Page 1: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

4aA87NE3ei0 2 .5196 BOWMAN 010

Report On

Overburden Drill Program

Cook Project

Bowman Township

RECEIVEDNOV 1 1 1982

AWNING UNDS SECTION

November 8, 1982

By

Asarco Exploration Company of Canada Limited

Page 2: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

42A07NE03ia 8 .5196 BOWMAN 010C

Page

Summary ................................... l

Location and Access ....................... l

Previous Work ..... ... ..................... l

Overburden Drill Program .................. 2Pleistocene Geology ...... .. . .. .... . .. . . . .. 2

Bedrock Geology ........................... 3

Conclusions ... . ... .. . .. . ... ...... ...... ... 3

Appendices

Report of WorkClaims Submitted for Assessment Credit (Attachment - l -)Breakdown of Assessment Credit (Attachment - 2 -}Invoice Supported Expenditures (Bradley Brothers Limited)General Location MapDrill Logs for Holes RC-1 and RC-2

Page 3: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Summary

On June 16th, 1982 two reverse circulation overburden drill holes totalling 127 feet were completed. Grey lacustrine clays weathered brown within ten feet of surface predominate most of the pleistocene section. These clays overlie a relat ively thinner unconsolidated clastic sedimentary unit which overlies bedrock. The clastic unit consists of basal sands, gravels and tills. One of the holes encountered basal sand and gravel while the other intersected basal sand, gravel and till.

Location and Access

The Cook property consists of twenty-six mining claims compris ing three separate groups. The group of claims for which this work is being filed is located in Bowman Township, Lots 8 and 9, Concession III and IV, and consists of the following claim numbers:

L545367 to L545369 inclusiveL545339L545342L545382L554705 and L554706L532706 and L532707

The claim group is accessible via a gravel road which runs south along the Lot 6 - Lot 7 boundary line from the intersection at Highway # 101, one mile west of the town of Matheson. The gravel road turns to the west along the Concession III - Concession IV boundary line and enters the claim group *s mile from the turn.

Previous Work

Asarco Exploration Company of Canada Limited and the Tillex Syndicate have been active in the general area since 1973. Several overburden holes were drilled on the claim group as well as one diamond drill hole completed in 1981 to a total depth of 492 feet. Ground geophysics including horizontal loop E.M. and magnetometer surveys have been conducted over the claim group.

Page 4: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

- 2 -

Overburden Drill Program

Drilling was carried out by Bradley Brothers Limited using a Longyear 1-38 drill modified for a dual-tube reverse circul ation drilling. The drill is mounted on an eighteen ton diesel FN 160 Flextrack Nodwell, and has a hydraulic derrick capable of handling twenty feet of rods.

A continuous return enables a continuous monitoring and logging of unconsolidated overburden. Bedrock cuttings were also collected for approximately the first five feet. Where till or basal material was identified or suspected approximately 10 - 15 pounds of -10 mesh material was collected for analysis of heavy mineral concentrates. Some -HO mesh material was added to assist in studies of till composition.

The two overburden drill holes were located in such a manner as to confirm the results of previous drilling and to trace anomaly trains up-ice from the holes initially drilled. In general this was a northerly trend.

Pleistocene Geology

Most of the area of Bowman Township including the claim group is underlain by Barlow-0jibway lacustrine clay deposits which in a few localities may grade upward and laterally into coarse sand and gravel outwash which may be proximal to a former shoreline. The deposits are underlain by glacial tills and basal sands and gravels.

The grey lacustrine clay occupies a greater part of the pleistocene section.

Hole # RG-l intersected fifty-seven feet of grey clay weathered brown within five feet of surface. Underlying this unit from fifty-seven to sixty-five feet was basal sand and gravel contain ing approximately 50 - 70% sand.

Hole # RC-2 intersected forty-nine feet of grey clay weathered brown within eleven feet of surface. Underlying this unit from forty-nine to fifty-three feet was a basal sand, gravel and till unit.

In both instances the clastic basal units were anomalous in Au values in the heavy mineral concentrates.

Page 5: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

b*Bedrock Geology

Only limited geology is known in Bowman Township over the claim group since no outcrops occur. A best attempt was made to identify bedrock geology from approximately five feet of bedrock chips in the return.

Hole l RC-1 intersected a chloritized basic volcanic probably an altered basalt with less than J.% disseminated pyrite.

Hole # RC-2 intersected a dark green chloritized basic volcanic with less than ^ disseminated pyrite, l - 2% disseminated magnetite, and several small altered syenite dykes and fractures with up to 31 pyrite.

Conclusions

The immediate subsurface pleistocene cover consists of grey clay from glacial lake Barlow-Ojibway. A basal sand, gravel and till unit underlying this provides a good sample medium where it is till, since sand and gravel transport is larger, more erratic and much more difficult to outline a source. However, both basal clastic units in the two holes drilled were anomalous in Au values.

Respectfully submitted,

Alex S. Horvath

ASH: mm

Page 6: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Attachment 2

Breakdown of Assessment Credit

Bowman Township

OVB. Hole No. Depth Drilling Time Set-Up S Moving Time

RC l 70 ft. l h hr. l hr. RC 2 57 ft. 1*5 hr. l hr.

Equipment Rental:

5 hours @ $218.00/hr. $ 1,090.00

Tricone Bit #090147 $725.00.+ J.5% 833.75

Move By Truck from Carr Twp. to Bowman Twp.:57 miles @ $5.00/mile 285.00

Demobilization: 50 miles @ $5.00/mile 250.00

Room and Board {Bradley Bros.) ^^^245.20

(Payment to Bradley Brothers) TOTAL $ 2,703.95

Field Expenses Directly Incurred by Asarco

A. Horvath GeologistD. Scott Field AssistantSalaries; One Day (June 16, 1982) $ 225.70

Living Expenses; One Day (June 16, 1982)

Timmins, Ontario (Motel S Meals)$45.00/Day per manA. HorvathD. Scott 90.00

Report Writing s Drafting

A. Horvath Two Days @ $150/Day 300.00

TOTAL $ 615.70

Page 7: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Page 2

Attachment 2

Total Expenditure by Asarco

$2,883.65 * 15

or 19 Days per Claim

$2,883.65

192 Days

We therefore wish to apply 19 days credit to each of the 10 claims listed on Attachment l (Bowman Township).

R.J. VGanfor Asarco Exploration Co.of Canada Limited

Page 8: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

I hereby certify that the aforementioned expenses were incurred by Asarco Exploration during all phases of their overburden drilling project in the Township of Bowman, Larder Lake Mining Division, Ontario.

R.J. Deifor Asarco Exploration Co.of Canada Limited

Page 9: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

BRADLEY 17, 1982

1 ago: J^il/i/i

t t./f HOLE No.

1"

l GR-*. 7l - *

9i*0-" i

(j

0

S.TD

.... . . MM/mjrr (IMW

Asarco Exploration Co. of Canada Ltd. 12th Floor - 350 Bay Street Toronto t Ontario M5U 2SG

TO COVER DIAMOND DRILLING FOR

FROM TO FOOTAGE COMPLETED

Carr d Bowman Township

Mobilisation - 51 miles e f5. 00

0* 162* 162' 0' 111* 111' O 1 106* 106' 0' 60* 60' O 1 103' 103' 0* 70* 70* 0* 57* 57'

Equipment rentals 25 hours 3 218.00

Down the hole consumables! 2 Tricone bits f 1725.00 - 11450.00 1 Adapter 570.00

(2020.00

Flos 15ft 301.00

Move by truck from Carr Twp to Bowman Township t 57 ailes 6 S. 00

Demobilisations 50 Kiloa g 5.00

Room t Board

July 5, 1982RECEIVED PAYMENT

IN FULL THANK /YOU ,

'Per ' "^^,/

WD DRILLING

9255

5,450

2,323

285

250

24518,800

00

00

00

00

00

2020

JR MM sneer fi.O. IOXM7- NOMNDA, OUt. MX SA9

Page 10: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

"DATE 16/^2. HOLE NO. PC-2. GEOLOGISTDRILLER GUY HOLE LOCATION IQQ m M or ROl

'BIT NO. QQQi-4-T FOOTAGE ON BIT

HOURS MOVE HOURS DRILL l *Jz K rs. OTHER

Page 11: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

JTOsDATE 3TTNE 16. I9fl:i HOLE NO.•r J ^--r-" J"j"""

bRILLER ^ilJY FORTIN________ HOLE LOCATION

_ FOOTAGE ON BIT —.—-——.

HOURS DRILL l 4-

GEOLOGIST A. MQRVATH

BIT NO. O9QJ47

ilOURS MOVE OTHER

f' 5

Ok .̂

"*

10-

,i -*

W"

*™^

"Mlhk **-

•i

: m

^-Mw

\.'l' J

;ln ~" -

m

40 —

•M*

M

.a

*

•Mro-"1*

..l m

•'•; m

\ ••M

'" . Ml

fc

* * w

.' ' *

*

M

•HA ^ CXOmP M o

^•MMMWM

1 ——— ———

——— . ———

—— . ———

— , ————

—— . ———

m , I N -•UN ,m

•.——••P——————— M———

•MWt ffMIBM

——— l' "" ' ' "' " '

.•••••/.•i".•:*'.*'.*

5^1i-.*:'.*W*

l

SAMPLENO.

-

-

-

-

-

-~ *

--

r

*.

^

jC-I-ot

^C-J-OZ

:RC-l-03

L.

u-

tOCKifliVlJ Li W O

NO RETURNWUNrtU^D. BRO\AXM C-LAV , hrtiMQR fil^r

G^EYCLAX WITH SILTPOOK RETURN

GREY CLAY WITH SILT UOCAULYGOOD RETURN

&AN6 AKO tiMVfL.S&'.to'H SAUD" ——————PEBBLCS IHCU/pCr lMTfKMCO.ro *AIX C VOLCANICS,iNTenKcuTo rciAfc iMTRyiivltTwoiKtHir, **CLvAr\T2 .

RAKE SMAUU coeeuci, VOLCANIC Pi&eucs WITHBLUE Q.UARTZ EYES^ULORrTIC EASft VOLC. PvMLCS, {.SMAU. fcOWUPKH ? J ..

BEDROCK: CHuxurxzeo BAMC VOLCANIC^PROBA8UY AUT6M.D BASAuT. MTNOR PY* < 1 V* FOOT OP WOLC ro'

0

i\ N A L Y S E S

*

'

Page 12: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Name :

Present Employer;

Employed Since:

Diplomas:

Alex S. Horvath

Asarco Exploration Co. of Canada Ltd. 12th Floor, 350 Bay Street Toronto, Ontario M5H 2S6

May 1982

SSGD Alderwood Collegiate Institute SSGHD Alderwood Collegiate Institute - Ba.Sc. University of Toronto (Geological

Engineering - Exploration Option)

Present Position: Exploration Geologist

Memberships: CIM (Toronto Branch)Prospectors and Developers Association

Work Experience: Operating Geophysical Surveys (E.M. 16, Max. Min. E.M., Magnetometer) Conducting Geochemical Surveys (Soil and Lithogeochem, Radon Gas) Overburden Drill Logging Diamond Drill Core Logging Surface and Underground Mapping Assistant Mine Geologist (Aquarius Mine)

Geological Environments: Primarily Canadian Greenstone Belts

Date: Signature: /A ̂ -

Page 13: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

UOT TLOT 10CO M C

LOT 8

(NOT oyPROPERTY;

I00m LIW,200mS

(3) LO, 350 m S(4) LO,. 500 m SO PREr 13 3Z 06 HOLES

9 1381 CI i HOLES

LOT io

SI~*e COOK JOTSfTLOTS S^S.CoNC III,IY

0 BOWMAN TWR, ONT.LOTS SCAUE: l: IO.OOO

Page 14: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Asarco Exploration

R, S. GrayManager

42A07NEe0ie 2.5)96 BOWMAN 900

November 15, 1982

Mr. F.W. Matthews Land Management Branch Whitney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3

ECEIVED

NOV17I982F, ANDERSON

tb R. MORTON

Q. C . SMITH

O. SHERMAN

'J. M . SMALL

RETURN TO H. 6 4 50

Report On Overburden Drilling Bowman Township/ Ontario -

Dear Sir:

Please find enclosed duplicate copies of a report on overburden drilling carried out during June 1982 by Asarco Exploration in Bowman Township.

This report includes a descriptive text and logs covering two holes on the Cook Project. We are reporting two holes for a total expenditure of $2,883.65 or 192 days credit ^IS/day). We wish to distribute this credit evenly over ten contiguous claims for a total of 19 days credit per claim. These particular claims have 22.5 days credit applied under previous submittals in expenditure credits. Included in the report is a cost break down with copies of expenses incurred, drill logs and a drill hole location map.

The Mining Act Report of Work has been previously submitted to the Mining Recorder, Larder Lake Mining Division.

Asarco Exploration Co. of Canada Ltd. 12th Floor, 350 Bay Street Toronto, Ontario M5H 2S6{416)383-7993

A subsidiary of

ASARCO

Page 15: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

r- 2 -

Once again we enclose a brief resume of the authors credentials which you may wish to keep on file for future use. Mr. A. Horvath is now an employee of Asarco Exploration in the Toronto office and will be filing additional assessment work in the months and years to come.

We trust all is in order and you will process our application forthwith. Thank you for your assistance.

Yours truly,

R. J.

RJD:mm

c.c. Mining Recorder Kirkland Lake

Page 16: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Asarco Exploration

R. S. Gray " *Manager

October 27, 1982

RECEIVEDKUV l V 1982

MINING LANDS SECTIONMr. G,J. KoleszarMining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, Ontario

Dear Sir:

Overburden DrillingCarr and Bowman Townships

Please find enclosed two separate Mining Act Report of Work forms upon which we are reporting two overburden drilling programmes completed in June 1982.

In Carr Township we are reporting five overburden holes (Carr-Destor Project) for a total expenditure of $7,035.65 or 469 days credit. We wish to distribute this credit evenly over twelve contiguous claims (595463-474 inclusive) for a total of 36 days credit per claim. With this application we fulfill the maximum allowable credit of 60 days per claim under "expenditures" as we have -previously submitted 24 days credit (expenditures) on each claim. Our records now indicate that these claims will remain in good standing until December 8, 1983.

In Bowman Township we are reporting two overburden holes (Cook Project) for a total expenditure of $2,883.65 or 192 days credit ^IS/day). We wish to distribute this credit evenly over ten contiguous claims (see Attachment 1) for a total of 19 days credit per claim. We have previously applied 22.5 days credit under "expenditures" on this claim group. Our records now indicate that these claims will remain in good standing until January 7, 1984 (8 claims) and February 6, 1984 (2 claims).

l'Asarco Exploration Co. of Canada Ltd.

: 12th Floor, 350 Bay Street 'l Toronto. Ontario M5H 2S6 A.ub*witryot

(416)368-7993 ASARCO

Page 17: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

2

Copies of the reports (2) including drill hole logs, descriptive text, location maps and an invoice supported breakdown covering all this work will be submitted to the Land Management Branch, Queen's Park, Toronto.

Yours truly,

R.J. Dean

RJD:mra

Encl.

Page 18: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

© Mimstryot Report of Work Natural ,- , . . f. . . . Resources (Geophysical, Geological,

Ontario ' ^fe v Geochemical and Expenditures) ^ f~~JOf

i. tt 1^^* . k^.^^^fi^^^^^WS^**^r*' " Z 5 5*2 76 to 1 HfJviining ActType of Surveyls) . ^.^

Overburden Drilling j f ~) f |Claim Holder(s) C?C ' '

Asarco Exploration Co. of Canada Limited

Instructions: —

Note: -

Please type or print If number of mining claims traversed exceeds space on this form, attach a list. Only days credits calculated in the "Expenditures" section may be entered in the "Expend. Days Cr." columns. Do not use shaded areas below.

f Township or Area

\r\ BowmanProspector's Licence No.

A 22916Address

350 Bay Street, 12th Floor, Toronto, Ontario M5H 2S6Survey Company Date of

Bradley Bros . - Timmins , Ontario Day jSurvey (from Si to)

Mo. | Yr. 1 Day | Mo. | Yr.Name and Address of Author (of Geo Technical report)

A. Horvath (Asarco Expl.) 12th Floor, 350 Bay St., Toronto,

Total Miles of line Cut

Ont. M5H 2S6Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total(s) here

Airborne Credits

Note: Special provisions credits do not apply to Airborne Surveys.

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Electromagnetic

Magnetometer

Radiometric

Days per Claim

Days per Claim

Days per Claim

Expenditures (excludes power stripping)

Mining Claims Traversed (List in numerical sequence)

Type of Work Performed

Overburden DrillingPerformed on Claim(s)

L 545368

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

S 2 ,883. 65Instructions

Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right. \

Mining ClaimPrefix

L

Number

545382

545339545342

545369

545368

545367532707

532706

55V17065514705

LAF

-IEN

Expend. Days Cr.

19

1919

19

19

191919

19

19

D e rvMINIMI*-m-

lil i 1 M ~111 W T—AM —— ————— '

7|8|9| 0|11|12|

L..

hIV

n w|2

Mining ClaimPrefix I Number

R! : CEIV* V* l* l V fa

M 4 8 1982MININ

AKE

/l J)823|4|5|

S LANDS Stl

•~

K—

Total number of mining claims covered by this report of work.

Expend. Days Cr.

-a*-

nor-

/'

l

v;!fi

t

10For Office Use Only

Total Days Cr. Recordd

Date Recorded"BUT-* 1982

Certification Verifying Report of Worll hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Person Certifying

R.J. Dean, Asarco Exploration Co* of Canada Ltd. 12th Floor, ^SjQlVay St. ,~* l Date Certified (Certified tfltXSiofinClre'T

Toronto, Ontario M5H 2S61362 (81/9)

al

l Oct. 27/82

Page 19: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Ministryof

SSLOntario

GeotechnicalReport Approval

Fill

Mining Lands Comments

To: Geophysics

Comments

Q Approved [~1 wish t o *ee "gain with correctionsData Signature

To: Geology - ExpendituresComments

pproved Wish to see again with correctionsDate Signature

To: Geochemistry

Comments

[~] Approved l ] Wish to see again with correctionsDate Signature

j j To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

1593 (SI/10)

Page 20: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

1982 11 23

364

2.5196

Mining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, OntarioP2N 1A2

Dear Sir:

We have received data for Assaying submitted under Section 77(19) of the Mining Act R.S.O. 1980 for Mining Claims L 545382 at al in the Township of Bowman.

This material will be examined and assessed and a statement of assessment work credits will be Issued.

We do not have a copy of the report of work which is normally filed by you prior to the submission of this technical data* Please forward a copy as soon as possible.

Yours very truly,

E.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phonet 416/965-1380

DWisc

cc: Asareo Exploration Company of Canada Ltd Toronto, Ontario Attn: A. Horvath

Page 21: RPT ON OB DR PROGRAM COOK PROJ · 4aA87NE3ei0 2.5196 BOWMAN 010 Report On Overburden Drill Program Cook Project Bowman Township RECEIVED NOV 1 1 1982 AWNING UNDS SECTION November

Carr Twp

McConn Twp,42A07NE00I0 2.5196 BOWMAN

J. v. KALBEN

200

Or

Q. OCO

THE TOWNSHIP OF

BOWMANDISTRICT OF COCHRANE

LARDER LAKE MINING DIVISION

SCALE : I-INC^40 CHAINS

LEGENDPATENTED LAND CROWN LAND SALE LEASES

LOCATED LANDLICENSE OF OCCUPATIONMINING RIGHTS ONLYSURFACE RIGHTS ONLYROADSIMPROVED R OADSKINGS H IGHWAYSRAILWAYSPOWER LINESMARSH OR MUSKEGMINESGEODECTIC STATION

NOTES-4OO SURFACE Peril's

ALL LA K. e. s

L O 8672 i ssued for flooding r ights on Watabeag R iver

GRAVEL AND SAND

0- QUARRY PERMIT

DATE OF ISSUE

APR 2 7 1983

inis'^ of Ka'ur2lRD:c-r::s TORONTO ___

PLAN NO.- M-333ONTARIO