route 116 corridor study

61
Final Report Vermont Route 116 Corridor Study June 2014 Prepared for: CCRPC Town of Hinesburg Prepared by: 28 North Main Street Randolph, Vermont 05060 (802) 728-3376

Upload: lenga

Post on 08-Jan-2017

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Route 116 Corridor Study

Final Report

Vermont Route 116 Corridor Study

June 2014 Prepared for:

CCRPC Town of Hinesburg Prepared by:

28 North Main Street Randolph, Vermont 05060 (802) 728-3376

Page 2: Route 116 Corridor Study

About this Report

Page 3: Route 116 Corridor Study

Page i

Table of Contents

Page 4: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page ii

Page 5: Route 116 Corridor Study

Page 1

1 Introduction

1.1 Background

Page 6: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 2

1.2 Study Area

Page 7: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 3

Study Area Limit

Study Area Limit

Page 8: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 4

1.3 Study Process

Month Activities

July 2013

August 2013

September 2013

October 2013

November 2013

January 2014

February 2014

April 2014

Page 9: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 5

1.4 Goals and Vision

1.4.1 Vision for Hinesburg’s Village Area and the Route 116 Corridor

1.4.2 Goals for the Corridor

o

o

o

o

o

o

o

o

Page 10: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 6

1.4.3 Town Plan Excerpts

3.2.2) To change the character of Route 116 to a "Main Street", and to create and reinforce "gateways" into the Village to give people a sense of arrival. a) Work aggressively with the CCMPO, CCRPC, VTrans, and Hinesburg's State Legislators to

implement provisions of the Route 116 Hinesburg Village Corridor Study. Pay particular attention to intersection improvements at Shelburne Falls Road, Silver Street, Charlotte Road, Mechanicsville Road, and Commerce Street.

b) Redesign the main portion of Route 116 through the Village to make it safer, more pedestrian friendly, more efficient, and more attractive. Overall, the roadway (traveled area plus shoulders) should be narrowed to reduce speeding, eliminate passing on the right, and provide more room in the right-of-way for pedestrian infrastructure, street trees, etc. Additional features should include: curbing, more sidewalks, bicycle lanes, street trees, improved lighting that is pedestrian friendly and attractive, and improved signage.

c) Assess the pros and cons of the Town taking over the Village portion of Route 116 (e.g., Buck Hill Road to Commerce Street) from the State. To create a truly "walkable" community by working toward safe and convenient pedestrian access to all portions of the Village.

3.2.3) To create a truly "walkable" community by working toward safe and convenient pedestrian

access to all portions of the Village. a) Ensure the continued safety of existing crosswalks through maintenance of signage, curbing, road

striping. b) Make modifications to the Official Map as necessary to ensure village sidewalks and paths are

connected and linked to significant destinations outside the Village. Coordinate this with efforts to create a system of footpaths and trails in the rural areas of town (see section 6.7).

c) Continue to make regular improvements to pedestrian infrastructure using Municipal, State, and Federal funds.

d) Plan for and install sidewalks on both sides of Route 116 through the Village area.

3.2.4) To address the overall traffic flow and road network in the Village area to ease congestion, offer new development opportunities, and improve safety. a) Develop the new West Side Road connecting Charlotte Road with Shelburne Falls Road as

documented in the official town map, working with the Saputo Site Redevelopment Committee and private developers, and updating zoning regulations where necessary to insure implementation consistent with goals for development of the greater village area.

b) Work with the CCMPO to continue tracking traffic count data in and around the Village area. c) Prioritize the enforcement of speed and other traffic laws in the Village to protect lives and promote Village character.

Page 11: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 7

1.5 Corridor Plan Summary

Page 12: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 8

2 Existing and Future Conditions Analysis

2.1 Village Land Use and Demographics

The variety of residential types, businesses, and schools in the Village make it both a lively place and the economic, social and institutional center for the Town. The Village residents range in age and background, and it is this diversity that provides a rich source of community information, involvement, and participation. While several single-family homes remain, many of the larger homes have been divided into apartments and several businesses have created apartments in their buildings. The condominiums at Lyman Meadows made ownership possible with the affordable pricing available to a larger scale development. The apartments at Kelley's Field offer safe and convenient elderly housing. Additionally, the Village is the location of the Town's public institutions. Much of the vitality of the Village stems from the core of most town services, public institutions and commerce that are within walking distance for those that live in the village as well as residents that drive to the village and then walk for shopping, recreation, public events, school, etc.

Page 13: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 9

Development Type(s) Approximate Size (if known) (square

feet)

Status

Town Police Station

Hannaford supermarket

Hinesburg Center Phase One

Hinesburg Center Phase Two

Haystack Crossing

Green Street

NRG/Blomstrann

Cairns

Bissonette Family

Cheese Plant

Development Units Status

Hinesburg Center Phase One

Hinesburg Center Phase Two

Haystack Crossing

Green Street

NRG/Blomstrann

Norris

Thistle Hill

Page 14: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 10

Page 15: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 11

2.2 Roadway Network

2.2.1 Traffic Volumes and Patterns

Route 116 Segment Traffic Volume (AADT, VTrans)

North of CVU Rd

Between CVU and Mechanicsville

Between Mechanicsville and Charlotte

Between Charlotte and Silver

South of Silver

Local Roads:

Shelburne Falls Rd

Mechanicsville Rd

Charlotte Rd

Silver Street

Intersection Traffic Control AM Peak Traffic (vph)

AM Pedestrians

PM Peak Traffic (vph)

PM Pedestrians

Silver

Charlotte

Mechanicsville

Commerce

CVU

Page 16: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 12

2.2.2 Planned Transportation Projects

o

o

o

o

o

o

o

o

Page 17: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 13

2.2.3 Traffic Operations

Intersection Delay

LOS Signalized Unsignalized Description

A

B

C

D

E

F

CVU Rd

Ro

ute

11

6

North

140 ft (7 car

200 ft (10 car

CVU Rd

Ro

ute

116

200 ft (10 car

lengths)

140 ft (10 car

lengths)

Page 18: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 14

Average Vehicle Delay (seconds)

Intersection AM Peak PM Peak

CVU/Shelburne Falls

Commerce Street

Mechanicsville Rd (unsignalized approach)

Charlotte Road

Silver St (unsignalized approach)

Morning Peak Hour

Afternoon Peak Hour

Page 19: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 15

Existing Morning and Afternoon Queues

Queue lengths with planned projects

Page 20: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 16

Page 21: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 17

8.8

6.7

0 2 4 6 8 10

2015 Existing

2015 w/Intersection Projects

Travel TIme (Minutes)

Southbound

Northbound

Page 22: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 18

2.3 Traffic Safety

Page 23: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 19

Page 24: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 20

Left Turn and Thru, Broadside

v<--

Left Turns, Opposite

Directions --^v--

No Turns, Broadside ^<

Opp Direction Sideswipe

Rear End

Rear to rear

Same Direction Sideswipe

Single Vehicle Crash

Other

0 5 10 15 20

Sunday

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Crashes (2008-2010)

Page 25: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 21

2.4 Pedestrian Network

Page 26: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 22

2.5 Bicycle Network

Page 27: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 23

Shared Use Path

Page 28: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 24

2.6 Transit System

2.7 Hydrology

Page 29: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 25

Bridge #27 Bridge #28

Type

Culvert Length

Span

Year Built

Condition Notes

Bridge #27

Bridge #28

Page 30: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 26

2.8 Future Conditions

TAZ Description 2010 Households Increase 2035 Households

334

406

407

408

411

412

413

333

335

401

402

403

404

405

409

410

Total

Page 31: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 27

TAZ Description 2010 Jobs Job Increase 2035 Jobs

334

406

407

408

411

412

413

335

401

402

403

333

404

405

409

410

Total

24% 29%

0

500

1000

1500

2000

2500

2010 2035

Ho

use

ho

lds

Outside Village

Village Growth Area

Page 32: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 28

77% 76%

0

200

400

600

800

1000

1200

1400

2010 2035

Job

s

Outside Village

Village Growth Area

Page 33: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 29

2.9 Key Findings

0

2,000

4,000

6,000

8,000

10,000

12,000

1975 1985 1995 2005 2015 2025 2035

Ave

rage

Dai

ly T

raff

ic/T

ow

n P

op

ula

tio

n

RT116-N of CVU Rd

RT116-S of Buck Hill

Silver St

Town Population

Page 34: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 30

3 Toolbox of Strategies

3.1 Efficient, Right-sized Intersection Design

3.2 Adopt a Target Speed and Reinforce with Traffic Calming

Page 35: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 31

Walkable Core

Transition Zones

Transition Zones

School Zone

Page 36: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 32

Page 37: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 33

3.3 Connected Local Street Network

The development pattern in the upper portion of the above graphic above has every land use connect directly to the arterial. The lower pattern has a highly connected street network with small blocks.

Every trip to or from the land uses in the upper pattern must use the arterial street, resulting in congestion and conflicts with through traffic. In the connected street network (lower), local trips can avoid the arterial, reducing conflicts and congestion.

Page 38: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 34

Page 39: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 35

10.2

8.6

8.0

0 2 4 6 8 10 12

2035 No Build

2035 with FarmallConnector

2035 with West Side Road

Travel Time (minutes)

Southbound

Northbound

Page 40: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 36

3.4 Pedestrian Network

0

200

400

600

800

1000

1200

1400

1600

1800

2015 NoBuild

2035 NoBuild

2035 withFarmall

Connector

2035 withWest Side

Road

West St SB

West St NB

Route 116 SB

Route 116 NB

Bridge Sites

Bridge Sites

Traffic Screenline

Page 41: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 37

Page 42: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 38

3.5 Bicycle network

Page 43: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 39

3.6 Stormwater Management Integrated Design

o

o

3.7 Travel Demand Management

3.7.1 Transit Stop/Park and Ride/Mobility Hub

3.7.2 Education and Outreach

Page 44: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 40

3.7.3 School Transportation

3.8 Access Management

3.9 Reclassification of Route 116 as a Class 1 Town Highway

Page 45: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 41

Page 46: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 42

3.9.1 Class 1 Town Highway Responsibilities

Current Class 1

Item Hinesburg VTrans Hinesburg VTrans

Traffic Signal Maintenance

Street Lights-Pedestrian

Street Lights-Highway Safety

Bridges and Culverts

Sidewalks

Striping – Centerline

Striping– Stop bars

Striping– Edge lines

Striping – on-street parking

Striping – Crosswalks on Side Streets (3)

Striping – Crosswalks on Route 116 (2)

Plowing – Travel Lanes

Plowing – on-street parking

Plowing – sidewalks

Pavement – Resurfacing

Pavement – Patching and crack sealing

Cleaning Curbs and Drainage

Replacing or Repairing Signs

3.9.2 Revenue and Costs

Page 47: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 43

Scenario Revenue/Year Cost/Year Net Cost to Town Cost/Revenue Ratio

CVU Road

Riggs Road

Commerce Road

Page 48: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 44

3.9.3 Benefits of Reclassification

Page 49: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 45

4 Detailed Plan

Page 50: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 46

Page 51: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 47

Page 52: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 48

Page 53: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 49

5 Implementation Plan

Page 54: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 50

Project (Not in priority order) Next Step Funding or Program Options

Initial Cost

Construction Cost *

Timeline (short, medium or long term)

Notes

1) Silver Street Intersection

2) New and Enhanced Crosswalks

3) Buck Hill Gateway

4) Riggs Road Roundabout

5) Sidewalk: Mechanicsville to Commerce

6) Sidewalk: School to Buck Hill Road

7) Pedestrian Enhancements of Charlotte Rd and Commerce Street Intersections

8) Shared Use Path: Lantman’s to Lyman Meadow

9) Mobility Hub/Park and Ride

10)a Bridge over Canal between Cheese Plant and Farmall Dr

10)b Bridge over Patrick Brook between Hinesburg Center and Bissonette

11) Replace Bridge #28

12) Future Path Right-of-way

Page 55: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 51

5.1.1 Silver Street Intersection

5.1.2 Multimodal Projects

Page 56: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 52

Page 57: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 53

5.1.3 Establish Village Gateways

Page 58: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 54

5.1.4 Establish Local Street Network

Page 59: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 55

5.1.5 Planning and Design Initiatives

5.1.6 Reclassification

5.2 Public Involvement, Issues and Priorities

Page 60: Route 116 Corridor Study

Hinesburg Route 116 Corridor Plan June 2, 2014

Page 56

5.3 Areas for Further Policy Development

5.3.1 Class 1 Town Highway Reclassification

5.3.2 Street Network Development

Page 61: Route 116 Corridor Study

Attachments