TIEN HAI – THAI BINH LOW PRESSURE GAS DISTRIBUTION PIPELINE SYSTEM PROJECT
RESPONSE SHEET NO.: RS-KTA.TB-PAC03-045.2
Comment sheet for Transmittal No.: KTA.TB-PAC03-PVGASD-AECC-T-121Transmittal’s Issue date: 22/12/2014RESPONSE Sheet’s Issue date: 27/12/2014
No Document No. Document Title RevCM code
Next
Rev
1. KTA.TB-PAC03-J13-005MAGNETIC LEVEL GAUGE WITH LEVEL TRANSMITTER DATASHEET
B 2C
2. KTA.TB-PAC03-J13-006DIFFERENTIAL PRESSURE TRANSMITTER DATASHEET
B 2C
3. KTA.TB-PAC03-J13-007PRESSURE TRANSMITTER DATASHEET
B 1 0
4. KTA.TB-PAC03-J13-008 Pressure gauge DatasheetB 2 C
5. KTA.TB-PAC03-J13-009TEMPERATURE GAUGE DATASHEET
B 1 0
*Review Status:1. Approved.2. Approved with comments.3. Rejected. 4. For Information.
PVGASD’s approval of any work/documentation shall in no way relieve AECC and/or VENDORS/SUPLLIERS of any responsibility for performing the provisions of equipment/package in accordance with the project requirements and relevant design documents.
*Notes:1.Closed: Agreed, no further comments2.Open: Still under discussion3.For those comment sheet with code 2 from Company, if Contractor/Vendoragreed with all comments from Company. Contractor/Vendor shall respond the comment sheet,revise and upgrade the document revision to higher revision. The response sheet shall be attached to the document when submitting to Company.4.For those comment sheet with code 2 from Company, if Contractor/Vendor disagreed with Company comments. Contractor/Vendor shall have a discipline meeting with Company to finalize and sign off the comment sheet, then revise and upgrade the document revision to higher revision. The response sheet shall be attached to the document when submitting to Company.
REVIEW COMMENTS:
A. KTA.TB-PAC03-J13-005 - MAGNETIC LEVEL GAUGE WITH LEVEL TRANSMITTER DATASHEET –REV.B
No.
Company comments Contractor/Vendor Response
Closed/ Open
Page 1 of 3
![Page 2: RS-KTA.TB-PAC03-045.2](https://reader035.vdocument.in/reader035/viewer/2022080221/563db881550346aa9a944be8/html5/thumbnails/2.jpg)
TIEN HAI – THAI BINH LOW PRESSURE GAS DISTRIBUTION PIPELINE SYSTEM PROJECT
1. Vật liệu for Drain & Vent Valves là SS316 (đã comment ở Rev.A)
Alpha – ecc đã sửa đổi Open
2. Item 27 : Indicator Scale là % & cm Alpha – ecc đã sửa đổi Open
3. Không thấy đề cập đến Specific Gravity và Viscosities của Liquid.
Do đã có Density đủ cho vendor tính toán Viscosities của Liquid .Prosernat đã rewiew
B. KTA.TB-PAC03-J13-006 - DIFFERENTIAL PRESSURE TRANSMITTER DATASHEET –REV.B
No.
Company comments Contractor/Vendor Response
Closed/ Open
4.
Item 34 : Calibration Range của PDT-0111 là 0-40.000mBar. Quá lớn so với dãi hoạt động 0-700mBar. Đề nghị kiểm tra lại. (thay đổi so với Rev.A)
Alpha – ecc đã sửa đổi Open
C. KTA.TB-PAC03-J13-007 - PRESSURE TRANSMITTER DATASHEET –REV.B
No.
Company comments Contractor/Vendor Response
Closed/ Open
5. No comment Close
D. KTA.TB-PAC03-J13-008 - PRESSURE GAUGE DATASHEET –REV.B
No.
Company comments Contractor/Vendor Response
Closed/ Open
6. Xem comment kèm theo Alpha – ecc đã sửa đổi
Open
E. KTA.TB-PAC03-J13-009 - TEMPERATURE GAUGE DATASHEET –REV.B
No.
Company comments Contractor/Vendor Response
Closed/ Open
7. No comment Close
Company names and signatures
Contractor/Vendor names and signatures
Commented by
Nguyễn Phước Minh Quân Le Dinh Binh
Page 2 of 3
![Page 3: RS-KTA.TB-PAC03-045.2](https://reader035.vdocument.in/reader035/viewer/2022080221/563db881550346aa9a944be8/html5/thumbnails/3.jpg)
TIEN HAI – THAI BINH LOW PRESSURE GAS DISTRIBUTION PIPELINE SYSTEM PROJECT
Checked byPhan Thị Hải Giang Nguyen Hai Cuong
Page 3 of 3