Rondo: Benjamin E Mays Internaonal Magnet 3171 3172 Capitol Hill Magnet Project Summary: Benjamin E. Mays challenges students to think crically on a global scale. As an Internaonal Baccalaureate (IB) school, we challenge students to understand the world around them and how to take acon within it. The IB program strives to help students develop an internaonal perspecve through class projects that examine real-life situaons around the world. Capitol Hill Giſted and Talented Magnet challenges all students by building on their strengths, interests and passions. Students can parcipate in music programs including band, choir, orchestra and Suzuki strings. Other acvies like Model UN, History Day, Science fair, geography bee, debate, Word Masters and more take place during the day or aſter school. Capitol Hill’s classes bring science, visual arts, drama, physical educaon and music to life. These schools are part of the Rondo Educaonal Complex which was originally constructed in 1978. Extensive renovaons were completed in 1991. The building contains 339,177 square feet. Issues Idenfied By School Community in 2015 Benjamin E Mays: 1. Updated fully funconing smart boards in every Instruconal Space 2. Hydraon staon (get rid of the current fountains) 3. Regulaon of heang system 4. Building safety - cameras, monitors, one-way atrium windows 5. Maintain current BEM space 6. Parent room - furniture technology, a place for them 7. Retractable blinds/shades for atrium 8. Retractable bleachers in gym 9. Remodel boys/girls restrooms - water pressure 10. Entryway identy - banner on building - parking entrance Capitol Hill: 1. Lighng in hallway 2. Upgraded science labs 3. Retractable blinds for Atria 4. Enhancing lunch room to meet capacity - windows and lights 5. Smaller assembly space - break out space 6. Front office space 7. Auditorium which will seat 700 8. Indoor playground 9. Beer bus pathways for drop off and pick up - handicap access indoor tutor 10. Clear outside sign with CH Grade Levels: K-5 Grade Levels: 1-8 SY 2014/15 Enrollment: XXXXX XXXXX Design Enrollment: XXXXX XXXXX 1 560 Concordia Avenue General Notes: Exisng ulizaon shown is for School Year 2014-2015 The Conceptual Ulizaon Plans are exploratory rather than actual construcon plans and represent the design at one moment in me, which will change as the design and funding process progress. The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no priorizaon implied in a work scope tle (e.g. “Work Scope A” is not necessarily the most crical work to be done). The plans in this document are not comprehensive of the enre building’s needs as maintenance and replacement of exisng building systems such as roofs and mechanical systems are omied to maintain graphic clarity of the overall vision generated during the Facilies Master Plan Process. Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authories will occur once the funding is secured.

Upload: others

Post on 06-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill MagnetProject Summary:Benjamin E. Mays challenges students to think critically on a global scale. As an International Baccalaureate (IB) school, we challenge students to understand the world around them and how to take action within it. The IB program strives to help students develop an international perspective through class projects that examine real-life situations around the world.

Capitol Hill Gifted and Talented Magnet challenges all students by building on their strengths, interests and passions. Students can participate in music programs including band, choir, orchestra and Suzuki strings. Other activities like Model UN, History Day, Science fair, geography bee, debate, Word Masters and more take place during the day or after school. Capitol Hill’s classes bring science, visual arts, drama, physical education and music to life.

These schools are part of the Rondo Educational Complex which was originally constructed in 1978. Extensive renovations were completed in 1991. The building contains 339,177 square feet.

Issues Identified By School Community in 2015Benjamin E Mays:1. Updated fully functioning smart boards in every Instructional Space2. Hydration station (get rid of the current fountains)3. Regulation of heating system4. Building safety - cameras, monitors, one-way atrium windows5. Maintain current BEM space6. Parent room - furniture technology, a place for them7. Retractable blinds/shades for atrium8. Retractable bleachers in gym9. Remodel boys/girls restrooms - water pressure10. Entryway identity - banner on building - parking entrance

Capitol Hill:1. Lighting in hallway2. Upgraded science labs3. Retractable blinds for Atria4. Enhancing lunch room to meet capacity - windows and lights 5. Smaller assembly space - break out space6. Front office space7. Auditorium which will seat 700 8. Indoor playground9. Better bus pathways for drop off and pick up - handicap access indoor tutor10. Clear outside sign with CH

Grade Levels: K-5Grade Levels: 1-8SY 2014/15 Enrollment: XXXXX XXXXXDesign Enrollment: XXXXX XXXXX

1

560 Concordia Avenue

General Notes:Existing utilization shown is for School Year 2014-2015

The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress.

The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. “Work Scope A” is not necessarily the most critical work to be done).

The plans in this document are not comprehensive of the entire building’s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process.

Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured.

Page 2: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill MagnetSite Concept

Legend:S1. New site signage

S2. New sidewalk and crossing

S3. Enhanced entry identification

AlterationsNew Landscape ConstructionNew Building Construction

Service Entry

Property Line

Secondary EntryMain Entry

2

MAT

CHLI

NE

Page 3: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill MagnetExisting Utilization

3.1

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

LOWER LEVEL

Page 4: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill MagnetExisting Utilization

3.2

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

UPPER LEVEL

Page 5: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill MagnetLegend:C1. Renovate Offices for more prominent identification (2,050 SF)

C2. Cafeteria expansion (1,108 SF)

C3. Reconfigure Capitol Hill Cafeteria with adjacent expansion (2,618 SF)

C4. Renovate Exhibit Hall (3,532 SF)

C5. Relocate Capitol Hill Band Room (1,822 SF)

C6. Relocate Capitol Hill Choir (1,822 SF)

C7. Upgrade Restrooms (1,858 SF)

C8. Capitol Hill Administration Offices (5,168 SF)

C9. Capitol Hill Conference Room and Counseling (2,470 SF)

C10. Instructional Space (8,193 SF)

C11. Capitol Hill Student Assembly/Commons/ Identity (1,732 SF)

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

4.1

Service Entry

Property Line

Secondary EntryMain Entry

ECFE/Discovery

ECFEEntry

CHEntry

Atrium

Atrium

ECFE

Discovery

Community Ed

New / Existing

Demolition / Removal

Conceptual Utilization Plan

Atrium

Atrium

Page 6: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill Magnet

General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation

AdministrationArt

Facilities Support

Service Entry

Property Line

Secondary EntryMain Entry

Legend:

C7. Upgrade Restrooms (1,844 SF)

C12. Upgrade Ben Mays/Capitol Hill Entry and School Identity (3,370 SF)

C13. Media Center expansion (1,111 SF)

C14. Renovate Media Center (6,358 SF)

C15. Renovate Ben Mays Cafeteria (3,300 SF)

C16. Create 700 seat Assembly Space (7,190 SF)

C17. Upgrade Capitol Hill Entry and School Identity (1,192 SF)

C18. Upgrade Science Labs (4,834 SF)

4.2

New / Existing

Demolition / Removal

Conceptual Utilization Plan

Atrium Atrium

Atrium Atrium

Page 7: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill Magnet

5.1

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A 8,440 SF 3,681 SF 3,532 SF

B 16,513 SF 3,801 SF 4,130 SF 8,272 SF

TOTAL 24,953 SF 7,482 SF 7,662 SF 8,272 SF

Line Items Unit Lump SumSignage and WayfindingTechnology in Instructional SpacesBuilding SecurityAtrium Window ShadesHallway Lighting, Ceilings & Walls

New / Existing

Demolition / Removal

Atrium Atrium

Atrium Atrium

Add Bleachers

ECFE CH

Conceptual Construction Plan

Page 8: Rondo: Benjamin E Mays International Magnet Capitol Hill ... · Benjamin E Mays: 1. Updated fully functioning smart boards in every Instructional Space 2. Hydration station (get rid

Rondo: Benjamin E Mays International Magnet

31713172

Capitol Hill Magnet

5.2

New ConstructionHeavy Remodel

Light RemodelFinishes Only

Medium Remodel

No Work

Scope Package

New Con-struction

Heavy Re-model

Medium Re-model Light Remodel Finishes Only

A 9,034 SF 7,538 SF 3,300 SF

B 4,832 SF 3,301 SF 5,888 SF

TOTAL 13,866 SF 10,839 SF 9,188 SF

Line Items Unit Lump SumSignage and WayfindingTechnology in Instructional SpacesBuilding SecurityAtrium Window ShadesHallway Lighting, Ceilings & Walls

New / Existing

Demolition / Removal

Atrium Atrium

Atrium Atrium

Conceptual Construction Plan

Remove roof to increase height to 24’ volume, tiered floor