rope arabian corridor meeting - coconino.az.gov
TRANSCRIPT
![Page 1: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/1.jpg)
Rope Arabian
Corridor Meeting
Thursday April 5, 2012
6:30 – 8:30 PM
![Page 2: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/2.jpg)
2
Welcome and Introductions
Supervisor Liz Archuleta
District 2
Coconino County
![Page 3: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/3.jpg)
3
Opening Remarks
Natural Resources Conservation Service
(NRCS)
Emergency Watershed Protection Program
(See Brochure)
![Page 4: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/4.jpg)
4
Background and Updates
Flood Mitigation Planning since 2010:
Broad-based Collaborative Process
Participation of the Public, Technical
Experts and Multiple State and Federal
Agencies
Understand the Science
Hydrology, Hydraulics, Sediment
Transport
![Page 5: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/5.jpg)
5
Background and Updates
Flood Mitigation Planning since 2010:
Conceptual Plans
Develop and Fully Vet All Possible
Alternatives (6 Pac Design Concepts)
Secure Funding
FEMA, NRCS, Federal Highways and
More
![Page 6: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/6.jpg)
6
Background and Updates
Flood Mitigation Planning since 2010:
Preliminary Plans
Select Most Feasible Alternatives and
Develop Preliminary Plans
Present to Public and Gather Input
March 2012 Corridor Meetings
![Page 7: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/7.jpg)
7
Preliminary Plans
Integrated Design Critical
Watershed Restoration on Forest
Mixture of Natural Channels, Lined
Channels and Individual Property
Protections in Neighborhoods
Forest Measures Contingent on
Neighborhood Measures and Vice-
Versa
![Page 8: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/8.jpg)
8
Preliminary Plans
Integrated Design: Technical Considerations
If only neighborhood measures are constructed,
then they would be overwhelmed by sediment
Erosion Will Continue Through Neighborhoods
Unless Natural Channels Utilized Downstream
If work was only completed upon Forest Service
land, then potential instability within the
residential area may migrate upslope and lead
to possible failure of the measures upon Forest
Service land
![Page 9: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/9.jpg)
9
Preliminary Plans
Why This Approach?
Key Issue is Volume of Sediment
Designs are Most Efficient At Reducing
and Transporting Sediment
Designs Avoid Diverting Water
Designs are Most Cost Effective
Designs are Supported by Current
Funding Sources
![Page 10: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/10.jpg)
10
EWP Funding
EWP is Single Best Opportunity for
Flood Mitigation
Very Fortunate to Have Received Funding
Very Tight Timeframe – 220 Days
Very Competitive Funding Environment
Federal Agencies Facing Budget Reductions
FEMA Grant Proposals Not Funded
Army Corps Technical Assistance Not Funded
![Page 11: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/11.jpg)
11
EWP Benefits
EWP Projects Will Improve Safety and
Property Value
County is Offering to Provide this Service
in Exchange for Drainage Easements
Easements will Allow for Safe and Stable
Flows through Neighborhoods
Easements Necessary for Work on Forest
![Page 12: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/12.jpg)
12
Remaining Risks
EWP Plans are Effective
However Flood Risks Will Remain
Larger Flood Events Than Those Designed For
Will Occur
Diverting Water Will be Avoided so that
Excessive Flows Will Continue to Flow Where
They Have Historically
Securing and Maintaining Flood
Insurance is Critical (See Brochure)
![Page 13: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/13.jpg)
13
EWP Process
Very Complex Process (See Flowchart)
Many Feasibility Issues
Different for Each Corridor
Plan to Move Forward Where Most
Feasible
Where Right of Entry Forms Have Been
Secured to Conduct Design Surveys
Learn from Less Challenging Corridors
Apply to More Challenging Corridors
![Page 14: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/14.jpg)
14
Public Involvement
Involvement and Participation Critical
Provide Right of Entry Forms for Survey
Corridor Meeting Questions and Feedback
Understand and Evaluate Information
Participate in Drainage Easement
Discussions
By Working Together we Can Achieve
Great Outcomes
![Page 15: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/15.jpg)
15
Watershed Restoration and
Flood Mitigation Measures
Natural Channel Design
![Page 16: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/16.jpg)
16
PROPOSED WATERSHED
RESTORATION PLAN FOR FLOOD
RELIEF
ROPE ARABIAN CORRIDOR
![Page 17: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/17.jpg)
17
![Page 18: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/18.jpg)
18
Rope Arabian Watershed Sediment Study Results
• Total sediment source from streambanks, roads, and hillslopes provide more
sediment than channels can carry ~12,306 tons/yr
• Streambanks contribute ~87% of this total
• Rehabilitation of eroding channel banks (stabilization) will reduce sediment
production
• Post restoration transport across the USFS boundary is expected to be 62 tons/yr
• Single thread channels through the neighborhood could feasibly carry post-
restoration sediment loads
![Page 19: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/19.jpg)
19
Potential Measures on Forest Service Land
North Copeland, Copeland, Glodia and Rope
Arabian Corridors
![Page 20: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/20.jpg)
20
Sediment Storage Area (Alluvial Fan Rehabilitation)
![Page 21: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/21.jpg)
21
Single – Thread
Channel Conversion
from incised to stable
Channel Conversion (from incised to stable)
![Page 22: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/22.jpg)
22
NEPA Process and Timelines
Coconino National Forest
(See Handouts)
![Page 23: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/23.jpg)
SCHULTZ SEDIMENT REDUCTION PROJECT
NEPA PROCESS - 2012
February/March: Proposal developed and submitted by
Coconino County.
Internal agency scoping
(Forest Plan consistency, need for design features, and
feasibility)
March 15-30: Public Scoping Period for the Proposed Action
April: Identify issues/possible alternatives from scoping
Specialists’ Analysis
May: Environmental Assessment (EA)
(If no significant impacts, proceed)
June: Public Comment Period on EA (30 days)
July: Decision Notice/Finding of No Significant Impacts (FONSI)
Mid-July-August: Appeal Period (45 days)
September: Implement
![Page 24: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/24.jpg)
24
Watershed Restoration and
Flood Mitigation Measures
Natural Channel Design
(See Handouts)
![Page 25: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/25.jpg)
25
Potential Measures within the
Residential Area
Rope Arabian Corridor
Treatment Measures on Private & County ROW
Earthen Berms
Flood Walls
Critical Area Planting
Driveway Berms
Lined Channels
Driveway Crossings
Road Crossings
Box Culvert
![Page 26: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/26.jpg)
26
Preliminary Plans (Rope Arabian)
Feasibility Considerations
Technical Analysis Sediment and Hydraulics
USFS Approval of Measures and Alignments
Avoidance of New Flood Risk Properties Along South Side of Upper Campbell
Conflicts Utilities
Septic
Etc.
Cost
![Page 27: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/27.jpg)
27
Typical Cross-Sections
![Page 28: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/28.jpg)
28
Channel Stabilization
![Page 29: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/29.jpg)
29
Restoration Example:
The Arboretum at Flagstaff
November 2007
September 2008
October 2009
![Page 30: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/30.jpg)
4/6/2012
Questions
Questions?
![Page 31: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/31.jpg)
31
Drainage Easements
Owner-Driven Process
Uniform Act and Alternative
Compensatory Opportunities
(See Handout)
![Page 32: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/32.jpg)
32
Questions
Questions?
![Page 33: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/33.jpg)
33
Next Steps
Securing Right of Entry Forms Necessary for Any
Further Work
Continue Working Through Survey and Design
Process
Incorporate Public Feedback into Final Designs
Additional Communications by Corridor and/or
Individually
Please Provide Feedback on Comment Cards
Reminder – 220 Day Timeframe for EWP
![Page 34: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/34.jpg)
34
Resources
Please Direct All Questions and
Comments To:
Schultz Flood Hotline: (928) 679-8390
Schultz Flood Email:
(Please Take a Refrigerator Magnet)
![Page 35: Rope Arabian Corridor Meeting - coconino.az.gov](https://reader033.vdocument.in/reader033/viewer/2022042408/625e7c42da271305d2212254/html5/thumbnails/35.jpg)
35
Thank You!
Please Review Maps, Ask Questions and
Provide Comments and Feedback
Please Fill Out Comment Cards
Please Provide Your E-Mail Address