route 28 (main st / davis straits / teatickethighway
TRANSCRIPT
![Page 1: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/1.jpg)
Conceptual Design Presentation& Listening Session
June 5, 20186:00 PM
Route 28 (Main St / Davis Straits / Teaticket Highway)Corridor Improvements
Town of Falmouth
![Page 2: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/2.jpg)
Project Team• Led by Falmouth Department of Public Works (DPW)• Consulting team consists of Tata & Howard and TEC, Inc.• Experts in utility and transportation design, respectively• MassDOT prequalified
![Page 3: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/3.jpg)
Route 28 Corridor Segments
1
Main Street
Davis Straits
TeaticketHighway
![Page 4: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/4.jpg)
Project Goals• Coordinate roadway improvements with
water line replacement project• Improve transportation safety concerns• Improve traffic control at key intersections• Upgrade multi-modal features (pedestrian
and bicycle accommodations)• Address accessible ramp upgrades• Evaluate opportunities to improve or
consolidate business driveways
![Page 5: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/5.jpg)
What this meeting is…• An opportunity for our team to LISTEN to public
concerns and challenges about the Route 28 corridor• An opportunity to LEARN some project background and
view early ideas • An opportunity to learn about our next steps and the
design and permitting process ahead
What this meeting is NOT…• A presentation of a final plan• Your only opportunity to provide input
![Page 6: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/6.jpg)
Project Activities Completed• Route 28 Corridor Study by McMahon Associates• Field survey and property research along roadway limits• Road Safety Audit with DPW, MassDOT, Cape Cod Commission and
Falmouth Police & Fire• Conceptual layout of multi-modal transportation improvements
• Intersection configurations• Traffic flow / controls• Sidewalks & crosswalks• Bike lanes
• Coordination with MassDOT and Cape Cod Commission for pending project applications and funding alternatives
![Page 7: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/7.jpg)
Current Challenges
• High volume of traffic
• Lack of turn lanes
• Queuing/blocking within intersections
• Crash severity at key intersections
![Page 8: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/8.jpg)
Current Challenges• Lack of ADA/AAB compliance for
accessible ramps (slopes, dimensions, tactile warning device)
![Page 9: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/9.jpg)
Current Challenges
• Lack of bicycle accommodations on Route 28
• Buffers to vehicular traffic
![Page 10: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/10.jpg)
Current Challenges
• Skewed Intersections
• Offset side streets
![Page 11: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/11.jpg)
Current Challenges
• Closely spaced commercial curb cuts
• Head-in parking / backing into Route 28
• Congestion from turning vehicles
![Page 12: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/12.jpg)
Proposed ImprovementsSegment 1 - Main Street
Extend Sidewalk to North Main St
Change Intersection
From Yield To Stop Controlled
Upgrade Antiquated Traffic Signal At Fire Station
Proposed ADA Compliant Wheelchair
Ramp (Typ.)
Existing Curb Cuts To Be Removed
(By Others)
Existing Curb Cuts To Be Removed
(By Others)
Proposed ADA Compliant Wheelchair Ramp (Typ.) & Crosswalk enhancements
Improve lane definition,
crosswalks, and ADA ramps
Explore traffic signal control and intersection geometry
![Page 13: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/13.jpg)
Recommended Cross-SectionSegment 1 - Main Street
![Page 14: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/14.jpg)
Key LocationScranton Avenue
Perform Additional Data Analysis To Determine Left Turn & Traffic
Signal Warrants
Remove Island
Upgrade ramps
![Page 15: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/15.jpg)
Proposed ImprovementsSegment 2 - Falmouth Heights to Sandwich Road
Proposed Roundabout
Introduce Sidewalk on North Side
Meet Jones Rd Improvements(MassDOT Project #605671)
Perform Additional Data Analysis To Determine Left
Turn Warrants. Consider “Do Not Block” Signs/Markings
Reconstruct Sidewalk
Proposed Bike Lanes
Meet Jones Rd Improvements(MassDOT Project #605671)
Proposed Bike Lanes
Proposed Bike LanesProposed
Bike Lanes
Reconstruct Sidewalk
Reconstruct Sidewalk on South Side
![Page 16: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/16.jpg)
Recommended Cross-SectionSegment 2 – No Left Turn Lane
![Page 17: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/17.jpg)
Recommended Cross-SectionSegment 2 – Left Turn Lane
![Page 18: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/18.jpg)
Key LocationFalmouth Heights Rd Roundabout
Roundabout Was Recently Endorsed By Board Of Selectmen
Sized For Commercial Trucks & Large Boat Trailers
Improves Access For Businesses By Eliminating Need For Certain Left-turns
![Page 19: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/19.jpg)
Key LocationDillingham Avenue / Spring Bars Road Traffic Signal
Introduce Bike Lanes North Of
Proposed Roundabout
Introduce Bike Lanes North Of
Proposed Roundabout
Existing Curb Cuts To Be Removed
(By Others)
Existing Curb Cuts To Be Removed
(By Others)
Perform Additional Data Analysis To
Determine Left Turn & Traffic Signal Warrants
Remove Island To Improve Alignment
Introduce Left Turn Lanes
![Page 20: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/20.jpg)
Key LocationWalmart Plaza & Maravista Avenue
Reconstruct Sidewalk To Be ADA
Compliant (5.5’ Minimum)
Reconstruct Sidewalk To Be ADA
Compliant
Maintain Existing Left Turn Lanes Into Various Driveways
Maintain Existing Left Turn Lanes Into Various Driveways
Remove Pedestrian Signal & Shift Xwalk South Of
Walmart Driveway; Perform Additional Data Analysis To Determine Traffic Signal Warrants
Remove Pedestrian Signal & Shift Xwalk South Of
Walmart Driveway; Perform Additional Data Analysis To Determine Traffic Signal Warrants
![Page 21: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/21.jpg)
Proposed ImprovementsSegment 3 - Sandwich Road to Oxbow Road
Left Turn Lane to Sandwich Road
Perform Additional Data Analysis To Determine Traffic Signal Warrants
Proposed Sidewalk With Grass Buffer
Reconfigure Traffic Signal To Accommodate Left Turn Lanes & ADA Accessibility
End Grass Buffer On South Side
End Grass Buffer On North Side
Proposed Bike LanesProposed
Bike Lanes
Proposed Sidewalk With Grass Buffer
![Page 22: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/22.jpg)
Recommended Cross-SectionSandwich Road to Oxbow Road
![Page 23: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/23.jpg)
Alternative 1(retains partial skew)
Key LocationSandwich Road
Alternative 2(“T” intersection)
Reconstruct Slip Lane To Be 60
Degrees Minimum
Propose Left Turn Lane Onto Sandwich Road
Perform Additional Data
Analysis To Determine Traffic Signal Warrants
Simplified Pedestrian Crossing
![Page 24: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/24.jpg)
Key LocationMaravista Avenue Extension / Homestead Lane
Reconfigure Existing Traffic Signal To
Accommodate Left Turn Lanes & ADA Accessibility
![Page 25: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/25.jpg)
Next Steps• Collect additional summertime traffic data
• Advance design and review impacts related to widening and options for traffic control
• Coordinate with utility companies
• Investigate MassWorks economic development grant for Falmouth Heights Road improvements as a Downtown “gateway” feature
• Falmouth Heights Road to Oxbow Road (State Highway):• MassDOT Project Review Committee - July - Seek Federal funds• 25% Design Submittal – Early 2019
![Page 26: Route 28 (Main St / Davis Straits / TeaticketHighway](https://reader030.vdocument.in/reader030/viewer/2022012019/616877ebd394e9041f6fc5a5/html5/thumbnails/26.jpg)
Questions ?Please send follow-up questions or observations to:
Kevin Dandrade, PE, PTOE (Principal)Jonathan Rockwell, PE (Project Manager)
c/o Megan [email protected]