![Page 1: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/1.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
RQ-4 Operations in Japan
5AF A3A
UNCLASSIFIED//FOUO
![Page 2: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/2.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Background
UNCLASSIFIED//FOUO
In 2010, full time deployment to Guam, ideal strategic location for RQ-4 operations
However, during summer months, many missions were lost due to severe en route turbulence
PACAF started to research alternative locations
![Page 3: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/3.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Background
UNCLASSIFIED//FOUO
The 2011 East Japan earthquake and nuclear crisis interrupted the study
RQ-4 was a valuable asset during the crisis
Late 2011, Misawa was selected as an ideal alternative location for summer ops
GoJ briefed that Misawa would be a viable location for summer ops
Fukushima nuclear facility (Mar 2011)
![Page 4: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/4.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Challenges
UNCLASSIFIED//FOUO
GoJ has no legal regulations for RPAs Airworthiness certificate initial issue No RPA operational experience GoJ had concerns about backup com Mil-Civ co-used congested airfield JASDF runway strip stand-by/barriers How to fly and where to fly in local area
![Page 5: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/5.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Misawa deployment
UNCLASSIFIED//FOUO
Early 2013 GoJ agrees to Misawa deploy Subsequently 2013 deployment was
cancelled due to budget cut A LOA was signed on 20 Mar 2014 for
summer ops at Misawa Key element of the LOA is that GH would
fly like any other aircraft at Misawa
![Page 6: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/6.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Flight Operations File and fly like typical manned aircraft 1801 flight plan is filed for every mission Aircraft will be dual controlled by LRE aircrews
at Misawa AB and MCE aircrews at Beale AFB NOTAM for departure and arrival No Temporary Flight Restrictions (TFR) Standard radio calls Stereotype departure and arrival
![Page 7: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/7.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7
MIS 090/074 42,000’ + 48,000’+
MIS 087/055 44,000’ + 49,000’+
MIS 073/060 36,000’ + 45,000’+
MIS 079/078 40,000’ + 47,000’+
B1 ENTRY/EXIT MIS 071/040 30,000 + IN
50,000 + OUT
MIS 106/002 4600’ +
ENKAI 12,000+’ 52,000’+
MIS 078/024 23,000’ +
HVT 52,000’ +
2+ X to 50,000’
Misawa AB RQ-4 Departure/Recovery Area Depiction
![Page 8: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/8.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Proven Weather Mitigation!
UNCLASSIFIED//FOUO
93%
63%
11%
2012 2013 2014
Weather Cancel Rate (Jun - Aug)
Andersen Andersen Misawa
![Page 9: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/9.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Reasons for Improvement
UNCLASSIFIED//FOUO
Great cooperation between the US/GOJ Focus on the mission by all ops units at
Misawa to accomplish mission objectives Favorable summer weather conditions Closer to areas of interest and allows for
longer station time GoJ interest in buying GH
![Page 10: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/10.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Successes
UNCLASSIFIED//FOUO
1st ever DOD RPA "file & fly" world-wide No TFR fly like local based aircraft 1st RQ-4 takeoff from mil/civ dual-use -- Safely integrating w/Civil Air Traffic Able to fly at Misawa when sea fog cancels manned flights due to low ceiling/visibility Seamlessly integrating with alert F-2 fighters Demo’d world-wide deployment capability for
Title 10 Congressional report
![Page 11: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/11.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The way ahead
UNCLASSIFIED//FOUO
2015 deployment on track for Misawa Operators will explore flying later into the
year to test winter weather and longer term deployment We will also assist GoJ on their GH
mission
![Page 12: RQ-4 Operations in Japan · 2015. 3. 25. · I n t e g r i t y - S e r v i c e - E x c e l l e n c e Background UNCLASSIFIED//FOUO In 2010, full time deployment to Guam, ideal strategic](https://reader033.vdocument.in/reader033/viewer/2022060913/60a79eedeb9c37461110bf87/html5/thumbnails/12.jpg)
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
UNCLASSIFIED//FOUO
“The Global Hawk ‘is a key component’ in the Pacific shift”
Gen Herbert Carlisle, Commander Pacific Air Forces, Washington, D.C., 5 May 14