ROYAL COMMISSION INFRASTRUCUTRE PROJECTS FOR INDUSTRIES AND INVESTORS. By Dale Goerner May 29, 2012. ROYAL COMMISSION INFRASTRUCUTRE PROJECTS FOR INDUSTRIES AND INVESTORS. AGENDA Overview of Yanbu Summary of Projects and Costs Land Development and Infrastructure - PowerPoint PPT PresentationTRANSCRIPT
By
Dale Goerner
May 29, 2012
AGENDA1. Overview of Yanbu
2. Summary of Projects and Costs
3. Land Development and Infrastructure
4. Universities and Colleges
5. Medical Facilities and Housing
6. Wrap-up
2
3
4
5
•LAND DEVELOPMENT & INFRASTRUCTURE UTILITIES
1. MAJOR TRANSPORTATION ROUTES: ROADS AND BRIDGES
2. WATERFRONT
3. COMMUNITY INFRASTRUCTURE
4. INDUSTRIAL
5. ELECTRICAL POWER
•UNIVERSITIES AND COLLEGES
•MEDICAL FACILITIES AND HOUSING DEMAND
6
7
CORNICHE ROADSR 24 M
PORT ROADSR 18 M
CORNICHE BRIDGE 48 M
SHAREH JEDDAHSR 48 M
COASTAL ROADSR 19 M
TAMA EXPANSIONSR 42 M
Highway 5 – King Abdulaziz Highway (TAMA)
Corniche Road
1. MAJOR ROADS / HIGHWAYS AND BRIDGES - SR 323 M
8
BY-PASS BRIDGESR 63 M
TAMA BRIDGESR 63 M
9
1. MAJOR ROADS / HIGHWAYS AND BRIDGES - SR 323 M
10
MAJOR TRANSPORTATION METHODS
2. WATERFRONT
Construction Activities # of Projects
COST (SR. Mil)
• WATERFRONT 6 1,542
11
RC Investment: -389 hectares along 15 KM of shoreline
- 5.4 million m3 of dredged sea material used as backfill - 8 new Beaches, 2 Islands, and various public facilities
-11 KM of Promenade and 45 KM various walkways -Roads and 5,250 parking spots
- Main Infrastructure Utilities (Elec, PW, S/S, Irrigation, Storm)
Private Investments: -14 Hotels ( 4,000 guest rooms in 3 ,4, and 5 star hotels)
-Tourist Apartments/Villas -Theme Park, Aquarium, Dive Center, Golf Course, Restaurants, Parks
WATERFRONT DEVELOPMENT - OVERALL
LAND DEVELOPMENT & INFRASTRUCTURE PROJECTS
12
WATERFRONT – Phase 1 & 2 Dredging and Backfill (SR 365 M)
13
WATERFRONT– Phase 1 Infrastructure (SR 163 M)
14
WATERFRONT – Phase 3 (SR 220 M)
15
6.2
6.27.28.2
6.27.2 8.2
6.27.2
6.27.28.2
5.26.2
7.28.2
6.2
5.26.27.2
5.2
7.2
4.26.2
4.26.2
8.2
4.26.28.2
10.2
8.26.2
4.2
4.2
6.2
6.2
6.2
8.2
7.2
7.26.2
8.2 6.2
6.2
5.2
7.26.2
6.2
5.2
5.2
5.2
6.25.2
7.25.2
5.2
5.2
5.2
6.27.2
7.26.2
5.2
6.26.27.2
8.2 6.24.2
4.26.2
8.2 6.24.2
4.26.2
6.28.26.2
6.2
4.2
4.26.28.26.2
8.2
8.2
6.0
6.0 8.0
6.0
4.0
4.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
4.0
4.0
4.0
6.0
6.0
4.04.0
4.0
6.0
6.0
12.010.0 12.0
8.0
8.0
8.0
6.0
8.0
10.0
2.0
8.0 10.0 12.0 14.04.0
12.0
12.05.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
3.0
7.0
3.0
7.0
9.07.0
9.0
11.011.0
3.0
3.0
3.0
5.0
3.04.0
3.04.0
7.06.0 9.0 11.013.0
7.08.010.0
3.0
4.03.0
5.0
PHA SE-2
C O A S T G U ARDS
COR
NICH
E RO
AD
PRI VA TE R ESORT
P I C N I C AREAS
MA R INA
D U N ES
R ED SEA
T HE MAN GR OVES
R ED SEA
C O N S E R V A TION
A R EA
M Y A S( COMMUN ITY AR EA)
C OR NI CH E RO AD
PHA SE-3
PHA SE-4
D I V ING
V I L L AGE
A Q U A PARK
A Q U A R I UM &
S C I E N C E CEN.
H O R S E BACK
R I D I N G AREA
P I C NIC
A R E AS
P R O M E N ADE
C O N S E R V A TION
A R EA
A L- NO WR US I SL AND
F I S H I N G PIER
P I C NIC
A R E AS
R ED SEA
5.0 4.56.0
4.0
4.5
4.0
4.5
3.54.0
3.5
4.0
4.0
3.54.0
3.5
4.0
3.03.5
3.5 3.0
B O R A D WALKS
WATERF RO NT DEVELOPMENT AT MYAS
(PHASE - 4 )
L A N D U S E P L A N
Roya l Comm iss ion fo r J uba il and Ya nbuKINGDOM O F SAUDI ARABIA
Dire cto rat e G ene ral fo r Yanb u Region
M ADI NAT YANBU AL-SINAIYAH
S E A T A X I ROUTE
B U I L D I N G S (Public)
I N V E S T O R ' S P A C KAGE AREA
D E S E R T S U RFACE
G R E E N AREA
P L A Z A S / WA L K WA Y S / PAVED AREA
S A N D Y B E A C H / S AND PITS
R O C KS
P R O M E N A D E / T R A IN TRACK
M ANGRO VES/C ONSER VATIO N AREA
R O A D A S PHALT
WATERFRONT – Phase 4 (SR 150 M)
16
3. COMMUNITY AND INFRASTRUCTURE
Construction Activities # of Projects
COST (SR. Mil)
• COMMUNITY AND INFRASTRUCTURE 8 534
17
Key Items of Neighborhood / Haii Projects:
- Primary, Secondary and Tertiary Roads- Main Utilities
Electrical Distribution 13.8 KV Street Lighting
Potable Water Mains Irrigation Water Mains
Sanitary / Sewer systems (including lift and pump stations) Storm Water Systems and Drainage
-Landscaping - Hardscaping
.
Sanitary Sewer (SR 55 M)
LAND DEVELOPMENT & INFRASTRUCTURE PROJECTS
3. COMMUNITY AND INFRASTRUCTURE
18
Roads and Utilities(SR 80 M)
Roads and Utilities(SR 140 M)
LAND DEVELOPMENT & INFRASTRUCTURE PROJECTS
3. COMMUNITY AND INFRASTRUCTURE
19
B4
C1 C2 C3
B5 B6
B7/B8 B9 B10
Roads and Utilities (SR 100 M)
Roads and Utilities (SR 177 M)
GAS DISTRIBUTION (SR 51 M)
LAND DEVELOPMENT & INFRASTRUCTURE PROJECTS
4. INDUSTRIAL – SR 560 M
20
Roads and Utilities (SR 120 M)
Utility Connections (SR 82 M)
B4
C1 C2 C3
SS9I and SSPP(429 M)
Port Substation Upgrade (29 M)
Substations 10J and 101(326 M)
ELECTRICAL POWER – INDUSTRIAL AREA
21
5. ELECTRICAL POWER – SR 784 M
MARAFIQ Plant1200 MW
New MARAFIQ Plant700 MW
Construction Activities # of Projects
COST(SR. Mil)
• WOMENS UNIVERSITY COLLEGE (WUC) 4 417
• MENS UNIVERSITY COLLEGE (MUC) 1 215
• YANBU TECHNICAL INSTITUTE (YTI) 3 154
• YANBU INDUSTRIAL COLLEGE (YIC) 2 230
TOTAL : 10 1,016
UNIVERSITIES AND COLLEGES
22
Women’s UCSR 417 M
YICSR 230 M
MEN’s UCSR 215 M
YTISR 154 M
UNIVERSITIES AND COLLEGES – SR 1,016 M
23
WOMEN UNIVERSITY COLLEGE – SR 417 M
UNIVERSITIES AND COLLEGES FACILITIES
24
25
YANBU INDUSTRIAL COLLEGE (YIC) – SR 230 M
MEDICAL AND HOUSING DEMANDS
Construction Activities # of Projects
COST(SR. Mil)
• MEDICAL FACILIITES 5 141
• MEDICAL HOUSING 4 274
• RC HOME OWNERSHIP PROGRAM (HOP) 5 1,072
• SABIC HOP 1 85
•MARAFIQ HOP - FUTURE - -
• SAFRA HOP – FUTURE - -
• GOSI HOP - FUTURE - -
TOTALS: 15 1,57226
RC HOP(SR 1,072 M)
GOSI HOP(FUTURE)
LAND DEVELOPMENT & INFRASTRUCTURE PROJECTS
HOME OWNERSHIP HOUSING (HOP)
27
MARAFIQ HOP(FUTURE)
SABIC HOP(SR 85 M)
SAFRA HOP(FUTURE)
The Royal Commission continues to Grow:
• Over 62 RC construction projects in 2012
• Value: SR 6,487 Million
• Land Development & Infrastructure Utilities
• Waterfront
• Transportation
• Electrical Power
• Universities and Colleges
• Medical and Housing Demand28