ROHN 25G Guyed Tower Standard Foundation Designs “Normal Soil” www.tessco.com/go/towers 800.472.7373 Alternate Square Pier PLAN VIEW A B No. 4 Circular ties, 3” O.C. with 24” laps Vertical bars equally spaced Pier Pin (2) No. 4 Circular ties, 2-1/2” O.C. with 2“ cover with 24” laps 4” Projection 6” No. 4 Circular ties, 3” Max. O.C. with 24” laps Vertical re-bars equally spaced with 90 hooks at bottom Roughen construction joint to a full amplitude of 1/4” Foundation Pad Horizontal reinforcing steel equally spaced each way C E D F ELEVATION VIEW B

Upload: djrexy

Post on 09-Nov-2015

14 views

Category:

Documents


9 download

DESCRIPTION

ROHN 25G Standard Foundation Designs

TRANSCRIPT

  • ROHN 25G Guyed Tower Standard Foundation Designs Normal Soil

    www.tessco.com/go/towers 800.472.7373

    AlternateSquarePier

    PLAN VIEW

    A

    B

    No. 4 Circular ties, 3 O.C. with 24 laps

    Vertical bars equally spaced

    Pier Pin

    (2) No. 4 Circular ties, 2-1/2 O.C. with 2 cover with 24 laps

    4 Projection

    6

    No. 4 Circular ties, 3 Max. O.C. with 24 laps

    Vertical re-bars equally spacedwith 90 hooks at bottom

    Roughen construction joint toa full amplitude of 1/4

    Foundation Pad

    Horizontal reinforcing steel equally spacedeach way

    C

    E

    D

    F

    ELEVATION VIEW

    B

  • ROHN 25G Guyed Tower Standard Foundation Designs Normal Soil

    www.tessco.com/go/towers 800.472.7373

    39 2010 ROHN PRODUCTS LLC

    S T A N D A R D F O U N D A T I O N S

    NOTES: 1. See tower assembly drawing for foundation layout and part numbers for bearing plate and pier pin.*2. Use minimum 2 - 6 sq. or 3 - 0 diameter round pier when BPC45G or BPC55G is used. 3. Vertical reinforcing steel shall be replaced with straight bars when no pad is required. 4. Horizontal bars in chart refer only to the bars in the foundation pad (each way).

    CB No.

    1G

    2G

    3G

    4G

    5G

    6G

    7G

    8G

    9G

    10G

    11G

    12G

    13G

    14G

    15G

    A

    2 - 6

    3 - 0

    3 - 6

    4 - 0

    2 - 0

    2 - 0

    2 - 0

    2 - 0

    2 - 0

    2 - 0

    2 - 6

    2 - 6

    2 - 6

    3 - 0

    3 - 0

    Vertical Bars(No. & Size)

    (8) #7

    (10) #7

    (12) #7

    (12) #8

    (8) #6

    (8) #6

    (8) #6

    (8) #6

    (8) #6

    (8) #6

    (8) #7

    (8) #7

    (8) #7

    (12) #7

    (12) #7

    Concrete Vol.(Cu. Yds.)

    Round Pier

    0.80

    1.20

    1.60

    2.10

    1.10

    1.30

    1.60

    1.80

    2.40

    2.80

    3.90

    4.30

    4.80

    6.30

    6.90

    B

    2 - 6

    3 - 0

    3 - 6

    4 - 0

    4 - 0

    4 - 6

    5 - 0

    5 - 6

    6 - 0

    6 - 6

    7 - 0

    7 - 6

    8 - 0

    8 - 6

    9 - 0

    C

    0

    0

    0

    0

    1 - 0

    1 - 3

    1 - 6

    1 - 9

    2 - 0

    2 - 3

    2 - 3

    2 - 6

    2 - 9

    2 - 9

    3 - 0

    Horiz. Barsin Pad**

    (No. & Size)

    NONE

    NONE

    NONE

    NONE

    (5) #5

    (6) #5

    (6) #5

    (7) #5

    (7) #6

    (8) #5

    (8) #6

    (9) #6

    (9) #6

    (9) #7

    (10) #7

    D

    4 - 0

    4 - 0

    4 - 0

    4 - 0

    4 - 0

    4 - 0

    4 - 6

    4 - 6

    4 - 6

    4 - 6

    5 - 0

    5 - 0

    5 - 0

    5 - 0

    5 - 0

    E

    0

    0

    0

    0

    3 - 3

    3 - 3

    3 - 9

    3 - 9

    3 - 6

    3 - 6

    3 - 9

    3 - 9

    3 - 9

    3 - 6

    3 - 6

    F

    0

    0

    0

    0

    1 - 3

    1 - 3

    1 - 3

    1 - 3

    1 - 6

    1 - 6

    1 - 9

    1 - 9

    1 - 9

    2 - 0

    2 - 0

    *

    **