Comment sheet for Transmittal No.: KTA.TB-PAC03-PVGASD-AECC-T-081Transmittal’s Issue date: 11/12/2014Response Sheet’s Issue date: 22/12/2014
No Document No. Document Title RevCM code
1. KTA.TB-PAC03-J13-005MAGNETIC LEVEL GAUGE WITH LEVEL TRANSMITTER DATASHEET
A 2
2. KTA.TB-PAC03-J13-006DIFFERENTIAL PRESSURE TRANSMITTER DATASHEET
A 2
3. KTA.TB-PAC03-J13-007PRESSURE TRANSMITTER DATASHEET
A 2
4. KTA.TB-PAC03-J13-008 Pressure gauge DatasheetA 2
5. KTA.TB-PAC03-J13-009 TEMPERATURE GAUGE DATASHEETA 2
*Review Status:1. Approved.2. Approved with comments.3. Rejected. 4. For Information.
PVGASD’s approval of any work/documentation shall in no way relieve AECC and/or VENDORS/SUPLLIERS of any responsibility for performing the provisions of equipment/package in accordance with the project requirements and relevant design documents.
*Notes:1.Closed: Agreed, no further comments2.Open: Still under discussion3.For those comment sheet with code 2 from Company, if Contractor/Vendoragreed with all comments from Company. Contractor/Vendor shall respond the comment sheet,revise and upgrade the document revision to higher revision. The response sheet shall be attached to the document when submitting to Company.4.For those comment sheet with code 2 from Company, if Contractor/Vendor disagreed with Company comments. Contractor/Vendor shall have a discipline meeting with Company to finalize and sign off the comment sheet, then revise and upgrade the document revision to higher revision. The response sheet shall be attached to the document when submitting to Company.
REVIEW COMMENTS:
No. Company comments Contractor/Vendor Response
Closed/ Open
1.Xem comment mark up trong bản vẽ kèm theo (điển hình, áp dụng thiết bị tương tự)
AECC đã chỉnh sửa, DAK y/c surge protect cho thiết bị, theo như spec. cho instrument là không y/c surge protect.
Open
Page 1 of 2
TIEN HAI – THAI BINH LOW PRESSURE GAS DISTRIBUTION PIPELINE SYSTEM PROJECT
Company names and signatures
Contractor/Vendor names and signatures
Commented by
Nguyễn Phước Minh Quân Lê Đình Bình
Checked byPhan Thị Hải Giang Nguyễn Hải Cường
Page 2 of 2