rol building concepts

36
River of Live Community Church Sept 29th, 2013 AGM Presentation Project: Sanctuary, Administration,& Children’s Centre Phase: Schematic Design

Upload: rolchurch

Post on 24-Jun-2015

339 views

Category:

Business


0 download

TRANSCRIPT

Page 1: ROL Building Concepts

River of Live Community

ChurchSept 29th, 2013

AGM Presentation

Project: Sanctuary, Administration,& Children’s Centre Phase: Schematic Design

Page 2: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary Phase: Schematic Design Status: Client Review

Inte

rior

Vie

ws…

…..

.

Page 3: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary Phase: Schematic Design Status: Client Review

Inte

rior

Vie

ws…

…..

.

Page 4: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary Phase: Schematic Design Status: Client Review

Inte

rior

Vie

ws…

…..

.

Page 5: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary Phase: Schematic Design Status: Client Review

Inte

rior

Vie

ws…

…..

.

Page 6: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary Phase: Schematic Design Status: Client Review

Balc

on

y

Sta

irs…

…..

.

Page 7: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary Phase: Schematic Design Status: Client Review

Exte

rior

Vie

ws…

…..

.

Page 8: ROL Building Concepts

ADMINISTRATION CLASSROOM

ADDITIONNorth of Sanctuary

Page 9: ROL Building Concepts

Ian MoxonArchitec

t

Project: Administration Phase: Schematic Design Status: Client Review

Ad

min

Main

Flo

or

Area of Main Floor Addition = 6700 SF

Page 10: ROL Building Concepts

Ian MoxonArchitec

t

Project: Administration Phase: Schematic Design Status: Client Review

Main

Flo

or…

…..

.

Page 11: ROL Building Concepts

Ian MoxonArchitec

t

Project: Administration Phase: Schematic Design Status: Client Review

Main

Flo

or…

…..

.

Page 12: ROL Building Concepts

Ian MoxonArchitec

t

Project: Administration Phase: Schematic Design Status: Client Review

Main

Flo

or…

…..

ISO

Page 13: ROL Building Concepts

Ian MoxonArchitec

t

Project: Second Floor Classrooms Phase: Schematic Design Status: Client Review

Secon

d

Flo

or…

…..

.

Page 14: ROL Building Concepts

Ian MoxonArchitec

t

Project: Administration Phase: Schematic Design Status: Client Review

Secon

d

Flo

or…

…..

.

Page 15: ROL Building Concepts

Ian MoxonArchitec

t

Project: Administration Phase: Schematic Design Status: Client Review

Secon

d

Flo

or…

…..

.

Page 16: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary and Administration Phase: Schematic Design Status: Client Review

Balc

on

y

Secti

on

....

Page 17: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary and Administration Phase: Schematic Design Status: Client Review

Balc

on

y…

….

……

...

Page 18: ROL Building Concepts

Ian MoxonArchitec

t

Project: Second Floor ClassroomPhase: Schematic Design Status: Client Review

Inte

rior

Vie

ws…

…..

.

Page 19: ROL Building Concepts

Ian MoxonArchitec

t

Project: Administration Phase: Schematic Design Status: Client Review

Exte

rior

Vie

ws…

…..

.

Page 20: ROL Building Concepts

Ian MoxonArchitec

t

Project: Sanctuary and Administration (Phase One) Phase: Schematic Design Status: Client Review

Exte

rior

Vie

ws…

…..

.

Page 21: ROL Building Concepts

CHILDREN’S CENTRE/FOYER

Existing Outdoor Play Area

Page 22: ROL Building Concepts

Ian MoxonArchitec

t

Project: Children’s AdditionPhase: Schematic Design Status: Client Review

Main

Flo

or…

…..

.

Page 23: ROL Building Concepts

Ian MoxonArchitec

t

Project: Children’s AdditionPhase: Schematic Design Status: Client Review

Secon

d

Flo

or…

…..

.

Page 24: ROL Building Concepts

Ian MoxonArchitec

t

Inte

rior

Vie

ws…

…..

.

Project: Children’s AdditionPhase: Schematic Design Status: Client Review

Page 25: ROL Building Concepts

Play Center Equipment Ideas

Page 26: ROL Building Concepts

Play Centre Equipment Ideas

Page 27: ROL Building Concepts

Ian MoxonArchitec

t

Inte

rior

Vie

ws…

…..

.

Project: Children’s AdditionPhase: Schematic Design Status: Client Review

Page 28: ROL Building Concepts

Ian MoxonArchitec

t

Exte

rior

Vie

ws…

…..

.

Project: Children’s AdditionPhase: Schematic Design Status: Client Review

Page 29: ROL Building Concepts

Ian MoxonArchitec

t

Exte

rior

Vie

ws…

…..

.

Project: Children’s AdditionPhase: Schematic Design Status: Client Review

Page 30: ROL Building Concepts

Ian MoxonArchitec

t

Exte

rior

Vie

ws…

…..

.

Project: Children’s AdditionPhase: Schematic Design Status: Client Review

Page 31: ROL Building Concepts

Building and Borrowing Costs

Page 32: ROL Building Concepts

Project Component Cost Estimate

Project Components Estimate

Professional Fees 400,000.00Sanctuary 1,256,000.00Administration 1,906,000.00Children’s Centre/Foyer 2,516.000.00Paving, Landscaping, Gym 306,000.00

Total Project Estimate 6,384,000.00

Annual Operating Costs 30,000.00

Page 33: ROL Building Concepts

Sample Borrowing Costs

Principle Amount Monthly Payment Increase

Monthly Operating Increase

Total Additional Required

4 Million 21,697.00 2900.00 24,597.00

3 Million 14,981.00 2900.00 17,881.00

2.5 Million 9,983.00 2,900.00 12,883.00

Interest Rate – 5.21 %5 Year Term20 Year Amortization

Our Current Mortgage Payment is 6400.00 per monthPlus our annual payment of $20,000 = $8067.00 per month

Page 34: ROL Building Concepts

Moving Towards a Tithe

ROL is excitedly preparing for a harvest in Lethbridge! We believe that God is asking us to dream, and expect growth in our church. In order to move forward with this dream we will need to increase our monthly budget, which requires an increase of giving from the congregation. In the next weeks we ask that everyone in our church pray about how they can help, whether it be starting to tithe, or adding an offering specifically for the building project. We will use next months to gauge the level of financial support for this project before coming back to the congregation with a plan to proceed with construction.

As a congregation, we also agreed to amended the 2013/2014 budget to spend the $70,000 needed to finalize design and engineering for the project. ROL is committed to only proceed with these costs as the giving increases in our congregation. Currently the average giving per month is around $93,000. According to 2011 average income/household statistics in Alberta if all 200 households in our membership tithed the average giving per month would increase by about $40,000, which would be more than enough to cover the payments for the project. If each person in our church were to increase their giving $5 per week (Family of 5 - $115 per month) then our giving would increase by about $15,000 per month which would cover the cost of borrowing $3M.

As you can see, this dream easily becomes possible if we join together as a family to increase our storehouse. Please pray about your role in the harvest!

Page 35: ROL Building Concepts

Complete Detailed Design

October – December (pretender construction estimate)

PROJECT DESIGN COST FOR REMINDER OF 2013

Building Appraisal 7,500.00

Site Survey 4,200.00

Developed Design Process 47,800.00

Geotechnical Investigation 8,000.00

Pre-tender Construction Estimate 2,500.00

Total 70,000.00 

Page 36: ROL Building Concepts