Page 1: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

Royal Institute of Technology Stockholm, April 15th 2014

AF2903 Road Construction and Maintenance

Placement of Hot Mix Asphalt

Dr. Alvaro Guarin

Highway and Railway EngineeringDepartment of Transportation Science

Page 2: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Asphalt Production (Batch Plant)

Page 3: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Asphalt Production (Continuous Plant)

Page 4: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Asphalt Production

Page 5: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Asphalt Production

Page 6: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Asphalt Production

Page 7: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

No

Yes

Control segregation

Page 8: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Tarping Loads

Page 9: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Bottom Dump truck

Page 10: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Live Bottom Truck

Page 11: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

End Dump Truck

Page 12: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Materials Transfer Vehicle

Page 13: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Materials Transfer Vehicle

Page 14: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Self Propelled Paving Machine

THE BASIC PRINCIPLE HAS NOT CHANGED

MUCH

Page 15: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Types of Pavers

Wheel type

Page 16: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Types of Pavers

Track type

Page 17: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Pavers (Key parts)

Page 18: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Material Flow

Page 19: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Paver Operation

Page 20: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Operational Principles of the Screed

• Self-leveling concepts

• Screed response versus distance

• Forces acting on a screed

Page 21: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Main Forces Acting on Screed • Speed of paver

• Head of material

• Angle of attack

• Other forces Pre-compaction Screed weight

Page 22: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Head of Material (Screed)

Page 23: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Types of Grade Reference

• Stringline

• Mobile reference

• Joint matching shoe

• Sonic sensor

• Laser guided controls

Page 24: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Stringline

Page 25: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Mobile Reference

Page 26: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Joint Matching Shoe

Page 27: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Sonic Sensor

Page 28: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Laser guided controls

Page 29: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Mixture Laydown Problems

Page 30: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Centerline Segregation

Mixture Laydown Problems

Page 31: Royal Institute of Technology Stockholm, April 15 th 2014 AF2903 Road Construction and Maintenance Placement of Hot Mix Asphalt Dr. Alvaro Guarin Highway

[email protected]

Questions?