rol building concepts
TRANSCRIPT
River of Live Community
ChurchSept 29th, 2013
AGM Presentation
Project: Sanctuary, Administration,& Children’s Centre Phase: Schematic Design
Ian MoxonArchitec
t
Project: Sanctuary Phase: Schematic Design Status: Client Review
Inte
rior
Vie
ws…
…..
.
Ian MoxonArchitec
t
Project: Sanctuary Phase: Schematic Design Status: Client Review
Inte
rior
Vie
ws…
…..
.
Ian MoxonArchitec
t
Project: Sanctuary Phase: Schematic Design Status: Client Review
Inte
rior
Vie
ws…
…..
.
Ian MoxonArchitec
t
Project: Sanctuary Phase: Schematic Design Status: Client Review
Inte
rior
Vie
ws…
…..
.
Ian MoxonArchitec
t
Project: Sanctuary Phase: Schematic Design Status: Client Review
Balc
on
y
Sta
irs…
…..
.
Ian MoxonArchitec
t
Project: Sanctuary Phase: Schematic Design Status: Client Review
Exte
rior
Vie
ws…
…..
.
ADMINISTRATION CLASSROOM
ADDITIONNorth of Sanctuary
Ian MoxonArchitec
t
Project: Administration Phase: Schematic Design Status: Client Review
Ad
min
Main
Flo
or
Area of Main Floor Addition = 6700 SF
Ian MoxonArchitec
t
Project: Administration Phase: Schematic Design Status: Client Review
Main
Flo
or…
…..
.
Ian MoxonArchitec
t
Project: Administration Phase: Schematic Design Status: Client Review
Main
Flo
or…
…..
.
Ian MoxonArchitec
t
Project: Administration Phase: Schematic Design Status: Client Review
Main
Flo
or…
…..
ISO
Ian MoxonArchitec
t
Project: Second Floor Classrooms Phase: Schematic Design Status: Client Review
Secon
d
Flo
or…
…..
.
Ian MoxonArchitec
t
Project: Administration Phase: Schematic Design Status: Client Review
Secon
d
Flo
or…
…..
.
Ian MoxonArchitec
t
Project: Administration Phase: Schematic Design Status: Client Review
Secon
d
Flo
or…
…..
.
Ian MoxonArchitec
t
Project: Sanctuary and Administration Phase: Schematic Design Status: Client Review
Balc
on
y
Secti
on
....
Ian MoxonArchitec
t
Project: Sanctuary and Administration Phase: Schematic Design Status: Client Review
Balc
on
y…
….
……
...
Ian MoxonArchitec
t
Project: Second Floor ClassroomPhase: Schematic Design Status: Client Review
Inte
rior
Vie
ws…
…..
.
Ian MoxonArchitec
t
Project: Administration Phase: Schematic Design Status: Client Review
Exte
rior
Vie
ws…
…..
.
Ian MoxonArchitec
t
Project: Sanctuary and Administration (Phase One) Phase: Schematic Design Status: Client Review
Exte
rior
Vie
ws…
…..
.
CHILDREN’S CENTRE/FOYER
Existing Outdoor Play Area
Ian MoxonArchitec
t
Project: Children’s AdditionPhase: Schematic Design Status: Client Review
Main
Flo
or…
…..
.
Ian MoxonArchitec
t
Project: Children’s AdditionPhase: Schematic Design Status: Client Review
Secon
d
Flo
or…
…..
.
Ian MoxonArchitec
t
Inte
rior
Vie
ws…
…..
.
Project: Children’s AdditionPhase: Schematic Design Status: Client Review
Play Center Equipment Ideas
Play Centre Equipment Ideas
Ian MoxonArchitec
t
Inte
rior
Vie
ws…
…..
.
Project: Children’s AdditionPhase: Schematic Design Status: Client Review
Ian MoxonArchitec
t
Exte
rior
Vie
ws…
…..
.
Project: Children’s AdditionPhase: Schematic Design Status: Client Review
Ian MoxonArchitec
t
Exte
rior
Vie
ws…
…..
.
Project: Children’s AdditionPhase: Schematic Design Status: Client Review
Ian MoxonArchitec
t
Exte
rior
Vie
ws…
…..
.
Project: Children’s AdditionPhase: Schematic Design Status: Client Review
Building and Borrowing Costs
Project Component Cost Estimate
Project Components Estimate
Professional Fees 400,000.00Sanctuary 1,256,000.00Administration 1,906,000.00Children’s Centre/Foyer 2,516.000.00Paving, Landscaping, Gym 306,000.00
Total Project Estimate 6,384,000.00
Annual Operating Costs 30,000.00
Sample Borrowing Costs
Principle Amount Monthly Payment Increase
Monthly Operating Increase
Total Additional Required
4 Million 21,697.00 2900.00 24,597.00
3 Million 14,981.00 2900.00 17,881.00
2.5 Million 9,983.00 2,900.00 12,883.00
Interest Rate – 5.21 %5 Year Term20 Year Amortization
Our Current Mortgage Payment is 6400.00 per monthPlus our annual payment of $20,000 = $8067.00 per month
Moving Towards a Tithe
ROL is excitedly preparing for a harvest in Lethbridge! We believe that God is asking us to dream, and expect growth in our church. In order to move forward with this dream we will need to increase our monthly budget, which requires an increase of giving from the congregation. In the next weeks we ask that everyone in our church pray about how they can help, whether it be starting to tithe, or adding an offering specifically for the building project. We will use next months to gauge the level of financial support for this project before coming back to the congregation with a plan to proceed with construction.
As a congregation, we also agreed to amended the 2013/2014 budget to spend the $70,000 needed to finalize design and engineering for the project. ROL is committed to only proceed with these costs as the giving increases in our congregation. Currently the average giving per month is around $93,000. According to 2011 average income/household statistics in Alberta if all 200 households in our membership tithed the average giving per month would increase by about $40,000, which would be more than enough to cover the payments for the project. If each person in our church were to increase their giving $5 per week (Family of 5 - $115 per month) then our giving would increase by about $15,000 per month which would cover the cost of borrowing $3M.
As you can see, this dream easily becomes possible if we join together as a family to increase our storehouse. Please pray about your role in the harvest!
Complete Detailed Design
October – December (pretender construction estimate)
PROJECT DESIGN COST FOR REMINDER OF 2013
Building Appraisal 7,500.00
Site Survey 4,200.00
Developed Design Process 47,800.00
Geotechnical Investigation 8,000.00
Pre-tender Construction Estimate 2,500.00
Total 70,000.00