Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp closed
Westbound:- Two right lanes shifted to north onto new deck- Left lane/XBL remains in current position,
however, construction barrier will be placed on north side creating a cattle chute
- 31st Street Ramp detoured to Paterson Plank RdEastbound: No changes to current configuration
31st Street Ramp Detoured to Paterson
Plank RoadNJ Transit access ramp
open 6am to 1pm
Work Zone(Typ.)
NB Ramp to Paterson Plank
Road Open
SB Ramp to Route 1&9
Closed
Construction Barrier (Typ.)
![Page 2: Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp … · 2020. 8. 24. · Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp closed Westbound:](https://reader035.vdocument.in/reader035/viewer/2022071213/602ef57ded7ded5943036fbe/html5/thumbnails/2.jpg)
Route 495 Rehabilitation Project – Stage 9 – West End
Construction Barrier (Typ.)
Westbound:- Two right lanes shifted to north onto new deck- Left lane/XBL remains in current position, however,
construction barrier will be placed on north side creating a cattle chute
- 31st Street Ramp detoured to Paterson Plank RoadEastbound: No changes to current configuration
Work Zone