Route 105 (Fort Eustis Blvd) Route 105 (Fort Eustis Blvd) Bridge Replacement Bridge Replacement over CSX Railroad over CSX Railroad over CSX Railroad over CSX Railroad City of Newport News Department of Engineering Thomas Cheney, II, LS

Upload: others

Post on 23-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

Route 105 (Fort Eustis Blvd) Route 105 (Fort Eustis Blvd) Bridge ReplacementBridge Replacement

over CSX Railroadover CSX Railroadover CSX Railroadover CSX Railroad

City of Newport NewsDepartment of Engineering

Thomas Cheney, II, LS

Page 2: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

Route 105 (Fort Eustis Blvd)Route 105 (Fort Eustis Blvd)

Page 3: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

• Four lane divided highway

• NHS / STRAHNET

• Bridge built in 1960

• Nearing the end of useful life

BackgroundBackground

Page 4: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� Current Cost $5.2 Million

� Total Bridge Replacement

� Continuous Steel Rolled Beams

� Semi-Integral Abutment

� Precast / Pre-Stressed Piles and H-Piles

� HL-93 Loading and Alternate Military Loading

� 209’-8” Between Abutments

Project ScopeProject Scope

� 209’-8” Between Abutments

� 72’ Wide

� 23’ – 1” Minimum Vertical Clearance

� FHWA Standards

Page 5: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� City of Newport News

� VDOT

� CSX

� Joint Base Langley-Eustis

� MMM Design Group

� Bryant Contracting, Inc.

StakeholdersStakeholders

� Bryant Contracting, Inc.

Page 6: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� Stage 1 Bridge Construction - 7.5 Months

� Stage 2 Bridge Construction – 8 Months

� Stage 3 Median / Road Restoration – 3 Weeks

Construction ScheduleConstruction Schedule

Page 7: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� Funding

� Utilities

� Changed Project Engineers

� Traffic

� CSX

� Communication

ChallengesChallenges

Page 8: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� Maintenance of Traffic Plan

� City’s Efforts

� Fort Eustis’ Efforts

� VDOT’s Efforts

Traffic Mitigation Traffic Mitigation

Page 9: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� 311

� Project Website

� Facebook

� City’s Website

� City’s TV Channel

� Fort Eustis

Press Releases

CommunicationCommunication

� Press Releases

� 511

� Interstate Message Boards

Page 10: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� Communicate

� Bigger Contingency

� Adequate Inspections

� No Single Lane Closures During Rush Hours

Lessons Learned to DateLessons Learned to Date

Page 11: Route 105 Bridge Replacement over CSX Railroad.ppt · Thomas Cheney, II, LS. Route 105 (Fort Eustis Blvd) ... Microsoft PowerPoint - Route 105 Bridge Replacement over CSX Railroad.ppt

� Traffic signal on Route 143 & I-64 exit 247

� Sprint completed July 2013

� AT&T start August 2013

� Phase 1 completion January 2014

� Phase 2 completion August 2014

� Phase 3 completion August 2014

Looking AheadLooking Ahead