roy l. bomowey -...
TRANSCRIPT
ROY L. BOMOWEY
CIVIL ENGINEER –QC-CIVIL INSPECTOR/QC- Material RECEIVING INSPECTOR Email Add. : [email protected]/ [email protected] Skype : roy.bomowey Mobile No. : +96894125108/+639071995007/+639196414525 PERMANENT HOME/LOCATION/ADDRESS CITY/TOWN : No.16 F. TICUAN ROAD, BAKAKENG SUR STATE : BAGUIO CITY 2600 COUNTRY : PHILIPPINES CURRENT LOCATION of WORK: COUNTRY : SULTANATE OF OMAN CITY/TOWN : MUSCAT (PETROLEUM DEVELOPMENT OF OMAN-Nimr Site) PERSONAL DATA: AGE: 37 DATE OF BIRTH: APRIL 28, 1976 GENDER: MALE CIVIL STATUS: MARRIED HEIGHT: 165 CM (5’ 5”) WEIGHT: 75 KG. NATIONALITY: FILIPINO RELIGION: ROMAN CATHOLIC (CHRISTIAN) PASSPORT No.: XX53920773 AVAILABILITY: ANYTIME
LANGUAGES FLUENCY ENGLISH SPEAK, READ, WRITE, LISTENG (IELTS BAND SCORE 6.5-June 8,2013) TAGALOG/FILIPINO SPEAK, READ, WRITE ARABIC BIGINNER/BASIC
EXPERIENCE CLASSIFICATION:
JOB FUNCTION YEARS EXPERIENCE QC-CIVIL ENGINEER/INSPECTOR 6YEARS 7months QC-MATERIAL ENGINEER /INSPECTOR 1 YEAR SITE CIVIL ENGINEER 6 YEARS TOTAL YEARS OF EXPEREINCE: 14 YEARS & WORKING EXPERIENCE IN THE FIELD OF ENGINEERING, MAINTAINANCE, PROCUREMENT &
CONSTRUCTION (EPC & EMC) INDUSTRY: (EPC & EMC) INDUSTRIAL FACILITIES, OIL & GAS, PIPELINES, TANK
FOUNDATIONS, CULVERTS, HOUSING/BUILDINGS, CONCRETE & ASPHALT ROADS, GRADED ROADS, BRIDGE, AIRPORT, EARTH WORK EXCAVATION AND COMPACTION, REINFORCE CONCRETE STRUCTURES
HIGHEST QUALIFICATION: BACHELOR OF SCIENCE IN CIVIL ENGINEERING (B.S.C.E.) WORK LOCATIONS: ANY LOCATION ARE YOU WILLING TO MOVE OR RELOCATE? YES - I WILL TRAVEL DOMESTICALLY YES - I WILL RELOCATE DOMESTICALLY YES - I WILL TRAVEL INTERNATIONALLY YES - I WILL RELOCATE INTERNATIONALLY IDEAL NEXT JOB:
a) QC-CIVIL ENGINEER/INSPECTOR; b) QC-MATERIAL ENGINEER; c) QC-BUILDING INSPECTOR d) PROJECT ENGINEER
REQUIRED SALARY AND CONDITION/PACKAGE: (CTC) USD 3,000/MONTH (BASIC); FREE: FOOD, ACCOMODATION, TRANSPORTATION, ROUND TRIP AIRTICKET, VACATION LEAVE W/ PAY, RESIDENT PERMIT, MEDICAL INSURANCE. QUALIFICATIONS:
MORE THAN 13 YEARS POST GRADUATE EXPERIENCE IN THE FIELD OF CIVIL ENGINEERING. I HAD COMPLETED THE DEGREE OF BACHELOR OF SCIENCE IN CIVIL ENGINEERING,
PASSED THE CIVIL LICENSURE EXAMINATION, (PHILIPPINE REGULATORY COMMISSION)
PASSED THE MATERIAL ENGINEER ACCREDITATION EXAMINATION OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PHILIPPINES, (DPWH)
PASSED THE SAUDI ARAMCO QC-CIVIL INSPECTOR AND QC-MATERIAL ENGINEER RECEIVING INSPECTOR ACCREDITATION INTERVIEW/EXAMINATION, MEMBER OF SAUDI ENGINEERING COUNCIL,
PASSED THE PETROLEUM DEVELOPMENT OMAN QC-CIVIL INSPECTOR COMPETENCY ASSESSMENT TEST (APPROVED QC CIVIL INSPECTOR).
6 YEARS & 7MONTHS WORKING AS QC-CIVIL ENGINEER/INSPECTOR IN INDUSTRIAL FACILITIES, OIL AND GAS (underground and above ground pipelines, tank pads/foundations, bund walls, rotating equipment foundations, rig location), HOUSING, BUILDINGS, PRE-CAST STRUCTURE, PEB, EARTHWORKS, BACKFILL & COMPACTION, EMBANKMENT, BITUMINOUS & PORTLAND CONCRETE ROADS AND PAVEMENT, AIRPORT TERMINAL.
7 YEARS WORKING EXPERIENCE AS SITE ENGINEER WHICH INCLUDES CONSTRUCTION MANAGEMENT, DRAFTING, SCHEDULING AND ESTIMATING OF BUILDINGS, EARTHWORKS, ROADS, BRIDGE, LONG SPAN POST TENSION GIRDERS AND OTHER CIVIL RELATED WORKS
FAMILIAR WITH INTERNATIONAL STANDARDS: ACI, ASTM, UBC ,IBC , AASHTO, BS, P.D.O. STDS, SHELL DEP/SIEP, SAUDI ARAMCO ENGINEERING STANDARDS (SAES,SAIC,SATIP,SATR,SAEP,SAMMS, ETC.) AND ROYAL COMMISSION OF JUBAIL & YANBU STANDARDS, SPECIFICATIONS/PROCEDURE, ITP.
COMPUTER LITERATE: MS WORDS, EXEL, ACAD
TECHNICAL SKILLS: a) WELDER (SMAW) SHEILDED METAL ARC WELDING (with training and TESDA NCII Certificate); b) CONCRETE/SOIL TECHNESIAN; c) STEEL FIXER; d) SHUTTERING CARPENTER; e) PAINTER
OBJECTIVE:
TO OBTAIN POSITION WHERE I CAN MAXIMIZE MY MULTI LAYER OF MANAGEMENT SKILLS, QUALITY
ASSURANCE, PROGRAM DEVELOPMENT, TRAINING EXPERIENCE, CUSTOMER SERVICE, AND SUCCESSFUL
TRACK RECORD IN THE FIELD OF ENGINEERING, MAINTAINANCE, PROCUREMENT AND CONSTRUCTION.
AS QC-CIVIL ENGINEER - ASSURES THE WORK TO ACHIEVE A HIGLY STANDARD OF EXCELENCE IN THE
ADMINISTRATION AND QUALITY CONTROL OF PROJECT, CONSISTENT IN THE INSPECTION, INSIST UPON
SPECIFICATION RESULTS, FROM START TO FINISH, LEAVE NOTHING A CHANCE. A WRONG METHOD IS
MORE EASILY CORRECTED THE FIRST TIME IT IS PRACTICE THAN AFTER IT BECOMES A HABIT.
EDUCATIONAL BACKGROUND
LEVEL SCHOOL COURSE YEAR GRADUATED
TERTIARY BAGUION CENTRAL UNIVERSITY BACHELOR OF SCIENCE IN 2000 MARCH
#18 Bonifacio Ave. Baguio city, CIVIL ENGINEERING
Philippines
SECONDARY ST. THERESITA'S SCHOOL HIGH SCHOOL 1993 MARCH
Tabuk, Kalinga, Philippines
91%NCEE (NATIONAL COLLEGE
ENTRANCE EXAMINATION)
PRIMARY NORTHERN TABUK CENTRAL ELEMENTARY 1989 MARCH
Tabuk, Kalinga, Philippines
TECHNICAL SCHOOL COURSE DURATION
COURSE NEXT GENERATION LEARNING BASIC AUTO CAD APRIL 11-27, 2005
1 CENTER ADULT COMPUTER ADVANCE AUTO CAD MAY6-20, 2005
TRAINING ( ACT )
Pelizloy Bldg. Session Rd Baguio
City, Philippines
2 TESDA
(SMAW) SHEILDED METAL ARC
WELDING OCT 2008-JAN 2009
3 GMS INSTITUTE OF TECHNOLOGY PRIMAVERA P3 with P6 February 7-11, 2011
Session Road, Baguio City,Phil.
PROFILE:
LICENSED CIVIL ENGINEER (license No.0097045) PHILIPPINE REGULATORYCOMMISSION
APPROVED PETROLEUM DEVELOPMENT OF OMAN (PDO) QC - CIVIL INSPECTOR
APPROVED SAUDI ARAMCO/SAUDI OIL COMPANY QC-CIVIL INSPECTOR/ ENGINEER
SAUDI ARAMCO SAP No.: 70013976
APPROVED SAUDI ARAMCO/SAUDI OIL COMPANY QC-MATERIAL ENGINEER RECEIVING
INSPECTOR
ACCREDITED MATERIAL ENGINEER -1 (QA/QC ENGINEER) ACI CERTIFICATION EQUIVALENT.
Accreditation No. 3181 (DPWH ) DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
PHILIPPINES GOVERNMENT STANDARD SPECIFICATIONS FOR ROADS, BRIDGES,AIRPORTS,
HIGHWAYS & STRUCTURAL FACILITIES.
HSE; H2S,IFR,DHR TRAINING CERTIFIED (SAFETY TRAINING)-NATIONAL TRAINING INSTITUTE
LLC, MADINAT AL SULTAN QABOOS, SULTANATE OF OMAN
WORK EXPERIENCE:
I have been working for 13 years & 7 months
1. POSITION: SR. QC CIVL INSPECTOR
COMPANY: WOOD GROUP-CCC LIMITED (JOINT VENTURE) Muscat, Sultanate of Oman PROJECT: (EMC) ENGINEERING MAINTAINANCE SERVICE CONTRACT- SOUTH PROJECT OMAN COMPANY INDUSTRY: (EPC & EMC) OIL & GAS REFINERY; TANKS, PIPLINES/ GENERAL CONSTRUCTION CLIENT: PETROLEUM DEVELOPMENT OF OMAN (P.D.O.) PROJECT COST: US$800M DATE OF JOINING: JULY 24, 2012 TO PRESENT JOB DESCRIPTION:
INSPECT FORM & REBAR INSTALLATION , EMBEDED ITEMS, ANCHOR BOLTS, SPACERS,ETC. ARE CORRECT.
INSPECT AND ENSURE THAT STRUCTURE INSTALLATION, ERRECTION, FABRICATION AND CONSTRUCTION IS IN ACCORDANCE TO APPROVED FOR CONSTRUCTION DRAWING AND TOLERANCE IS ACCEPTABLE AS PER INTERNATIONAL STANDARD eg. ACI 117, BS EN, ASTM, etc.)
CHECK AND REVIEW SOIL AND CONCRETE TEST REPORT eg. (SOIL: Compaction test-FDT,
Atterberg Limit, Particle Size Analysis, Moisture Test, Specific Gravity, Los Angeles Abrasion Test,
California Bearing Ratio, OMC & MDD, Soluble Sulphate and Chloride Content; Concrete
Ambient & Concrete Temp check, Slump, Concrete Mould Compression Test and review
concrete mix design .
CONDUCT MONITOR DAILY FIELD ACTIVITIES AND ENSURE STANDARDS OF PERFORMANCE AND
WORKMANSHIP COMPLIES AS PER PROJECT SPECS AND APPLICABLE INTERNATIONAL
ENGINEERING STANDARDS.
REVIEW SPECIFICATIONS, CODES, STANDARDS, PROCEDURES AND VERIFY WHERE EXCEPTIONS
ARE TAKEN TOGETHER WITH THE NECESSARY ENGINEERING APPROVAL SIGN OFF. ENSURE ALL
REFERENCE DOCUMENTS, INCLUDING THE CORRECT REVISION ARE INCLUDED IN THE WORK
PACK AND THAT THE ERECTION/FABRICATION CONTRACTORS UNDERSTAND AND COMPLIES
WITH THE REQUIREMENTS FOR SPECIFICATION AND QUALITY.
REVIEW CIVIL AND STRUCTURAL BUILDING WORK-PACK DOCUMENTATION REQUIREMENTS FOR
ERECTION, FABRICATION, AND INSPECTION TO ENSURE THAT ALL THE VERIFICATIONS HAVE
BEEN CARRIED OUT AND THE APPROPRIATE CHECKLIST BEEN COMPLETED AND SIGN OFF
PROPERLY
REVIEW THE GENERAL ARRANGEMENT AND DETAIL DRAWING FOR THE CIVIL WORK TO ENSURE
THAT THE LATEST REVISION OF THE PROJECT DRAWINGS ARE INCLUDED IN THE WORK-PACK
VERIFY THAT CONTRACTOR MATERIAL TRACEABILITY AND INSPECTION/TESTING
DOCUMENTATION IS PROPERLY DEVELOPED IN ACCORDANCE WITH THE PROJECT PROCEDURES.
VERIFY MATERIAL CORRELATION WITH THE CERTIFICATE AND COMPLIANCE WITH CODES AND
APPROVED SPECIFICATIONS. REVIEW THE MATERIAL LIST FOR THE WORK-PACK WITH RESPECT
TO THE DETAIL DRAWING DEFINITION DESCRIPTION.
ENSURE THAT WORK IS CARRIED OUT IN ACCORDANCE WITH PROJECT PROCEDURES AND
DESIGN AND ESPECIALLY WITH RESPECT TO WORKMANSHIP, QUALITY, ACCURACY AND SAFETY.
MONITOR SUPPLIERS/CONTRACTORS WORK FOR COMPLIANCE TO ENSURE THAT ALL REQUIRED
TESTING FOR BUILDING AND CIVIL WORKS ARE CARRIED OUT BY THE CONTRACTOR IN
ACCORDANCE TO THE APPROVED ITP, REVIEW AND APPROVED THE REPORT ISSUED.
ENSURE THAT DAILY LOG OF CIVIL, BUILDING ACTIVITIES UNDERTAKEN IS MAINTAIN.
COORDINATE AND REVIEW THE WORK-PACK COMPLETION INSPECTION AND DOCUMENTATION
REQUIRED FOR FINAL ACCEPTANCE AND CONTRACT CLOSE OUT.
ENSURE THAT ALL DOCUMENTATION PLANS AND AS BUILT INFORMATION CIVIL/BUILDINGS
ACTIVITIES ARE COLLECTED, FILLED AND DISTRIBUTED METHODICALLY. ADVISED PROMPTLY
QA/QC ENGINEER OF ANY QUALITY RELATED PROBLEM, DEVIATION OR NON-COMPLIANCE.
PERFORM SITE INSPECTION /MONITORING OF SITE ACTIVITIES SUCH AS: EXCAVATION,
BACKFILLING COMPACTION, FORMWORKS, REINFORCING BARS INSTALLATION , CONCRETE
PLACEMENT TO ENSURE THAT RELATED ACTIVITIES ARE PROPERLY IMPLEMENTED AS PER PLAN
AND IN ACCORDANCE WITH PROJECT SPECIFIATIONS AND APPLICABLE INTERNATIONAL CODES
AND STANDARDS
ADVICE THE PROJECT ENGINEER REGARDING ACCEPTANCE CRITERIA AS PER INSPECTION TEST
PLAN (ITP) AND RAISED QC RELEVANT DOCUMENTS (REQUEST FOR INSPECTION, MATERIAL
IINSPECTION REQUEST) AND OBTAIN APPROVAL.
SUPPORTING THE ENGINEERING STAFF AS PER THE QUALITY AND INTEGRITY OF THE PROJECT
MAINTAIN CONTACTS WITH OTHER DISCIPLINE FOR QC ISSUES INNER HIS TEAM AND
INSPECTION ON-SITE
ASSES CONTRACTORS QC TEAM PERFORMANCE ON SITE AND THE SHARE ASSESMENT REPORT
WITH PROJECT QC COORDINATOR.
2. POSITION: (a) QA/QC- CIVIL ENGINEER/INSPECTOR SAUDI ARAMCO SAP No. : 70013979
(b) QC-MATERIAL ENGINEER RECEIVING INSPECTOR
DURATION: APRIL 16, 2011 – JULY 24, 2012
COMPANY: AL-OSAIS INTERNATIONAL HOLDING COMPANY DAMMAM, KINGDOM OF SAUDI ARABIA
COMPANY INDUSTRY: (EPC) GENERAL CONSTRUCTION, ROADS, TUNNELS, OIL & GAS REFINARYY &
INDUSTRIAL FACILITIES
DEPARTMENT: QA/QC DEPARTMENT
PROJECT TITTLE: SAUDI ARAMCO INDUSTRIAL SUPPORT FACILITIES (MANIFA, TANAJIB
FACILITIES EXPANSION PROJECT)
(AIR STRIP AIRPORT TERMINAL, CONTROL TOWET, PRE-CAST 4-STOREY ADMIN BUILDINGS,
GYMNASIUM, PRE-ENGINEERED BUILDINGS, 3-STOREY PRE-CAST RESIDENCIAL BUILDINGS, SPACE
FRAMES, SWIMMING POOL, WARE HOUSE, SECURITY GATEHOUSE BUILDING, SITE GRADINGS, CAR
PARKS AND SHADES, BITUMINOUS CONCRETE & ASPHALT ROAD, EARTH WORKS BACKFILL &
COMPACTION, DRAINAGE SYSTEM, IRRIGATION, LANDSCAPING, PORTLAND CEMENT CONCRETE
PAVEMENT, UNDERGROUND CONCRETE TANKS & OTHER REINFORCED CONCRETE STRUCTURES.
LOCATION: TANAJIB, KINGDOM OF SAUDI ARABIA
PROJECT COST: US$190M
CLIENT: SAUDI ARAMCO/ SAUDI ARABIA OIL COMPANY
JOB DESCRIPTION:
TO REGULATE THE DEGREE OF EXCELLENT IN THE IMPLEMENTATION AND EXECUTION OF THE PROJECTS AS PER APPROVED INSPECTION TEST PLAN (ITP), METHOD STATEMENT, IFC DRAWINGS, PROJECT SPECIFICATIONS, SAUDI ARAMCO ENGINEERING STANDARDS AND APPLICABLE INTERNATIONAL ENGINEERING STANDARDS.
REVIEW OF PROJECT QUALITY CONTROL PROCEDURE, INSPECTION AND TEST PLAN(ITP), INSPECTION CHECKLIST, METHOD STATEMENT IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND ENSURES THAT ACCEPTANCE CRITERIA ARE EXECUTED ACCURATELY, CONSISTENT AND TIMELY AS PER SAES, ACI, ASTM, SASO, UBC AND OTHER APPLICABLE INTERNATIONAL STANDARD SPECIFICATIONS.
RESPONSIBLE FOR ALL EARTH WORKS, CUT, EXCAVATION, BACKFILLING AND COMPACTION (FDT) AND ENSURE THAT SELLECT FILL MATERIALS ARE SUITABLE AS PER SAES A 114; CONCRETING AND OTHER CIVIL RELATED WORKS.
ENSURE WITNESS POINTS AND HOLDPOINTS ARE WITNESSED AND OBTAIN APPROVAL FROM
SAUDI ARAMCO REPRESENTATIVE PRIOR TO STARTING THE NEXT STAGE OF ACTIVITY.
TO SUPERVISED, GUIDE AND WITNESS APPROVED THIRD PARTY REPRESENTATIVE IN
CONDUCTING SAMPLING, AND TESTING OF MATERIALS AND TO ACCOMPANY THE SAUDI
ARAMCO REPRESENTATIVE (SAPID) TO INITIATE INSPECTION AND OBTAIN THEIR APPROVAL FOR
AN ACTIVITY.
TO ENSURE THAT ALL MATERIALS TO BE USED IN THE ERRECTION AND CONSTRUCTION OF THE
PROJECT ARE PROCURED FROM APPROVED VENDORS/ MANUFACTURERS, AND COMPLIES WITH
MINIMUM CONTRACTUAL REQUIREMENTS AND SAUDI ARAMCO ENGINEERING STANDARDS
(SATIP,SAIC, SAES,SAER 1972, SAMSS) ,WITH APPROVED DOCUMENT TRANSMITAL AND VALID
TEST CERTIFICATES PRIOR TO INSTALLATION IN ORDER TO ELIMINATE UNSATISFACTORY
PERFORMANCE AT ALL STAGES TO ATTAIN ECONOMIC EFFECTIVENESS.
TO ENSURE THAT MATERIALS HANDLING, STORAGE, TRACEABILITY AND PRESERVATION ARE
DONE AS PER APPROVED PROCEDURES AND MANUFACTURERS WRITEN INSTRUCTION.
-
3. POSITION: QA/QC CIVIL ENGINEER
DURATION: JULY 2010 – NOVEMBER 2010
COMPANY: BUILDING CONSTRUCTION COMPANY LTD. (BCC)
COMPANY INDUSTRY: (EPC) GENERAL CONSTRUCTION, ROADS, TUNNELS
LOCATION: DHARAN, AL-KHOBAR, KINGDOM OF SAUDI ARABIA
DEPARTMENT: QA/QC DEPARTMENT
PROJECT TITTLE: AL-KHOBAR LAKE DEVELOPMENT PROJECT (CONSTRUCTION OF 110 SPANISH
AND ARABIC TYPE VILLAS, EARTH WORKS, ASPHALT ROAD,CAR PARKS AND
SHADES, DRAINAGE SYSTEM, ARTIFICIAL LAKE)
PROJECT COST: US$113M
CLIENT: EMAAR MIDDLE EAST
JOB DESCRIPTION:
COORDINATING WITH MULTIPLE TRADES AND CUSTOMERS TO ENSURE SMOOTH RUNNING OF
PROJECTS
ENSURE ALL ACTIVITIES COMPLY WITH STRICT HEALTH AND SAFETY STANDARDS AND
PROTOCOLS
ENSURE VALID STANDARDS, TECHNICAL REQUIREMENTS AND GOOD ENGINEERING PRACTICE
TO ENSURE THAT PROJECT ARE EXECUTED IN LINE WITH AGREED SPECIFICATIONS.
CONDUCT MONITOR DAILY FIELD ACTIVITIES AND ENSURE STANDARDS OF PERFORMANCE AND
WORKMANSHIP COMPLIES AS PER PROJECT SPECS AND APPLICABLE INTERNATIONAL
ENGINEERING STANDARDS.
PERFORM SITE INSPECTION /MONITORING OF SITE ACTIVITIES SUCH AS: EXCAVATION, BACKFILLING COMPACTION, FORMWORKS, REINFORCING BARS INSTALLATION , CONCRETE PLACEMENT TO ENSURE THAT RELATED ACTIVITIES ARE PROPERLY IMPLEMENTED AS PERPLAN AND IN ACCORDANCE WITH PROJECT SPECIFIATIONS AND APPLICABLE INTERNATIONAL CODES AND STANDARDS
ADVICE THE PROJECT ENGINEER REGARDING ACCEPTANCE CRITERIA AS PER INSPECTION TEST
PLAN AND RAISED QC RELEVANT DOCUMENTS (REQUEST FOR INSPECTION, MATERIAL
IINSPECTION REQUEST) AND OBTAIN APPROVAL.
COORDINATE WITH THE PROJECT CONSULTANTS CONCERN ON THE PROJECT
IMPLEMENTATION.
REVIEW RELEVANT QC DOCUMENTS SUCH AS SUBMITALS, TRANSMITALS, METHOD OF
STATEMENTS, IFC DRAWINGS, RFI AND READY FOR INSPECTION WHEN REQUIRED OR AUDITED.
TO ENSURE THAT ALL MATERIALS ARE APPROVE AND PASSED THE MINIMUM CONTRACTUAL
REQUIREMENTS AND APPLICABLE INTERNATIONAL ENGINEERING STANDARDS WITH COMPLETE
DOCUMENTS AND VALID TEST CERTIFICATES PRIOR TO INSTALLATION.
4. POSITION: QA/QC-CIVIL ENGINEER/INSPECTOR
DURATION: NOVEMBER 2010 – FEBRUARY 5, 2011
COMPANY: BUILDING CONSTRUCTION COMPANY LTD. (BCC) AL-KHOBAR, KINGDOM OF SAUDI ARABIA
COMPANY INDUSTRY: (EPC) GENERAL CONSTRUCTION, ROADS, TUNNELS
DEPARTMENT: QA/QC DEPARTMENT
PROJECT TITTLE: PROCURE AND CONSTRUCTION (P & C) OF CITY PLANT NURSERY
(PRE-ENGINEERED BUILDINGS, GLASS HOUSES, REINFORCE CONCRETE ADMIN BUILDING, SITE GRADING,
EARTH WORKS EXCAVATION, BACKFILL AND COMPACTION, ASPHALT ROADS, PORTLAND CEMENT
CONCRETE PAVEMENT, DRAINAGE SYSTEM, IRRIGATION SYSTEM, CAR PARKS AND SHADES.)
LOCATION: JUBAIL INDUSTRIAL CITY, KINGDOM OF SAUDI ARABIA
PROJECT COST: SR. 33,000,000.00 (US$12.5M)
CLIENT: ROYAL COMMISSION FOR JUBAIL & YANBU, KINGDOM OF SAUDI ARABIA
JOB DESCRIPTION:
• PROVIDING A CONTINUOUS SUPPORT TO THE QUALITY AND CONSTRUCTION MANAGEMENT TO ACHIEVE THE HIGH QUALITY OF WORKMANSHIP AND MEET THE PROJECT CONTRACTUAL REQUIREMENT
• REVIEW THE APPROVED DRAWINGS, SPECIFICATIONS, PROJECT QUALITY PLAN, QUALITY CONTROL PROCEDURE, INSPECTION AND TEST PLAN, INSPECTION CHECKLIST, METHOD STATEMENTS AND OTHER APPROVED DOCUMENT RELEVANT FOR THE PROJECT.
• PERFORM SITE INSPECTION/MONITORING OF QUALITY ACTIVITIES LIKE EXCAVATION, BACKFILLING, COMPACTION, FORMWORKS, REINFORCING BARS INSTALLATION, CONCRETE PLACEMENT ARE IMPLEMENTED AS PER PLAN AND IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND APPLICABLE INTERNATIONAL STANDARDS.
• REVIEW ALL RELEVANT DOCUMENTS AND TEST REPORT ISSUED BY PARTIES INVOLVED (THIRD PARTY REPRESENTATIVE, LAB. TECHNISIANS, SURVEYORS) AND SUBMIT RECORD.
• COORDINATE WITH SURVEYORS THAT PROPER LOCATION WITH RESPECT TO ELEVATIONS AND COORDINATE ARE ESTABLISHED ACCURATELY.
• COORDINATE WITH OTHER DISCIPLINE THAT CIVIL ACTIVITIES THAT REQUIRES INSPECTION ARE APPROVED AND CLEARED.
• ACCOMPANY THE CONSULTANT REPRESENTATIVE TO CARRY OUT INSPECTION, WITNESSED AND RELEASED HOLD POINTS.
• ISSUE NCR’S WHEN AND WHERE REQUIRED TO CHECK THAT THE CONSTRUCTION DEPARTMENTS PROVIDES TIMELY APPROPRIATE AND PREVENTIVE ACTION..
ATTEND WEEKLY MEETING WITH THE ROYAL COMMISSION REPRESENTATIVES INORDER THAT
QUALITY SYSTEM IS VIEWED IN TERMS OF INFORMATION FLOW BETWEEN PROJECT
ORGANIZATION AND INTERACTION AMONG INDIVIDUAL IN THE PROJECT TEAM.
CONDUCT MONITOR DAILY FIELD ACTIVITIES AND ENSURE COMPLIANCE AS PER PROJECT SPECS
AND APPLICABLE INTERNATIONAL ENGINEERING STANDARDS.
COORDINATE WITH THE PROJECT CONSULTANTS CONCERN ON THE PROJECT
IMPLEMENTATION.
ENSURE ALL MATERIALS ARE APPROVED BY CONSULTANT PRIOR ANY APPLICATION.
5. POSITION: QA/QC CIVIL ENGINEER/MATERIAL ENGINEER (M.E.-1 D.P.W.H)
DURATION: MARCH 2006 – July 2010
COMPANY: PBO CONSTRUCTION TABUK CITY, PHILIPPINES.
PROJECTS: CONSTRUCTION OF PORTLANT CEMENT CONCRETE PAVEMENT ROADS, BITUMINOUS
CONCRETE PAVEMENT ROADS, EMBANKMENT, SLOPE PROTECTION (RIPRAP AND STONE
MASONRY), EARTH WORKS EXCAVATION, BACKFILL AND COMPACTION, BRIDGE,
REINFORCED CONCRETE STRUCTURES AND GOVT FACILITIES.
JOB DESCRIPTION:
TO ASCERTAIN THAT ALL MATERIALS INCORPORATED INTO THEWORK PASS THE REQUIREMENT
OF STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGE AND AIRPORTS AND TO STRICTLY
COMPLY WITH THE SCHEDULE OF MINIMUM TESTING REQUIREMENTS.
TO ADVISE THE PROJECT ENGINEER ON THE ACCEPTANCE OR REJECTION OF CONSTRUCTION
MATERIALS INTENDED FOR USE IN THE PROJECT, BASED ON TEST RESULTS.
RECOMMEND TO THE PROJECT ENGINEER REMEDIAL MEASEURES FOR THE CORRECTION OF
UNSATISFACTORY CONDITION OF MATERIALS.
TO PREPARE DESIGN MIXES FOR CONCRETE AND BITUMINOUS MIXTURES.
TO CONDUCT SOIL INVESTIGATION AND MATERIALS SURVEY FOR PROBABLE SOURCES OF
MATERIALS, AND REPORTING THE APPROXIMATE QUANTITY AVAILABLE, SUITABILITY OF
MATERIALS AND OTHER PERTINENT DATA.
TO ENSURE THAT SAMPLE ARE PROPERLY CURED BY STANDARD PROCEDURES.
TO SEE THAT SAMPLE SENT TO LABORATORY ARE WELL PACKED IN DURABLE CONTAINERS TO
AVOID DAMAGES IN TRANSIT, AND THAT ALL SAMPLES ARE ACCOMPANIED BY A SAMPLE CARD
FILLED-UP IN DETAIL.
TO FULL ACQUAINT WITH THE STANDARD PROCEDURES OF SAMPLING, TESTING AND CONTROL.
TO SEE THE FIELD LABORATORY BUILDING IS CONSTRUCTED IN ACCORDANCE WITH THE
STANDARD SPECIFICATIONS.
TO SEE THAT THE FIELD LABORATOERY IS ADEQUATELY EQUIPPED SUCH THAT THE PROGRESS
OF THE WORK WILL NOT BE IMPEDED TO LABORATORY TESTING AND THAT NON-
PERFORMANCE OF TEST SHOULD NOT BE A CAUSE OF DELAY IN THE PROSECUTION OF THE
WORK.
TO SEE THAT ALL LABORATORY EQUIPMENT IS PROTECTED FROM DUST OR FOREIGN MATTERS
THAT TENDS TO DESTROY THEIR SENSITIVITY.
TO SEE THAT ALL WEIGHING DEVICES AND TESTING MACHINES ARE MAINTAINED AND
CALIBRATED IN ACCORDANCE WITH THE STANDARD SPECIFICATION.
TO HAVE AT ALL TIME THE COMPLETE AND UP-TO-DATE MATERIALS MAP OF THE PROVINCE OR
CITY, CHARTS AND DIAGRAM SHOWING PROGRESS OF WORK, ETC. POSTED IN THE
LABORATORY BUILDING.
TO KEEP A RECORD OF THE DAILY ACTIVITIES READY FOR INSPECTION ANYTIME.
TO COMPLY STRICTLY WITH ALL INSTRUCTION AND MEMORANDA.
TO SUBMIT WITHIN REQUIRED TIME FRAME TEST REPORTS AND OTHER PERTINENT PAPERS TO
THE OFFICES CONCERNED.
6. POSITION: SITE ENGINEER
DURATION: June 2005 – Aug 2005
COMPANY: BBR PHILIPPINES CORPORATION Brgy. Capitolyo Pasig City, Philippines PROJECT: CONSTRUCTION AND POST TENSIONINING OF TYPE V1 BRIDGE GIRDER
LOCATION: SULIPAN BRIDGE, SULIPAN APALIT, PANGPANGA PHILIPPINES.
CLIENT: HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD.
7. POSITION: SITE ENGINEER
COMPANY: BBR PHILIPPINES CORPORATION Brgy. Capitolyo Pasig City, Philippines PROJECT: CONSTRUCTION AND POST TENSIONING OF PORAC PANGPANGA MEGA DIKE
BRIDGE GIRDER.
8. POSITION: SITE ENGINEER
COMPANY: BBR PHILIPPINES CORPORATION Brgy. Capitolyo Pasig City, Philippines
PROJECT: POST TENSIONING OF NORTH TRIANGLE COMMERCIAL CENTER (N.T.C.C. now
TRINOMA.) LONG SPAN GIRDERS.
LOCATION: NORTH AVENUE, QUEZON CITY PHILIPPINES
CLIENT: SUMA KUMAGAI INC. (S. K. I.)
9. POSITION: SITE ENGINEER/ESTIMATOR
DURATION: JUNE 2000 – JANUARY 2005
COMPANY: MOUNTAIN CERIAL PRODUCT CORPORATION BUILDERS AND DEVELOPERS (M.C.P.C.) Magsaysay, Tabuk City, Kalinga Province, Philippines
PROJECTS: CONSTRUCTION OF EARTH ROADS & EARTH WORKS, PORTLAND CEMENT CONCRETE
PAVEMENT, MEDIUM RISE COMMERCIAL, RESIDENSTIAL, SCHOOL BUILDINGS, COVERED
COURT, WAREHOUSE.
JOB DESCCRIPTION
SUPERVISES DAY TO DAY IMPLEMENTATION AND CONTROL IN THE EXECUTION OF THE PROJECT.
ASSIST THE PROJECTENGINEER IN THE OVER ALL DIRECTION AND SUPERVISION OF THE FIELD
OPERATION.
PREPARE AND SUBMIT PHYSICAL AND FINANCIAL STATUS TO THE PROJECT ENGINEER
PREPARE AND SUBMIT CERTIFICATE OF WORK ACCOMPLISHMENT
RECOMMEND REMEDIAL ACTIONS TO RESOLVE PROBLEMS IN THE FIELD IMPLEMENTATION.
PREPARES BAR BENDING SCHEDULES AND ESTIMATES
SUPERVISED FOREMAN, LEADMAN AND SKILLED WORKERS IN THE PROPER EXECUTION OF
WORK AS PER CONTRACTUAL REQUIREMENTS TO MINIMIZE ERROR.
TO EXPEDITE THE PROJECT EFFECTIVELY WITHOUT ADDITIONAL COST, ACCIDENT AND DELAY AS
PER PROJECT MILESTONE.
I THEREFORE CERTIFY THAT ALL THE INFORMATIONS PROVIDED HEREIN ARE TRUE AND CORRECT AT THE
BEST OF MY KNOWLEDGE.
ENGR. ROY L. BOMOWEY CIVIL ENGINEER