Round 3 Firth of Forth Development Zone Pile Driving Analysis MB1 & MB2– Additional Assessment Technical Note C162T30-01 Page 1 of 29 March 2012 Round 3 Firth of Forth Development Zone Pile Driving Analysis – Additional Assessment including Drive-Drill-Drive Mode Document reference: C162T30-01 Seagreen document number: A4MRSEAG-Z-ENG950-CTN-006 Document type: Technical Note Issue: Final Date: March 2012 Author(s): Victor Terente Checker(s): Mike Rose Reviewer(s): Jamie Irvine Circulation: Lee Goulding, Alan Smith SUMMARY Seagreen have commissioned Cathie Associates to produce a pile driving assessment for the Marr Bank 1 and 2 provinces of the Phase 1 of Round 3 Firth of Forth Offshore Wind Development. The purpose of this assessment is to provide supporting information for the environmental impact assessment, including impact energies, blow counts and the likely pile driving equipment required.

Upload: dangkhanh

Post on 16-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2– Additional AssessmentTechnical Note

C162T30-01Page 1 of 29

March 2012

Round 3 Firth of Forth Development Zone

Pile Driving Analysis – Additional Assessment including Drive-Drill-DriveMode

Document reference: C162T30-01

Seagreen document number: A4MRSEAG-Z-ENG950-CTN-006

Document type: Technical Note

Issue: Final

Date: March 2012

Author(s): Victor Terente

Checker(s): Mike Rose

Reviewer(s): Jamie Irvine

Circulation: Lee Goulding, Alan Smith

SUMMARY

Seagreen have commissioned Cathie Associates to produce a pile driving assessment for the MarrBank 1 and 2 provinces of the Phase 1 of Round 3 Firth of Forth Offshore Wind Development. Thepurpose of this assessment is to provide supporting information for the environmental impactassessment, including impact energies, blow counts and the likely pile driving equipment required.

Page 2: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2– Additional AssessmentTechnical Note

C162T30-01Page 2 of 29

March 2012

1 INTRODUCTION

Cathie Associates have been commissioned by Seagreen to undertake a preliminary pile drivingassessment for the Marr Bank 1 and Marr Bank 2 provinces of the Phase 1 Firth of Forth OffshoreWind Development. This assessment has been undertaken to provide noise data for input into theEnvironmental Impact Assessment (EIA).

A preliminary pile driving assessment for all areas of Phase 1 was produced and reported as atechnical memo in September 2011, reference C162T24-01 [1]. This initial technical memo providedpreliminary pile driving data for the entire Phase 1, based on the derivation of four ground models.

This additional technical memo reports the results of the assessment of pile driving completed forthe provinces of Marr Bank 1 and 2 only. The locations of these provinces are shown in drawingreference C162R16-D01-01, Appendix A.

2 SCOPE OF WORKS

This assessment comprises the following work items:

1. Production of geotechnical profiles by:

The review of existing ground investigation reports and GIS database.

The use of two representative depth to bedrock geological scenarios:

Mean Case Bedrock (MCB) 12m below seabed.

Deep Case Bedrock (DCB) 20m below seabed.

The selection of geotechnical parameters (Upper Bound (UB) and BestEstimate (BE)) values for each geological scenario.

2. Use the pile design methodology recommended by DNV[3] as implemented in thespecialist software package ‘OPILE’ to determine the pile lengths required to support6MW turbine loads for each scenario. 2m and 3m pile diameters and the followingpile construction cases are to be considered:

Driving - Pile driving from seabed to target depth.

Drive Drill Drive - Pile driving from seabed to top of Triassic Group, drilling ofrock socket and then driving to target depth through the rock socket.

3. Determine the preliminary Soil Resistance to Driving profiles (SRD) for eachgeotechnical profile and pile diameter (16 SRD’s in total).

4. Conduct an assessment of pile driving using the specialist software package‘GRLWeap’ and the derived SRD profiles.

5. Derive the following for each scenario, construction case, and pile diameterrequired:

Recommended hammer size.

Blow count per change in efficiency.

Installation time.

Work items 2 through 5 were also run considering 7MW turbine loads for the DCB UB scenarios forboth pile construction cases.

Page 3: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2– Additional AssessmentTechnical Note

C162T30-01Page 3 of 29

March 2012

3 DESIGN LOADS

The adopted design loads have been extracted from the Foundation Concept Engineering StudyReport No: A4MRSEAG-Z-ENG945-SRP-084, supplied by Seagreen [2].

Design Case 11 was selected, as it models a typical 7MW turbine, with a jacket foundation in 50 mwater depth. This is considered to be a conservative representation of the possible range ofinstallation conditions potentially implemented on the Phase 1 area. Those loads were thenreduced by 12% in order to obtain an estimate of the loadings corresponding to a 6MW turbine asinstructed by Seagreen. The loads adopted for a 6MW turbine are as follows:

• Maximum ULS Pile Compression Load 34, 070 kN

• Maximum ULS Pile Tension Load 25,970 kN

For a 7MW turbine the following loads were adopted:

• Maximum ULS Pile Compression Load 38,710 kN

• Maximum ULS Pile Tension Load 29,510 kN

These loads are understood to have been factored in accordance with DNV J101[3].

4 GEOLOGY OF MARR BANK ONE & MARR BANK TWO PROVINCES

The location and extent of Marr Bank 1 & 2 Provinces within Phase 1 of the Firth of Forth Offshoredevelopment is shown in drawing 162R16-D01-01, Appendix A. These provinces were defined by amaximum depth to rock head of 20m and the absence of Wee Bankie and Aberdeen GroundFormations.

4.1 Geological Units

The different geological units present in this site have been defined on the basis of a desk study andan intrusive ground investigation. The relevant information extracted for this assessment issummarised below.

4.1.1 Desk study and geophysical Survey

The initial desk study [4] indicated the geology of the entire Phase 1 area to comprise Holocene andPleistocene deposits underlain by Triassic bedrock. The geophysical survey confirmed the presenceof these formations and provided more detail regarding their extent and distribution.

The Holocene deposits encountered in the Marr Bank 1 and 2 provinces of Phase 1 comprise twoformations: Undifferentiated Holocene sediments and Forth Formation. These formations aregenerally similar in composition predominantly comprising sand with occasional pockets of gravel.These two formations have been considered as Undifferentiated Holocene for the purposes of thisassessment.

Marr Bank Formation is the only Pleistocene Formation present in Marr Bank 1 and 2 provinces. It isgenerally described as sand with abundant lithic gravel and pebbles. The lateral transitionbetween Marr Bank formation (glacio-marine sediments) and Wee Bankie formation (glacial till) issituated to the west of Marr Bank provinces 1 & 2, and runs in a general north south orientationthrough the Phase 1 area. This transition is shown in drawing 162R16-D01-01.

The Triassic Group comprises sandstones, siltstones, mudstones and marls with thin sporadic bandsof gypsum.

Page 4: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2– Additional AssessmentTechnical Note

C162T30-01Page 4 of 29

March 2012

4.1.2 Findings of the Geotechnical Survey

The Phase 1 Geological Report is being prepared and has not as yet been issued. However theavailable borehole logs, CPT test data and laboratory testing completed to date has enabled apreliminary geological and geotechnical characterisation of the different formations for thepurpose of this assessment. The formations encountered across the Marr Bank 1 & 2 Provinces canbe typically described as follows:

• Undifferentiated Holocene. Loose to dense yellow and greyish brown silty fine tocoarse SAND with shells, with occasional subordinate soft to stiff slightly silty clays.

• Marr Bank. Very dense dark grey silty fine SAND with sporadic pockets of clay,organic material and occasional silt layers.

• Undifferentiated Triassic. Extremely to moderately weak reddish brown laminatedhighly weathered SILTSTONE. Subordinate layers and units of very weak reddishbrown fine grained SANDSTONE.

4.2 Geological Scenarios

The scenarios were developed following a review of the available geophysical data and thepreliminary borehole logs and CPT data provided by the geotechnical survey. This assessment hasbeen completed on the basis of two representative ground profiles or ‘scenarios’, defined asfollows:

• Mean Case Bedrock (MCB). Models the mean depth to rock head, calculatedacross both; Marr Bank 1 and Marr Bank 2 provinces. This case is considered torepresent the most likely pile lengths required.

• Deep Case Bedrock (DCB). Models the maximum depth to rock head for Marr Bank1 and Marr Bank 2 provinces, defined in previous studies as 20m below seabed. Thiscase is likely to require longer piles.

The scenarios represent the range of ground conditions present within Marr Bank 1 & 2. Theformation thicknesses were derived from the available GIS data and are summarised in Table 1.

Table 1 – Geological Scenarios

Geological UnitFormation levels (m below mud line)

Deep Case Bedrock Mean Case Bedrock

Unit 1

UndifferentiatedHolocene

0 – 5.6 0-5.6

Unit 2a

Wee BankieNot present Not present

Unit 2b

Marr Bank5.6- 20 5.6-12.2

Unit 3

Aberdeen Ground

Not present Not present

Unit 4

Undifferentiated Triassic20+ 12.2+

Page 5: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2– Additional AssessmentTechnical Note

C162T30-01Page 5 of 29

March 2012

5 GEOTECHNICAL PARAMETERS

Geotechnical parameters are required to determine the requisite pile lengths and for thederivation of soil resistance to driving (SRD) profiles. The derivation of geotechnical parametervalues was made from available borehole descriptions, in-situ test data, laboratory test results andengineering judgement.

The Marr Bank Formation soils are typically cohesionless, however a significant cohesive silt portionhas been observed locally. It was not deemed representative to model this detail at this level ofassessment. Therefore, the Marr Bank has been considered only as a cohesionless unit.

The Triassic Group is generally described as extremely to moderately weak mudstone and siltstone,with the exception of the northeast of the site where it was described as sandstone. The mudstoneand siltstone has potential for remoulding during driving, therefore in the absence of advancedtesting this formation was modelled as a very hard cohesive material.

Pile capacity and driving resistance were calculated using the same relative values, i.e. both UB orboth BE. The combination of parameters used for the geotechnical profiles are detailed in Tables 2and 3.

Page 6: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Ro

un

d3

Fir

th

of

Fo

rt

hD

ev

el

op

me

nt

Zo

ne

Pil

eD

riv

ing

An

al

ys

isM

B1

&M

B2

–A

dd

itio

na

lA

ss

es

sm

en

tT

ec

hn

ica

lN

ot

e

C1

62

T3

0-0

1P

ag

e6

of

29

Ma

rc

h2

01

2

Tab

le2

–M

ea

nC

ase

Be

dro

ck

Ge

ote

ch

nic

alP

ara

me

ters

Un

it(M

ajo

rFr

ac

tio

n)

Un

itTo

pD

ep

th(m

bsb

)

Un

itB

ott

om

De

pth

(mb

sb)

Thic

kn

ess

(m)

Effe

ctiv

e(b

uo

ya

nt)

Un

itW

eig

ht

(kN

/m3)

Pla

stic

ity

Up

pe

rB

ou

nd

Un

dra

ine

dSh

ea

rStr

en

gth

(kPa

)A

xia

lR

esi

sta

nc

ePa

ram

ete

rs

Liq

uid

Lim

it(%

)

Pla

stic

Lim

it(%

)

Top

of

Un

it(k

Pa

)

Bo

tto

mo

fU

nit

(kPa

)

Ma

xSk

inFr

ictio

n(k

Pa

)

Ma

xEn

dB

ea

rin

g(k

Pa

)

Fric

tio

nA

ng

le(d

eg

ree

s)

Be

arin

gC

ap

ac

ity

Fac

tor

Me

an

Ca

seB

ed

roc

k-

Be

stEst

ima

teP

ara

me

ters

Un

diffe

ren

tia

ted

Ho

loc

en

e(S

AN

D)

05

.65

.61

1-

--

-9

69

600

30

40

Ma

rrB

an

k(S

AN

D)

5.6

12

.26

.69

--

--

96

96

00

30

40

Un

diffe

ren

tia

ted

Tria

ssic

(Mo

de

lled

as

CLA

Y)

12

.2>

50

m>

50

m1

23

82

11

000

12

00

--

--

Me

an

Ca

seB

ed

roc

k-

Up

pe

rB

ou

nd

Pa

ram

ete

rs

Un

diffe

ren

tia

ted

Ho

loc

en

e(S

AN

D)

05

.65

.61

1-

--

-9

69

600

30

40

Ma

rrB

an

k(S

AN

D)

5.6

12

.26

.61

0-

--

-1

15

12

00

03

55

0

Un

diffe

ren

tia

ted

Tria

ssic

(Mo

de

lled

as

CLA

Y)

12

.2>

50

m>

50

m1

3.5

38

21

10

00

15

00

--

--

Page 7: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Ro

un

d3

Fir

th

of

Fo

rt

hD

ev

el

op

me

nt

Zo

ne

Pil

eD

riv

ing

An

al

ys

isM

B1

&M

B2

–A

dd

itio

na

lA

ss

es

sm

en

tT

ec

hn

ica

lN

ot

e

C1

62

T3

0-0

1P

ag

e7

of

29

Ma

rc

h2

01

2

Tab

le3

–D

ee

pC

ase

Be

dro

ck

Ge

ote

ch

nic

alP

ara

me

ters

Un

it(M

ajo

rFr

ac

tio

n)

Un

itTo

pD

ep

th(m

bsb

)

Un

itB

ott

om

De

pth

(mb

sb)

Thic

kn

ess

(m)

Effe

ctiv

e(b

uo

ya

nt)

Un

itW

eig

ht

(kN

/m3)

Pla

stic

ity

Up

pe

rB

ou

nd

Un

dra

ine

dSh

ea

rStr

en

gth

(kPa

)A

xia

lR

esi

sta

nc

ePa

ram

ete

rs

Liq

uid

Lim

it(%

)

Pla

stic

Lim

it(%

)

Top

of

Un

it(k

Pa

)

Bo

tto

mo

fU

nit

(kPa

)

Ma

xSk

inFr

ictio

n(k

Pa

)

Ma

xEn

dB

ea

rin

g(k

Pa

)

Fric

tio

nA

ng

le(d

eg

ree

s)

Be

arin

gC

ap

ac

ity

Fac

tor

De

ep

Ca

seB

ed

roc

k-

Be

stEst

ima

teP

ara

me

ters

Un

diffe

ren

tia

ted

Ho

loc

en

e(S

AN

D)

05

.65

.61

1-

--

-9

69

600

30

40

Ma

rrB

an

k(S

AN

D)

5.6

20

6.6

9-

--

-9

69

600

30

40

Un

diffe

ren

tia

ted

Tria

ssic

(Mo

de

lled

as

CLA

Y)

20

>5

0m

>5

0m

12

38

21

10

00

12

00

--

--

De

ep

Ca

seB

ed

roc

k-

Up

pe

rB

ou

nd

Pa

ram

ete

rs

Un

diffe

ren

tia

ted

Ho

loc

en

e(S

AN

D)

05

.65

.61

1-

--

-9

69

600

30

40

Ma

rrB

an

k(S

AN

D)

5.6

20

6.6

10

--

--

11

51

200

03

55

0

Un

diffe

ren

tia

ted

Tria

ssic

(Mo

de

lled

as

CLA

Y)

20

>5

0m

>5

0m

13

.53

82

11

000

15

00

--

--

Page 8: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 8 of 29

March 2012

6 PILE DESIGN

6.1 Methodology

The preliminary pile design followed the methodologies recommended by the standard DNV J101[3] and was implemented with the Cathie Associates’ commercial software package OPile [5].Relevant details of this methodology are presented in the following sections.

6.1.1 Evaluation of Static Skin Friction & End Bearing Capacity

The ultimate bearing capacity of a single pile, Qd, is determined from the following equation[3].

Qd = Qf + Qp = ΣfAs + qAa

Where:

Qf = skin friction, kN,

Qp = total end bearing, kN,

f = unit skin friction capacity, kPa,

As = external pile shaft area, m²,

q = unit end bearing capacity, kPa,

Aa = base area of pile, m².

The base area is only taken into account if the pile is calculated as being plugged duringinstallation and at the final target penetration. In the unplugged condition, the internal skin frictionis taken into account to quantify the total shaft resistance.

6.1.2 Cohesive Soils

The (static) unit shaft friction in clay, f, is calculated by the following empirical equation for totalstress methods [3]:

f = Su

Where:

Su is the undrained shear strength and α is the adhesion factor calculated by:

= 0.5 (Su/p’) -0.5 for (Su/p’) ≤ 1.0

= 0.5 (Su/p’) -0.25 for (Su/p’) > 1.0

Where:

p’ is the effective overburden pressure, in kPa, at the depth being considered.

For piles end bearing in cohesive soils, the unit end bearing, q, in kPa is computed from:

q = 9Su

6.1.3 Cohesionless Soils

For pipe piles in cohesionless soils, the shaft friction, f, in kPa, is calculated as follows:

f = k po tan

Where:

Page 9: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 9 of 29

March 2012

K = coefficient of lateral earth pressure at rest, taken as 0.8 for tension andcompression,

po = effective overburden pressure, kPa, at the depth being considered,

δ = friction angle between the soil and the pile wall.

For piles end bearing in cohesionless soil, the unit end bearing, q may be computed from thefollowing:

q = p0 Nq

Where:

Nq is a dimensionless bearing capacity factor.

Limiting values of skin friction and end bearing were applied in cohesionless soil as per DNV J101recommendations.

A factor of safety of 1.25 on the characteristic soil resistances calculated was applied to derive theallowable soil resistance used to determine the final pile length.

Two construction methods were considered:

• Piles driven to depth. The smallest of the plugged and unplugged capacitycalculations was selected as design resistance value.

• Piles driven to bedrock, drilled to final depth and driven through the rock socket. Inthis case the internal skin friction was reduced and the end bearing was calculatedconsidering the annulus of the pile only.

6.2 Pile Sizing

Seagreen’s conceptual design engineering was based on the following pile sizes:

• 2m diameter, 60mm wall thickness

• 3m diameter, 60mm wall thickness

The required pile lengths and diameters for the scenarios considered are summarised below andexample calculations are contained in Appendix B.

Page 10: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 10 of 29

March 2012

Table 4 –Pile Lengths Adopted for Driving Assessment

Scenario

(Geotechnicalparameters)

2m DiameterPile Length

(m)

3m DiameterPile Length (m)

Pile Drive Mode

MCB BE 6MW 27 22

MCB UB 6MW 25 21

DCB BE 6MW 32 27

DCB UB 6MW 30 26

DCB UB 7MW 32 27

Drive-Drill-Drive Mode

MCB BE 6MW 29 24

MCB UB 6MW 27 22

DCB BE 6MW 35 29

DCB UB 6MW 32 27

DCB UB 7MW 34 29

The 2m diameter piles require a greater length to support the loads applied. The pile lengthscalculated for the drive-drill-drive mode are slightly longer as would be expected from the minimalinternal skin friction and end bearing area limited to the pile annulus.

Page 11: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 11 of 29

March 2012

7 PILE DRIVING ASSESSMENT

A pile driving assessment was undertaken with the wave equation analysis method on the basis ofestimated soil resistance to driving profiles (SRD) for each scenario, set of geotechnical properties,loadings and pile size. The wave equation method models the impact energy and blow countsrequired to drive the piles to the required depths. This model was completed using the softwareprogram GRLWEAP [6].

7.1 Soil Resistance to Driving

The soil resistance to driving (SRD) profiles are estimated from empirical relationships with staticresistance as explained in the following sections.

7.1.1 Sand (Undifferentiated Holocene and Marr Bank Formation)

The static shaft friction and end bearing capacities are calculated following the DNV method [3].The limiting skin frictions and end bearing values specified in DNV J101 for granular materials werealso adopted. However, for sand, the dynamic resistance factor on static shaft friction is taken as0.7 in accordance to the Stevens Method [7].

Dynamic Shaft Capacity, SRD = 0.7 x Static Capacity

Dynamic End bearing Capacity, SRD = End Bearing Capacity

7.1.2 Clay (Triassic Group)

The empirical method proposed by Stevens [7] was adopted to estimate the shaft resistance of thisGroup during driving. The static shaft resistance was estimated from DNV J101 [3] and then reducedby applying a Dynamic Resistance Factor (Fp) to calculate the dynamic shaft resistance.

Fp = 0.5(OCR)0.3

Where,

OCR =Over-consolidationratio

[Su (oc) / Su (nc)]1/0.85

Su (oc) = Undrained shear strength of over-consolidated clay,

Su (nc) = Undrained shear strength of normally-consolidated clay, where:

In calculating OCR, the value of Su(nc) is calculated using the effective overburden stress, p’0, fromthe following equation:

Su (nc) = v (0.11 + 0.0037PI), and

PI = Plasticity Index

Mercia Mudstone behaves as a ‘lightly’ to ‘moderately’ over consolidated clay[8] . An OCR of 1 hasbeen adopted for this formation in the absence of detailed geotechnical testing.

In summary the following Dynamic Resistance Factors were applied for the Triassic Group:

Shaft capacity, SRD = Fp x Static Capacity

Page 12: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 12 of 29

March 2012

End bearing Capacity, SRD = 1.0 x End Bearing Capacity

7.1.3 Influence of construction methods

Driven piles

The pile driving mode is typically unplugged (coring) when piles are initially driven. On furtherpenetration, the pile driving mode may become ‘plugged’ when the internal shaft resistance(inside the pile) exceeds the end bearing resistance acting on the area of soil within the pileannulus. It should be noted that plugged piles may subsequently unplug with further driving. Thistypically occurs when significant increases in end bearing resistance are encountered. The depthof plugging cannot be predicted accurately and depends on local soil conditions, driving energyand pile diameter.

The final SRD profile was based on the smaller soil capacity obtained when comparing the pluggedand unplugged modes in their static condition.

Drive-drill-drive

As detailed in Section 2, the pile shall be driven through Holocene and Pleistocene sediment tobedrock, a rock socket will then be drilled and the pile driven to target depth through the rocksocket. Therefore, the internal shaft resistance to driving was ignored when deriving the SRD for pilesdrilled through the Triassic Group. Drilled Sockets of 1m and 1.25m diameter were considered for 2mdiameter and 3m diameter piles respectively in order to quantify the volume of debrisaccumulated inside the hollowed pile when driving through a drilled socket. It was assumed thatthe debris would generate a magnitude of internal skin friction proportional to its own volume.

7.1.4 Influence of soil set up

The effects of increasing axial pile capacity with time and enhanced resistance to driving aredocumented in numerous papers [9 & 10]. The construction of drilled sockets in the Triassic Groupwould require the use of drilling techniques. The change of construction techniques from driving todrilling and finally driving through the rock socket may take several hours or, in case ofunfavourable weather conditions, several days.

A set up factor of 2 was applied to the total external skin friction and end bearing values in the first2m of the Triassic Group to calculate the SRD in the case of drive-drill-drive mode. This assumption isbased on the data presented by Jardine et all (2005), ‘ICP methods for driven piles in sands andclays’ [9] and the approach discussed in Skov R and Denver H (1988), ‘Time-dependence of bearingcapacity of piles Proc. 3rd Int. Conf. on Application of Stress-wave Theory to Piles (Ottawa,Canada, 25-27 May 1988)’ [10] and is considered adequate for delays up to 20 days betweendrilling and driving.

7.2 Pile Driving Assessment

The SRD profiles, pile sizes and target depths were modelled in GRLWEAP for a range of hammersizes.

A maximum hammer operating efficiency of 95% was used to define the likely hammer sizerequired to drive the piles. A hammer efficiency of 95% corresponds to global efficiencies ofapproximately 90%. The global efficiency is defined as the ratio between the ENTHRU energy(energy transmitted to the pile) and the maximum rated energy of the hammer.

The wave equation analysis shall use the following input parameters, adopted from the preliminarypile driving assessment for all areas of Phase 1, reference C162T24-01 [1]:

Page 13: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 13 of 29

March 2012

Table 5 – Wave Equation Parameters

Parameter Cohesive Cohesionless

Quake – shaft 2.5mm 2.5mm

Quake – toe 2.5mm 2.5mm

Damping – shaft 0.2 0.2

Damping – toe 0.5 0.5

A preliminary pile driving assessment was completed by assuming a rate of 400 blows per metre asthe refusal criteria for each scenario to determine the hammer size. This preliminary assessment ofhammer size assumed the piling hammer to be operating at 95% efficiency for the entire durationof the installation operations.

A more detailed driving assessment was then completed for each scenario and pile size as follows:

• An initial hammer efficiency of 15% is applied from mud line level until a limit of 100blows per meter is achieved.

• Once the limit is achieved, the hammer efficiency is increased in 20% intervals tofinal penetration.

The results of the pile drivability assessment were exported to a table, which is presented inAppendix C. A summary of the results is presented in tables 6 & 7 below.

Table 6 – Pile driving to full depth.

ScenarioPile

diameter(m)

Piling Summary

PenetrationDepth (m)

MaxSRD

(MN)Hammer

Hammerefficiency

MaxImpactEnergy

(kJ)

Total No.of blows

Duration(hours)

MCB BE6MW

2 27 78.5* IHC-S1800 15-95% 1420 2316 0.9

3 22 61 IHC-S1800 15-95% 1436 1329 0.5

MCB UB6MW

2 25 90.8** IHC S2300 15-95% 2056 1553 0.6

3 21 67.6 IHC-S2300 15-95% 2081 893 0.3

DCB BE6MW

2 32 78.1*** IHC-S1800 15-95% 1432 2381 0.9

3 27 56.6 IHC-S1800 15-95% 1449 1406 0.5

DCB UB

6MW

2 30 58.3 IHC-S1800 15-95% 1445 1597 0.6

3 26 63.2 IHC-S1800 15-95% 1446 1393 0.5

DCB UB7MW

2 <32 Refusal with maximum hammer size of IHC S2300****

3 27 69 IHC 1800 15-95% 1449 1449 0.5

Range 2-3 21-32 56.6-91 IHC 1800 15-95%1420-2081

893-2381 0.5-0.9

*Plugged at 24m, **Plugged at 25m, ***Plugged at 30m, ****Maximum hammer considered, assumes plugging at depth.

Page 14: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 14 of 29

March 2012

Table 7 – Pile driving to bedrock and drilled socket in the Triassic Group

ScenarioPile

diameter(m)

Piling Summary

PenetrationDepth (m)

MaxSRD

(MN)Hammer

Hammerefficiency

MaxImpactEnergy

(kJ)

Total No.of blows

Duration(hours)

MCB BE6MW

2 29 40.8 IHC-S1200 15-75% 916 1445 0.5

3 24 40.3 IHC-S1200 15-75% 920 1362 0.5

MCB UB6MW

2 27 40.8 IHC-S1200 15-75% 915 1351 0.5

3 22 49 IHC-S1200 15-75% 919 1081 0.4

DCB BE6MW

2 35 39.4 IHC-S1200 15-75% 870 2061 0.8

3 29 46.3 IHC-S1200 15-75% 870 1746 0.6

DCB UB

6MW

2 32 40.3 IHC-S1200 15-75% 869 1802 0.7

3 27 47.7 IHC-S1200 15-75% 869 1662 0.6

DCB UB7MW

2 34 45.6 IHC-S1200 15-95% 1100 2062 0.8

3 29 55.6 IHC-S1200 15-95% 1099 2199 0.8

Range 2-3 22-3439.4-55.6

IHC-S1200 15-95% 870-11001081-2199

0.5-0.9

The piling durations have been preliminarily assessed by assuming a hammer frequency of 45blows/meter and uninterrupted driving operations. The total durations anticipated (assumingcontinuous driving) are presented in Appendix C. A summary of the results is presented in Table 7.

The Triassic Group shows significantly higher resistance to driving than the overlying Marr BankFormation and Undifferentiated Holocene Formation.

Page 15: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 15 of 29

March 2012

8 INDICATIVE PILING DURATIONS

Indicative piling operation timings for drive-drill-drive and driven piling are provided in Table 8.These timings have been derived from records from recent piling operations in similar groundconditions (source confidential); however piling operations vary significantly depending upon thecontractor, installation vessel, weather and plant. The following assumptions have been made inthe derivation of these timings:

• The installation vessel is a self-propelled jack-up.

• A single four pile jacket structure is the sub-structure

• The drilling operation is top driven.

• The drill bit diameter is 1.7m.

• The drilling operation is a single run.

• No significant problems and optimum weather conditions.

• Deep bedrock case, 2m diameter pile, with a toe depth of 27m BSBL.

Page 16: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Ro

un

d3

Fir

th

of

Fo

rt

hD

ev

el

op

me

nt

Zo

ne

Pil

eD

riv

ing

An

al

ys

isM

B1

&M

B2

–A

dd

itio

na

lA

ss

es

sm

en

tT

ec

hn

ica

lN

ot

e

C1

62

T3

0-0

1P

ag

e1

6o

f2

9

Ma

rc

h2

01

2

Tab

le8

–In

dic

ative

Pile

Tim

ing

s

Op

era

tio

nD

rive

nPili

ng

Op

era

tio

ns

Dri

ve

Dri

llD

riv

ePili

ng

Op

era

tio

ns

Pile

1P

ile2

Pile

3P

ile4

Pile

1P

ile2

Pile

3P

ile4

On

-site

an

dJa

ck-u

p2h

rs2h

rs2h

rs2h

rs2h

rs2h

rs2h

rs2h

rs

De

plo

ym

en

ta

nd

set-

up

of

pili

ng

tem

pla

te4h

rsN

AN

AN

A4h

rsN

AN

AN

A

Pile

pla

ce

me

nt

an

dse

lf-w

eig

ht

sett

le2h

rs2h

rs2h

rs2h

rs2h

r2h

rs2h

rs2h

rs

Pili

ng

set-

up

an

dse

ttin

gb

low

s2h

rs2h

rs2h

rs2h

rs1.5

hrs

1.5

hrs

1.5

hrs

1.5

hrs

Pile

Drivin

g1h

r1h

r1h

r1h

r0.5

hrs

0.5

hrs

0.5

hrs

0.5

hrs

Re

mo

ve

Ha

mm

er

an

dIn

sta

llD

rillR

igN

AN

AN

AN

A6h

rs6h

rs6h

rs6h

rs

Top

Drill

an

dR

ea

min

gN

AN

AN

AN

A15h

rs15h

rs15h

rs15h

rs

Re

mo

ve

drill

rig

an

dre

inst

all

Ha

mm

er

NA

NA

NA

NA

4h

rs4h

rs4h

rs4h

rs

Pili

ng

(re

)se

t-u

pN

AN

AN

AN

A1h

r1h

r1h

r1h

r

Pile

Drivin

g(R

est

art

)N

AN

AN

AN

A1h

r1h

r1h

r1h

r

Po

stP

ilin

go

ps

1h

r1h

r1h

r1h

r1h

r1h

r1h

r1h

r

Re

co

ve

ryo

fp

ilin

gte

mp

late

NA

NA

NA

3h

rsN

AN

AN

A3h

r

Jac

kd

ow

n2h

rs2h

rs2h

rs2h

rs2h

rs2h

rs2h

rs2h

rs

Tra

nsi

tin

gto

ne

xtlo

ca

tio

na

nd

po

sitio

nin

g1h

r1h

r1h

rN

A/U

nkn

ow

n1h

r1h

r1h

rN

A/U

nkn

ow

n

Pe

rp

ileTo

tal

15h

rs11h

rs11h

rs13h

rs41h

rs37h

rs37h

rs39h

rs

JAC

KET

TOTA

L50h

rs15

4h

rs

Page 17: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 17 of 29

March 2012

9 CONCLUSIONS AND RECOMMENDATIONS

The following conclusions can be drawn from this assessment:

A significant range of driving energies, blow counts and durations can be expected duringthe piling work operations.

The range of impact energies associated with drive-drill-drive mode is significantly lowerthan on driven mode only.

The MCB UB 6MW scenario for full depth pile driving requires very high impact energies toachieve target penetration. Due to a number of issues, including the noise generated andits potential effect on marine mammals, this installation scenario is not considered to be afeasible method of installing piles in these circumstances. Therefore, for this scenario drive-drill-drive installation should be considered.

The delays associated with changes between driving and drilling techniques cannot bepredicted accurately and will depend on the contractors’ method of work, howeversignificant ‘pile set-up’ is expected.

The possibility of plugging, particularly on the 2m diameter piles when driven though theTriassic Group cannot be accurately predicted.

The use of 2m diameter piles will result in a risk of refusal before target depth and adequatepile capacity is achieved.

This is a preliminary assessment based upon preliminary ground investigation information. Werecommend that this assessment is re-visited on receipt of more detailed geological and/orgeotechnical data.

Page 18: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01Page 18 of 29

March 2012

10 REFERENCES

1. Cathie Associates, Round 3 Firth of Forth Development Zone. Pile Driving Analysis –Preliminary Assessment. Document reference C162T24-01, September 2011.

2. Garrad Hassan and Partners Ltd, Firth of Forth Offshore Wind Farm WTG Foundation ConceptEngineering Study: 1086/BR/009, Seagreen Report No: A4MRSEAG-Z-ENG945-SRP-084, August2011.

3. Det Norske Veritas (DNV), Design of offshore Wind Turbine Structures, DNV-OS-J101, Oct2011.

4. SEtech (Geotechnical Engineers) Ltd, Seagreen Wind Energy Round 3 Firth of ForthDevelopment Zone Geotechnical Desktop Study: 8768-1-, January 2010.

5. Cathie Associates Ltd, OPile Manual, 2011.

6. Pile Dynamics, Inc (2005) GRLWEAPTM; Wave Equation Analysis of Pile Driving, Proceduresand Models, Version 2005, Pile Dynamics Inc, Ohio, USA.

7. Stevens, R., Wiltsie, E. & Turton, T., (1982), Evaluating Pile Drivability for Hard Clay, Very Dense

Sand and Rock, Offshore Technology Conference, OTC 4205, pp. 465-481.

8. British Geological Survey (2002), Engineering Geology of British Rocks and Soils. Mudstones ofthe Mercia Mudstone Group. Urban Geoscience and Geological Hazards Programme.Research Report RR/01/02.

9. Jardine et all (2005), ICP methods for driven piles in sands and clays’. Thomas Telford.

10. ‘Skov R and Denver H (1988) Time-dependence of bearing capacity of piles Proc. 3rd Int.Conf. on Application of Stress-wave Theory to Piles (Ottawa, Canada, 25-27 May 1988)’

Page 19: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01

March 2012

Appendix A

Location of Marr Bank 1 & Marr Bank 2 Provinces.

Drawing 162R16-001-01

Page 20: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological
Page 21: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Brav

o

Alph

a

Charl

ieFo

xtrot

5550

00

5550

00

5600

00

5600

00

5650

00

5650

00

5700

00

5700

00

5750

00

5750

00

5800

00

5800

00

5850

00

5850

00

5900

00

5900

00

5950

00

5950

00

6000

00

6000

00

6260000

6260000

6265000

6265000

6270000

6270000

6275000

6275000

6280000

6280000

6285000

6285000

Loca

tion M

ap

Revis

ion St

atus

Rev

Date

Detai

ls of

Chan

ges

Dr'n

Ch'k

Proje

ction

/Scale

Licen

ces/C

opyri

ght

115

/02/12

PSL

MRO

Firth

of Fo

rth O

ffsho

re Wi

nd Fa

rm

R16 -

Phas

e 1 D

evelo

pmen

t Zon

e Int

erpret

ive R

epor

tPr

ovinc

e Map

Rev 1

PSL

First

Issue

WGS_

1984

_UTM

_Zon

e_30

NPr

ojecti

on: T

ransv

erse_

Merca

torFa

lse_E

astin

g: 50

0000

.0000

00Fa

lse_N

orthin

g: 0.0

0000

0Ce

ntral_

Merid

ian: -3

.0000

00Sc

ale_F

actor

: 0.99

9600

Latitu

de_O

f_Orig

in: 0.

0000

00Lin

ear U

nit: M

eter

GCS_

WGS_

1984

Datum

: D_W

GS_1

984

C162

R16-D

01-01

µ

Lege

nd

Split

Betw

een M

arr Ba

nk an

d Wee

Bank

ie

Prov

ince

MB1

MB2

MB3

MB4

MB5

MB6

WB1

WB2

WB3

WB4

WB5

WB6

Breakd

own o

f Prov

inces

Provin

ceDe

script

ionMB

1Ma

rr Bank

/0-20m

to be

drock

with 0

-5m ho

locen

e thic

kness

MB2

Marr B

ank/0-

20m to

bedro

ck wit

h >5m

holoc

ene t

hickne

ssMB

3Ma

rr Bank

/20-35

m to b

edroc

k with

0-5m h

olocen

e thic

kness

MB4

Marr B

ank/20

-35m t

o bed

rock w

ith >5

m holo

cene t

hickne

ssMB

5Ma

rr Bank

/>35m

to be

drock

with 0

-5m ho

locen

e thic

kness

MB6

Marr B

ank/>3

5m to

bedro

ck wit

h >5m

holoc

ene t

hickne

ssWB

1We

e Bank

ie/0-2

0m to

bedro

ck wit

h 0-5m

holoc

ene t

hickne

ssWB

2We

e Bank

ie/0-2

0m to

bedro

ck wit

h >5m

holoc

ene t

hickne

ssWB

3We

e Bank

ie/20-

35m to

bedro

ck wit

h 0-5m

holoc

ene t

hickne

ssWB

4We

e Bank

ie/20-

35m to

bedro

ck wit

h >5m

holoc

ene t

hickne

ssWB

5We

e Bank

ie/>35

m to b

edroc

k with

0-5m h

olocen

e thic

kness

WB6

Wee B

ankie/

>35m t

o bed

rock w

ith >5

m holo

cene t

hickne

ss

Page 22: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological
Page 23: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01

March 2012

Appendix B

Example of Pile Sizing Calculations

Page 24: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological
Page 25: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

PIL

ED

RIV

ING

ASS

ESSM

ENT

Pile

Sizi

ng

Cal

cula

tio

ns

MC

B_B

E6M

W

Req

uir

emen

tR

esu

lts

Co

mpr

ess

(MN

)Te

nsio

n(M

N)

Co

mp

ress

Ten

sC

om

pre

ssTe

ns

2m34

.07

25.9

72

m27

51.8

027

.50

0.66

0.94

3m34

.07

25.9

73

m22

55.9

726

.52

0.61

0.98

1.25

resi

stan

cefa

cto

rap

plie

dto

soil

resi

stan

ces

(DN

V-O

S-J1

01)

2mP

ileD

iam

eter

3mP

ileD

iam

eter

Fact

ore

dFi

nal

Fact

ore

dTo

talC

apac

ity

Plu

gged

/Un

plu

Tota

lTo

tal

Fin

alFa

cto

red

Tota

lFa

cto

red

Pen

Plu

gged

Un

plu

gC

om

pre

sTe

nsi

on

Ten

sio

nPl

ugg

edU

np

lugg

edC

apac

ity

Cap

acit

yPe

nPl

ugg

edU

np

lug

Co

mp

res

Ten

sio

nTe

nsi

on

Plu

gged

Un

plu

gged

Cap

acit

yTo

tal

(m)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(m

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)C

apac

ity

00

00

00

00

PLU

GG

ED

00

0.1

00

00

00

0P

LUG

GE

D0

(kN

)3

00

00

00

0P

LUG

GE

D0

03

.90

00

00

00

PLU

GG

ED

00

34

14

75

16

36

36

28.6

4182

.75

52

UN

PLU

GG

ED

55

244

24

12

44

0.7

99

3.5

11

8.9

11

8.9

115

.128

12

45

9.6

10

12

.4U

NP

LUG

GE

D10

12.4

810

45

52

97

82

14

71

47

117.

984

5676

.79

30

UN

PLU

GG

ED

93

074

45

15

55

0.9

14

44

.22

34

.39

23

4.3

918

7.51

21

57

85

.31

67

8.6

UN

PLU

GG

ED

1678

.613

435

69

12

10

78

29

12

91

232.

912

7202

.61

36

9U

NP

LUG

GE

D1

36

910

955

.61

74

17

17

36

.73

86

.67

38

6.6

730

9.33

61

78

03

.72

12

3.4

UN

PLU

GG

ED

2123

.416

996

77

41

12

70

39

33

93

314.

1281

33.5

16

63

UN

PLU

GG

ED

16

63

1330

6.6

20

52

7.2

22

60

.96

78

.76

67

8.7

654

3.00

82

12

05

.92

93

9.7

UN

PLU

GG

ED

2939

.723

527

88

72

15

82

58

45

84

467.

584

9456

.32

16

7U

NP

LUG

GE

D2

16

717

337

21

77

1.2

24

83

.58

09

.01

80

9.0

164

7.20

82

25

80

.23

29

2.5

UN

PLU

GG

ED

3292

.526

347

93

24

17

14

66

96

69

534.

816

9992

.82

38

2U

NP

LUG

GE

D2

38

219

068

24

88

1.4

30

72

.11

16

8.1

11

68

.193

4.48

26

04

9.6

42

40

.3U

NP

LUG

GE

D42

40.3

3392

81

04

55

20

60

89

78

97

717.

536

1135

2.1

29

57

UN

PLU

GG

ED

29

57

2366

92

79

91

.63

70

6.7

15

75

.21

57

5.2

1260

.16

29

56

6.7

52

81

.8U

NP

LUG

GE

D52

81.8

4225

91

15

86

24

31

11

51

11

51

921.

1212

737.

63

58

2U

NP

LUG

GE

D3

58

228

661

03

11

01

.84

38

7.2

20

30

.12

03

0.1

1624

.08

33

13

1.8

64

17

.3U

NP

LUG

GE

D64

17.3

5134

10

12

71

72

82

61

43

21

43

211

45.6

814

149.

24

25

9U

NP

LUG

GE

D4

25

934

071

13

42

11

.95

11

3.7

25

32

.82

53

2.8

2026

.24

36

74

4.8

76

46

.6U

NP

LUG

GE

D76

46.6

6117

11

13

84

83

24

61

73

91

73

913

91.0

415

587

49

85

UN

PLU

GG

ED

49

85

3988

12

37

32

2.1

58

86

.23

08

3.5

30

83

.524

66.8

40

40

5.6

89

69

.7U

NP

LUG

GE

D89

69.7

7176

12

14

97

93

69

12

07

22

07

216

57.3

617

050.

85

76

3U

NP

LUG

GE

D5

76

346

101

2.2

37

94

4.2

60

46

.23

19

9.4

31

99

.425

59.5

24

11

43

.59

24

5.6

UN

PLU

GG

ED

9245

.673

961

21

52

05

37

83

21

41

21

41

1713

.12

1734

6.7

59

24

UN

PLU

GG

ED

59

24

4739

13

.26

36

17

.21

08

19

.86

07

5.2

60

75

.248

60.1

66

96

92

.51

68

95

UN

PLU

GG

ED

1689

513

516

13

28

42

47

08

84

02

14

02

132

16.4

3244

4.5

11

10

8U

NP

LUG

GE

D1

11

08

8887

14

63

61

7.2

13

06

08

40

8.7

84

08

.767

26.9

67

20

26

21

46

8.7

UN

PLU

GG

ED

2146

8.7

1717

51

42

85

44

85

49

55

60

55

60

4448

.24

3410

3.9

14

11

0U

NP

LUG

GE

D1

41

10

1128

81

56

36

17

.21

58

98

11

36

5.1

11

36

5.1

9092

.08

74

98

2.3

27

26

3.1

UN

PLU

GG

ED

2726

3.1

2181

01

52

86

93

10

41

77

52

97

52

960

22.8

836

221.

81

79

45

UN

PLU

GG

ED

17

94

514

356

16

63

61

7.2

18

77

6.5

14

36

3.4

14

36

3.4

1149

0.72

77

98

0.7

33

13

9.9

UN

PLU

GG

ED

3313

9.9

2651

21

62

88

43

12

32

89

54

39

54

376

34.7

238

386.

22

18

72

UN

PLU

GG

ED

21

87

217

497

17

63

61

7.2

21

69

3.7

17

40

2.2

17

40

2.2

1392

1.76

81

01

9.4

39

09

5.8

UN

PLU

GG

ED

3909

5.8

3127

71

72

89

92

14

28

11

16

03

11

60

392

82.2

440

595.

22

58

84

UN

PLU

GG

ED

25

88

420

707

18

63

61

7.2

24

64

8.1

20

47

9.7

20

47

9.7

1638

3.76

84

09

6.9

45

12

7.7

UN

PLU

GG

ED

4512

7.7

3610

21

82

91

42

16

27

51

37

05

13

70

510

964.

1642

847.

22

99

80

UN

PLU

GG

ED

29

98

023

984

19

63

61

7.2

27

63

8.4

23

59

4.6

23

59

4.6

1887

5.68

87

21

1.8

51

23

2.9

UN

PLU

GG

ED

5123

2.9

4098

61

92

92

92

18

30

81

58

49

15

84

912

679.

3645

140.

83

41

57

UN

PLU

GG

ED

34

15

727

326

20

63

61

7.2

30

66

3.3

26

74

5.5

26

74

5.5

2139

6.4

90

36

2.8

57

40

8.8

UN

PLU

GG

ED

5740

8.8

4592

72

02

94

41

20

37

91

80

34

18

03

414

426.

847

474.

73

84

12

UN

PLU

GG

ED

38

41

230

730

21

63

61

7.2

33

72

1.7

29

93

1.4

29

93

1.4

2394

5.12

93

54

8.6

63

65

3.1

UN

PLU

GG

ED

6365

3.1

5092

22

12

95

91

22

48

62

02

57

20

25

716

205.

6849

847.

94

27

43

UN

PLU

GG

ED

42

74

334

194

22

63

61

7.2

36

81

2.6

33

15

13

31

51

2652

0.8

96

76

8.2

69

96

3.5

UN

PLU

GG

ED

6996

3.5

5597

12

22

97

40

24

63

02

25

19

22

51

918

015.

1252

259.

34

71

48

UN

PLU

GG

ED

47

14

837

719

23

63

61

7.2

39

93

4.8

36

40

3.4

36

40

3.4

2912

2.72

10

00

20

.67

63

38

.2U

NP

LUG

GE

D76

338.

261

071

23

29

89

02

68

08

24

81

82

48

18

1985

4.32

5470

7.9

51

62

6U

NP

LUG

GE

D5

16

26

4130

12

46

36

17

.24

30

87

.63

96

87

.53

96

87

.531

750

10

33

04

.88

27

75

.1U

NP

LUG

GE

D82

775.

166

220

24

30

04

02

90

21

27

15

32

71

53

2172

2.72

5719

35

61

74

UN

PLU

GG

ED

56

17

444

939

25

63

61

7.2

46

27

04

30

02

.64

30

02

.634

402.

081

06

61

9.8

89

27

2.6

UN

PLU

GG

ED

8927

2.6

7141

82

53

01

89

31

26

72

95

25

29

52

523

619.

6859

713.

86

07

92

PLU

GG

ED

59

71

447

771

26

63

61

7.2

49

48

1.3

46

34

7.6

46

34

7.6

3707

8.08

10

99

64

.99

58

29

UN

PLU

GG

ED

9582

976

663

26

30

33

93

35

46

31

93

13

19

31

2554

4.56

6226

9.5

65

47

7P

LUG

GE

D6

22

70

4981

62

76

36

17

.25

27

20

.74

97

22

49

72

239

777.

61

13

33

9.2

10

24

42

.7U

NP

LUG

GE

D10

2442

.781

954

27

30

48

83

58

58

34

37

13

43

71

2749

6.96

6485

9.6

70

22

9P

LUG

GE

D6

48

60

5188

82

86

36

17

.25

59

87

.45

31

24

.85

31

24

.842

499.

841

16

74

2.1

10

91

12

.3U

NP

LUG

GE

D10

9112

.387

290

28

30

63

83

82

01

36

84

53

68

45

2947

6.32

6748

3.4

75

04

6P

LUG

GE

D6

74

83

5398

72

96

36

17

.25

92

80

.95

65

55

.55

65

55

.545

244.

41

20

17

2.8

11

58

36

.4U

NP

LUG

GE

D11

5836

.492

669

29

30

78

84

05

75

39

35

33

93

53

3148

2.24

7014

0.4

79

92

8P

LUG

GE

D7

01

40

5611

23

06

36

17

.26

26

00

.46

00

13

.36

00

13

.348

010.

641

23

63

0.6

12

26

13

.7U

NP

LUG

GE

D12

2613

.798

091

30

30

93

74

29

80

41

89

34

18

93

3351

4.32

7283

0.1

84

87

3P

LUG

GE

D7

28

30

5826

43

16

36

17

.26

59

45

.46

34

97

.76

34

97

.750

798.

161

27

11

4.9

12

94

43

.1P

LUG

GE

D12

7114

.910

1692

31

31

08

74

54

16

44

46

54

44

65

3557

2.08

7555

1.9

89

88

1P

LUG

GE

D7

55

52

6044

23

26

36

17

.26

93

15

.36

70

08

67

00

853

606.

41

30

62

5.2

13

63

23

.2P

LUG

GE

D13

0625

.210

4500

32

31

23

64

78

81

47

06

94

70

69

3765

5.28

7830

5.5

94

95

0P

LUG

GE

D7

83

06

6264

43

36

36

17

.27

27

09

.57

05

43

.77

05

43

.756

434.

961

34

16

0.9

14

32

53

.2P

LUG

GE

D13

4160

.910

7329

33

31

38

65

03

76

49

70

54

97

05

3976

3.6

8109

0.5

10

00

80

PLU

GG

ED

81

09

164

872

34

63

61

7.2

76

12

7.6

74

10

4.2

74

10

4.2

5928

3.36

13

77

21

.41

50

23

1.8

PLU

GG

ED

1377

21.4

1101

773

43

15

36

52

89

95

23

71

52

37

141

896.

5683

906.

31

05

27

0P

LUG

GE

D8

39

06

6712

53

56

36

17

.27

95

69

77

68

97

76

89

6215

1.2

14

13

06

.21

57

25

8P

LUG

GE

D14

1306

.211

3045

35

31

68

55

54

52

55

06

85

50

68

4405

4.08

8675

2.8

11

05

19

PLU

GG

ED

86

75

369

402

36

63

61

7.2

83

03

3.4

81

29

7.7

81

29

7.7

6503

8.16

14

49

14

.91

64

33

1.1

PLU

GG

ED

1449

14.9

1159

323

63

18

35

58

03

35

77

95

57

79

546

235.

6889

629.

41

15

82

7P

LUG

GE

D8

96

29

7170

43

76

36

17

.28

65

20

.28

49

29

.88

49

29

.867

943.

841

48

54

71

71

44

9.9

PLU

GG

ED

1485

4711

8838

37

31

98

46

06

42

60

55

26

05

52

4844

1.28

9253

61

21

19

3P

LUG

GE

D9

25

36

7402

93

86

36

17

.29

00

29

88

58

4.8

88

58

4.8

7086

7.84

15

22

02

17

86

13

.7P

LUG

GE

D15

2202

1217

623

83

21

34

63

27

86

33

38

63

33

850

670.

4895

472.

11

26

61

6P

LUG

GE

D9

54

72

7637

83

96

36

17

.29

35

59

.49

22

62

.39

22

62

.373

809.

841

55

87

9.5

18

58

21

.7P

LUG

GE

D15

5879

.512

4704

39

32

28

46

59

43

66

15

46

61

54

5292

3.12

9843

7.5

13

20

97

PLU

GG

ED

98

43

878

750

40

63

61

7.2

97

11

19

59

61

.99

59

61

.976

769.

521

59

57

9.2

19

30

73

PLU

GG

ED

1595

79.2

1276

634

03

24

33

68

63

46

89

99

68

99

955

199.

0410

1432

13

76

33

PLU

GG

ED

10

14

32

8114

64

16

36

17

.21

00

68

3.5

99

68

3.3

99

68

3.3

7974

6.64

16

33

00

.52

00

36

6.8

PLU

GG

ED

1633

00.5

1306

404

13

25

83

71

35

37

18

72

71

87

257

497.

9210

4455

.21

43

22

5P

LUG

GE

D1

04

45

583

564

42

63

61

7.2

10

42

76

.51

03

42

61

03

42

682

740.

81

67

04

3.2

20

77

02

.5P

LUG

GE

D16

7043

.213

3635

42

32

73

27

40

98

74

77

57

47

75

5981

9.68

1075

071

48

87

3P

LUG

GE

D1

07

50

786

006

43

63

61

7.2

10

78

89

.71

07

18

9.6

10

71

89

.685

751.

681

70

80

6.9

21

50

79

.3P

LUG

GE

D17

0806

.913

6646

43

32

88

27

68

70

77

70

57

77

05

6216

411

0587

15

45

75

PLU

GG

ED

11

05

87

8847

04

46

36

17

.21

11

52

2.6

11

09

74

11

09

74

8877

9.2

17

45

91

.22

22

49

6.6

PLU

GG

ED

1745

91.2

1396

734

43

30

32

79

66

98

06

63

80

66

364

530.

7211

3695

16

03

32

PLU

GG

ED

11

36

95

9095

64

56

36

17

.21

15

17

5.1

11

47

78

.61

14

77

8.6

9182

2.88

17

83

95

.92

29

95

3.7

PLU

GG

ED

1783

95.9

1427

174

53

31

81

82

49

38

36

50

83

65

066

919.

7611

6830

.91

66

14

3P

LUG

GE

D1

16

83

193

465

46

63

61

7.2

11

88

46

.71

18

60

3.2

11

86

03

.294

882.

561

82

22

0.5

23

74

49

.9P

LUG

GE

D18

2220

.514

5776

46

33

33

18

53

44

86

66

48

66

64

6933

0.96

1199

94.5

17

20

07

PLU

GG

ED

11

99

95

9599

64

76

36

17

.21

22

53

7.2

12

24

47

.51

22

44

7.5

9795

81

86

06

4.8

24

49

84

.8P

LUG

GE

D18

6064

.814

8852

47

33

48

08

82

20

89

70

58

97

05

7176

412

3185

.41

77

92

5P

LUG

GE

D1

23

18

598

548

48

63

61

7.2

12

62

46

.41

26

31

1.2

12

63

11

.210

1048

.96

18

99

28

.52

52

55

7.6

PLU

GG

ED

1899

28.5

1519

434

83

36

30

91

12

29

27

74

92

77

474

218.

9612

6403

.71

83

89

6P

LUG

GE

D1

26

40

410

1123

49

63

61

7.2

12

99

73

.81

30

19

41

30

19

410

4155

.21

93

81

1.2

26

01

67

.8P

LUG

GE

D19

3811

.215

5049

49

33

78

09

40

49

95

86

99

58

69

7669

5.52

1296

491

89

91

9P

LUG

GE

D1

29

64

910

3719

50

63

61

7.2

13

37

19

.41

34

09

5.6

13

40

95

.610

7276

.48

19

77

12

.82

67

81

5P

LUG

GE

D19

7712

.815

8170

50

33

92

99

70

02

98

99

29

89

92

7919

3.6

1329

21.2

19

59

94

PLU

GG

ED

13

29

21

1063

370

End

Cap

acit

yC

um

Fric

tio

nEn

dC

apac

ity

Pile

Dia

met

erJa

cket

Pile

Dia

met

erR

equ

ire

dPi

leLe

ngt

h

Cap

acit

yU

tilis

atio

n

Cu

mFr

icti

on

Tota

lCap

acit

y

Ham

mer

Type

/Siz

e

IHC

-S18

00

IHC

-S18

00

Page 26: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

PIL

ED

RIV

ING

ASS

ESSM

ENT

Pile

Sizi

ng

Cal

cula

tio

ns

DC

B_B

E_7M

WLo

ads

Req

uir

emen

tR

esu

lts

Co

mpr

ess

(MN

)Te

nsio

n(M

N)

Co

mp

ress

Ten

sC

om

pre

ssTe

ns

2m38

.71

29.5

12

m32

61.7

931

.93

0.63

0.92

3m38

.71

29.5

13

m27

64.5

430

.34

0.60

0.97

1.25

resi

stan

cefa

cto

rap

plie

dto

soil

resi

stan

ces

(DN

V-O

S-J1

01)

2mP

ileD

iam

eter

3mP

ileD

iam

eter

Fact

ore

dFi

nal

Fact

ore

dTo

talC

apac

ity

Plu

gged

/Un

plu

Tota

lTo

tal

Fin

alFa

cto

red

Tota

lFa

cto

red

Pen

Plu

gged

Un

plu

gC

om

pre

sTe

nsi

on

Ten

sio

nPl

ugg

edU

np

lugg

edC

apac

ity

Cap

acit

yPe

nPl

ugg

edU

np

lug

Co

mp

res

Ten

sio

nTe

nsi

on

Plu

gged

Un

plu

gged

Cap

acit

yTo

tal

(m)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(m

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)(k

N)

(kN

)C

apac

ity

00

00

00

00

PLU

GG

ED

00

0.1

00

00

00

0P

LUG

GE

D0

(kN

)3

00

00

00

0P

LUG

GE

D0

03

.90

00

00

00

PLU

GG

ED

00

34

14

75

16

36

36

28.6

4182

.75

52

UN

PLU

GG

ED

55

244

24

12

44

0.7

99

3.5

11

8.9

11

8.9

115

.128

12

45

9.6

10

12

.4U

NP

LUG

GE

D10

12.4

810

45

52

97

82

14

71

47

117.

984

5676

.79

30

UN

PLU

GG

ED

93

074

45

15

55

0.9

14

44

.22

34

.39

23

4.3

918

7.51

21

57

85

.31

67

8.6

UN

PLU

GG

ED

1678

.613

435

69

12

10

78

29

12

91

232.

912

7202

.61

36

9U

NP

LUG

GE

D1

36

910

955

.61

74

17

17

36

.73

86

.67

38

6.6

730

9.33

61

78

03

.72

12

3.4

UN

PLU

GG

ED

2123

.416

996

77

41

12

70

39

33

93

314.

1281

33.5

16

63

UN

PLU

GG

ED

16

63

1330

6.6

20

24

4.4

22

95

.97

38

.28

73

8.2

859

0.62

42

09

82

.73

03

4.2

UN

PLU

GG

ED

3034

.224

277

89

98

16

37

62

76

27

501.

648

9624

.62

26

4U

NP

LUG

GE

D2

26

418

117

21

37

5.4

25

33

.88

93

.78

93

.771

4.96

22

26

9.1

34

27

.5U

NP

LUG

GE

D34

27.5

2742

79

50

01

79

37

31

73

158

4.54

410

230.

92

52

3U

NP

LUG

GE

D2

52

320

198

24

20

2.8

31

64

13

19

.21

31

9.2

1055

.36

25

52

2.1

44

83

.2U

NP

LUG

GE

D44

83.2

3587

81

07

57

22

06

10

14

10

14

811.

5211

771.

23

22

0U

NP

LUG

GE

D3

22

025

769

27

03

0.3

38

44

.81

79

7.5

17

97

.514

382

88

27

.85

64

2.4

UN

PLU

GG

ED

5642

.445

149

12

01

42

65

21

33

31

33

310

66.5

613

346.

73

98

5U

NP

LUG

GE

D3

98

531

881

02

98

57

.74

57

6.4

23

28

.72

32

8.7

1862

.96

32

18

6.4

69

05

UN

PLU

GG

ED

6905

5524

10

13

27

03

13

11

68

71

68

713

49.8

414

957.

44

81

8U

NP

LUG

GE

D4

81

838

541

13

26

85

.15

35

8.6

29

12

.62

91

2.6

2330

.08

35

59

7.7

82

71

.1U

NP

LUG

GE

D82

71.1

6617

11

14

52

73

64

32

07

72

07

716

61.2

816

603.

35

72

0U

NP

LUG

GE

D5

72

045

761

23

55

12

.66

19

1.5

35

49

.33

54

9.3

2839

.44

39

06

1.8

97

40

.7U

NP

LUG

GE

D97

40.7

7793

12

15

78

34

18

82

50

12

50

120

00.8

1828

4.4

66

89

UN

PLU

GG

ED

66

89

5351

13

38

34

07

07

5.1

42

38

.84

23

8.8

3391

.04

42

57

8.8

11

31

3.8

UN

PLU

GG

ED

1131

3.8

9051

13

17

04

04

76

72

96

12

96

123

68.5

620

000.

77

72

7U

NP

LUG

GE

D7

72

761

821

44

11

67

.48

00

9.3

49

81

49

81

3984

.84

61

48

.51

29

90

.4U

NP

LUG

GE

D12

990.

410

392

14

18

29

75

37

83

45

63

45

627

64.4

821

752.

28

83

4U

NP

LUG

GE

D8

83

470

671

54

39

94

.98

99

4.3

57

76

.15

77

6.1

4620

.88

49

77

11

47

70

.4U

NP

LUG

GE

D14

770.

411

816

15

19

55

36

02

33

98

63

98

631

88.4

823

538.

91

00

08

UN

PLU

GG

ED

10

00

880

061

64

68

22

.31

00

29

.96

62

46

62

452

99.2

53

44

6.3

16

65

3.9

UN

PLU

GG

ED

1665

3.9

1332

31

62

08

10

67

00

45

51

45

51

3640

.72

2536

0.8

11

25

1U

NP

LUG

GE

D1

12

51

9001

17

49

64

9.7

11

11

6.2

75

24

.77

52

4.7

6019

.76

57

17

4.4

18

64

0.9

UN

PLU

GG

ED

1864

0.9

1491

31

72

20

67

74

11

51

51

51

51

4121

.04

2721

7.9

12

56

2U

NP

LUG

GE

D1

25

62

1005

01

85

24

77

.21

22

53

.28

47

8.1

84

78

.167

82.4

86

09

55

.32

07

31

.4U

NP

LUG

GE

D20

731.

416

585

18

23

32

38

15

55

78

75

78

746

29.6

2911

0.2

13

94

2U

NP

LUG

GE

D1

39

42

1115

31

95

53

04

.61

34

40

.99

48

4.4

94

84

.475

87.5

26

47

89

22

92

5.3

UN

PLU

GG

ED

2292

5.3

1834

01

92

45

80

89

31

64

58

64

58

5166

.24

3103

7.6

15

38

9U

NP

LUG

GE

D1

53

89

1231

12

05

81

32

14

67

9.3

10

54

3.5

10

54

3.5

8434

.86

86

75

.52

52

22

.7U

NP

LUG

GE

D25

222.

720

178

20

25

83

79

74

17

16

47

16

457

31.1

233

000.

31

69

05

UN

PLU

GG

ED

16

90

513

524

21

76

97

6.9

19

68

8.7

14

22

2.6

14

22

2.6

1137

8.08

91

19

9.5

33

91

1.3

UN

PLU

GG

ED

3391

1.3

2712

92

13

42

12

13

02

29

61

79

61

776

93.2

843

828.

52

26

39

UN

PLU

GG

ED

22

63

918

111

22

77

61

32

33

47

.61

79

82

.11

79

82

.114

385.

689

55

95

.14

13

29

.7U

NP

LUG

GE

D41

329.

733

064

22

34

49

51

54

11

12

12

31

21

23

9698

.32

4661

7.6

27

53

4U

NP

LUG

GE

D2

75

34

2202

72

37

82

49

.22

70

82

21

82

02

18

20

1745

61

00

06

9.3

48

90

2U

NP

LUG

GE

D48

902

3912

22

33

47

77

17

84

91

46

82

14

68

211

745.

2849

459

32

53

0U

NP

LUG

GE

D3

25

30

2602

42

47

88

85

.43

08

90

25

73

4.8

25

73

4.8

2058

7.84

10

46

20

.25

66

24

.9U

NP

LUG

GE

D56

624.

945

300

24

35

06

02

03

35

17

29

11

72

91

1383

3.12

5235

1.6

37

62

6U

NP

LUG

GE

D3

76

26

3010

12

57

95

21

.63

47

70

.42

97

24

.92

97

24

.923

779.

921

09

24

6.5

64

49

5.3

UN

PLU

GG

ED

6449

5.3

5159

62

53

53

43

22

86

81

99

52

19

95

215

961.

255

294.

44

28

20

UN

PLU

GG

ED

42

82

034

256

26

80

15

7.7

38

72

1.7

33

78

8.9

33

78

8.9

2703

1.12

11

39

46

.67

25

10

.6U

NP

LUG

GE

D72

510.

658

008

26

35

62

62

54

48

22

66

12

26

61

1812

8.64

5828

6.5

48

10

9U

NP

LUG

GE

D4

81

09

3848

72

78

07

93

.94

27

42

.83

79

25

.63

79

25

.630

340.

481

18

71

9.5

80

66

8.5

UN

PLU

GG

ED

8066

8.5

6453

52

73

59

08

28

07

32

54

19

25

41

920

334.

8861

327

53

49

2U

NP

LUG

GE

D5

34

92

4279

42

88

14

30

.14

68

32

.74

21

33

.94

21

33

.933

707.

121

23

56

48

89

66

.6U

NP

LUG

GE

D88

966.

671

173

28

36

19

13

07

43

28

22

42

82

24

2257

9.28

6441

5.3

58

96

8U

NP

LUG

GE

D5

89

68

4717

42

98

20

66

.35

09

90

.24

64

12

.74

64

12

.737

130.

161

28

47

99

74

03

UN

PLU

GG

ED

9740

377

922

29

36

47

43

34

58

31

07

73

10

77

2486

1.36

6755

0.6

64

53

4U

NP

LUG

GE

D6

45

34

5162

83

08

27

02

.45

52

14

.65

07

61

.25

07

61

.240

608.

961

33

46

3.6

10

59

75

.7U

NP

LUG

GE

D10

5975

.784

781

30

36

75

73

62

16

33

97

63

39

76

2718

0.48

7073

2.3

70

19

1U

NP

LUG

GE

D7

01

91

5615

33

18

33

38

.65

95

04

.95

51

78

.35

51

78

.344

142.

641

38

51

6.9

11

46

83

.2U

NP

LUG

GE

D11

4683

.291

747

31

37

03

93

90

17

36

92

03

69

20

2953

6.32

7395

9.8

75

93

7P

LUG

GE

D7

39

60

5916

83

28

39

74

.86

38

60

.45

96

63

.35

96

63

.347

730.

641

43

63

8.1

12

35

23

.8U

NP

LUG

GE

D12

3523

.898

819

32

37

32

24

18

60

39

91

03

99

10

3192

8.32

7723

2.6

81

77

1P

LUG

GE

D7

72

33

6178

63

38

46

10

.96

82

80

.46

42

15

.66

42

15

.651

372.

481

48

82

6.5

13

24

96

UN

PLU

GG

ED

1324

9610

5997

33

37

60

54

47

46

42

94

54

29

45

3435

6.16

8055

0.1

87

69

1P

LUG

GE

D8

05

50

6444

03

48

52

47

.17

27

64

.26

88

34

.26

88

34

.255

067.

361

54

08

1.3

14

15

98

.5U

NP

LUG

GE

D14

1598

.511

3279

34

37

88

84

76

73

46

02

44

60

24

3681

9.52

8391

29

36

97

PLU

GG

ED

83

91

267

130

35

85

88

3.3

77

31

1.2

73

51

8.7

73

51

8.7

5881

4.96

15

94

02

15

08

30

UN

PLU

GG

ED

1508

3012

0664

35

38

17

05

06

42

49

14

74

91

47

3931

7.92

8731

7.7

99

78

9P

LUG

GE

D8

73

18

6985

43

68

65

19

.58

19

20

.87

82

68

.57

82

68

.562

614.

81

64

78

7.9

16

01

89

.3U

NP

LUG

GE

D16

0189

.312

8151

36

38

45

35

36

51

52

31

45

23

14

4185

1.04

9076

6.9

10

59

65

PLU

GG

ED

90

76

772

614

37

87

15

5.6

86

59

2.5

83

08

2.8

83

08

2.8

6646

6.24

17

02

38

.51

69

67

5.4

UN

PLU

GG

ED

1696

75.4

1357

403

73

87

36

56

70

15

55

23

55

52

344

418.

7294

259.

31

12

22

4P

LUG

GE

D9

42

59

7540

73

88

77

91

.89

13

25

.88

79

61

.48

79

61

.470

369.

121

75

75

3.2

17

92

87

.1P

LUG

GE

D17

5753

.214

0603

38

39

01

95

97

91

58

77

65

87

76

4702

0.64

9779

4.4

11

85

67

PLU

GG

ED

97

79

478

236

39

88

42

89

61

20

.19

29

03

.59

29

03

.574

322.

81

81

33

1.5

18

90

23

.6P

LUG

GE

D18

1331

.514

5065

39

39

30

16

29

21

62

07

16

20

71

4965

6.4

1013

71.9

12

49

92

PLU

GG

ED

10

13

72

8109

84

08

90

64

.11

00

97

5.1

97

90

8.8

97

90

8.8

7832

7.04

18

69

72

.91

98

88

3.8

PLU

GG

ED

1869

72.9

1495

784

03

95

84

66

09

16

54

07

65

40

752

325.

9210

4991

.51

31

49

8P

LUG

GE

D1

04

99

283

993

41

89

70

0.3

10

58

90

.21

02

97

6.8

10

29

76

.882

381.

441

92

67

7.1

20

88

67

.1P

LUG

GE

D19

2677

.115

4142

41

39

86

76

92

99

68

78

66

87

86

5502

8.88

1086

52.9

13

80

86

PLU

GG

ED

10

86

53

8692

24

29

03

36

.51

10

86

5.2

10

81

07

.21

08

10

7.2

8648

5.76

19

84

43

.72

18

97

2.4

PLU

GG

ED

1984

43.7

1587

554

24

01

50

72

54

77

22

06

72

20

657

765.

0411

2355

.91

44

75

4P

LUG

GE

D1

12

35

689

885

43

90

97

2.7

11

58

99

.71

13

29

9.4

11

32

99

.490

639.

522

04

27

2.1

22

91

99

.1P

LUG

GE

D20

4272

.116

3418

43

40

43

27

58

34

75

66

87

56

68

6053

4.24

1161

00.1

15

15

02

PLU

GG

ED

11

61

00

9288

04

49

16

08

.81

20

99

3.2

11

85

53

.21

18

55

3.2

9484

2.56

21

01

62

.12

39

54

6.5

PLU

GG

ED

2101

62.1

1681

304

44

07

15

79

15

97

91

70

79

17

063

336.

3211

9885

.41

58

33

0P

LUG

GE

D1

19

88

595

908

45

92

24

51

26

14

5.5

12

38

68

.21

23

86

8.2

9909

4.56

21

61

13

.22

50

01

3.8

PLU

GG

ED

2161

13.2

1728

914

54

09

98

82

52

38

27

14

82

71

466

170.

9612

3711

.51

65

23

7P

LUG

GE

D1

23

71

298

969

46

92

88

1.2

13

13

56

.21

29

24

4.1

12

92

44

.110

3395

.28

22

21

25

.32

60

60

0.3

PLU

GG

ED

2221

25.3

1777

004

64

12

81

85

92

58

62

98

86

29

869

038.

0812

7578

.11

72

22

2P

LUG

GE

D1

27

57

810

2062

47

93

51

7.4

13

66

25

.11

34

68

0.5

13

46

80

.510

7744

.42

28

19

7.9

27

13

05

.6P

LUG

GE

D22

8197

.918

2558

47

41

56

38

93

65

89

92

28

99

22

7193

7.52

1314

85.2

17

92

87

PLU

GG

ED

13

14

85

1051

884

89

41

53

.51

41

95

1.8

14

01

77

.21

40

17

7.2

1121

41.7

62

34

33

0.8

28

21

29

PLU

GG

ED

2343

30.8

1874

654

84

18

46

92

84

29

35

86

93

58

674

869.

1213

5432

.41

86

42

8P

LUG

GE

D1

35

43

210

8346

49

94

78

9.7

14

73

36

14

57

33

.91

45

73

3.9

1165

87.1

22

40

52

3.6

29

30

69

.9P

LUG

GE

D24

0523

.619

2419

49

42

12

99

63

57

97

29

19

72

91

7783

2.64

1394

19.6

19

36

48

PLU

GG

ED

13

94

20

1115

365

09

54

25

.91

52

77

7.6

15

13

50

.21

51

35

0.2

1210

80.1

62

46

77

6.1

30

41

27

.8P

LUG

GE

D24

6776

.119

7421

50

42

41

29

99

10

10

10

35

10

10

35

8082

814

3446

.52

00

94

5P

LUG

GE

D1

43

44

711

4757

00

00

End

Cap

acit

yC

um

Fric

tio

nEn

dC

apac

ity

Pile

Dia

met

erJa

cket

Pile

Dia

met

erR

equ

ire

dPi

leLe

ngt

h

Cap

acit

yU

tilis

atio

n

Cu

mFr

icti

on

Tota

lCap

acit

y

Ham

mer

Type

/Siz

e

Page 27: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

Round 3 Firth of Forth Development ZonePile Driving Analysis MB1 & MB2–Additional AssessmentTechnical Note

C162T30-01

March 2012

Appendix C

Piling Driveability Assessment Results

Page 28: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

PILE DRIVING ASSESSMENTPile Driveability Calculations

Client : Seagreen

Project : Round 3 Firth of Forth Phase 1

Project No : C162

Revision History

Revision Purpose Date Author Checked Reviewed

0 For Comment 06/03/2002 VTE MRO JIR

Page 29: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

C1

62

-Se

agre

en

Ro

un

d3

Firt

ho

fFo

rth

Ph

ase

1D

eve

lop

me

nt

Zon

eA

dd

itio

nal

Pile

Dri

veab

ility

Ass

ess

me

nt

incl

ud

ing

vari

able

eff

icie

ncy

and

dri

ve-d

rill

dri

vem

od

eP

ileD

rivi

ng

Mo

de

Re

sult

s

Du

rati

on

*

Co

mp

(MN

)Te

n(M

N)

Req

uir

edP

ile

Len

gth

(m)

Co

mp

(MN

)Te

n(M

N)

Co

mp

ress

Ten

sD

rive

able

Pile

Len

gth

(m)

Ma

xC

om

p

(MP

a)

Ma

xTe

n

(MP

a)(H

ou

r)M

in(1

5%)

Ma

x(9

5%)

MC

B_B

E2m

34.0

725

.97

2751

.80

27.1

00.

660.

9678

504

IHC

-S18

0027

235.

23-2

4.10

2316

0.9

233

1420

Plu

gged

at24

m

MC

B_B

E3m

34.0

725

.97

2255

.97

26.5

20.

610.

9861

027

IHC

-S18

0022

198.

47-3

1.81

1329

0.5

231

1436

Un

plu

gged

dri

vin

g

MC

B_U

B2m

34.0

725

.97

2557

.28

27.8

40.

590.

9390

766

IHC

-S23

0025

248.

68-3

2.55

1553

0.6

327

2056

Plu

ugg

edat

25m

MC

B_U

B3m

34.0

725

.97

2160

.80

28.4

30.

560.

9167

648

IHC

-S23

0021

211.

21-2

7.33

893

0.3

333

2081

Un

plu

gged

dri

vin

g

DC

B_B

E2m

34.0

725

.97

3249

.42

26.8

00.

690.

9778

083

IHC

-S18

0032

233.

78-2

7.32

2381

0.9

233

1432

Plu

gged

at30

m

DC

B_B

E3m

34.0

725

.97

2755

.00

26.0

60.

621.

0056

647

IHC

-S18

0027

196.

36-3

8.32

1406

0.5

231

1449

Un

plu

gged

dri

vin

g

DC

B_U

B2m

34.0

725

.97

3056

.15

27.1

80.

610.

9658

340

IHC

-S18

0030

229.

75-2

7.07

1597

0.6

233

1445

Un

plu

gged

dri

vin

g

DC

B_U

B3m

34.0

725

.97

2658

.00

27.0

00.

590.

9663

156

IHC

-S18

0026

196.

98-3

9.51

1393

0.5

231

1446

Un

plu

gged

dri

vin

g

DC

B_U

B_7

MW

2m38

.71

29.5

132

61.7

931

.93

0.63

0.92

6666

8IH

C-S

2300

<32

Ref

usa

lin

plu

gged

mo

de

at30

mB

SBL

DC

B_U

B_7

MW

3m38

.71

29.5

127

64.5

430

.34

0.59

0.96

6919

0IH

C-S

1800

2719

7.50

-58.

6014

210.

523

114

49U

np

lugg

edd

rivi

ng

*Do

esn

ot

incl

ud

ech

ange

sin

ham

mer

effi

cien

cy,h

elm

ets

etc

and

assu

mes

aco

nti

no

us

dri

vin

gp

roce

ssat

45b

low

s/m

in

Axi

alC

ap

aci

tyP

ileD

rive

ab

ility

Ass

ess

me

nt

Dri

veab

ility

Res

ult

sTo

talB

low

Co

un

tSc

enar

io

Ach

ieve

dC

apac

ity

Uti

lisat

ion

Ma

xSR

D

(kN

)

Req

uir

ed

n/a

Co

mm

ent/

Ass

um

pti

on

s

Enth

ru(k

J)

Ham

mer

Size

Pile

Dia

met

er

Page 30: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

C162 - Seagreen Round 3 Firth of Forth Phase 1 Development ZoneAdditional Pile Driveability Assessement

Pile Driving Mode

Ground Model Parameter ModelPile Diameter

(m)Pile Length (m) Hammer Model Efficiency (%) Depth(m) SRD (kN)

Blows permeter

Compression(MPa)

Tension (MPa) Energy (kJ)CumulativeBlowcount

15% 0.0 2000 0 0 0 0 0

15% 6.0 4000 26 86 -51 233 77

15% 10.0 5000 33 86 -46 233 195

15% 11.5 5200 35 86 -45 233 246

35% 14.5 14539 72 122 -31 411 405

55% 17.5 24205 80 155 -25 644 632

75% 22.5 40649 87 203 -29 1143 1047

95% 23.5 70782 228 234 -26 1428 1205

95% 25.5 74626 274 235 -25 1425 1707

95% 27.0 78504 335 235 -24 1421 2316

15% 0.0 470 0 0 0 0 0

15% 1.5 1377 0 0 0 0 0

15% 3.5 3031 21 73 -57 231 21

15% 6.1 4915 33 74 -51 231 90

15% 8.5 7827 55 74 -42 230 196

35% 11.5 17552 64 116 -37 537 375

55% 13.6 31502 81 148 -25 840 527

75% 16.5 46152 92 174 -23 1139 778

95% 19.5 51085 84 197 -27 1441 1042

95% 22.0 61027 107 198 -32 1436 1329

15% 3.5 912 0 0 0 0 0

15% 6.8 2723 14 88 -46 327 23

15% 10.5 5504 26 89 -30 328 97

15% 12.7 10575 53 89 -19 330 184

35% 15.5 21337 53 138 -13 780 332

35% 18.5 33084 93 139 -13 775 550

55% 21.5 45055 96 177 -18 1214 833

75% 23.5 53161 91 208 -23 1653 1019

95% 24.5 88347 308 247 -33 2060 1219

95% 25.0 90766 361 249 -33 2056 1553

15% 3.5 1377 0 0 0 0 0

15% 6.1 3467 16 79 -49 333 21

15% 7.5 4806 21 79 -44 333 48

15% 9.5 7035 33 79 -37 333 102

15% 12.1 10474 51 79 -26 333 211

35% 13.6 21079 53 123 -13 778 289

35% 15.5 32067 82 124 -17 780 416

55% 17.5 43778 77 158 -25 1218 575

75% 19.5 55638 79 186 -25 1653 731

95% 21.0 67648 83 211 -27 2081 893

15% 7.5 2710.0 20 86 -65 233 75

15% 10.5 4509.0 29 86 -58 232 149

15% 13.5 6720.00 44 86 -48 230 258

15% 16.5 9343 61 86 -38 229 415

15% 19.5 12377 88 87 -29 224 639

35% 22.5 21388 72 136 -35 530 879

55% 25.5 31130 73 172 -29 829 1096

75% 28.5 41060 88 202 -25 1144 1337

95% 29.5 72083.0 247 233 -24 1436 1505

95% 32.0 78083.0 337 234 -27 1432 2381

15% 3.5 1500 0 0 0 0 0

15% 6.1 3031 21 73 -61 231 27

15% 7.5 4082 28 74 -57 231 61

15% 10.5 6788 48 74 -49 230 174

15% 13.5 10110 74 74 -40 230 357

35% 16.5 14050 51 116 -55 539 544

35% 19.5 18607 71 116 -41 538 726

55% 22.5 32134 82 147 -29 844 955

75% 25.5 46747 93 173 -33 1146 1217

95% 27.0 56647 96 196 -38 1449 1406

15% 5.3 1640 0 0 0 0 0

15% 6.8 2453 19 86 -61 233 15

15% 9.5 4303 29 86 -51 233 79

15% 12.5 6878 48 86 -38 232 194

15% 15.5 10007 73 86 -25 232 376

35% 18.5 13691 50 134 -30 542 561

35% 21.5 22418 84 135 -12 538 761

75% 25.5 38070 81 201 -32 1147 1089

95% 28.5 50138 100 229 -27 1448 1360

95% 30.0 58340 137 230 -27 1445 1597

15% 5.3 2473 0 0 0 0 0

15% 6.8 3697 25 73 -58 231 19

15% 9.5 6478 46 74 -49 230 115

15% 12.5 10347 75 74 -38 230 296

15% 15.5 15047 55 116 -51 539 491

35% 18.5 20580 81 116 -35 538 694

35% 21.5 33689 85 147 -28 843 943

75% 24.5 51228 84 196 -36 1449 1198

95% 25.5 57168 97 197 -39 1448 1288

95% 26.0 63155 112 197 -40 1446 1393

15% 5.3 2473 0 0 0 0 0

15% 6.8 3697 25 73 -59 231 19

15% 9.5 6478 46 74 -50 230 115

15% 12.5 10347 75 74 -39 230 297

35% 15.5 15047 55 116 -52 539 492

35% 18.5 20580 81 116 -35 538 695

55% 21.5 33690 85 147 -30 843 945

75% 23.5 45335 90 173 -32 1146 1120

95% 25.5 57168 97 196 -38 1449 1307

95% 26.5 69190 131 197 -37 1445 1421

BEMCB 2 27 IHC S1800

MCB BE 3 22 IHC S1800

BE 2 32 IHC S1800

MCB

MCB

DCB

UB 2 25 IHC S2300

UB 3 21 IHC S2300

DCB UB 2 30 IHC S1800

BE 3 27 IHC S1800DCB

DCB UB 3 26 IHC S1800

DCB_7MW UB 3 27 IHC S1800

Refusal at approximately 30m below mudlineDCB_7MW UB 2 32 (plugged) IHC S2300

Page 31: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

C1

62

-Se

agre

en

Ro

un

d3

Firt

ho

fFo

rth

Ph

ase

1D

eve

lop

me

nt

Zon

eA

dd

itio

nal

Pile

Dri

veab

ility

Ass

ess

me

nt

incl

ud

ing

vari

able

eff

icie

ncy

and

dri

ve-d

rill

dri

vem

od

eD

rive

Dri

llD

rive

Mo

de

Re

sult

s

Du

rati

on

Du

rati

on

*

Co

mp

(MN

)Te

n(M

N)

Req

uir

edP

ile

Len

gth

(m)

Co

mp

(MN

)Te

n(M

N)

Co

mp

ress

Ten

s

Dri

lled

sect

ion

(mb

elo

w

mu

dlin

e)

Max

Co

mp

(MP

a)

Max

Ten

(MP

a)(M

in)

(Ho

ur)

Min

(15%

)M

ax(7

5%)

MC

B_B

E2m

34.0

725

.97

2934

.35

31.4

80.

990.

8240

837

IHC

S120

017

190.

28-6

3.58

1445

320.

518

991

6Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

MC

B_B

E3m

34.0

725

.97

2435

.74

31.7

50.

950.

8240

293

IHC

S120

012

161.

02-5

9.45

1362

300.

518

692

0Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

MC

B_U

B2m

34.0

725

.97

2735

.91

32.4

40.

950.

8040

773

IHC

S120

015

190.

49-6

4.65

1351

300.

518

991

5Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

MC

B_U

B3m

34.0

725

.97

2236

.74

31.6

40.

930.

8248

956

IHC

S120

010

161.

36-5

8.78

1081

240.

418

791

9Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

DC

B_B

E2m

34.0

725

.97

3535

.20

32.6

00.

970.

8039

397

IHC

S120

015

182.

74-5

4.74

2061

460.

817

687

0Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

DC

B_B

E3m

34.0

725

.97

2935

.56

31.5

70.

960.

8246

347

IHC

S120

09

154.

81-5

4.69

1746

390.

617

587

0Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

DC

B_U

B2m

34.0

725

.97

3235

.40

31.9

00.

960.

8140

323

IHC

S120

012

182.

90-5

8.91

1802

400.

717

786

9Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

DC

B_U

B3m

34.0

725

.97

2735

.41

30.3

40.

960.

8647

722

IHC

S120

07

154.

90-5

8.09

1662

370.

617

586

9Se

ere

po

rtfo

ras

sum

pti

on

sad

op

ted

.

DC

B_U

B_7

MW

2m38

.71

29.5

134

40.3

536

.80

0.96

0.80

4558

0IH

CS1

200

1420

6.89

-50.

3920

6246

0.8

176

1100

Max

ener

gyq

uo

ted

isat

95%

effi

cien

cy

DC

B_U

B_7

MW

3m38

.71

29.5

129

42.2

837

.13

0.92

0.79

5561

9IH

CS1

200

917

5.19

-53.

5421

9949

0.8

175

1099

Max

ener

gyq

uo

ted

isat

95%

effi

cien

cy

Tota

lBlo

w

Co

un

t

Enth

ru(k

J)

Co

mm

en

t

Axi

alC

apac

ity

Pile

Dri

veab

ility

Ass

essm

ent

Max

SRD

(kN

)H

amm

erSi

ze

Dri

veab

ility

Res

ult

s

Scen

ario

Pile

Dia

met

er

Req

uir

edA

chie

ved

Cap

acit

yU

tilis

ati

on

Page 32: Round 3 Firth of Forth Development Zone Pile Driving ...marine.gov.scot/datafiles/lot/SG_FoF_alpha-bravo/SG_Phase1_Offsh…The use of two representative depth to bedrock geological

C162 - Seagreen Round 3 Firth of Forth Phase 1 Development ZoneAdditional Pile Driveability Assessement

Drive_Drill_Drive Mode

Ground Model Parameter ModelPile Diameter

(m)Pile Length (m) Hammer Model Efficiency (%) Depth(m) SRD (kN)

Blows permeter

Compression(MPa)

Tension (MPa) Energy (kJ)CumulativeBlowcount

15% 7.5 3263.9 24 80 -64 189 89

15% 9.5 4509.4 34 80 -59 188 146

15% 11.5 5632 43 80 -55 188 223

35% 12.7 14079 52 126 -59 435 280

35% 14.5 11345 41 126 -68 437 364

35% 17.5 16676 65 126 -51 434 524

35% 20.5 22311 85 126 -40 431 750

55% 23.5 28227 72 161 -43 677 985

55% 26.5 34407 90 162 -35 673 1228

75% 29.0 40837 84 190 -32 916 1445

15% 6.8 3533 29 68 -59 186 97

15% 9.5 5818 47 68 -54 186 199

15% 11.5 7827 66 68 -50 186 313

35% 12.7 18417 91 107 -52 432 407

35% 14.5 21660 71 107 -60 433 553

35% 16.5 17765 96 107 -49 431 719

55% 18.5 23206 79 136 -59 679 894

55% 20.5 28780 90 136 -50 677 1063

75% 22.5 34478 80 161 -53 922 1233

75% 24.0 40293 91 161 -50 920 1362

15% 6.8 2723 21 80 -65 189 70

15% 9.5 4671 35 80 -57 188 146

15% 12.1 6958 54 80 -48 187 261

35% 13.6 16779 66 126 -44 433 351

35% 14.5 11447 42 126 -64 437 399

35% 16.5 15494 59 126 -49 434 500

35% 19.5 21904 85 127 -35 431 717

55% 22.5 28691 75 161 -40 675 957

55% 25.5 35829 97 162 -34 671 1215

75% 27.0 40773 85 190 -35 915 1351

15% 6.1 3467 26 68 -59 187 78

15% 9.5 7035 57 68 -50 186 270

15% 11.5 9633 79 68 -45 185 455

15% 12.1 10473 86 68 -43 185 519

55% 13.6 30400 83 136 -47 678 564

55% 15.5 24200 67 136 -62 679 515

55% 17.5 30939 84 136 -46 678 736

55% 19.5 37953 100 137 -44 676 974

75% 21.5 45226 91 161 -47 920 975

75% 22.0 48956 98 161 -47 919 1081

15% 12.5 5938 50 77 -55 176 313

15% 17.5 10309 92 78 -42 175 667

35% 19.5 12377 49 121 -67 411 808

35% 21.5 20760 82 122 -48 408 939

35% 23.5 15874 67 122 -59 409 1088

35% 25.5 19647 79 122 -50 408 1234

35% 27.5 23483 93 122 -42 407 1406

55% 30.5 29348 78 155 -47 640 1662

55% 33.5 35338 98 155 -35 638 1925

75% 35.0 39397 83 183 -39 870 2061

15% 9.5 5818 51 65 -55 175 244

15% 12.5 8935 81 65 -49 174 442

35% 15.5 12669 54 103 -74 409 645

35% 18.5 17020 73 103 -64 408 836

35% 19.5 18607 81 103 -61 408 914

55% 21.5 36391 98 131 -51 639 1092

55% 23.5 27862 79 131 -64 641 1269

55% 25.5 33928 92 131 -53 639 1440

75% 27.5 40091 82 155 -56 871 1614

75% 29.0 46347 94 155 -47 870 1746

15% 9.5 4303 35 77 -59 177 164

15% 12.5 6878 57 77 -49 176 301

15% 15.5 10007 87 78 -39 175 516

35% 18.5 13691 55 122 -57 410 728

35% 19.5 15042 62 122 -53 409 787

35% 21.5 24239 98 122 -38 407 946

35% 23.5 18554 77 122 -45 408 1121

55% 26.5 25456 69 155 -47 640 1340

55% 29.5 32717 90 155 -34 638 1580

75% 32.0 40323 88 183 -32 869 1802

15% 6.8 3697 31 65 -58 175 106

15% 9.5 6478 57 65 -53 175 225

15% 12.5 10347 94 65 -45 174 452

35% 15.5 15047 64 103 -66 408 688

35% 18.5 20580 93 103 -53 407 924

35% 19.5 22608 99 103 -49 407 1020

75% 21.5 42590 89 155 -48 870 1208

75% 23.5 32677 71 154 -63 873 1368

75% 25.5 40072 84 155 -50 871 1524

75% 27.0 47722 100 155 -43 869 1662

15% 12.5 6878 57 77 -50 176 356

15% 15.5 10007 88 78 -41 175 572

35% 18.5 13691 55 121 -61 410 786

35% 19.5 15042 62 122 -58 410 845

35% 21.5 24239 97 122 -40 407 1004

35% 23.5 18554 76 122 -49 408 1177

55% 26.5 25456 68 155 -51 641 1393

55% 29.5 32717 89 155 -36 638 1629

75% 32.5 40323 87 183 -33 869 1893

95% 34.5 45580 82 207 -35 1100 2062

15% 12.5 6478 58 65 -54 175 361

15% 15.5 10347 94 65 -46 174 589

35% 18.5 15047 64 103 -68 408 827

35% 19.5 20580 92 103 -57 407 905

35% 21.5 22608 97 103 -53 407 1094

75% 23.5 42590 87 155 -53 871 1278

75% 26.5 32677 70 154 -71 873 1512

75% 29.5 40072 82 155 -56 871 1740

75% 32.5 47722 97 155 -45 870 2009

95% 34.5 55619 93 175 -44 1099 2199

DCB_7MW UB 2 34 IHC S1200

DCB_7MW UB 3 29 IHC S1200

DCB BE 2 35 IHC S1200

DCB BE 3 29 IHC S1200

MCB UB 2 27 IHC S1200

MCB UB 3 22 IHC S1200

MCB BE 2 29 IHC S1200

MCB BE 3 24 IHC S1200

DCB UB 2 32 IHC S1200