route 15 wastewater study - october 4, 2010
TRANSCRIPT
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
1/12
Project Overview
Route 15 Wastewater Study,
,
Dave Prickett, P.E.Project Manager/ Associate
, .
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
2/12
Pro ect Area
Route 15 Stud Area
Corridor along Route 15
Only east side of Route 15
Approximately 600 acres and 80parcels (40-50% of land developable)
15
from CWMP) bounded by
I-84
Main Street
Mashapaug Road
u ne aug ver
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
3/12
Pro ect Ob ective
Evaluate Wastewater Mana ement Alternatives in
Route 15 Study Area Collection
Sewer (gravity, low pressure, pump station, force main)
Non-Sewer (septic systems) rea men
Centralized (Sturbridge WWTF)
-
Disposal
Surface water (Sturbridge WWTF Outfall to Quinebaug River)
Groundwater (Subsurface disposal)
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
4/12
Summar of Alternatives
m s o o en a
Collection System
rea men an
Disposal atSturbridge WWTF
rea men a
Sturbridge WWTFand GroundwaterDisposal w ithinRoute 15 Study
rea men a
Satellite WWTFand GroundwaterDisposal in Route
15 Study AreaArea
Route 15 Sewer Only Alternative 1A Alternative 1B Alternative 1C
Route 15 Sewer andFuture Service Area
Alternative 2A Alternative 2B Alternative 2C
Route 15 Sewer andExpanded Service Area
Alternative 3A Alternative 3B Alternative 3C
1. Alternative 4 is no-action alternative; continued reliance on septic systems
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
5/12
Sewer System Alternative 1A
Conce t
Gravity sewer (5,700 feet) fromMobil to gas main crossing
Pump Station near gas main crossing
Force main/low pressure sewer(10,200 feet) from pump station to
ur r ge
Comments
erves on y eas s e o ou e
Limited potential for futureexpansion
$5M capital cost
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
6/12
Sewer System Alternative 2A
Concept
Gravity sewer (10,200 feet) fromMobil to north of gas main crossingand down Kelly Road
Pump Station near Kelly Road andRiver Road
Force main/low pressure sewer(16,500 feet) from pump station toSturbridge WWTF
Comments
Serves Kelley Road
Facilitates future sewer expansionwithin Special Zoning District
$8M capital cost
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
7/12
Sewer System Alternative 3A
Features
Expanded gravity sewer (27,900feet)
ump a on near e y oa anRiver Road
Force main/low pressure sewer,
Sturbridge WWTF
Comments
Larger service area to increase lots
served and reduce unit costs
$13M capital cost
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
8/12
Preliminar Ca ital Costs
Limits of Potential Treatment and Treatment at Treatment at
Sturbridge WWTF
and GroundwaterDisposal w ithinRoute 15 Study
Area
and GroundwaterDisposal in Route
15 Study Area
Route 15 Sewer Only Alternative 1A
$5M
Alternative 1B
$8M
Alternative 1C
$14M
Route 15 Sewer andFuture Service Area
Alternative 2A$8M
Alternative 2B$12M
Alternative 2C$19M
Expanded Service Area
$13M
$18M
$26M
1. Alternative 4 is no-action alternative; continued reliance on septic systems
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
9/12
Potential Betterment Costs Per Parcel
Limits of Potential Treatment and Treatment at Treatment at
Sturbridge WWTF
and Groundwater
Disposal withinRoute 15 Study Area
Groundwater
Disposal in Route 15Study Area
Route 15 Sewer Only Alternative 1A
$15,000-$3,100,000
Alternative 1B
$24,000-$5,000,000
Alternative 1C
$42,000-$8,700,000
Route 15 Sewer andFuture Service Area
Alternative 2A$22,000-$4,700,000
Alternative 2B$33,000-$7,100,000
Alternative 2C$52,000-$11,000,000
Expanded Service Area
$21,000-$4,600,000
$29,000-$6,400,000
$42,000-$9,200,000
Notes:
1. Alternative 4 is no-action alternative; continued reliance on septic systems2. Typical cost for residential septic system is $20,000 to $30,000
3. Challenging cost apportionment: large lots; partially developed; few lots with majority of development
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
10/12
Wastewater Recommendations
High capital costs
No current WWTF capacity available Challenges to obtaining sewer extension permit
Route 15 (Study Area 19) is not part of Recommended Plan inCWMP
Potential Future WWTF Flow Increase
Construction/upgrade on-going
EPA/MassDEP negotiation period
Sewer expansion (Alternatives 1, 2 and 3) shouldbe tabled for approximately 3 years
-groundwater disposal (septic systems)
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
11/12
Water System Alternative
Features
Extend 12-inch water main fromShattuck Road south to Mobil
Comments
Existing water main is close to
Capacity available
Lower cost than sewer alternatives
Provides fire flow service to Route15 corridor
.
-
8/8/2019 Route 15 Wastewater Study - October 4, 2010
12/12
Water Recommendations
Proceed w ith Plannin for Water Main Extension
Conduct follow-up public informational meeting
Explore funding sources
Rural Development
Window of grant eligibility is closing (post-2010 census)
Pursue other economic development funding sources
Conceptual Project Implementation Schedule
Planning (Fall 2010 through Spring 2011)
Town Meeting (Spring 2011)
Design (Summer/Fall 2011)
Construction (2012)