i Royal York Open House-Summary Report – December 2, 2013
i
Royal York Station Easier Access Project
Public Open House
December 2, 2013 6:30 pm – 8:30 pm
Consultation Summary Report
Prepared by Lito Romano
December 13, 2013
The Old Mill- Balmoral Room
21 Old Mill Road
ii Royal York Open House-Summary Report – December 2, 2013
(This page intentionally left blank.)
i Royal York Open House-Summary Report – December 2, 2013
i
Table of Contents
1 INTRODUCTION ..............................................................................................................................1
1.1 BACKGROUND ........................................................................................................................................................ 1
1.2 CONSULTATION PROCESS ................................................................................................................................. 1
1.3 EVENT DETAILS .................................................................................................................................................... 1
2.0 SUMMARY OF ALL QUESTIONS AND COMMENTS ............................................................. 2
2.1 TEMPORARY LOSS OF PUBLIC PARKING ....................................................................................................... 2
2.2 STATION PRIORITIES FOR THE EASIER ACCESS PROGRAM .................................................................. 2
2.3 OPERATIONAL CHALLENGES DURING CONSTRUCTION ........................................................................... 2
2.4 DESIGN AND CONSTRUCTION ................................................................................................................................. 3
2.5 ADDITIONAL COMMENTS ................................................................................................................................... 3
2.6 NON PROJECT RELATED QUESTIONS AND COMMENTS ....................................................................................... 4
3.0 NEXT STEPS ................................................................................................................................. 4
ii Royal York Open House-Summary Report – December 2, 2013
(This page intentionally left blank.)
1 Royal York Open House-Summary Report – December 2, 2013
1 Introduction
1.1 Background Since March 1990, the Commission has set a goal of making all TTC service and facilities
accessible. To date 31 of 69 stations across the network have been made accessible with
the Easier Access Program. By 2025, TTC expects to have all stations accessible, including
Woodbine. Funding for the program is included in TTC’s 5-year capital program which was
approved by City Council on December 8, 2009.
The Easier Access Project at Woodbine Station will include three new elevators, sliding
doors, accessible fare gate and new signage. To minimize disruption in the community, this
work will be coordinated with other required upgrades at the station including, repaving of
the bus loop.
Construction is expected to begin in late 2014 and be completed in 2017.
1.2 Consultation Process On December 2, 2013, the community was invited to the first open house where TTC presented
the preliminary plans for the project, including the preliminary schedule, construction impacts
and adjustment to bus operations (See Appendix-Presentation Panels)
1.3 Event Details Date: December 2, 2013
Venue: The Old Mill- Balmoral Room 21 Old Mill Road
Time: 6:30 pm - 8:30 pm
Attendees: 20
The event was promoted as follows:
November 13, 2013 - 4100 Event Notices were distributed via Canada Post to an area
bound by Dundas Ave W., Kingsway , Leland Ave and Mimico Creek
October 18, 2013 – Event Notice posted on the TTC project website - www.ttc.ca
November 28, 2013 - Colour ad placed in the south and central editions of the Etobicoke
Guardian
Event promoted through the councillor office
Personal visits to property owners immediately adjacent to the site
Meeting with the Chair of the Kingsway BIA sharing details of the project and
encouraging their members to attend the event
2 Royal York Open House-Summary Report – December 2, 2013
2.0 Summary of all Questions and Comments The following is a high-level summary of the feedback received at the meeting. Comments were
recorded by TTC staff who were available throughout the evening to answer questions from
participants.
2.1 Temporary loss of Public Parking
Businesses were concerned about the temporary loss of 34 parking spots at the adjacent
Toronto Parking Authority (TPA) lot. The parking spots will be restored following
construction.
o TTC advised that these spots will be used for the contractor’s staging as well as
for the excavation. Two elevators between the concourse level and the platform
are located immediately below the parking lot. Representatives from TPA were
available to address questions.
Residents who use the short term parking lot behind Shoppers Drugmart were pleased
to learn that these spots would not be impacted by construction.
Parking in this area is critical for business owners, particularly those west of Royal York
Road where there are limited public spots.
2.2 Station Priorities for the Easier Access Program What were the criteria for establishing priority stations for the Easier Access Program?
o A number of factors were considered in consultation with TTC’s Advisory
Committee on Accessible Transit (ACAT) including, ridership levels, proportion of
ridership by seniors and disabled people, geographic location and transfers
between transportation modes.
Resident requested that TTC place Old Mill station, higher on the priority list, given the
number of seniors in the area.
2.3 Operational Challenges during Construction Will the sidewalk at the northwest corner of Royal York and Bloor be able to
accommodate the onslaught of passengers when TTC installs the temporary bus stop?
Passengers who would normally get off at the station will be getting off at this location
while the loop is closed for approximately 20 months.
o TTC has reviewed this and determined that the sidewalk is sufficiently wide to
accommodate transit riders. A temporary shelter is being explored at this
location.
Participants commented that, interlining the buses (running continuous service) along
Royal York while the loop is being resurfaced was “ingenious”. Riders who travel
through the station on the Royal York Bus will not be required to transfer at the station.
Routes 48 and 73 north bound will be seamless, as will the 15 and 76 southbound.
3 Royal York Open House-Summary Report – December 2, 2013
Request for four temporary bus shelters in front of the station.
o TTC advised that there is limited space for bus shelter however anyone waiting
for a bus at the station entrance can seek shelter within the station.
o TTC will explore the possibility of a temporary shelter at the northwest corner of
Royal York Road and Bloor Street to accommodate southbound-transit users.
o
Q. What are the work hours during construction?
A. TTC indicated that
o the contractor was bound by City of Toronto by-laws
o Work is permitted between 7 am and 7pm during the week and on Saturdays
from 9 am to 7 pm.
2.4 Design and Construction
Q. Will TTC consider installing public washrooms at the station?
A. Public washrooms are available at terminal stations. There are no plans to install
washrooms at Royal York Station.
Q. What are TTC’s plans to handle the extra volume of passengers when Humbertown
Plaza and the buildings north of Humbertown are developed? Are there plans to expand
the station to accommodate the added density? Plans for multi-story building are
currently before the OMB.
A. TTC has neither plans nor space to expand the station, other than widening the north
driveway to provide additional bus layover space. The bus terminal and the station have
sufficient capacity to absorb the added density from the Humbertown site.
Q. Will there be disabled parking spots when the TPA lot is restored?
A. TTC will work with TPA to add two disabled parking spots. The spots will be located as
close as possible to the station entrance.
Q. Can the acoustic fence at the north end of the TPA parking lot be taller to avoid people
throwing debris onto private property?
A. TTC will work with the neighbour and TPA to explore this further
Q. Is there a public art component for this Station?
A. Public art for this project is still under review
2.5 Additional Comments
Access to the drop-off lane on Royal York is hampered by taxis that park very close to
this lane making it difficult to make a turn. Can taxis be set further back in order to
4 Royal York Open House-Summary Report – December 2, 2013
provide easier access to anyone wishing to use the drop off lane? Will this be rectified as
part of the bus loop repaving?
o The bus loop repaving will not impact this area but the concern has been relayed
onto the City of Toronto Transportation Division for consideration, as this falls
within their purview.
2.6 Non Project related Questions and Comments
Comments:
Some residents were concerned about maintenance around the parking lot and
scattered debris. These issues were noted by TPA staff that were present.
3.0 Next Steps
Construction is scheduled to begin in late 2014. TTC will continue to meet with residents and
stakeholders to keep them abreast of developments on the project. A second public open house
will be arranged in 2014, prior to construction to share more details on the schedule and
staging of the project.
5 Royal York Open House-Summary Report – December 2, 2013
Appendix 1
Event Flyer
6 Royal York Open House-Summary Report – December 2, 2013
Appendix 2 - Newspaper Ad
7 Royal York Open House-Summary Report – December 2, 2013
Appendix 3 Royal York Public Open House - Photos
8 Royal York Open House-Summary Report – December 2, 2013
9 Royal York Open House-Summary Report – December 2, 2013
10 Royal York Open House-Summary Report – December 2, 2013
Appendix 4 Presentation Panels
1Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York StationEasier Access Project
Public Open HouseThe Old Mill – Balmoral RoomDecember 2, 2013
2Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Easier Access – Program Wide•All69stationstobeaccessibleby2025•31stationscompleted-almosthalfwaythere•WorkingwithAdvisoryCommitteeonAccessibleTransitoneffectivedesign
•Lookforelevators,slidingdoors,fare-gatesandotherfeaturesthatwillimprovemobilityforalltransit riders
3Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Easier Access Project Background•Threestationscurrentlyunderconstruction:
•Pape(2013year-endcompletion) •Dufferin(2014completion) •LawrenceWest(2014completion)
Royal York Station •Constructionstart–late2014 •Scheduledcompletion–2017
4Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York StationScopeofWork
Easy Access•Threeelevators•Accessiblefaregate•Improvedsignage•Slidingdoors•CCTV
BusLoopResurfacing•Waterproblemsinthestationandwornbusroadsurface•Busroadwayexpandedatnorthendtoaccommodate
added bus capacity
5Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York Station
Royal YorkTorontoStationParking
Authority
rk R
dYo
Ro
yal
Ent
ranc
e Required forConstruction
New Paving Will
ing
do
n B
lvd
Lane
Co
nstr
uctio
n A
cces
s
Construction Access
Existing Fence
AerialViewExtended Paving
6Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York Station
Existing Paid Area
EasierAccessFare Gate
ExistingBooth
Existing Stair
Existing Bus Platform
Existing Bus Platform
Existing Bus Platform
Existing Escalator
Easier Access Path Elevator E1to Concourse
Concourse
Platform
Station
EASTBOUND TRAIN WESTBOUND TRAIN
Elevator E2
Elevator E1
Elevator E3
New Sliding Door
New Sliding Door
New Sliding Door
New Sliding Door
StreetLevel
7Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York Station
Easier Access Path
GlassPanel
Easier Access
Path
Exis
ting
Reta
il
Elevator E1to Street Level
Elevator E2to Platform
Elevator E3to Platform
GlassPanel
Concourse
Platform
Station
EASTBOUND TRAIN WESTBOUND TRAIN
Elevator E2
Elevator E1
Elevator E3
Cross Section
ConcourseLevel
8Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York Station
Easier Access Path
GlassPanel
Easier Access
Path
Exis
ting
Reta
il
Elevator E1to Street Level
Elevator E2to Platform
Elevator E3to Platform
GlassPanel
Cross Section
Concourse
Platform
End ofPlatform
Station Elevator E1
Elevator E3Elevator E2
ElevatorCrossSection
9Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York StationElevator E2to Concourse
Elevator E3to Concourse
Eastbound Platform
Westbound Platform
Tracks
PlatformLevel
10Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
TTCCommitment•Providedetailedinformationpriortoconstruction•Provideclear,accurateandtimelyconstructioninformation
•Supportthecommunityduringconstruction•Listenandrespondtoissues•CommunityLiaisontorespondtoallquestionsandadvocateforthecommunity
•Meetwithstakeholders:businesses,residentsandtheKingswayBIAforspecificenquiries
•Postregularupdatesonadedicatedprojectpageatprojects.ttc.ca
11Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
ImpactsandMitigation•34parkingspotsrequiredfromTorontoParkingAuthority(TPA)lottocompleteconstruction
•Busloopwillbeclosedfor20monthsduringresurfacingandelevatorconstruction
•TemporarybusstopsaddedonRoyalYorkRoad •Routesaffected:15Evans,48Rathburn,73RoyalYork,
76RoyalYorkSouth•Uptofivetreestoberemovedfromnorthsideof
TPA parking lot•TreeswillbereplantedinaccordancewithCityofTorontorequirements
12Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York Station
Royal YorkStation
Bloor Street West
Roy
al Y
ork
Roa
d
Cliv
eden
Ave
Hum
ber
vale
Blv
d
Els
field
Rd
Bre
ntw
ood
Rd
S
Bre
ntw
ood
Rd
N
Will
ing
don
Blv
d
Jack
son
AveBirchview Blvd
White Oak Blvd
Varley Ln
15, 76 TemporaryBus Stop
48, 73 TemporaryBus Stop
TransitChanges
13Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
Royal York Station
Royal YorkStation
Ro
yal Y
ork
Ro
ad
Will
ing
do
n B
lvd
Fivetreestoberemoved
14Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
ScheduleDec 2/13 Design Public Open House
2014 PreconstructionPublicOpenHouse
2014 Startconstruction
2017 Completeconstruction
15Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013
ContactUsWeb: projects.ttc.caEmail: [email protected]: 416-397-8699TTY: 416-397-0831Fax: 416-338-0251Mail: LitoRomano TTCCommunityLiaisonOfficer 5160YongeStreet,13thFloor Toronto,ONM2N6L9
Thankyouforyourparticipation!
16Royal York Stat ion Easier Access – Publ ic Open HouseDecember 2, 2013