

106

OFFICE

113

MULTI-PURPOSE

124

TLT

126

VEST

103

STOR.

301

HUMAN SERVICES

108

CPT- CARPET TILE, R.T.F.S,INSTALLATION: TBD

LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD

PTF- PORCELAIN TILE,INSTALLATION: TBD,

R.T.F.S

PTF- PORCELAIN TILE,INSTALLATION: TBD,

R.T.F.S

LVT- VINYL TILE,INSTALLATION: TBD

R.T.F.S

OFFICE

114

A7.4

1

2

4

3

A7.3

7

12

A7.3 11

6

15

2

A7.3

5

A7.316

3

8

13

A7.5 5

1

2

6

A7.3

14

17

4

9

A7.04

A7.02

A7.01

A7.05

A7.024

9

14

19

A7.0 15

10

25

20

A7.48

5

6

7

PTF- PORCELAIN TILE, R.T.F.S,INSTALLATION: TBD

CWT- CERAMIC TILE,FULL HT. & WIDTH OFDESK FRONT, R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

LVT- VINYL TILE, R.T.F.SINSTALLATION: TBD

LVT- VINYL TILE, R.T.F.SINSTALLATION: TBD

PTF- TILE FLOOR, R.T.F.SINSTALLATION: TBD

EXISTING TO REMAIN

EXISTING STAGE FLOOR TO BE REPAIRED & REFINISHED

QTF- QUARRY TILE,INSTALLATION: TBD

R.T.F.S

SC- SEALED CONCRETE,

R.T.F.SQTF- QUARRY TILE,INSTALLATION: TBD

R.T.F.S

EXISTING TO REMAIN

PTF- PORCELAIN TILE,INSTALLATION: TBD

R.T.F.S

EXISTING TO REMAIN

EXISTING TO REMAIN

SC- SEALED CONCRETE,

R.T.F.S

PTF- PORCELAIN TILE,INSTALLATION: TBD

R.T.F.S

PTF- TILE FLOOR,INSTALLATION: TBD,

R.T.F.S

A7.3

10

QZ- QUARTZ TRANSACTION COUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATE COUNTERTOP, R.T.F.S

A7.4 9

WORK RM

133

SC- SEALED CONCRETE,R.T.F.S

PL- PLASTIC LAMINATECASEWORK, R.T.F.S

HEALTH

144

A7.6

1

A7.62 A7.6 3A7.6

4

REFER TO FFE SCOPE REFER TO FFE SCOPE REFER TO FFE SCOPE

EXISTING FLOOR TO REMAIN

2

TRANSITION IN DOORWAYFROM PTF TO EXISTING

2

PTF-PORCELAIN

TILE,INSTALLATION:

TBDR.T.F.S

2

EM1- ENTRANCE MAT,INSTALLATION: TBD

2

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

6/20

20 3

:45:

35 P

M

A10.1A

ENLARGED FINISH PLANS-PART A

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"A10.1A1 FIRST FLOOR FINISH PLAN- PLAN A

Revisions