Reconst. of North Runway 1C‐19C and Associated Taxiways Y, Y2, Y3, Y4 & Y5
1 1
Runway 1C-19C Reconstruction Runway and Taxiway Reconstruction Taxiway Y Widening to Accommodate Larger Aircraft Sanitary Sewer Installation Construct New Service Road
Project Overview
2
Other Project Elements
AOA Fencing and Gate 204 Improvements Staging Area / Batch Plant Improvements & Utilities Maintenance of Air Traffic (MOT) Temporary Displaced 19C Threshold AC Shoulder Rehabilitation Pavement Markings Underdrains and Infield Drainage Improvements Electrical
Airfield Lighting Runway (19C) Status Lights - FAA Facility
3
General Phasing
4
Gate 204 & Staging AreaBB
CCAA
AABBCC
1122
4433
A,B&CA,B&CB&CB&C
CC1212
13013035358484
MM 125125
1&41&4
A,B&CA,B&C
Site Access, Hauling and Storage
5
Contractor Staging, Batch Plant, Storage
Area
Waste Mat. Disposal Area
Work Area
Mat. Crushing, Processing and Storage Area
Temp. Haul Road
Gate 204Construction
Entrance
Staging, Batch Plant & Storage
6
Glide Slope Dr.
UTILITY CONNECTIONS
NEWGATE 204
LOCATION
EXISTING FENCING WHICH CAN BE
REMOVED
EXISTING OVERHEAD
POWERLINES
Gate 204 Installation
Contractor Supplied & Installed Lighting Deadman Cable Fencing Haul Road Guard House Foundation Signs Port-a-Johns Power
7
MWAA Supplied & Installed Card Reader Security Camera Fiber
Contractor Installed Guard House Concrete (Jersey) Barricades (including transportation)
MWAA Supplied Guard House Concrete (Jersey) Barricades
8
Gate 204 Installation
8
Temporary Displaced Threshold
9
Temporary 19C Threshold
Temporary 19C PAPI
BBR/W Length = 6,000-ft
cc
Temporary Displaced Threshold Elements Temporary Marking (Install/Removal) Temporary PAPI Installation Temporary Threshold Lights Temporary Electrical
Cover Distance Remaining Signs Change Light Fixtures
Pavement Reconstruction
10
Soil Cement
Crushed Agg. Base (P-209)#3 Stone Subbase
Fabric
1010
New Shoulder Pavement
New Pavement SectionsWith Soil Cement
PCC18” RWY16” TWY
0.25” Choke Stone
6” CTB
12” Soil Cement
Taxiway Typical Section
Runway Typical Section
11
Taxiway Y Typical Section
New Pavement SectionsWith Agg. And Fabric
PCC18” TXY Y16” TXY Y5
0.25” Choke Stone
6” CTB
6” Aggregate Base Course
5.75” #3 Stone Subbase
Taxiway Y5 Typica Section
12
Drainage Improvements
XXX
X
X
13
14
Sanitary Sewer
NEW 60” MH
NEW 72” MH
NEW 72” MH
NEW 60” MH
BYPASS PUMPING
Reinstall Existing Lights on Existing
Cans
Airfield Lighting and ElectricalNew Conduit
with New Cable
Existing Lights on New Base
Cans
New Conduit
New Fixture on New Base
Cans
15
Runway Status Lights (FAA)FAA Take-off Hold Lights
(THL)
FAA New Conduit and
Cable
FAA Runway Entrance
Lights (REL)
16
17
Service Road
CULVERT A10’x 4’ Box
CULVERT B10’x 4’ Box
CULVERT A30” RCP
17
18