Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp closed Westbound: - Two right lanes shifted to north onto new deck - Left lane/XBL remains in current position, however, construction barrier will be placed on north side creating a cattle chute - 31st Street Ramp detoured to Paterson Plank Rd Eastbound: No changes to current configuration 31st Street Ramp Detoured to Paterson Plank Road NJ Transit access ramp open 6am to 1pm Work Zone (Typ.) NB Ramp to Paterson Plank Road Open SB Ramp to Route 1&9 Closed Construction Barrier (Typ.)

Upload: others

Post on 05-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp … · 2020. 8. 24. · Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp closed Westbound:

Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp closed

Westbound:- Two right lanes shifted to north onto new deck- Left lane/XBL remains in current position,

however, construction barrier will be placed on north side creating a cattle chute

- 31st Street Ramp detoured to Paterson Plank RdEastbound: No changes to current configuration

31st Street Ramp Detoured to Paterson

Plank RoadNJ Transit access ramp

open 6am to 1pm

Work Zone(Typ.)

NB Ramp to Paterson Plank

Road Open

SB Ramp to Route 1&9

Closed

Construction Barrier (Typ.)

Page 2: Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp … · 2020. 8. 24. · Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp closed Westbound:

Route 495 Rehabilitation Project – Stage 9 – West End

Construction Barrier (Typ.)

Westbound:- Two right lanes shifted to north onto new deck- Left lane/XBL remains in current position, however,

construction barrier will be placed on north side creating a cattle chute

- 31st Street Ramp detoured to Paterson Plank RoadEastbound: No changes to current configuration

Work Zone