Welcome to the sprint! In the Sprint, you will build a realistic product/ process in 5 days.

Upload: amy-raubenolt

Post on 10-Feb-2017

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RPPR Sprint department slides

Welcome to the sprint!In the Sprint, you will build a realistic product/ process in 5 days.

Page 2: RPPR Sprint department slides

Sprints have their origin in software development and manufacturing fields. Google Venture formalized the process.(SPRINT by Jake Knapp)

Page 3: RPPR Sprint department slides

Rules of the Sprint:1. The Facilitator is in charge of the

schedule and taking notes. 2. The Decider makes the tough

decisions.3. The Scrum Master keeps the

team on task.4. No devices in the room (laptops

or cell phones). *step out if you need to.

5. 6-10 people on the Sprint team

Page 4: RPPR Sprint department slides

RPPR Sprint TeamMelinda MichaelAllison MeaghanKelly AmyJackson (Paige)ManzoorCody

Page 5: RPPR Sprint department slides

Sprint Challenges:Abbreviated format

(Traditional Sprint: 5 days/6 hrs ea vs. FSP Sprint: 5 days/2 hrs ea)Room schedulingRolling white boardIndividual schedules

Page 6: RPPR Sprint department slides

How the sprint works:

Page 7: RPPR Sprint department slides

Nobody knows everything, so you share info.

Page 8: RPPR Sprint department slides

Ask the experts

Invite experts on the problem to the Sprint. Talk to one person at a time. Facilitator takes notes on board and team takes “How Might We” Notes

Page 9: RPPR Sprint department slides

This is a simple diagram of the process or problem with around 5-15 steps. This will be how it currently looks-NOT how you want it to look. It helps you to identify the problem.

Page 10: RPPR Sprint department slides
Page 11: RPPR Sprint department slides

“How Might We” Notes

Identify “broken” parts of the process and decide where to focus.

Page 12: RPPR Sprint department slides

This day is the biggest departure from the workgroup model we currently use.

Page 13: RPPR Sprint department slides

Group brainstorms don’t work, so you sketch alone.

Page 14: RPPR Sprint department slides

Your sketches will look like this:

Page 15: RPPR Sprint department slides

We did not combine our sketches into “storyboards,” as recommended due to time restrictions…but we should have.

Page 16: RPPR Sprint department slides
Page 17: RPPR Sprint department slides

Sticky decision

Choose the best sketches with silent review and structured critique.

Page 18: RPPR Sprint department slides

Sticky decision

Page 19: RPPR Sprint department slides

We combined Decision Day with Sketching Day on Wednesday… leaving us Thursday and Friday to re-map the process build our materials.

Page 20: RPPR Sprint department slides

Thursday: Re-MappingWe designed what the process should be.

Page 21: RPPR Sprint department slides
Page 22: RPPR Sprint department slides

At this stage, we had developed a shared understanding of the process and of RPPR handoff timepoints.

Page 23: RPPR Sprint department slides

Determined we needed: • RPPR Process Checklist• SPO Final Review Checklist• GCO Sub Document

Checklist• 2 SPO Email Templates• 1 GCO Email Template

Page 24: RPPR Sprint department slides
Page 25: RPPR Sprint department slides

We spent Friday building the RPPR Process Checklist.

Page 26: RPPR Sprint department slides

We assigned the other materials needed to individuals and set up a follow-up meeting to go over them.

Page 27: RPPR Sprint department slides

One of the challenging parts of the Sprint was that just as we discovered what materials we needed to build, we ran out of Sprint time to build them. More time dedicated to future Sprint sessions will help with this

Page 28: RPPR Sprint department slides

The 5-Day Sprint ended!

Page 29: RPPR Sprint department slides

GCO Subsite Document Checklist

Page 30: RPPR Sprint department slides

SPO Final Review Checklist

Page 31: RPPR Sprint department slides

Sprint Follow Up SurveyWhat could have improved the Sprint?-More time allocated (62.5%)-Dedicated room space (62.5%)-Prior education on the problem (37%)

Page 32: RPPR Sprint department slides

Sprint Follow Up Survey

Page 33: RPPR Sprint department slides

Sprint Follow Up Survey

Page 34: RPPR Sprint department slides

Sprint Follow Up Survey

Page 35: RPPR Sprint department slides

Sprint Follow Up Survey

Page 36: RPPR Sprint department slides

Sprint Follow Up Survey

Page 37: RPPR Sprint department slides

Analysis• We should consider the Sprint

model for future problem-solving opportunities

• We should seek opportunities to bring individual problem-solving techniques into group problem-solving sessions

Page 38: RPPR Sprint department slides

Recommendations for future Sprints• 3-4 hours/day• Dedicated room space, if

possible• Allow for “storyboarding” • Multiple shorter sketching

sessions• Offer a summary of the

problem to the Sprint team in advance to help promote understanding

Page 39: RPPR Sprint department slides

…But what about the RPPR Process? Did the Sprint solve it?SPOs and GCOs have begun using the checklists, templates, and the process created in the Sprint. We will check in at the 4-month point to determine if we need to modify it.*We anticipate that our pending new systems may yield the need to modify as well.

Page 40: RPPR Sprint department slides

Want to learn more about the Sprint session?Check out the Sprint folder on the G Drive to see our documents, pictures, templates, survey, etc. You can also read the article I’ve been writing about it in that folder.(An Analysis of Collaborative Problem-Solving Mechanisms in Sponsored Projects: Applying the 5-Day Sprint Model)

Page 41: RPPR Sprint department slides

Thank you to this fantastic first Sprint team and to Aaron and Melinda for letting us try out this problem-solving model here in FSP!