    Project Overview

    Route 15 Wastewater Study,

    ,

    Dave Prickett, P.E.Project Manager/ Associate

    , .

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    2/12

    Pro ect Area

    Route 15 Stud Area

    Corridor along Route 15

    Only east side of Route 15

    Approximately 600 acres and 80parcels (40-50% of land developable)

    15

    from CWMP) bounded by

    I-84

    Main Street

    Mashapaug Road

    u ne aug ver

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    3/12

    Pro ect Ob ective

    Evaluate Wastewater Mana ement Alternatives in

    Route 15 Study Area Collection

    Sewer (gravity, low pressure, pump station, force main)

    Non-Sewer (septic systems) rea men

    Centralized (Sturbridge WWTF)

    -

    Disposal

    Surface water (Sturbridge WWTF Outfall to Quinebaug River)

    Groundwater (Subsurface disposal)

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    4/12

    Summar of Alternatives

    m s o o en a

    Collection System

    rea men an

    Disposal atSturbridge WWTF

    rea men a

    Sturbridge WWTFand GroundwaterDisposal w ithinRoute 15 Study

    rea men a

    Satellite WWTFand GroundwaterDisposal in Route

    15 Study AreaArea

    Route 15 Sewer Only Alternative 1A Alternative 1B Alternative 1C

    Route 15 Sewer andFuture Service Area

    Alternative 2A Alternative 2B Alternative 2C

    Route 15 Sewer andExpanded Service Area

    Alternative 3A Alternative 3B Alternative 3C

    1. Alternative 4 is no-action alternative; continued reliance on septic systems

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    5/12

    Sewer System Alternative 1A

    Conce t

    Gravity sewer (5,700 feet) fromMobil to gas main crossing

    Pump Station near gas main crossing

    Force main/low pressure sewer(10,200 feet) from pump station to

    ur r ge

    Comments

    erves on y eas s e o ou e

    Limited potential for futureexpansion

    $5M capital cost

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    6/12

    Sewer System Alternative 2A

    Concept

    Gravity sewer (10,200 feet) fromMobil to north of gas main crossingand down Kelly Road

    Pump Station near Kelly Road andRiver Road

    Force main/low pressure sewer(16,500 feet) from pump station toSturbridge WWTF

    Comments

    Serves Kelley Road

    Facilitates future sewer expansionwithin Special Zoning District

    $8M capital cost

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    7/12

    Sewer System Alternative 3A

    Features

    Expanded gravity sewer (27,900feet)

    ump a on near e y oa anRiver Road

    Force main/low pressure sewer,

    Sturbridge WWTF

    Comments

    Larger service area to increase lots

    served and reduce unit costs

    $13M capital cost

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    8/12

    Preliminar Ca ital Costs

    Limits of Potential Treatment and Treatment at Treatment at

    Sturbridge WWTF

    and GroundwaterDisposal w ithinRoute 15 Study

    Area

    and GroundwaterDisposal in Route

    15 Study Area

    Route 15 Sewer Only Alternative 1A

    $5M

    Alternative 1B

    $8M

    Alternative 1C

    $14M

    Route 15 Sewer andFuture Service Area

    Alternative 2A$8M

    Alternative 2B$12M

    Alternative 2C$19M

    Expanded Service Area

    $13M

    $18M

    $26M

    1. Alternative 4 is no-action alternative; continued reliance on septic systems

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    9/12

    Potential Betterment Costs Per Parcel

    Limits of Potential Treatment and Treatment at Treatment at

    Sturbridge WWTF

    and Groundwater

    Disposal withinRoute 15 Study Area

    Groundwater

    Disposal in Route 15Study Area

    Route 15 Sewer Only Alternative 1A

    $15,000-$3,100,000

    Alternative 1B

    $24,000-$5,000,000

    Alternative 1C

    $42,000-$8,700,000

    Route 15 Sewer andFuture Service Area

    Alternative 2A$22,000-$4,700,000

    Alternative 2B$33,000-$7,100,000

    Alternative 2C$52,000-$11,000,000

    Expanded Service Area

    $21,000-$4,600,000

    $29,000-$6,400,000

    $42,000-$9,200,000

    Notes:

    1. Alternative 4 is no-action alternative; continued reliance on septic systems2. Typical cost for residential septic system is $20,000 to $30,000

    3. Challenging cost apportionment: large lots; partially developed; few lots with majority of development

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    10/12

    Wastewater Recommendations

    High capital costs

    No current WWTF capacity available Challenges to obtaining sewer extension permit

    Route 15 (Study Area 19) is not part of Recommended Plan inCWMP

    Potential Future WWTF Flow Increase

    Construction/upgrade on-going

    EPA/MassDEP negotiation period

    Sewer expansion (Alternatives 1, 2 and 3) shouldbe tabled for approximately 3 years

    -groundwater disposal (septic systems)

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    11/12

    Water System Alternative

    Features

    Extend 12-inch water main fromShattuck Road south to Mobil

    Comments

    Existing water main is close to

    Capacity available

    Lower cost than sewer alternatives

    Provides fire flow service to Route15 corridor

    .

  • 8/8/2019 Route 15 Wastewater Study - October 4, 2010

    12/12

    Water Recommendations

    Proceed w ith Plannin for Water Main Extension

    Conduct follow-up public informational meeting

    Explore funding sources

    Rural Development

    Window of grant eligibility is closing (post-2010 census)

    Pursue other economic development funding sources

    Conceptual Project Implementation Schedule

    Planning (Fall 2010 through Spring 2011)

    Town Meeting (Spring 2011)

    Design (Summer/Fall 2011)

    Construction (2012)