rural small and micro enterprise promotion project phase ii … · 2020-02-07 · rwanda: rural...
TRANSCRIPT
REPUBLIC OF RWANDA
Rural Small and Micro Enterprise Promotion Project – Phase II (PPPMER II) Follow-up Report
Type of report: Follow-up
Report No.: 2507-RW Date: 14 November 2011
INTERNATIONAL FUND FOR AGRICULTURAL DEVELOPMENT
FONDS INTERNATIONAL DE DÉVELOPPEMENT AGRICOLE
FONDO INTERNACIONAL DE DESARROLLO AGRÍCOLA
Via Paolo Di Dono 44•00142 Rome, Italy•Tel. + 39-6-54591•Fax + 39-6-5043463•E-mail [email protected]•Telex 620330
IFAD
FOLLOW-UP REPORT
of the
International Fund for Agricultural Development
and
United Nations Industrial Development Organization
Country: Republic of Rwanda
Project: Rural Small and Micro Enterprise Promotion Project –
Phase II (PPPMER II)
IFAD Loan: 613-RW
Date: 14 November 2011
IFAD Report No. 2507 - RW
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
Front Cover: The cooperative COOPAV-Mararo in Musanze runs this shop at the entrance of
the Vulcanoes National Park, at which tourists like buying the handmade baskets, handbags,
puppets and carvings. PPPMER assisted amongst others with training and coaching in
cooperative management, handicraft techniques and marketing. Vice-president Marie Rose said:
"With the help of PPPMER, the cooperative has brought enormous improvements to our lives.
Our incomes have multiplied since its creation in 2004." Photos : Markus Rosenberger
Back Cover: Florence Mukamana, president of CATM, a manioc cooperative in Gisagara
District, checks the cassava chips drying in the recently completed solar driers Photo : Claus Reiner
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
i
TABLE OF CONTENTS
Currency Equivalents, weights and measures, fiscal year ................................................................... ii
Abbreviations and acronyms .................................................................................................................. ii
Project map.............................................................................................................................................. iii
Aide Mémoire ........................................................................................................................................... 1
A. Introduction ................................................................................................................................ 1
B. Background Information ............................................................................................................. 1
C. Mission Findings and Agreements ............................................................................................. 1
D. Linkages ..................................................................................................................................... 9
E. Prospects and Follow-up .......................................................................................................... 10
Annexes
Annex 1: Agreed Actions, based on the Implementation of the Previous Agreed Actions ................. 11
Annex 2: Project Financial Status ........................................................................................................ 19
Annex 3: Project Status of Funds ........................................................................................................ 21
Annex 4: No-Objection Tracking Sheet .............................................................................................. 23
Annex 5: Compliance with Loan Covenants ....................................................................................... 26
Appendices
Appendix 1: Agriculture Value Chains ............................................................................................... 29
Appendix 2: Apprenticeship Support .................................................................................................. 39
Appendix 3: Rural SME Development ................................................................................................ 44
Appendix 4: Cooperative Development .............................................................................................. 56
Appendix 5: Handicraft and Tailoring Value Chains .......................................................................... 60
Appendix 6: Financial Services for Rural SMEs ................................................................................. 64
Appendix 7: Gender Inclusiveness ...................................................................................................... 68
Appendix 8: Monitoring and Evaluation ............................................................................................. 70
Appendix 9: Project Management ....................................................................................................... 72
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
ii
CURRENCY EQUIVALENTS, WEIGHTS AND MEASURES, FISCAL YEAR
1 USD = 600 RWF (November 2011)
Weights and measures: Metric system
Fiscal year: 1 July to 30 June
ABBREVIATIONS AND ACRONYMS
AWPB Annual Workplan and Budget
BDF BRD Development Fund
BDC Business Development Centre (RDB supported)
BDS Business Development Service Centre (PSF supported)
BIC Business Incubation Centre (RDB supported)
BPR Banque Populaire du Rwanda
CEAC Comité d‟évaluation et d‟analyse des crédits
CER Conseiller d‟entreprise rurale
CF Conseiller de filière
CIS Craft Industry Secretariat
COPORWA Communauté des potiers du Rwanda
DRF Demande de retrait de fonds
DU Demonstration Unit
FAC Fonds d‟appui à la commercialisation
FE Formateur d‟entreprise
FIDA Fonds international de développement agricole
FIT Fonds d‟appui à l'innovation technologique
MINICOM Ministry of Trade and Industry
MFI Microfinance institution
MOU Memorandum of Understanding
MSME Micro, small and medium enterprise
ONG Organisation non gouvernementale
ONUDI Organisation des Nations Unies pour le développement industriel
PCU Project Coordination Unit
PMER Petite et micro-entreprise rurales
PPPMER Projet pour la promotion des petites et micro-entreprises rurales
PSF Private Sector Federation
PTBA Programme de travail et budget annuels
PROBA Proximity Business Advisor
RCA Rwanda Cooperative Agency
RDB Rwanda Development Board
RSE Responsable du suivi-évaluation
RWF Rwandan Franc
SACCO Savings and Credit Cooperative
SDR Special Drawing Rights
SPIU Single Project Implementation Unit
TOR Terms of Reference
TVET Technical and Vocational Education and Training
UNIDO United Nations Industrial Development Organization
USD United States Dollar
WDA Workforce Development Authority
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
iii
PROJECT MAP
%U
%U%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U
%U%U
%U
%U%U
%U
%U
KAYONZA
GATSIBO
KIREHE
NYAGATARE
RUSIZI
RUTSIRO
BUGESERA
NGOMA
KARONGI
HUYE
GICUMBI
NYAMAGABE
NYAMASHEKENYANZA
NYARUGURU
BURERA
GAKENKE
KAMONYI
GISAGARA
MUHANGA
RULINDO
RUHANGO
NYABIHU
MUSANZE
NGOROREROGASABO
RWAMAGANA
RUBAVU
KICUKIRONYARUGENGE
EASTERN PROVINCE
WESTERN PROVINCE
SOUTHERN PROVINCE
NORTHERN PROVINCE
TOWN OF KIGALI
MWIRI
RWIMBOGO
MURUNDI
KARANGAZI
MPANGA
RWERU
NDEGO
KIVU
RWIMIYAGA
CYATO
BUTARE
BWEYEYE
BONEZA
MUSASA
GAHINI
KITABI
JURU NASHO
KABARE
KINIGI
RUHERU
GIHOMBO
GAHARA
KAZO
NYAGATARE
RWEMPASHA
MAYANGE
GISHYITA
KIGEYO
RILIMA
ZAZA
BURUHUKIRO
GITESI
JARAMA
MUKURA
KABARORE
MUYIRA
MATA
KINAZI
MUSHELI
MUGINA
GITOKI
MBUYE
MAMBA
KIBIRIZI
TWUMBA
MUSAZA
KIVUMU
KIGARAMA
MUHANDA
SAKE
MUBUGA
RONGI
TABAGWE
NYABIMATA
KIBEHO
KAGANO
RULI
KIGINA
NTARAMA
GASHORA
SOVU
COKO
KINAZI
JALI
NGERUKA
GITI
MUSENYI
RUHANGO
MUGANZA
KAMABUYE
BUSHEKERI
MUSHIKIRI
RUKIRA
MACUBA
MUGANO
KARAMBI
NYABIRASI
NYAMATA
MATIMBA
CYEZA
RANGIRO
MUNINI
GIHANGO
KADUHA
BUSORO
NDORA
NTONGWE
TARE
MUSHUBATI
NGERA
KIGOMA
UWINKINGI
MIMULI
KIRIMBI
KIYUMBA
NYAMUGALI
MUKO
MURAMA
MUKINGO
MUZO
MURINGA
SIMBI
NKOMANE
GATARE
MAHAMA
SAVE
GASHARI
RUKARA
NDARO
KIYOMBE
KABACUZI
GISHUBI
RUGALIKA
JENDA
KATABAGEMU
MUSHONYI
MUKAMA
NDERA
GATORE
RUKUMBERI
KANSI
MUGANZA
BUTARO
RUNDA
RUGABANO
RUVUNE
KINIHIRA
NYARUBUYE
MINAZI
BWISHYURA
RWINKWAVU
GATSIBO
MUSHA
BYIMANA
MUTETE
NTYAZO
MBAZI
KIBIRIZI
MURUNDI
KIREHE
NDUBA
NYAGISOZI
KAVUMU
MAREBA
KAGEYO
NYAMIYAGA
RUGARAMA
RUTARE
NZIGE
RURENGE
RUKOMO
RUBONA
KARENGE
NYANGE
MUGESERA
MUTENDERI
NYANGE
KARAMA
KARAMA
KIGOMA
HUYE
MURAMBI
KIZIGURO
BUYOGA
MWOGO
RUBENGERA
MUSHA
MUHAZI
NZAHAHA
KABAYA
SHANGI
NGOMA
REMERA
KARAMA
RUGANDA
MUSEBEYA
CYANIKA
KAGEYO
MARABA
KABAGALI
MUHANGA
RUSENGE
CYERU
BUSANZE
RWANKUBA
GITOVU
MWENDO
RUKOMA
REMERA
BYUMBA
BWIRA
MWULIRE
BUMBOGO
RAMBURA
MURAMA
RUKOMO
MUHURA
MURAMBI
NYABITEKERI
RWANIRO
KIBILIZI
MBAZI
NGARAMA
GISHARI
BWISIGE
GATUNDA
SHINGIRO
BASE
MBOGO
MUKINDO
MAHEMBE
NYAGIHANGA
NEMBA
KABATWA
RUHANGO
GIKONKO
RUSHAKI
GAHENGERI
MUSAMBIRA
MUHONDO
KIBANGU
NYAMYUMBA
KANIGA
KANAMA
CYAHINDA
KIVUYE
RUSATIRA
JOMBA
RUHUHA
KISARO
BUKURE
JANJA
NYAMIRAMA
RURAMBA
RUSEBEYA
KIGEMBE
GASAKA
CYUVE
MUYUMBU
KIGABIRO
FUMBWE
TUMBA
KIRAMURUZI
BIGOGWE
RUGERA
NYANZA
GATEBE
MUTUNTU
KINYABABACYANIKA
RWERERE
KANJONGO
JABANA
GIHEKE
CYABAKAMYI
KIBUNGO
GATARAGA
SHYIRA
MUSANGE
KINONI
NYARUSANGE
KARAGO
GASANGE
KARENGERA
RUSORORO
GATUMBA
NYAKARIRO
RUHUNDE
RUTUNGA
KABARONDO
GAKENKE
NKUNGU
MUKARANGE
MATYAZO
KIBUMBWE
KAYENZI
MURUNDA
NGOMA
RUSIGA
BWERAMANA
MUSHISHIRO
HINDIRO
MUNYAGA
GASHENYI
MATABA
NGORORERO
GASHONGA
MUGOMBWA
MUSHUBI
BUSHOKI
RURAMIRA
RUREMBO
RUHARAMBUGA
GACACA
RUSHASHIBUREGA
BUSENGO
MANIHIRA
RWABICUMA
RWAZA
RUHASHYA
GITAMBI
SHYORONGI
SHYARA
MURURU
KAGEYO
KAREMBO
RUSASA
NGAMBA
NYARUBAKA
CYINZUZI
NKANKA
NYUNDO
MIYOVE
SHYOGWE
NYABINONI
BUSASAMANA
MUSANZE
GASHAKI
KAYUMBU
GASHANDA
BUGESHI
RUGARAMA
MUDENDE
MASORO
NKOMBO
NYARUGENGE
NYAMIYAGA
NKOTSI
MUKURA
MUKO
MUKAMIRA
BUSHENGE
GIHUNDWE
NYAGISOZI
NEMBA
NYAKABUYE
RUBAVU
GIKOMERO
MUKARANGE
MURAMBI
KINTOBO
KINIHIRA
KAMEGERI
MUHORORO
KAMUBUGA
KAGOGO
REMERA
KIVURUGA
GACURABWENGE
RWAMIKO
RUGENDABARI
NTARABANA
GAHUNGA
GISHAMVU
BUNGWE
MUGUNGA
MUYONGWE
NGOMA
CYANZARWE
CYUMBA
KINYINYA
SHANGASHA
TUMBA
NYANKENKE
KIMONYI
MUNYIGINYA
BUSASAMANA
MUHOZA
MANYAGIRO
KANYINYA
NYAMABUYE
RUKOZO
CYABINGO
BUSOGO
NYAKARENZO
GIKUNDAMVURA
NYAKILIBA
RWIMBOGO
CYUNGO
BUGARAMA
RUGERERO
KARAMBO
KANZENZE
RUBAYA
GISENYI
RUSARABUGE
MUGANZA
KAMEMBE
RUGENGABARI
GISOZI
NYAMIRAMBO
GATSATA
MUHIMANY ARUGE NGE
KACYIRU
GITEGA
KIMIRONKO
RE MERA
KIMIHURURAGITEGA
RW EZAMENY ONY AKAB ANDA
NY AMIRAMBO
KIGALIGIKONDO
KIGARAM A
GATENGA
KAGARAMA
NIBOYE
KANOMBE
NY ARUGUNGA
GAHA NGAMAGERAGERE
MASA KA
MWIRI
RWIMBOGO
MURUNDI
KARANGAZI
MPANGA
RWERU
NDEGO
KIVU
RWIMIYAGA
CYATO
BUTARE
BWEYEYE
BONEZA
MUSASA
GAHINI
KITABI
JURU NASHO
KABARE
KINIGI
RUHERU
GIHOMBO
GAHARA
KAZO
NYAGATARE
RWEMPASHA
MAYANGE
GISHYITA
KIGEYO
RILIMA
ZAZA
BURUHUKIRO
GITESI
JARAMA
MUKURA
KABARORE
MUYIRA
MATA
KINAZI
MUSHELI
MUGINA
GITOKI
MBUYE
MAMBA
KIBIRIZI
TWUMBA
MUSAZA
KIVUMU
KIGARAMA
MUHANDA
SAKE
MUBUGA
RONGI
TABAGWE
NYABIMATA
KIBEHO
KAGANO
RULI
KIGINA
NTARAMA
GASHORA
SOVU
COKO
KINAZI
JALI
NGERUKA
GITI
MUSENYI
RUHANGO
MUGANZA
KAMABUYE
BUSHEKERI
MUSHIKIRI
RUKIRA
MACUBA
MUGANO
KARAMBI
NYABIRASI
NYAMATA
MATIMBA
CYEZA
RANGIRO
MUNINI
GIHANGO
KADUHA
BUSORO
NDORA
NTONGWE
TARE
MUSHUBATI
NGERA
KIGOMA
UWINKINGI
MIMULI
KIRIMBI
KIYUMBA
NYAMUGALI
MUKO
MURAMA
MUKINGO
MUZO
MURINGA
SIMBI
NKOMANE
GATARE
MAHAMA
SAVE
GASHARI
RUKARA
NDARO
KIYOMBE
KABACUZI
GISHUBI
RUGALIKA
JENDA
KATABAGEMU
MUSHONYI
MUKAMA
NDERA
GATORE
RUKUMBERI
KANSI
MUGANZA
BUTARO
RUNDA
RUGABANO
RUVUNE
KINIHIRA
NYARUBUYE
MINAZI
BWISHYURA
RWINKWAVU
GATSIBO
MUSHA
BYIMANA
MUTETE
NTYAZO
MBAZI
KIBIRIZI
MURUNDI
KIREHE
NDUBA
NYAGISOZI
KAVUMU
MAREBA
KAGEYO
NYAMIYAGA
RUGARAMA
RUTARE
NZIGE
RURENGE
RUKOMO
RUBONA
KARENGE
NYANGE
MUGESERA
MUTENDERI
NYANGE
KARAMA
KARAMA
KIGOMA
HUYE
MURAMBI
KIZIGURO
BUYOGA
MWOGO
RUBENGERA
MUSHA
MUHAZI
NZAHAHA
KABAYA
SHANGI
NGOMA
REMERA
KARAMA
RUGANDA
MUSEBEYA
CYANIKA
KAGEYO
MARABA
KABAGALI
MUHANGA
RUSENGE
CYERU
BUSANZE
RWANKUBA
GITOVU
MWENDO
RUKOMA
REMERA
BYUMBA
BWIRA
MWULIRE
BUMBOGO
RAMBURA
MURAMA
RUKOMO
MUHURA
MURAMBI
NYABITEKERI
RWANIRO
KIBILIZI
MBAZI
NGARAMA
GISHARI
BWISIGE
GATUNDA
SHINGIRO
BASE
MBOGO
MUKINDO
MAHEMBE
NYAGIHANGA
NEMBA
KABATWA
RUHANGO
GIKONKO
RUSHAKI
GAHENGERI
MUSAMBIRA
MUHONDO
KIBANGU
NYAMYUMBA
KANIGA
KANAMA
CYAHINDA
KIVUYE
RUSATIRA
JOMBA
RUHUHA
KISARO
BUKURE
JANJA
NYAMIRAMA
RURAMBA
RUSEBEYA
KIGEMBE
GASAKA
CYUVE
MUYUMBU
KIGABIRO
FUMBWE
TUMBA
KIRAMURUZI
BIGOGWE
RUGERA
NYANZA
GATEBE
MUTUNTU
KINYABABACYANIKA
RWERERE
KANJONGO
JABANA
GIHEKE
CYABAKAMYI
KIBUNGO
GATARAGA
SHYIRA
MUSANGE
KINONI
NYARUSANGE
KARAGO
GASANGE
KARENGERA
RUSORORO
GATUMBA
NYAKARIRO
RUHUNDE
RUTUNGA
KABARONDO
GAKENKE
NKUNGU
MUKARANGE
MATYAZO
KIBUMBWE
KAYENZI
MURUNDA
NGOMA
RUSIGA
BWERAMANA
MUSHISHIRO
HINDIRO
MUNYAGA
GASHENYI
MATABA
NGORORERO
GASHONGA
MUGOMBWA
MUSHUBI
BUSHOKI
RURAMIRA
RUREMBO
RUHARAMBUGA
GACACA
RUSHASHIBUREGA
BUSENGO
MANIHIRA
RWABICUMA
RWAZA
RUHASHYA
GITAMBI
SHYORONGI
SHYARA
MURURU
KAGEYO
KAREMBO
RUSASA
NGAMBA
NYARUBAKA
CYINZUZI
NKANKA
NYUNDO
MIYOVE
SHYOGWE
NYABINONI
BUSASAMANA
MUSANZE
GASHAKI
KAYUMBU
GASHANDA
BUGESHI
RUGARAMA
MUDENDE
MASORO
NKOMBO
NYARUGENGE
NYAMIYAGA
NKOTSI
MUKURA
MUKO
MUKAMIRA
BUSHENGE
GIHUNDWE
NYAGISOZI
NEMBA
NYAKABUYE
RUBAVU
GIKOMERO
MUKARANGE
MURAMBI
KINTOBO
KINIHIRA
KAMEGERI
MUHORORO
KAMUBUGA
KAGOGO
REMERA
KIVURUGA
GACURABWENGE
RWAMIKO
RUGENDABARI
NTARABANA
GAHUNGA
GISHAMVU
BUNGWE
MUGUNGA
MUYONGWE
NGOMA
CYANZARWE
CYUMBA
KINYINYA
SHANGASHA
TUMBA
NYANKENKE
KIMONYI
MUNYIGINYA
BUSASAMANA
MUHOZA
MANYAGIRO
KANYINYA
NYAMABUYE
RUKOZO
CYABINGO
BUSOGO
NYAKARENZO
GIKUNDAMVURA
NYAKILIBA
RWIMBOGO
CYUNGO
BUGARAMA
RUGERERO
KARAMBO
KANZENZE
RUBAYA
GISENYI
RUSARABUGE
MUGANZA
KAMEMBE
RUGENGABARI
GISOZI
NYAMIRAMBO
GATSATA
MUHIMANY ARUGE NGE
KACYIRU
GITEGA
KIMIRONKO
RE MERA
KIMIHURURAGITEGA
RW EZAMENY ONY AKAB ANDA
NY AMIRAMBO
KIGALIGIKONDO
KIGARAM A
GATENGA
KAGARAMA
NIBOYE
KANOMBE
NY ARUGUNGA
GAHA NGAMAGERAGERE
MASA KA
©Institut National de la Statistique du Rwanda, Avril 2006
T
A
NZ
AN
IA
BU R
U
N
D
I
D.
R.
C
ON
GO
U G A N D AS
N
EW
CARTE ADMINISTRATIVE DU RWANDA
0 10 Km
DISTRICTS ET SECTEURS D'INTERVENTION DU PROJET PPPMER-II
Chef-lieu de district%U
Routes
National paved road Route Nationale asphaltée
National unpaved road / Route Nationale non asphaltée
Secondary road / Route secondaire
Limite nationale
Limite de Province
Limite de District
Limite de secteur
Lac
Réserve Naturelle
Parc national
Secteurs d'intervention du projet PPMER
Légende
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
1
Republic of Rwanda
Rural Small and Micro Enterprise Promotion Project (PPPMER)
IFAD Loan 613-RW
9th Mission: Implementation Support
AIDE MÉMOIRE
A. INTRODUCTION
1. A joint implementation support mission1 of IFAD and the United Nations Industrial
Development Organization (UNIDO) visited Rwanda from 17 to 28 October 2011 with the purpose of
reviewing the implementation progress of project activities and making practical recommendations in its
support.
2. The team met senior representatives of MINICOM, Rwanda Development Board (RDB),
Rwanda Workforce Development Authority (WDA), Rwanda Cooperative Agency (RCA), BRD
Development Fund (BDF), Private Sector Federation (PSF), Banque Populaire du Rwanda (BPR),
Duterimbere IMF and Access to Finance Rwanda. The mission held working sessions with the Single
Project Implementation Unit (SPIU) and visited stakeholders in the districts of Burera, Gakenke,
Gisagara, Huye, Musanze, Nyabihu, Rubavu, Rulindo and Rwamagana. The team members express
their sincere appreciation to MINICOM and district staff for their enthusiastic support to the mission.
3. This Aide Mémoire was discussed and agreed at a wrap-up meeting chaired by the Permanent
Secretary on 28 October, attended by representatives of the SPIU and its key partners. Its content is
subject to confirmation by way of an IFAD Management Letter.
B. BACKGROUND INFORMATION
4. PPPMER-II is a 9-year investment project implemented by MINICOM aiming at reducing rural
poverty through the development of rural off-farm small and micro enterprises. It started in June 2004
and will be completed in June 2013, after a 2-years extension period decided in January 2011. The
total cost of the project is estimated at USD 18.17 million. The IFAD loan commitment amounts to
USD 14.90 million.
C. MISSION FINDINGS AND AGREEMENTS
5. General. The mission was pleased to note that the Single Project Implementation Unit (SPIU)
is in place with an enthusiastic and experienced team. Notwithstanding this, the period leading up to its
creation was a difficult time for the PCU staff, which led to a slowdown in the rate of implementation
and the project pro-activeness. With this, the service provision to rural microenterprises has also been
reduced to a few directed activities, which are useful but tiny, and the chance of building functioning
sustainable services has so far not been addressed. It will be important to utilise well this chance,
building on strategic decisions that take into account project experiences and capacities.
6. As a basis for such decisions, the Ministry has reconfirmed the validity of both the SME Policy,
which directs government at channeling its support through permanent public entities in conjunction
with project mechanisms, and the objectives of the project as a vehicle to improve the performance of
1 The mission comprised Claus Reiner, IFAD Country Programme Manager, Team Leader, Damien Ngendahayo,
Agriculture Value Chains and Apprenticeship Expert; Gaspard Kabalisa, Business Plans Expert; Markus Rosenberger,
Cooperative Development and Handicrafts Expert; James Kagaba, UNIDO Agro SME Expert; Elizabeth Ssendiwala,
Gender Expert; Sonia Ntukanyagwe, Rural Finance and M&E Expert; and Christian Hakiba, Financial Management
Expert.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
2
the rural microenterprise sector in the country. In this context, it was noted that PPPMER is
MINICOM‟s main vehicle for reaching this target group, and as such it was indeed necessary to widen
the targeting to all rural sectors in the country and all types of rural microenterprises. This also means
widening the project‟s focus from a number of identified beneficiary SMEs to a broad target group,
which was intended at design.
Component 1: Strengthening Partner Capacities
7. Cooperatives. Including through RCA, the project has supported some 850 cooperatives with
coaching and training services, with 171 ones (comprising some 3 700 members) intensively
accompanied in preparing cooperative development plans. Furthermore, 9 unions and 5 federations of
cooperatives operating in the priority value chains have been created with project support. Women are
relatively well represented in the decision-making positions of the cooperatives. The mission noted a
varying level of performance of the cooperatives and their unions. Especially business skills and the
problem solving capacity have to be developed further to reach operational and economic sustainability
of these groups. It was thus agreed to focus in the future on strengthening pro-activeness and on the
development of marketing skills adapted to their specific context. Since these important support services
take time to reach sustainability, activities should be limited to cooperatives, unions and federations
created before 2012.
8. The simplified and summarized guidelines for cooperative management and governance have
been distributed to cooperative unions and federations. However, these documents are principally
required by the cooperatives themselves, in Kinyarwanda. RCA agreed to distributing the guidelines
further, to establish a list of recipients, and to using them in its coaching programme.
9. The Conseillers d’entreprise rurale (CER) are currently working with RCA, coaching and
training some 150 cooperatives participating in the Crop Intensification Programme (CIP). The mission
is pleased to see that the services delivered by the CER are highly appreciated by these cooperatives.
However, this intensive support was planned to be temporary, the agricultural focus of most of these
cooperatives as well as their advanced status suggest that the targeting is not fully in line with the
PPPMER objectives of supporting rural microenterprises. In addition, MINICOM favours adopting a
model of service provision driven by the demand of all SMEs regardless of their organizational form.
For this, the CER will be released by RCA immediately after signature of the district MOUs, at the latest
by 1 January 2012.
10. RCA also agreed to addressing the reporting shortcomings, in both format and timeliness.
Quarterly and final reports for the period ended in June 2011 have not been submitted as agreed, and
delays led to incompleteness of the project‟s annual report. The final report is a precondition for the
continuation of the collaboration and has to be submitted by November. The reporting format also needs
improvement with a cumulative comparison of expected and achieved results. The MOU for the next
period has to be finalized by November 2011.
11. Business Development Centers (BDCs). The mission acknowledges government‟s decision
and steps to privatise the BDCs, and observes that BDCs are unlikely to reach rural small and micro
enterprises (RSMEs) (which are the targeted PPPMER clients) given thee distances and their limited
capacity to afford their services. Moreover, no voucher system is envisaged by RDB. Nonetheless, RDB
is planning to develop its strategic plan for the BDCs soon, for which it does not require the previously
envisaged project support from UNIDO.
12. Business Incubation Center (BIC). The BIC at Masaka has started training in its leather unit.
Meanwhile, the fruit, dairy and bamboo units are awaiting installation, expected for end-2011. Under the
expired project MOU with RDB to finance fruit processing equipment, the BIC was to train 100 persons
in fruit processing. To conclude the activity, it was agreed to extend the duration of the MOU until end-
2012, and that RDB hire a fruit processing trainer to be coached by the available technical assistance.
Moreover, it was noted that no business strategy for the Centre was in place, and that plans for weaning
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
3
entrepreneurs from its services were notional. Such business strategy should include training plans for
experienced and new entrepreneurs, clear rules for the use of the facilities during and after the training
with a cost escalation, a chart of costs for use of the sub-sections of each unit, pricing of tools and
materials, a communication strategy and an M&E system. This being an urgent need for technical
assistance to RDB for the elaboration of the business strategy to ensure the operationality of the BIC, it
was agreed that this activity will be supported by UNIDO in the framework of the One UN funded
project on Livestock Resource Value Chain Development.
13. Rural Microenterprise Development. Both the mission and MINICOM senior management
confirmed the need for business development services by a very large number of rural microenterprises,
which together with agriculture constitute the basis of the currently weak rural economy. In response to
this unfulfilled need and consistent with the SME Policy, it was observed that while no central level
agency is oriented towards filling this gap, the districts and sectors are well placed and mandated to
facilitate such services. Furthermore, recognising the capacity constraints in local government and
MINICOM‟s intentions of building demand-driven services, service provision by small-scale businesses
in rural areas initially supported through a voucher system presents itself as the system of choice.
14. It was thus agreed to initiate the Proximity Business Advisory (PROBA) Scheme in partnership
between the SPIU and the districts. To coordinate it, each district will contract the services of an RSME
Facilitator (the former CER) with performance incentives, who will organize the identification and
accreditation of the PROBAs (including the former FE) and the voucher distribution. With the vouchers,
RSMEs will be able to contract the services of nearby PROBAs on a 1-to-1 basis. Subsidies for the
vouchers will be slowly reduced. All payments will be done through SACCOs on a commission basis. A
District PROBAS Committee will oversee the implementation of the scheme and report to the SPIU. An
MOU will be signed between the SPIU and each district, to which an annex MOU will be added
between the district and the Sector SACCOs. A schematic diagram of the scheme is shown below.
15. An important feature of the PROBA Scheme will be its demand-driven nature, allowing each
participating RSME (both individual enterprise and cooperative) to choose its service provider from a
SPIU
RSME
Facilitator
Rural and Micro
Enterprises
BDC, BDS,
Proximity Business
Advisors
Serv
ices
Vo
uch
ers
District Contract
Propose voucher recipients
District PROBAS
Committee
Sector
SACCO
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
4
PROBA list regularly updated by the RSME Facilitator. Initially, the vouchers would cost RWF 500 and
have a face value of RWF 5 000, buying about 4 to 8 hours of service. For control and M&E purposes,
each PROBA will fill in the service details on the vouchers cashed in (see also paragraph 40.).
16. The system would be set up immediately, with an effective start date of 1 January 2012, with
intensive sensitisation campaigns launched before that date. To ensure gender responsiveness in the
system, the campaign messages should be packaged in a way that gives rural poor women and men
confidence to seek for the business advisory services. Initially, the 211 former FEs will be accredited,
immediately followed by the mobilisation of more PROBAs, aiming at 2-3 PROBAs per sector. All
PROBAs will require training to provide quality services, mainly in business management and
coaching. For this, the project will build on the PCU‟s request to the International Labour Organization
(ILO) to utilize its SIYB (Start and Improve Your Business) modules to enhance technical skills of the
PROBAs. This activity will be supported by UNIDO in the framework of the One UN funded project on
Livestock Resource Value Chain Development.
Component 2: Operational Support to Rural SMEs
17. Apprenticeship training. Despite previous agreements, the rural apprenticeship training
programme, still implemented directly by the project, has not yet been integrated in a partner agency.
Nonetheless, implementation is on track. So far, 8 546 youth (56% of women) have completed their
6 to 12-month training by rural micro-enterprises in 31 different trades. In addition, 1 500
apprenticeships (63% of women) are ongoing and the project is identifying 2 000 apprentices to start
in November 2011. Apprenticeship training manuals related to 7 main trades were prepared by
KTC/WDA and distributed to 445 participating training enterprises. During the mission, the
Workforce Development Authority (WDA) expressed its strong interest in working in partnership
with the SPIU to implement the programme. The mission found out that all activities related to
apprenticeships were not yet transferred to WDA. To develop the partnership between the SPIU and
WDA, the following actions were agreed upon:
a) The SPIU to share key project documents (extension design, follow-up and implementation
support reports, apprenticeships strategy, etc.) by 30 October 2011;
b) The SPIU to prepare a concept note on modalities of collaboration with WDA, to be discussed
and finalized by 15 November;
c) WDA to prepare an outline of the apprenticeship programme document (including the planned
accreditation of participating training enterprises and the certification of apprentices,
differentiation between new and experienced apprentices, follow-up by PROBAs to be contracted
directly by WDA, possibly selected and supervised by its vocational training centres - VTCs) by
15 December; and
d) The SPIU to prepare an MOU with WDA based on the above document, to be signed by
15 January with a view to take over the implementation from the SPIU immediately thereafter.
18. Key constraints currently experienced by the apprenticeship programme include training
follow-up, which is not satisfactory at the moment since CERs are overloaded by work in their new
mandate and FEs are no more on board. This will affect the quality of ongoing training if corrective
measures are not taken. In addition, most post-apprenticeship training activities for apprentices
graduated in February and March 2011 are not yet done. To address these shortcomings, it was agreed
with the SPIU and WDA that WDA will: (i) contract PROBAs for apprenticeship follow-up using the
voucher system; and (ii) provide graduate apprentices with vouchers for post-apprenticeship training.
19. The mission was pleased that there are more women apprentices than men. However, men
and women are concentrated in different trades according to the „traditional lines‟, with women trades
generally less lucrative than men‟s. It is recommended that the sensitization campaigns should include
messages that encourage women to join the traditional male trades (such as leather).
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
5
20. Handicraft and Tailoring Value Chains. The mission notes a varying performance in the
training of artisans, with annual training achievements ranging from 60% to overachievement. This is
left uncommented in the annual report. In view of the migration of the Crafts Industry Secretariat
(CIS) to the SPIU and in line with the SME Policy, further activities as of 1 March 2012 are to be
carried out by partner institutions such as PSF (for marketing support), WDA (for innovation and
technical training) and consultants (for example, for marketing support and workshops with clearly
specified targets). They should be more demand-driven and tied to the elaboration of realistic
marketing plans. The SPIU needs to assist and consult the service providers on a day-to-day basis.
21. The mission notes that marketing support is largely limited to beneficiaries‟ trade fair
participation, which is of limited effectiveness and very costly. It was agreed that the SPIU put more
emphasis on demand-driven and context-adapted coaching and training in small-scale marketing,
focussing on strengthening self-reliance and pro-activeness among the RSMEs. Local service
providers, such as the PROBAs, should be trained by creative business persons for this purpose.
22. The MOUs concerning the ownership and use rights of the 13 artisan houses and kiosks have
still not been signed by the district authorities, and the handover ceremonies are yet to be organized. It
was agreed that the conclusion of these MOUs be a priority activity, to be finalized by end-2011.
23. Based on good implementation performance and high target group relevance, it was agreed
that the partnership with the Community of the Potters of Rwanda (COPORWA) be re-initiated with a
new MOU, focusing on better technologies as well as training and study tours to upgrade ceramics
production techniques and marketing.
24. In view of the increasingly scarce project resources, it was agreed that the value chain
activities require more rigorous planning, with strategic objectives and a priority afforded to activities
with low costs per client. The plan should include a calendar with quantified objectives, the roles and
responsibilities of the SPIU and its partners.
25. Demonstration units (DUs). DUs foreseen to be supported by the project include 5 cassava
units, 4 honey units and 1 passion fruit unit. Despite previous mission recommendations, all 10 units
but one are still not operational. Equipment was supplied to cassava DUs by 30 May 2011, but are not
yet tested. The mission found some of them, particularly the chippers, in miserable condition, with
urgent need for replacement by the manufacturer. The cassava mills have not yet proven their
functionality, and need immediate elaborate testing at all 5 locations. In addition, it was noted that
some materials were oversupplied and should be put to proper use. External constraints that further
delayed start-up activities include: i) 2 DUs have no water; ii) the roof structure of a third unit has
been taken away by a storm. It was agreed to start production, training and demonstration activities in
the remaining two DUs, while waiting for remaining works in the 3 dysfunctional DUs to be
completed with the support of MINICOM and the districts. Training manuals are being finalized by
the cassava and fruits value chain adviser. Most of the required equipment for honey and passion fruit
DUs are expected to be supplied in November 2011. To guarantee the quality of the passion fruit
equipment, it was agreed that UNIDO be involved in their inspection during the elaborate testing.
26. Even though cooperatives operating DUs were rated among the best performing at the DU
conceptualisation stage, the mission noted that key staff were insufficiently trained and still need
refresher training. Most cooperatives had prepared 3-year business plans, but never updated them to
the current market conditions. MOUs were signed with only 3 cassava cooperatives. It was agreed to:
(i) prepare and sign MOUs for the 7 remaining cooperatives; (ii) assist all 10 cooperatives in
updating their business plans and finalize training and demonstration work plans; and (iii) require
the cooperatives to prepare monthly DU performance reports.
27. Technical and marketing support (FIT/FAC). Improvements are notable in the use of FIT
and FAC, which funds provide capital to RSMEs for technological innovation and marketing. To date,
42 projects have been approved and an additional 18 are being evaluated, mostly in the agro-
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
6
processing and tailoring value chains. The increase in the funds utilization is a result of the previous
mission‟s recommendation to allow beneficiaries to procure equipment directly and due to FIT and
FAC advertising campaigns. However, only 17 projects have yet been fully financed, partly due to
long administrative processes, and partly due to difficulties of some recipients to raise their
contribution. The mission recommends that the SPIU link these to the RSME credit services of BPR
and Duterimbere. The average project cost is RWF 5.5 million. The project contribution to the
42 approved projects ranges from RWF 700 000 to RWF 6.8 million, totaling RWF 150 million, equal
to one third of the funds. No more applications were accepted after March 2011, as agreed with the
previous mission. The mission notes that while the FAC finances primarily trade fair participation
with questionable impact, the FIT finances both investments and training activities that often respond
to a real need. To reduce further the bureaucratic delays in approval and execution of the proposals,
and in an effort to raise the cost effectiveness of the support, it was agreed that the project will
respond more flexibly and directly to requests for training that are beyond the scope of the PROBAs,
channeled through the RSME Facilitators. Where possible, local training institutions such as BIC and
VTCs would be used for this. An in-kind beneficiary contribution (about 25%) will be required, to be
negotiated on a case-by-case basis. After end-June 2012, no more FIT and FAC proposals will be
approved.
Component 3: Financial Services for Rural SME
28. Credit lines. The BRD Development Fund (BDF), mandated by the SME Policy to manage
funds aimed at providing finance to SMEs, has begun operations and will continue the wholesale
management of the project credit lines to BPR and the participating MFIs. The PCU has not advanced
in this regard. It was now agreed that the SPIU prepare a wholesale credit transfer agreement by end-
November, specifying that BDF will carry the lending risk, and detailing management and reporting
obligations, and cost recovery and incentives for BDF services. The agreement will be signed between
MINICOM and BDF, and the SPIU will assist in its implementation.
29. In addition, in an effort to reduce the retail lending risk, it was agreed that BDF will expand
its range of credit guarantees to also cover SME loan portfolios. For this, it will develop a concept
note by end-December 2011 describing the terms and conditions of the product, the review
procedures, and the eligibility criteria. To cater effectively for the SME sector, it is critical that simple
wholesale approval mechanism can be found, and that working capital loans be explicitly included in
the guarantee cover.
30. It was agreed that the SPIU prepare for BDF a note on lessons learnt on its wholesale credit
lines. It is also important that the SPIU‟s Sector Specialist, Access to Rural Finance, develop a closer
working relationship with BDF, directly supporting the planning processes and thereafter following
up on the agreed arrangements.
31. The BPR credit line has financed 1 890 projects for a total amount of RWF 969.2 million. Its
current outstanding balance is RWF 213.1 million, with an alarming overall arrears rate of 36% that
partly reflects high risk, and partly that few loans have been disbursed for about a year. Despite the
low usage, BPR is interested in a re-launch of the credit line for this particular target group by
developing improvements, including a consistent collaboration with Credit Analysis and Evaluation
Committees (CEACs) and also with the Access to Finance Forum. The CEAC is a sector-based group
that pre-screens loan applications before the bank‟s review, and also helps to sensitize RSMEs about
financial services and helps with recovery and follow-up. Despite these useful services, so far most
CEACs have never received the premiums stipulated in the BPR‟s credit agreement with the PCU. It
was agreed that regular payments to the CEAC begin immediately, and that the project support one
member per CEAC with an indemnity of RWF 10 000 per month for coordination functions. The
Access to Finance Forum is a new district-based mechanism to address financial service issues,
including recovery support. BPR has agreed to provide lists of defaulters to the forum to facilitate
recovery. The mission confirmed that loans will be made available nationwide and to all rural
microenterprises found bankable by the participating financial institutions.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
7
32. The mission noted many reporting issues including reporting delays by BPR headquarters,
poor format adherence by many BPR branches and sub-branches and lack of feedback to the reports.
It was agreed that BPR improve its reporting and fill its data gaps, with assistance by the SPIU. In
addition, an assessment of BPR‟s statements on the credit line is planned to establish the current
situation by end-November before transferring the credit line management to BDF.
33. The project also works with Duterimbere MFI through a RWF 30 million credit line that has
funded 30 RSMEs for a total of RWF 11.4 million, with an arrears rate of 2%. Problems remain in the
accessibility of funds and in reporting (similar to BPR). The SPIU will also assist Duterimbere MFI in
improving its working relationship with the CEACs, and the MFI will share information on defaulters
with the Access to Finance Forum.
34. The two other MFI credit lines need to be discontinued with urgency. CT Byumba recently
closed down and as a result the recovery process must be initiated immediately. It was noted that the
agreed recovery of the funds from UCAPEC has not begun, and that notice needs to be given
immediately to the SACCO to repay the credit funds borrowed by UCAPEC.
35. Financial capacity building. Through RCA, the project supports some Sector SACCOs by
building their capacity to provide financial services to RSMEs. Thus far, three manuals and seven
modules have been developed and management training is ongoing including savings mobilization
and management, audit and finance management. It was agreed that a capacity building workplan for
SACCOs be developed immediately by RCA to guide its support to priority areas.
Component 4: Project Coordination
36. Project management. The establishment of the SPIU is well advanced for PPPMER. Still
outstanding are the hand-over by the PCU, the audit, the consolidation of procedures and the induction
training of staff. It was agreed that the SPIU maintain the PPPMER special and operations accounts (to
be called sub-accounts), while a combined counterpart fund account will be established for all SPIU
projects. A number of project management tools, already used by the PCU to a large extent, was shared
by the mission with the SPIU, which intends applying these to the management of its overall portfolio.
Moreover, the preparation of the SPIU administration and finance procedures manual will draw from the
new Project Implementation Manual (PIM) being developed for IFAD projects within the SPIU in
MINAGRI. It was agreed that it be submitted to IFAD for no-objection for compliance with section
6.01(c) of the loan agreement.
37. The mission noted that the SPIU has not instituted a mechanism or responsibility to address
issues of gender equality and women‟s empowerment. In an effort to address this, it was agreed that a
gender focal point be appointed to ‘champion’ gender issues, while it is every staff’s responsibility to
contribute to gender equality in their functions.
38. Financial management capacity. While the project‟s financial management function is still
executed by the PCU, as of 1 November 2011 the SPIU Finance Management Services will take over.
It is made up of a finance management specialist, a chief accountant and an accountant. The
recruitment of two additional accountants is underway. It was agreed that the change of signatories to
the project accounts and their signature specimen be communicated to the IFAD Nairobi office at the
earliest, and that the SPIU finance unit fully utilize the experience of the former finance unit for
training and familiarisation with IFAD loan administration procedures.
39. Planning. The project MOUs with partner institutions require finalization to take into account
the agreed modifications to the current AWPB. Moreover, the SPIU has started consolidating all
project AWPBs into a single AWPB, for the format of which improvements were suggested by the
mission. It was agreed that the SPIU submit the consolidated 2011/12 AWPB to IFAD for no-
objection to the activities pertaining to PPPMER only, and subsequently the modified MOUs.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
8
40. Monitoring and Evaluation. The SPIU is still in its initial stages of setting up an M&E
system. Its M&E Specialist is currently building on existing M&E frameworks of the different
projects to create a single M&E system with planning and reporting templates for all projects. While
there has been no progress in updating the RSME database and filling its data gaps, its use remained
limited. To satisfy its information needs on business development services, the SPIU will establish a
more comprehensive database on RSME service provision countrywide, fed with gender disaggregated
information from the vouchers of the PROBA Scheme, to be provided regularly by the districts. It is
important that this system, including the data to be collected on the vouchers and the districts‟ role,
include the key data collected by the PCU and that it be agreed before the PROBA Scheme begins.
41. Reporting on gender was observed to be haphazard, depending on individual initiative rather
than an institutional requirement. Where there is gender reporting, it normally stops at sex
disaggregated statistics which are not backed by an analysis of the reasons behind the numbers. As
such, opportunities for learning on gender equality are often missed. It was agreed that reporting on
gender will become a routine requirement. Qualitative analysis should be used to explain gender
differences observed in the quantitative data.
42. Reporting. The PCU periodically reports on its activities through progress reports. The
mission reiterates the previous recommendation that these reports be improved qualitatively by
highlighting key issues and lessons learned, and proposing solutions for the future.
43. Procurement. The mission reviewed the implementation status of the 2010/11 procurement
plan and noted considerable delays, such as in the acquisition of equipment for the demonstration
units for fruit processing and beekeeping. More importantly, one performance guarantee had expired
and was promptly renewed during the mission. It was agreed that the PCU regularly monitor such
critical contractual elements for delayed procurement, and ensure that liquidated damages are
enforced in case of late delivery.
44. In response to an audit enquiry, IFAD confirms that all assets procured with project funds are
owned by the government, and that it would be reasonable for the implementing ministry to continue
managing them after project completion.
45. Contract management. The contract register is not updated regularly, with some MOUs
included during the period of the mission and columns related to the no-objection and the Contract
Management Forms (CMFs) not filled in regularly. Payment progress monitoring would be better
done on the CMFs themselves. More importantly, the mission was not provided with the contract
collection to ascertain its completeness, which raises serious concerns regarding the contract
management function. In addition, it was noted that the project keeps a different CMF format that
does not track invoices and performance guarantees. It was agreed that to improve its contract
management function, the SPIU start using the current CMF format and regularly keep an updated
electronic archive of all its contracts and MOUs.
46. Disbursements and liquidity. While the 2010/11 AWPB was executed at 75%, current
disbursements are low. As of 30 September 2011, the project has disbursed 77% or RWF 8.90 million
of the total planned project financing of RWF 11.50 million. Against its 2011/12 AWPB amounting to
RWF 1.97 million, disbursements stand at 12.2% (7% for component 1, 13% for component 2, 5% for
component 3, and 38% for component 4). Notwithstanding, the remaining loan funds as at
30 September 2011 are estimated at USD 1.915 million, considering the pending withdrawal
application (WA) 84, the upcoming WA 85 and the balance of the project accounts. Tight
disbursement planning and monitoring will be required in the remaining project period.
47. The mission carried out a random review of items from recent statements of expenditure
(SOE). Overall, the mission found that all items had full supporting documents and were eligible for
financing by IFAD. As the available balance of funds has reached the threshold, it was agreed that,
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
9
for future WAs, recovery of the Authorised Allocation will be done at 50% to allow for a timely
recovery of the initial deposit.
48. Counterpart funds. The receipt of counterpart funds for 2010/11 was satisfactory, standing
at RWF 270 million or 90.0% of the AWPB. However, cumulatively, the government contribution
only stands at RWF 686 million or 51.7% of the commitment in the Loan Agreement. The mission
was informed that the government allocation for the fiscal year 2011/12 has been set to only
RWF 90 million, against a budgeted amount of RWF 325 million. The planned RWF 90 million
would bring the cumulative government contribution to only 59%. Considering a potential budget
revision in December 2011, it was agreed that MINICOM advocate for an increase in government’s
budget allocation to PPPMER in order to allow for a timely execution of the 2011/12 AWPB and to
deliver against government’s commitment in the Loan Agreement.
49. Audit. The mission is pleased to note that the 2010/11 audit mission was undertaken in
October 2011 as planned and that the PCU has executed the 2009/10 audit recommendations at a rate
of 88% as confirmed by the Auditor General. However, it is noted that the PCU has not implemented
recommendations related to compliance to the cut-off principle of accounting, the management of the
BPR credit line and the reconciliation of its reports. It was agreed that the SPIU urgently implement
the pending 2009/10 audit recommendations.
D. LINKAGES
50. The mission is pleased to note the high degree of complementarity between PPPMER and the
newly designed MSME Development Project. Apart from being implemented by the same Programme
of the SPIU, the two projects share the focus on a wide spectrum of small and microenterprises, and the
market-based demand-driven approach. There are a number of direct complementarities between the
two projects, and also some fundamental differences that distinguish PPPMER from the MSME
Development Project in its current design. These have implications on the possible linkages between the
two in implementation.
51. Firstly, in component 1 the MSME Development Project proposes the continuation of the
apprenticeship programme, albeit provided through the VTCs. This is in fact not a continuation but a
parallel programme, which complements well the enterprise-based apprenticeships offered by PPPMER.
Enterprise-based apprenticeships offer many training vacancies at a very low cost, with a mix of skills
ranging from technical to managerial, reinforced by practical difficulties that emerge in daily
entrepreneurial life. Once these basic skills are acquired, more formal and specialised training through
the VTC system can be an ideal complement to allow graduation to the successful microenterprises. As
such, it is recommended to operate the two systems in parallel, and to build continued learning bridges
between the two.
52. Secondly, in component 2 the MSME Development Project will provide targeted grants to
businesses in priority value chains, while other value chains would benefit from a voucher system,
which is not yet conceptualised. With the design of the PROBA Scheme, PPPMER will lead the way for
a unified voucher scheme to reach small and microenterprise throughout the country, which can and
should eventually be used by both projects jointly. However, the MSME Development Project plans to
focus the voucher support on small enterprises, while PPPMER will target microenterprises with the
same scheme. This difference is likely to disappear as neither PSF nor RDB are attracted towards a
voucher scheme, and the services for their larger-scale target group may already find a ready market at
their respective district-based centres. As such, both PPPMER and the MSME Development Project
may find themselves working with a similar target group. Nevertheless, different voucher values are a
possibility within the same system to cater for different types and costs of services.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
10
E. PROSPECTS AND FOLLOW-UP
53. The mission reiterated IFAD‟s position that there is scope for IFAD to consider further support to
the rural microenterprise sector in Rwanda – provided the availability of funds – once the two conditions
previously communicated are met: (i) that PPPMER effectively implement a comprehensive range of
support activities for rural microenterprises in line with the SME Policy; and (ii) that the capacities
established by PPPMER be used by and integrated in the structures thus created.
54. The next joint mission for the project is planned for May 2012 in the form of a follow-up mission.
An assessment of the conditions above being met may be undertaken as early as during this mission.
Claus Reiner Emmanuel Hategeka
Country Programme Manager, IFAD Permanent Secretary, MINICOM
Kigali, 28 October 2011
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
11
ANNEX 1:AGREED ACTIONS, BASED ON THE IMPLEMENTATION OF THE
PREVIOUS AGREED ACTIONS
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline 1. Strengthening Partner Capacities
Cooperative support
4 Distribuer au moins 2 copies du guide
simplifié de gestion des coopératives par
coopérative encadré. (Antennes, 30 juin 2011)
Les copies des guides simplifiés de gestion
des coopératives ont été distribuées au
niveau des unions et fédérations de
coopératives, ainsi qu‟aux encadreurs et
formateurs des coopératives au niveau des
Districts.
4. Distribute the cooperative guidelines
to each cooperative, establish a list of
recipients so that they can be used in
RCA coaching programme (RCA, 31
Dec. 2011).
71 Les rapports d‟activités doivent être
conformes au canevas fourni et contenir des
résultats chiffrés et des appréciations
qualitatives sur l‟avancement des activités.
(CIS, continu)
La recommandation a été respectée. Les
rapports présentent des données chiffrées, et
conformément au canevas convenu.
OK
106A. Submit 2010/11 annual report
including cumulative comparison of
expected and achieved results (RCA,
30 Nov 2011).
106B. Finalize new MOU between
RCA and SPIU (RCA & SPIU, 30
Nov 2011).
Business Development Centres
81B La base de données du Projet déjà
ventilée par District doit être transféré à RDB
d‟abord et aux BDS ensuite. (UCP, 30 juin
2011).
81C La formation des FE par le staff des
BDS, avec l‟appui du Projet doit être
complètement achevée. (UCP, 30 juin 2011)
81D Toutes les activités prévues par les 2
précédents MOU avec RDB doivent être
réalisées entièrement. (RDB / UCP, 30 juin
2011).
81 E En relation avec l‟extension du Projet
PPPMER, un nouveau MOU doit être signé
avec RDB dans l‟esprit de la réorientation du
Projet. (RDB / UCP, 30 juin 2011).
81 F Un plan d‟action et un budget détaillé de
la participation de l‟ONUDI dans les activités
La base de données ventilée par District
avait été déjà transférée aux CER affectés à
RDB pour être intégrés dans les BDS.
Quand RDB a officiellement décliné
l‟utilisation des services des CER, ces
derniers ont été transférés dans l‟Agence
Rwandaise des Coopératives. La Base de
données reste toujours à leur disposition, et
sera partagée avec les BDS Centres dès que
ces centres seront opérationnels.
Le staff des BDS n‟étant pas encore en
place, cette formation n‟a pas encore eu
lieu, mais les concertations ont été déjà
engagées avec ILO pour organiser la
formation des CER au 2ème
trimestre
2011_2012.
Toutes les dispositions avaient été prises
pour réaliser les activités prévues. Les BDS
avaient été mis en place, l‟intégration des
CER dans les BDS et les formations du staff
des BDS en cours. Suite aux changements
intervenus dans l‟orientation des BDS
comme des structures totalement privées,
Les CER ont été intégré dans l‟agence
Rwandaise des Coopératives en vue de
faciliter leur tâche d‟encadrement des
coopératives de pmer et des autres pmer en
général.
Le plan d‟action du Projet pour l‟année
2011_2012 fait ressortir la participation et le
OK, no longer applicable
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
12
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline du Projet doit être élaboré, discuté et intégré
dans le plan global du Projet. (RDB / UCP, 15
juin 2011)
budget global de l‟ONUDI, particulièrement
au niveau de l‟assistance technique des
BDS, mais le budget détaillé sera spécifié
après le recrutement des gestionnaires
privés des BDS.
Business Incubation Centres
107. Extend the duration of the MOU
with RDB until end-2012 to complete
planned activities. (SPIU, 15
December 2011)
108. Support the elaboration of the
business strategy for the BIC at
Masaka to ensure its operationality.
(UNIDO, 31 January 2012). Rural SME Advisory System
82B En collaboration avec RDB, le Projet, à
travers ses antennes, doit organiser sans tarder
la séance de reconnaissance des FE.
(UCP/RDB, 30 juin 2011).
82D La base de données des personnes
ressources & services aux pmer rurales (CER,
FE, IMF, autres prestataires) déjà disponible,
doit être transféré à RDB d‟abord et aux BDS
ensuite. (UCP / RDB, 30 juin 2011).
Les séances de reconnaissance des FE
devaient être conjointement organisées en
collaboration avec RDB, mais au moment
prévu pour l‟organisation de ces séances,
RDB a décliné son offre d‟intégrer les CER
dans les BDS, et nous avons opté pour la
solution du processus de renforcement des
capacités des FE en collaboration avec ILO,
en vue de renforcer leur capacité de
partenariat avec les gestionnaires privés des
BDS sitôt mis en place.
Cette base de données est déjà partagée avec
les gestionnaires de cette base au niveau
District et sera mis à la disposition des BDS
sitôt qu‟ils seront opérationnels.
OK, no longer applicable
97 Intégrer le programme dans le SME
Development Project action plan. (MINICOM,
31 mai 2011)
Le projet a été intégré dans le SME
Development Project action plan et le
coordonnateur du MSME Development
Project est en même temps coordonnateur
du PPPMER II.
OK
109. Initiate the Proximity Business
Advisory (PROBA) Scheme in
partnership with the districts.
(SPIU, 1 Jan 2012).
2. Operational Support to Rural SMEs
Apprenticeship Training
10 D Distribuer les manuels d‟apprentissage
avant fin juin et établir les listes emmargées
des récipiendaires des manuels. (UCP,
Antennes, 30 juin 2011)
Les manuels d‟apprentissage ont été
distribués aux 445 PP (311 en couture, 85
en menuiserie, 12 en mécanique/réparation,
1 en électricité, 24 en soudure, 11 en
vannerie, et 1 dans le traitement du cuir),
formateurs des apprentis au cours de cette
session.
OK
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
13
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline 11 A Réviser le document de stratégie sur
l‟apprentissage, voir note technique. (UCP, 30
juin 2011)
11 B Organiser un atelier avec les institutions
et projets concernés afin de présenter la
stratégie d‟apprentissage et les résultats
atteints. (UCP, 30 juin 2011)
Le document élaboré par le projet n‟a pas
encore été révisé. La révision sera réalisée
en concertation avec l‟unité du MSME
déléguée par le MINICOM pour la
pérennisation du programme
d‟apprentissage.
(WDA to be involved in the process)
L‟atelier sera organisé après la révision du
document de stratégie sur l‟apprentissage.
OK, now covered by # 99.
98 Mandater une institution qui a la charge du
programme rural d‟apprentissage.
(MINICOM, 31 mai 2011).
Le programme rural d‟apprentissage sera
sous la supervision du programme manager
du MSME. (WDA was mandated to
implement apprenticeship programme)
OK
99A Conclure un MOU avec cette Institution
relatif à l‟appui conseil et l‟appui direct du
PPPMER. (UCP, 30 juin 2011)
99B Nommer et placer le personnel d‟appui
conseil au sein de cette Institution. (UCP, 30
juin 2011).
Au cours des deux années d‟extension du
Projet, le Projet va partager son expérience
dans la conduite de l‟apprentissage avec ce
programme au sein du MINICOM, procéder
à la révision de la stratégie adoptée si
nécessaire, en collaboration avec d‟autres
institutions chargées de la formation
professionnelle, en particulier le WDA.
Le personnel chargé du suivi des activités
du PPPMER a été mis en place au sein du
MSME.
99A. Share key project documents
with WDA (SPIU, 30 October 2011).
99B. Prepare, discuss and finalize a
concept note on modalities of
collaboration with WDA (SPIU, 15
November 2011).
99C. Prepare an outline of the
apprenticeship programme document
(WDA, 15 December 2011).
99D. Sign an MOU with WDA, with
a view to take over the
implementation from the SPIU (SPIU,
15 January 2012).
100 Participer au TVET development donor
cluster de WDA. (UCP, continu).
OK, no longer applicable
110A. Contract PROBAs for
apprenticeship follow-up using the
voucher system (WDA, 15 January
2012)
110B. Inform the districts to provide
graduate apprentices with vouchers
for post-apprenticeship trainings
(WDA, 15 January 2012)
Handicraft Support
49. Evaluer la performance des comités de
gestion des halls des artisans avec un
consultant spécialisé dans la gestion des
coopératives. Le consultant devrait aussi
apporter des recommandations et réviser le
manuel de procédures. (UCP ; 30 juin 2011).
Cette évaluation sera faite par le consultant
qui va mener l‟étude sur l‟artisanat. Le
bureau d‟étude Green and Clean Solutions
(GCS) vient d‟obtenir la non objection pour
réaliser cette étude, et il lui sera demandé de
donner des recommandations appropriées
sur la gestion des halls des artisans et
réviser le manuel de procédures.
49A. Evaluate the performance of the
management committees of the
artisan houses with the help of
cooperative management expert.
(SPIU; 31 Dec 2011)
49B. The consultant should also
revise the related operation manuals.
(SPIU; 15 Dec 2011)
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
14
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline 50 Organiser une cérémonie de remise
officielle des maisons des artisans et kiosques
construits avec l‟appui du Projet, réunissant
toutes les parties prenantes pour la signature
du protocole d‟accord. (UCP, 30 juin 2011).
Pour garantir l‟utilisation et la gestion des
maisons des artisans conformément à la
mission leur allouée, il a été jugé opportun
que les cérémonies de remise officielle de
ces maisons soient organisées après la mise
en place de la structure qui va assurer la
pérennisation des activités du PPPMER II.
50. Organise an official handover
ceremony of the 13 artisan houses and
kiosks funded by the project, at which
the handover MOU will be signed.
(SPIU; 31 Dec 2011).
60A. Organiser un atelier dans la filière
artisanat avec des acheteurs et designers
internationaux, producteurs et commerçants /
exportateurs nationaux, en vue de développer
de nouveaux produits et introduire de
nouvelles techniques. L‟atelier doit cibler des
acheteurs et designers internationaux,
producteurs et commerçants / Exportateurs
nationaux. (UCP, 30 septembre 2011).
Deux ateliers ont été organisés avec les
designers, acheteurs et volontaires
impliqués dans la promotion de l‟artisanat.
Le premier atelier a regroupé 92 artisans,
designers venant des différents horizons
comme François 1er, designer en couture
contemporaine venant du Paris mais aussi
les experts du CBI et du SIAO. Cet atelier a
été clôturé par un défilé de mode pour 6
meilleurs ateliers de pmer venant de chaque
province du pays. Les gagnants de cette
compétition ont été rémunérés et encouragés
à être plus innovateurs dans les
compétitions à venir.
Les séances de préparation du défilé de
mode ont été organisé par le CF couture,
sous l‟encadrement de François 1er
.
Le second atelier était beaucoup plus centré
sur la relation design et marché. Cet atelier a
été animé par les volontaires venant de
Grande Bretagne et plus de 80 artisans ont y
participé pendant 6 jours. Tous ces ateliers
ont été clôturé par le Ministre du Commerce
et de l‟Industrie.
OK
78 Etablir un plan d‟action des filières pour
les 2 ans, indiquant les étapes clés et les
produits quantifiés à obtenir. (UCP, 30 juin
2011).
Le plan d‟action a été établi et soumis au
consultant du FIDA qui avait fait cette
recommandation, et le plan d‟action a été
adopté.
OK
111. Re-initiate the partnership with
the Community of the Potters of
Rwanda (COPORWA) with a new
MOU. (SPIU, 30 Nov 2011).
Demonstration Units
79A Assurer impérativement l‟équipement et
la mise en route des UD manioc, fruits et miel,
en prenant éventuellement d‟autres
coopératives qui disposent de locaux prêts et
de tous les branchements. (UCP, 30 juin 2011)
79B Etablir avec les UD un calendrier des
sessions de démonstration et les modalités
pour les organiser. (UCP, 30 juin 2011).
Les équipements ont été totalement fournis
pour les UD manioc, fourniture d‟une partie
pour l‟unité Fruits, et en cours d‟acquisition
pour les unités Miel. (Equipments expected
to be supplied by November).
La formation va commencer en novembre
2011 pour les unités manioc, après la mise
en place de ces équipements et
l‟achèvement de la construction des aires de
séchage. (Action plans required)
79A. Involve UNIDO in equipment
inspection and elaborate testing of the
processing equipment of the passion
fruit DU (SPIU; 15 December 2011).
OK
112. Assist all 10 cooperatives with
DUs in updating their business plans
and finalize training & demonstration
work plans. (SPIU; 31 Jan 2012)
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
15
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline 113. Cooperatives with DUs to
prepare monthly performance reports.
(SPIU; monthly as of 1 Nov 2011)
Technical and Technological Support (FIT/FAC)
80D Revoir les modalités d‟acquisition du
matériel (promotion FIT/FAC) pour raccourcir
les délais d‟acquisition. Préparer une
proposition au FIDA concernant la possibilité
des bénéficiaires de se procurer eux-mêmes
les équipements selon les spécifications et
factures pro forma contenus dans le dossier
approuvé (UCP, 30 mai 2011)
80 E Achever l‟évaluation des dossiers de
demande. (UCP, 30 juin 2011).
Les modalités d‟acquisition du matériel
pour la promotion FIT /FAC ont été revu,
actuellement les bénéficiaires du FIT/FAC
participent au choix des fournisseurs de ces
équipements, les procédures de passation
des marchés sont organisées par eux-
mêmes. Un manuel facilitant ce processus a
été élaboré et mis à la disposition des
bénéficiaires.
Les dossiers jusqu‟à présent ont été évalués.
14 dossiers ont été financé, 27 dossiers
agrées et les processus de financement en
cours, 21 dossiers ont été remis aux
bénéficiaires pour ajustement et correction
OK
4. Financial Services for Rural SME
Credit Lines
55. Signer des contrats de recouvrement avec
les 14 IMF. (UCP ; 30 juin 2011).
Le projet a consulté les IMFs concernés
pour se mettre d‟accord sur les modalités de
recouvrement. Il a été convenu que la tache
de recouvrement soit assignée aux autorités
du district (Access to Finance Forum) pour
qu‟ils soient impliqués dans la
sensibilisation des mauvais débiteurs qui
habitent dans leurs secteurs. Les
correspondances y relative ont été préparée
et seront envoyées aux districts concernés
avant la fin du mois d‟octobre 2011.
55. Sign contracts for recovery of the
credit lines from the concerned MFIs.
(SPIU ; 31 December 2011).
56A. Mener une évaluation d‟impact des
fonds de crédit du projet. (UCP ; 30 juin
2011).
L‟activité n‟a pas été réalisée, mais est
planifiée dans le programme de travail
2011_2012.
56 A. Conduct an assessment of the
status report of the BPR credit line
(SPIU; 31 December 2011).
89. Elaborer un plan d‟évolution des CEAC.
(UCP ; 30 juin 2011).
Le projet est en premier lieu en cours de
négociation de reconnaissance des CEAC
par les Institutions financières partenaires,
puisque jusqu‟à présent cette
reconnaissance n‟est pas acquise. Ensuite,
renforcer la capacité des membres des
CEAC, pour qu‟ils soient effectifs dans
l‟analyse et l‟évaluation des projets. Enfin
uniformiser partout la régularité de la
distribution des primes d‟encouragement en
provenance de la partie des intérêts perçus,
en conformité avec le protocole d‟accord
signé avec ces Institutions financières.
89. Prepare TOR for the CEACs and
modalities to support one member per
CEAC for coordination functions.
(SPIU; 30 November 2011).
101 Redoubler les efforts pour le
recouvrement des créances non performantes.
(BPR, UCP, continu).
Plusieurs visites de travail avec les Banques
Populaires pour le recouvrement des
créances non performantes ont été réalisées,
et les rapports y relatif sont disponibles.
101. Strengthen efforts in credit
recovery, particularly through use of
the Access to Finance Forum and
CEACs. (PCU ; 31 December 2011)
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
16
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline 102 Conclure un nouveau MOU cadrant bien
les activités à mener par BDF. (UCP, BDF, 30
juin 2011)
Le draft du MOU a été préparé mais n‟est
pas encore signé. Le BDF posait beaucoup
de conditions non prévues, et qui exigeaient
beaucoup de dépenses au projet. Les
négociations sont toujours en cours et nous
comptons sur la présente mission pour
conseils sur la limite du budget et des
activités autorisées dans ce MOU.
OK, no longer applicable
103 Redistribuer la part des intérêts revenant
aux membres des CEAC et aux pmer ayant
respecté leurs échéances, comme convenu
dans le MOU. UCP, BPR, 30 juin 2011).
Des concertations menées avec les BPR ont
aboutit à recommander aux banques
concernées de mettre à jour le plus
rapidement possible les listes des membres
des CEAC bénéficiaires de la part de ces
intérêts, pour permettre le décaissement de
ces primes dans la transparence. L‟activité
est toujours en cours.
103. Begin regular payments to
CEAC. (BPR, Duterimbere;
30 November 2011).
104 Signer des accords de recouvrement avec
les UCAPEC. (UCP, UCAPEC ; 31 mai
2011).
Les visites de travail avec UCAPEC pour
conclure des accords de recouvrement ont
été réalisées. Il est ressorti de ces
concertations, particulièrement lors de la
dernière séance de travail du mois d‟août
2011, qu‟avant d‟entamer le processus de
recouvrement, Il fallait mettre à jour la
situation des risques et préciser l‟adresse
actuelle des débiteurs. Les accords de
recouvrement seront signés sur base de ce
document toujours en cours d‟actualisation.
104A. Give notice to UCAPEC, with
a recovery plan. (SPIU; 30
November 2011).
104A. Give notice to CT Byumba,
with a recovery plan. (SPIU; 30
November 2011).
114A. Prepare wholesale credit
transfer agreements for BPR and
Duterimbere crdit lines. (SPIU; 30
November 2011).
114B. Prepare a note on lessons learnt
on wholesale credit lines. (SPIU; 30
November 2011).
Capacity Building
105 Développer un plan d‟action et entamer
les formations pour les SACCO (RCA, UCP,
30 mai 2011)
Les formations ont été effectuées comme
prévues. 60 membres des SACCO et 20
agents du RCA ont été formés en 5 modules
complémentaires, pendant 5 jours pour
chaque module. Selon le contrat avec le
formateur (The Friends Consultant LTD),
les agents formés auront la tâche de former
les autres membres du staff des SACCOs,
afin que tous les 416 SACCOs managers
soient formés avant la fin de l‟année 2011.
105. Prepare a capacity building
workplan for SACCOs. (RCA with
SPIU support; 30 November 2011).
4. Project coordination
General
65A. Etablir un calendrier précis des activités
à mener et des résultats à produire pour tous
les contrats de consultance signés, et suivre de
près la livraison à temps des produits. (UCP ;
30 juin 2011).
65B. Etablir un plan de travail pour les
activités de consultance dont le processus de
recrutement est en cours avec des délais bien
précis. (UCP ; 30 juin 2011).
Les consultants transmettent régulièrement
leur rapport d‟activité mensuel, et leur
paiement est effectué sur base de
l‟appréciation de ces rapports.
OK
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
17
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline 66. Assurer le suivi auprès du MINECOFIN
pour l‟acquisition des fonds additionnels de
contrepartie. (UCP ; 30 juin 2011).
Le suivi est régulièrement assuré. Les 3
premières tranches du fonds de contrepartie
ont été transférés sur le compte du projet, la
4ème
tranche a été aussi accordé.
66. Increase government‟s budget
allocation to PPPMER II in
compliance with the AWPB and Loan
Agreement. (MINICOM, 31
December 2011)
89. Transférer tous les documents, tableaux et
base de données aux institutions et partenaires
chargés de la continuité du PPPMER II.
(UCP ; 30 juin 2011).
Le rassemblement des documents, tableaux,
base de données et autres informations
relatives aux actions du PPPMER II est
entrain d‟être réalisé, pour leur remise à la
coordination du SPIU, et copies seront
réservé au MINICOM, à l‟ARC et à RDB.
89. Transfer all key project
documents and database to the SPIU
(PCU staff; 31 December 2011)
90. Préparer et envoyer au FIDA un rapport
d‟achèvement du Projet. (UCP ; 30 juin 2011).
Cette recommandation n‟était plus
applicable avec l‟extension du projet.
OK
91. Mettre à jour le site Web du PPPMER
avec les documents clés et les résultats
obtenus. (UCP ; 30 juin 2011).
Le site Web du Projet avait été mis en place,
mais non encore opérationnel. Le SPIU est
entrain de mettre en place un autre site
91. Update PPPMER website with
key documents and success stories.
(SPIU ; 31 December 2011)
M&E and Knowledge Management
69A. Etablir le mode d‟emplois des bases de
données, former les agents SE des antennes.
(UCP ; 30 juin 2011).
69B. Saisir toutes les données existantes sur
les pmer dans les bases de données.
(Antennes, 30 juin 2011).
69C. Suivre l‟exhaustivité et la fiabilité des
données saisies et les compléter.
(UCP/Antennes ; 30 juin 2011).
Les chargés de suivi et évaluation au niveau
des antennes avaient été formés sur
l‟utilisation de la base de données. Cette
formation est prévu aussi pour les CER
gestionnaires de cette base au niveau des
Districts.
La mise à jour et le complément des
informations existantes seront réalisés par
les CER après leur formation.
L‟Assistant au suivi et évaluation est chargé
régulièrement de la vérification et suivi de
la fiabilité de cette base.
OK, no longer applicable
83. Préparer des reportages sur une dizaine au
moins de success stories du projet, et les
publier (articles, illustrés, émissions radio,
vidéo). (UCP ; 30 juin 2011).
Les reportages ont été faits sur la couture,
l‟apprentissage des jeunes aux métiers, les
formations en technologies améliorées, les
pmer en transformation des fruits,
l‟apiculture, et la gestion des maisons des
artisans. L‟exploitation de ces reportage est
en cours.
83. Prepare at least a dozen success
stories on project achievements
through articles, documentaries etc.
(PCU; 30 December 2011)
84. Réaliser l‟étude d‟impact du projet.
(UCP ; 30 juin 2011).
Avec l‟extension du projet pour 2 ans, cette
étude a été reporté plus tard (1 année avant
l‟achèvement du projet).
OK
85. Mettre à jour les informations et données
qui serviront de base au rapport d‟achèvement
du projet. (UCP ; 30 juin 2011).
Les informations et données sont
régulièrement collectées, mais le rapport
d‟achèvement n‟a pas été réalisé suite à
l‟extension du projet pour 2 ans.
OK
86. Mettre en œuvre toutes les activités du
plan d‟achèvement du projet en respectant
impérativement les délais. (UCP ; 30 juin
2011).
Ce plan n‟a pas été mis en exécution, car
l‟achèvement a été reporté au 30 juin 2013.
OK
87. Elaborer les listes d‟inventaires
recouvrement des soldes des crédits-baux et
transférer de manière documentée les biens au
Ministère de tutelle. (UCP ; 30 juin 2011).
Les soldes de crédit-baux ont été inventoriés
et seront transmis au Président du Comité de
Coordination Nationale du Projet pour la
décision de leur affectation définitive.
OK
88. Préparer des études thématiques portant
sur les activités stratégiques importantes
menées par le projet. (UCP ; 30 juin 2011).
Ces études n‟ont pas encore été réalisées 88. Prepare thematic studies on key
strategic activities undertaken by the
project (SPIU; 31 December 2011)
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
18
Agreed Action (May 2011)
with Responsibility and Deadline
Status Update by PCU,
15 October 2011
Agreed Action (October 2011)
with Responsibility & Deadline 96. Procéder à une évaluation de l‟impact du
partenariat avec COPORWA. (UCP ; 30 juin
2011).
Cette évaluation est prévue au cours de
l‟année 2011_2012
96. Commission an impact
assessment of the partnership with
COPORWA (SPIU; 31 December
2011)
Some key PPPMER PCU staff whose
contracts have been renewed up to
December 2011 must take their leave within
the three months‟ period, yet they are
needed to support SPIU during the
extension period for smooth handover.
115. Extend contracts or agree on
compensation for leave for key staff
of the PCU of PPPMER (SPIU, 15
December 2011)
Financial Management & Procurement
92. Etablir et faire le suivi rapproché d‟un
plan de décaissement mensuel jusqu‟à
prévisionnel allant jusqu‟à la clôture du projet.
(UCP ; 30 juin 2011).
OK, no longer applicable
93. Achever sans exceptions, toutes les
passations des marchés au 31 mars 2011.
(UCP ; 30 juin 2011).
Avec l‟extension du projet jusqu‟au 30 juin
2013, cette recommandation n‟ait plus
applicable.
OK, no longer applicable
94 Elaborer un plan de travail et des TdR
clairs pour la période d‟extension précisant les
types d‟activités de soutien et les modalités et
ressources à mettre en œuvre avec chaque
partenaire. (UCP ; 30 juin 2011).
Le plan de travail pour l‟année 2011_2012 a
été élaboré et acquis la non objection du
FIDA. Les MOU avec les partenaires
techniques qui vont pérenniser les activités
du PPPMER II sont en cours
d‟actualisation.
94. Revise the AWPB in line with the
Aide Mémoire. (SPIU; 15 December
2011).
95. Créer des dossiers individuels pour chaque
contrat, y compris des copies numérisées de
chaque contrat, toutes les modifications ou
ajouts, les certificats d‟avancement et les
CMF. (UCP ; 30 juin 2011).
Ces dossiers ont été crées avec toutes les
spécifications demandées
95. Update electronic archive of every
contract and MOU, all amendments
and CMF in a folder with a reference
number. (SPIU; 31 December 2011,
then continuous)
116. Submit for IFAD no-objection,
the SPIU administrative and finance
procedures manual. (SPIU; 31
December 2011)
117. Appoint an SPIU “gender issues
champion”. (SPIU; 30 Nov. 2011)
118. Implement the pending 2009/10
audit recommendations.
(SPIU; 31 December 2011)
119. Establish a comprehensive
national database on RSME service
provision based on the PROBA
scheme (SPIU; 31 January 2012)
120. Require gender disaggregated
information in project and partners‟
reporting (SPIU; 30 November 2011)
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
19
ANNEX 2 PROJECT FINANCIAL STATUS
A. Basic Facts
Country Rwanda Project ID 1276 Loan/Grant No. 613-RW
Project Rural Small and Micro Enterprise Promotion Project - Phase II
(PPPMER II) Supp. Loan/Grant
Date of Update: 28-Oct-2011 Last Supervision May 2010 Financing terms HC
Supervising Inst. IFAD/IFAD No. of Supervisions 10
USD
million Disb.rate%
Approval 11-Sep-03 Quality at entry rating Total costs 17.57
Agreement 03-Nov-03 Effectiveness lag 9.3 IFAD loan 14.91 89%
Effectiveness 15-Jun-04 Problem project No DSF grant
MTR Sept. 2008 IFAD grant
Current completion 30-Jun-13 Last Amendment Domestic 2.65
Current closing 31-Dec-13 Last Audit Dec-2010 Cofinancing
No. of extensions 1 Cofinanciers
B. Project Performance Ratings
(6) highly satisfactory; (5) satisfactory; (4) moderately satisfactory; (3) moderately unsatisfactory; (2) unsatisfactory; (1) highly unsatisfactory
B.1 Fiduciary Aspects Last Current B.2 Project implementation progress Last Current
1. Quality of financial management 5 5 1. Quality of project management 3 4
2. Acceptable disbursement rate 5 3 2. Performance of M&E 5 4
3. Counterpart funds 5 3 3. Coherence between AWPB &
implementation 3 4
4. Compliance with loan covenants 5 5 4. Gender focus 5 4
5. Compliance with procurement 4 4 5. Poverty focus 5 4
6. Quality and timeliness of audits 4 5 6. Effectiveness of targeting approach 5 4
7. Innovation and learning 4 4
B.3 Outputs and outcomes Last Current B.4 Sustainability Last Current
1. Strengthening Partner Capacities 4 3 1. Institution building (organizations, etc.) 3 3
1.1 Strengthening SMEs, cooperatives and
SPs 4 3 2. Empowerment 4 4
1.2 Policy and Legislative Support 4 n/a 3. Quality of beneficiary participation 5 5
2. Operational Support to Rural SMEs 4 4 4. Responsiveness of service providers 5 4
2.1 Apprenticeship training 5 5 5. Exit strategy (readiness and quality) 3 3
2.2 & 2.3 Value Chain Support 4 4 6. Potential for scaling up and replication 5 5
3. Financial Services for Rural SME 4 3
4. Project Coordination 4 3
C. Overall Assessment and Risk Profile Last Current
C.1 Physical/financial assets 5 4
C.2 Food security 5 5
C.3 Overall implementation progress (Sections B1 and B2) 4 4
Rationale for implementation progress rating
C 4 Likelihood of achieving the development objectives (section B 3 and B4) 4 3
C 5 Risks Short description of major risks for each section and their impact on achievement of development objectives and
sustainability
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
20
Fiduciary aspects The financial performance is overall satisfactory.
Project implementation progress
Most physical targets were achieved, some even exceeded. Only the
technological support activities and to a lesser extent the rural finance
activities remain far behind.
No progress so far relative to the targets of the extension period.
Outputs and outcomes
Delays in the transfer of project activities to partner agencies and in setting up
the PROBA Scheme would risk the achievements of the outputs and outcomes
of the extension period.
The demonstration units (UD) are still not functional.
Sustainability
The 2-year extension of the project is oriented towards the transfer of project
systems and advisory support to national institutions in support of RSMEs, the
development of a national apprenticeship program and the establishment of
sustainable financial services for RSMEs. To this, the district-implemented
PROBA Scheme was added. The SPIU staff need to work closely with these
teams to address the risk of non-sustainability of project support activities.
Description of supervision modality
The project is under direct supervision by IFAD since 1 January 2008.
In 2010, 26 non objections were provided with an average turn-around time of 2.2 working days.
2011 so far: 20 non objections, average turn-around time of 1.2 working days.
Progress Indicators Last Current
Frequency of supervision n/a n/a
Quality of supervision n/a n/a
Impact on project implementation n/a n/a
Overall Supervision Rating n/a n/a
Justification of rating
D. Follow-up Action
Issue/problem Recommended Action Timing Status
None - - -
Additional observations:
21
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
ANNEX 3: PROJECT STATUS OF FUNDS
Table 1: Cumulative Financial execution of the project by category and by financier as at 30 September 2011 (FRW „000)
Table 2: Cumulative Financial execution of the project by component and by financier as at 30 September 2011 (FRW „000)
22
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
Table 3: Financial execution of the 2011/12 AWPB of the project by category and by financier as at 30 September 2011 (FRW „000)
Table 4: Financial execution of the 2011/12 AWPB of the project by component and by financier as at 30 September 2011 (FRW „000)
RW
AN
DA
: Rap
po
rt d‟ap
pu
i – P
PP
ME
R II
Ap
pen
dice 1
:Plan
d‟actio
ns p
ou
r l‟achèv
emen
t du
Pro
jet
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
23
ANNEX 4: NO-OBJECTION TRACKING SHEET
Overall 2.0 working days average turn-around time 2.1 1.6
Description of Goods/ Works or ServicesDATE OF FIRST
RECEPTION
DATE OF
COMPLETE
RECEPTION
Date No-Objection
Provided By CPMREMARKS
WORKING
DAYS in ESA
DATE OF FIRST
RECEPTION
DATE OF
COMPLETE
RECEPTION
Date No-
Objection
Provided by
CPM
REMARKSWORKING
DAYS in ESA
NO 001 - Recrutement antenne Nord - passations
de marchés, secrétaire comptable25-Jan-08 29-Jan-08 2 n/a
NO 002 -Etude de faisabilité sur des unités de
transformation des produits agricoles21-Feb-08 26-Feb-08 3 n/a
NO 003 - PTBA 2008 19-Dec-07 21-Jan-08 19 n/a
NO 004 - renouvellement contrats des PSE 11-Mar-08 14-Mar-08 3 n/a
NO 005 - Audit compte 2007 9-May-08 9-May-08 0 n/a
NO 006 - SNV 5-Aug-08 20-Aug-08 20-Aug-08 0 n/a
NO 007 - DAO modele halls expostitions 18-Aug-08 19-Aug-08 1 n/a
NO 008 - étude filiere 17-Oct-08 21-Oct-08 2 n/a
NO 009 - Appui pubblicité pmer 22-Oct-08 declined on 24/11/08 n/a n/a
NO 010 - recrutement secrétaire comptable 30-Oct-08 31-Oct-08 1 n/a
NO 011 - collaboration avec PADC-GR 7-Nov-08 8-Nov-08 0 n/a
NO 012 - recrutement expert etude filiere 13-Nov-08 14-Nov-08 1 n/a
NO 013 - rapport analyse maison rubavu 2-Dec-08 4-Dec-08 4-Dec-08 0 n/a
NO 014 - TdR agent de SE d'antenne 23-Dec-08 24-Dec-08 1 n/a
NO 015 - Recrutement conseillers 4 filieres 8-Jan-09 8-Jan-09 0 3-Apr-09 8-Apr-09 13-Apr-09 seulement 3 conseillers 1
NO 016- PTBA 2009 et 1er sem. 2010 15-Jan-09 20-Jan-09 2-Feb-09 9 n/a
NO 017- enquete nutritionnelle et RIMS 17-Mar-09 19-Mar-09 2 n/a
No 018 - recrutement 4 agents SE 27-Mar-09 27-Mar-09 0 n/a
No 018b - recrutement 4 agents SE 8-Apr-09 14-Apr-09 2 n/a
No 019 - manuel de procédures du FAC et FIT 14-Apr-09 declined on 15/04/09 n/a n/a
No 019b - manuel de procédures du FAC et FIT
(révisé)10-May-09 21-May-09 21-May-09 0 n/a
NO 020 - reallocation of funds to Crafts Industry
Secretariat29-Apr-09 29-Apr-09 1-May-09 1 n/a
NO 021 - vélos 6-May-09 6-May-09 6-May-09 0 n/a
NO 022 - Audit comptes 2008 20-May-09 25-May-09 changed decision 3 n/a
STAGE ONE (Review of Bidding Documents) STAGE TWO (Review of Evaluation Reports)
RW
AN
DA
: Rap
po
rt d‟ap
pu
i – P
PP
ME
R II
Ap
pen
dice 1
:Plan
d‟actio
ns p
ou
r l‟achèv
emen
t du
Pro
jet
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
24
Overall 2.0 working days average turn-around time 2.1 1.6
Description of Goods/ Works or ServicesDATE OF FIRST
RECEPTION
DATE OF
COMPLETE
RECEPTION
Date No-Objection
Provided By CPMREMARKS
WORKING
DAYS in ESA
DATE OF FIRST
RECEPTION
DATE OF
COMPLETE
RECEPTION
Date No-
Objection
Provided by
CPM
REMARKSWORKING
DAYS in ESA
NO 023 - avenant au MOU avec BPR 20-May-09 21-May-09 declined on 25/05/09 n/a n/a
NO 023b - avenant au MOU avec BPR 26-Jun-09 declined on 29/06/09 n/a n/a
NO 023c - avenant au MOU avec BPR 30-Jun-09 2-Jul-09 2 n/a
NO 024 - MOU avec RDB 18-Jun-09 declined on 22/06/09 n/a n/a
NO 024b - MOU avec RDB 3-Jul-09 3-Jul-09 0 n/a
NO 025 - fournitures de bureau (3 lots) 26-Jun-09 29-Jun-09 1 6-Nov-09 8-Nov-09 0
NO 026. Fruit processing equipm., Masaka 7-Jul-09 7-Jul-09 0 n/a
NO 026b. Fruit processing equipm., Masaka 7-Jul-10 9-Jul-10 2 29-Oct-10 3-Nov-10 3
No 027 . Enquete nutritionnelle ??? n/a 13-Jul-09 16-Jul-09 3
NO 028. PTBA 2010 17-Jul-09 declined on 19/08/09 n/a n/a
NO 028b. PTBA 2010 (revisé) 17-Sep-09 15-Oct-09 19 n/a
NO 029. Construction kiosque à Kibehobudget < threshold for
review, thus no NO required n/a 14-Aug-09 19-Aug-09 2
NO 030. 4 pickup 17-Aug-09 21-Aug-09 3 5-Nov-09 6-Nov-09 1
NO 031 MOU entre PPPMER et ARC 20-Aug-09 declined on 31/08/09 n/a n/a
NO 032 MOU avec Rwanda Work Force
Development Authority28-Aug-09 1-Sep-09 2 n/a
NO 033 note conceptuelle des UD (manioc) 28-Aug-09 2-Sep-09 3 n/a
NO 033b note conceptuelle des UD (manioc) 24-Sep-09 declined on 28Sep09 n/a n/a
NO 033c note conceptuelle des UD (manioc) 9-Nov-09 9-Nov-09 0 30-Jun-10 6-Jul-10 4
NO 034b contrats avec 3 IMF 1-Oct-09 6-Oct-09 3 n/a
NO 034c modified Duterimbere contract 30-Dec-09 5-Jan-10 2 n/a
NO 035. TOR for the study on crafts industry 12-Nov-09 declined on 14Nov09 n/a n/a
NO 035b. TOR for the study on crafts industry 3-Mar-10 4-Mar-10 1 28-Dec-10 5-Jan-11 5-Jan-11 0
NO 035d. consultancy on craft sector study n/a 2-Mar-11 3-Mar-11 1
NO 035e. consultancy on craft sector study n/a 21-Mar-11 22-Mar-11 22-Mar-11 0
NO 035f. consultancy on craft sector study n/a 29-Jun-11 declined on 30-Jun-11 n/a
NO 035g. consultancy on craft sector study n/a 30-Sep-11 5-Oct-11 5-Oct-11 0
NO 036 MOU avec CIS 22-Dec-09 23-Dec-09 1 n/a
No 037. Note conceptuelle, UD maracuja 6-Jan-10 8-Jan-10 2 n/a
NO 038. travaux maison d. artisans Bugesera 26-Feb-10 28-Feb-10 0 17-May-10 18-May-10 1
NO 039. formation à l'ARC (COOPEC) 26-Feb-10 declined on 28Feb10 n/a n/a
NO 039b. formation à l'ARC (COOPEC) 15-Apr-10 20-Apr-10 3 6-Oct-10 7-Oct-10 declined on 8Oct10 n/a
NO 039d. formation à l'ARC (COOPEC) n/a 15-Oct-10 28-Oct-10 9
NO 039e. formation à l'ARC (COOPEC) n/a 29-Nov-10 29-Nov-10 0
NO 040. formation à l'ARC (gestion de coop) 26-Feb-10 declined on 1-Mar-10 n/a n/a
NO 040b. formation à l'ARC (gestion coop) 15-Apr-10 19-Apr-10 2 6-Oct-10 7-Oct-10 declined on 8Oct10 n/a
NO 040c. formation à l'ARC (gestion coop) n/a 15-Oct-10 declined on 20 Oct10 n/a
NO 040d. formation à l'ARC (gestion coop) n/a 21-Oct-10 25-Oct-10 27-Oct-10 2
NO 040f. formation à l'ARC (gestion coop) n/a 29-Nov-10 29-Nov-10 0
NO 041. Equipement FIT FAC 4-Mar-10 6-Mar-10 1 17-Dec-10 20-Dec-10 1
NO 042. Achat de 21 motos pour l'ARC 15-Apr-10 20-Apr-10 3 n/a
NO 043. Recruitment Tailoring VC Advisor 28-Jun-10 30-Jun-10 2 n/a
STAGE ONE (Review of Bidding Documents) STAGE TWO (Review of Evaluation Reports)
RW
AN
DA
: Rap
po
rt d‟ap
pu
i – P
PP
ME
R II
Ap
pen
dice 1
:Plan
d‟actio
ns p
ou
r l‟achèv
emen
t du
Pro
jet
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
25
Overall 2.0 working days average turn-around time 2.1 1.6
Description of Goods/ Works or ServicesDATE OF FIRST
RECEPTION
DATE OF
COMPLETE
RECEPTION
Date No-Objection
Provided By CPMREMARKS
WORKING
DAYS in ESA
DATE OF FIRST
RECEPTION
DATE OF
COMPLETE
RECEPTION
Date No-
Objection
Provided by
CPM
REMARKSWORKING
DAYS in ESA
NO 044. PTBA 2010/11 31-Jul-10 12-Aug-10 8 n/a
NO 045. MOU avec COPORWA 31-Jul-10 12-Aug-10 8 n/a
NO 046. Recruitment results 30-Aug-10 30-Aug-10 0 n/a
NO 047. Recruitment of craft Advisor 9-Sep-10 10-Sep-10 0 n/a
N0 048. 4 UD apicoles 21-Sep-10 23-Sep-10 2 n/a
NO 049. RFP for SPIU 24-Sep-10 24-Sep-10 0 28-Dec-10 5-Jan-11 5
NO 049c. Financ Eval RFP for SPIU n/a 26-Jan-11 27-Jan-11 1
NO 049d. SPIU Implementation process 21-Feb-11 22-Feb-11 1 14-Mar-11 15-Mar-11 1
NO 049f. SPIU Implementation process 2-May-11 declined on 11-may-11 n/a n/a
NO 049g. Additional Work for CDC 10-Jun-11 7-Jul-11 8-Jul-11 info requested on 15 June 1 n/a
NO 050. fruit processing equipment 22-Oct-10 27-Oct-10 27-Oct-10 based on NO 041 0 n/a
NO 050d. Adding a company to NO 050 29-Oct-10 declined on 29Oct10 n/a n/a
NO 051. MOU with BRD on BDF 26-Oct-10 1-Nov-10 4 n/a
NO 052.Construction drying machine shelter 9-Nov-10 1-Dec-10 declined on 8-Dec-10 n/a n/a
NO 053. acquisition of 27 motorcycles 9-Nov-10 9-Nov-10 0 26-Jan-11 26-Jan-11 0
NO 054. MOU avec RDB 30-Nov-10 2-Dec-10 2-Dec-10 0 n/a
NO 055. Achat 15 motos for BDS 17-Feb-11 21-Feb-11 2 18-Apr-11 19-Apr-11 1
NO 056.Business Advisor Appoint by RDB 23-Feb-11 4-Mar-11 6-Mar-11 0 n/a
NO 057. Recrutement CF fruits et manioc 30-Mar-11 8-Apr-11 13-Apr-11 3 n/a
NO 058. Application of new salary 31-Mar-11 31-Mar-11 0 n/a
NO 059. Mini PTBA (Mar-Jun11) 8-Apr-11 declined on 13-Apr-11 n/a n/a
NO 059b. Mini PTBA 19-Apr-11 declined on 25-Apr-11 n/a n/a
NO 059c. Mini PTBA 12-May-11 13-May-11 1 n/a
NO 060. TOR Audit of the BPR credit line 13-Apr-11 declined on 14-Apr-11 n/a n/a
NO 061. PTBA 2011-2012 8-Jul-11 13-Jul-11 declined on 13-July-11 n/a n/a
NO 061b. PTBA 2011-2012 21-Jul-11 declined on 1-Aug-11 n/a n/a
NO 061c. PTBA 2011-2012 8-Aug-11 declined on 10-Aug-11 n/a n/a
NO 061d. PTBA 2011-2012 12-Aug-11 16-Aug-11 1 n/a
NO 062. Audit of PPPMER credit lines 13-Jul-11 15-Jul-11 2 n/a
NO 063. MoU entre RCA et PPPMER-II 15-Jul-11 declined on 20-july-11 n/a n/a
NO 064. Complaint days off 21-Sep-11 declined on 23-Sep-11 n/a n/a
NO 065. 3-mth extension of PCU staff 21-Sep-11 23-Sep-11 2 n/a
NO 66. recruitment SPIU staff 21-Sep-11 23-Sep-11 only 3 staff 2 13-Oct-11 13-Oct-11 the remaining 3 staff 0
NO 66c. specialist in charge of Market access 3-Nov-11 8-Nov-11 2 n/a
NO 67. contract ext., MSME Design Team 14-Oct-11 14-Oct-11 0 n/a
STAGE ONE (Review of Bidding Documents) STAGE TWO (Review of Evaluation Reports)
RW
AN
DA
: Rap
po
rt d‟ap
pu
i – P
PP
ME
R II
Ap
pen
dice 1
:Plan
d‟actio
ns p
ou
r l‟achèv
emen
t du
Pro
jet
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
26
ANNEX 5: COMPLIANCE WITH LOAN COVENANTS
Section/Covenants Objectives/Execution
Agreed date
Status
SECTION 2.03 a): Special account. The borrower opens and maintains, for the purpose of
receiving the loan proceeds, a special account in USD in the National Bank of Rwanda (BNR)
Immediately after the signing of the loan
agreement
Done
SECTION 3.02 b): Annual Work Plan and Budget. The project shall submit the draft AWPB to
the CNCP before to be submitted to the Fund and the Cooperating Institution for comments and
approval
At least 45 days before the beginning of the
financial year
Deadline not respected
SECTION 3. 03 : Project Account. Within a reasonable time after the effective date, the lead
project agency shall open and maintain, for the financing of the project, a project account in local
currency within a bank acceptable to the Fund.
Immediately after the entry-into-force of
PPPMER II
Done
SECTION 3. 05 b) Availability of additional resources. On a request by the PCU and on the
basis of the AWPB, the borrower shall make available, in the project account, a first deposit
amounting to USD 30 000 equivalent to the needs for the first year.
Immediately after the entry-into-force of
PPPMER II
Done
SECTION 3. 05 c) Availability of additional resources. The borrower will regularly make
disbursements to the project account in accordance with the provisions set in AWPB. Counterpart
funds will be earmarked to the Public Investment Program (PIP)
In accordance with the AWPB Covenant respected. However
2011/12 allocations are very low
compared to current AWPB.
SECTION 3. 06 : Procurement. All procurement of goods, civil works and services needed by
the project and financed by the proceeds of the Loan and Grant shall be carried out in accordance
with Schedule 4
Continuous activity Covenant respected. Procedures are
followed and but contract register
needs to be updated
SECTION 5. 02 : Audit Reports (…) The Lead project agency (…) presents a certified copy of
the audit report stipulated in Section 9.03 (Audit of accounts) in the general conditions to the Fund
and the Cooperating Institution within six months after the end of that fiscal year
Within six months after the end of that fiscal
year
Covenant respected. The Office of the
Auditor General has completed its
audit mission for the 2010/11 fiscal
year.
ANNEX 3 A Organization and Management 2.1. Establishment. The Lead Project Agency
establishes a National Project Steering Committee (PSC)) in accordance with its national
procedures
2.1. Establishment of PSC Done
ANNEX 3 B Modalities of project’s exit strategy towards professional organizations
Exit strategy Despite a noted delay, the project is
being integrated in the SPIU/MSME
Program and is transferring some of
its activities in national institutions
ANNEX 3A Additional Commitments 4. Insurance of Staff The borrow ensures that its staff is insured
against risk of diseases and accident, in
accordance with national practices
Done. Personnel has a health
insurance with RAMA
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
27
APPENDICES
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
29
APPENDIX 1: AGRICULTURE VALUE CHAINS
A. Introduction
1. The project support to agricultural value chains development is mainly focused on
establishing demonstration units (DUs) on cassava, maracuja and honey. Thus, this appendix reviews
the progress made by the project with regard to 10 DUs, which include 5 cassava DUs, 4 honey DUs
and 1 maracuja DU, and makes practical recommendations in their support. It provides more details
on DUs implementation status including main constraints met. The mission visited 2 DUs for cassava
(CATM in Gisagara district and URUGANGAZI in Nyanza district), 1 for maracuja
(COVAFGA/Gakenke district) and 1 for honey (UNICOPAV/Burera district). In carrying out its
tasks, the mission worked in close consultation with the SPIU staff, districts staff, former CERs, FEs
and managers of cooperatives hosting DUs.
B. Implementation status
2. Despite previous mission recommendations, all 10 but one DUs are still not operational.
Delays were experienced in constructing DUs buildings and in supplying equipments required to start
activities. The May 2011 follow-up mission recommended that all equipments be supplied by
15 June 2011. To date, only cassava DUs received equipments as shown below.
3. Cassava DUs are hosted by primary cooperatives which were chosen for their good
performances in organization & management. These cooperatives were trained in management and
technical aspects (mainly cassava production) by PPPMER II and other projects, including RSSP.
However, even though those cooperatives were rated among the best performing, the mission noted
that key staff were insufficiently trained and still need refresher training. In particular, the staff met
didn‟t have a good knowledge of how to calculate the final product cost. Business plans were
prepared for 3 DUs (CATM, URUGANGAZI and NYEGANYEGA/Huye district) in January 2010,
covering a period of 3 years (2010-2012). To date, the implementation of these plans is not yet
effective. Business plans for 2 cassava DUs (COPEBUGA/Bugesera district and KIAI/Gatsibo
district) are not yet prepared. It appeared from discussions held with CATM that the replacement of
equipment was not taken into account in these business plans. This is critical since some equipment
such as plastic tents cannot be used more than 4 years. The mission found out that MOUs describing
responsibilities and obligations for both the project and the cooperative were signed with only 3
cassava cooperatives (CATM, KIAI and URUGANGAZI).
4. The building construction of all DUs except KIAI was financed mainly by MINICOM. For
KIAI, the building was given by the RSSP but it did not include fermentation tanks. Two
fermentation tanks were then included in the PPPMER support package. It should be noted that 2
DUs (COPEBUGA and URUGANGAZI) have no water and therefore cannot start cassava
processing. From discussions held with the Chairman of URUGANGAZA, it appears that the district
is committed to support the cooperative in solving the water problem since the district performance
contract includes the functionality of URUGANGAZA‟s DU. It should be also noted that this DU
will be part of locations covered by the Red Cross ongoing water supply project in Nyanza district.
The rectification and completion of cassava fermentation tanks and drying beds of COPEBUGA‟s
DU has started but is not yet finished. COPEBUGA is also struggling to get water supplied in the DU
before it starts its activities. To this end, the cooperative which is owned by persons living with HIV,
is seeking support from the district. In addition, it envisages to raise funds from its members to
contribute to the water supply. The case of NYEGANYEGA is much more worrying since its roof
structure has been taken away by a storm. The rectification and completion of cassava fermentation
tanks and drying beds has not yet started. It waits for the roof structure to be restored. The required
works will be financed by MINICOM.
5. It should be noted that the buildings of the DUs have not yet been officially handed to
cooperatives. In addition, the ownership status of DU buildings needs to be clarified. The DU plot of
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
30
URUGANGAZI, for instance, was recently registered in the cooperative‟s name, whereas the DU
plot of CATM is under the lease system. The ownership of DUs should be harmonized for all
cooperatives. To facilitate cooperatives access to loans, they should be provided with the title deeds
of DUs plots.
6. Equipment was supplied to cassava DUs by 30 May 2011. Each of the 5 cassava DUs
received from the project the following equipment: i) materials for installation of solar tent dryers
(plastic tent, metallic trellis, wood timbers, cement, nails, metallic mesh); ii) 2 manual cassava
chippers; iii) one hammer mill with a diesel engine; and iv) 10 solar tent driers (10m x 2.60m) with
the installation labour paid by PPPMER. The beneficiaries contributed to: i) site preparation; ii)
wood trucks for construction; and iii) stones and sand collection. The detailed cost of the DUs by
cooperative is shown in the table below, with an estimate of the training cost of cooperative members
during production trials (20 persons per cooperative). At the exception of NYEGANYEGA which
has not completed the participation of beneficiaries, the participation rate of beneficiaries for other
cooperatives varies from 7.7% to 15.3% of the total cost. Two DUs (CATM and URUGANGAZI)
received additional support from RSSP including a covered shed used for receiving, peeling and
washing tubers.
Table 1: PPPMER Support and own Contributions to the Cassava DUs (RWF)
CATM URUGANGAZI NYEGANYEGA KIAI COPEBUGA
PPPMER participation
Equipment 14,682,000 14,682,000 14,682,000 14,682,000 14,682,000
Dryer construction materials 3, 826,000 3,166,250 4,650,000 5, 942,000 4,882,750
Dryer construction 2, 242,000 2, 134,000 2, 510,000 2,119,276 2, 998,000
Training (transportation,
meals, training supplies, DSA for trainer)
351,0002 351,000 351,000 351,000 351,000
Total participation 15,033,000 18,199,250 19,683,000 17,152,276 19,915,750
% participation 92.3 89.5 99.8 84.7 88.0
Cooperative participation
Stones 450,000 800,000 ?3 750,000 320,000
Sand 550,000 750,000 ? 500,000 720,000
Gravel 120,000 ?
Wood stems 180,000 200,000 ? 1,750,000 320,000
Site preparation 20,000 200,000 ? 55,000 980,000
Nails (cover sheets) 24,000 ?
Cleaning ? 120,000
Water 9,000 ? 80,000
Guard shed construction ? 135,000
Participation to training cost 39,000 39,000 39,000 39,000 39,000
Total participation 1,248,000 2,133,000 39,000 3,094,000 2,714,000
% participation 7.7 10.5 0.2 15.3 12.0
TOTAL 16,281,000 20,332,250 19,722,000 20,246,276 22,629,750
Source: PPPMER, Cassava and fruit value chain adviser
7. The mission found some of the equipment, particularly the chippers, in miserable condition,
with urgent need for replacement by the manufacturer. The cassava mills have not yet proven their
functionality, and need immediate elaborate testing at all 5 locations. Since the quality warranty
period for chippers and mills will expire end-November 2011, production trials should start
immediately to identify defaults of these equipment before the warranty expiry. Even though some
DUs cannot fully function without water, there is a possibility to test the equipment by processing
cassava from clients living around the DUs. In addition, it was noted that some materials were
oversupplied. These materials should be owned by the cooperatives and used as spare parts.
8. Honey and Maracuja DUs. The 4 cooperatives which will host honey DUs are actually 2
primary cooperatives (CAR/Gicumbi district and KOPAKI/Kirehe district) and 2 unions
(UNICOPAV and UNICOPAIGI/Rutsiro district) with 6 participant cooperatives each. These
2 AWPB 2011/12 total cost by session is estimated at RWF 390,000. Beneficiaries will pay 10% while the project will pay 90% of the cost. 3 Not yet known
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
31
cooperatives and unions, which are classified among the best performing SMEs, were supported by
SNV in preparing their business plans. In addition, they received technical, management and
marketing trainings with PPPMER support. The same training was provided to COVAFGA hosting
the maracuja DU. All cooperatives also participated in study tours organised by PPPMER, which
were aimed at improving the cooperatives‟ technical and management skills. COVAFGA proved to
be the best performing agro-processing cooperative supported by the project, as confirmed by its
awards received at provincial and national fairs. The chairman of COVAFGA was recently trained on
“Women entrepreneurship” at the School of Finance Banking. After the training, she presented a 5-
year (2012-2016) business plan for her cooperative and got an award for the quality of the business
plan presented. Like cassava cooperatives, the implementation of both honey and maracuja business
plans is not yet effective. The mission found that MOUs describing responsibilities and obligations
for both the project and honey and maracuja cooperatives were not yet signed. This should be done
before the equipment supply.
9. Most of the honey cooperatives and unions use traditional hives and rudimentary equipment
for honey production. While this cautious approach is laudable, as a result their production is low
compared to their potential if they had modern hives and equipment. Nonetheless, for these
cooperatives to serve as honey DUs, missing improved equipment was identified by cooperatives
themselves with the project support. The contract to acquire the proposed equipment was signed end-
April with a delivery period not exceeding 45 days. The supplier failed to meet the contract
obligations and the honey equipment is not yet delivered. It is expected to be supplied in November.
During the mission, the honey equipment was inspected with the involvement of the UNIDO expert
and was found to be of good quality. The table below shows the quantity and the cost of honey
equipment to be supplied to the 4 cooperatives, with an estimate of the training cost of cooperative
members during production trials (20 persons per cooperative).
Table 2: PPPMER Support to the Honey DUs (RWF)
MATERIAL Qty
KO
PA
KI
CA
R
UN
ICO
AP
IGI
UN
ICO
PA
V
Un
it C
ost
To
tal
1 Drums soaker 2 1 1 310,000 620,000
2 Pouring buckets 3 1 1 1 35,000 105,000
3 Jerrycans 20L 6 1 1 5,000 30,000
4 Refractometer 3 1 1 1 120,000 360,000
5 Mixer 3 1 1 1 800,000 2,400,000
6 Skimmer 4 1 1 1 1 450,000 1,800,000
7 Candle machine 4 1 1 1 1 940,000 3,760,000
8 Waffle hand synthetic 3 1 1 1 450,000 1,350,000
9 Brushes for bees 4 1 1 1 1 15,000 60,000
10 Radial extractors 2 1 1 899,000 1,798,000
11 Source pans 8 2 2 2 2 350,000 2,800,000
12 Candle molds 90 22 22 23 23 10,000 900,000
13 Twist-off capsules 13,048 3,262 3,262 3,262 3,262 60 782,880
14 Water tank 1 1 860,000 860,000
15 Encapsulators 3 1 1 1 450,000 1,350,000
16 Stainless spoon for honey 4 1 1 1 1 80,000 320,000
17 Carrier bars for bees 10 4 4 4 4 2,500 25,000
18 Bee smoker with galvanic protection 2 1 1 50,000 100,000
19 Uncapping folk 1 1 12,000 12,000
20 Overall without gloves 1 1 64,000 64,000
21 Gloves (pair) 1 1 8,000 8,000
22 Hives 12 12 216,000 2,592,000
Total 22,096,880
Training
1,560,0004
Source: PPPMER, Cassava and fruit value chain adviser.
4 The AWPB 2011/12 gives FRW 390,000 for training in each DU, that is RWF 390,000x4=RWF 1,560,000. For 4 honey DUs,
beneficiaries will participate for 20% in the costs.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
32
10. With project support, COVAFGA identified required equipment for maracuja processing to
improve its performance. The contract to acquire the proposed equipment was signed end-February
with a delivery period not exceeding 7 months. The supplier of honey equipment was also selected to
supply maracuja equipment. Most of the equipment supplied to COVAFGA didn‟t comply with the
technical specifications. The supplier was thus requested to replace it. It is foreseen that all maracuja
equipment be supplied before end-December 2011. To guarantee its quality, it was agreed that
UNIDO be involved in their inspection during the elaborate testing. The table below shows the
quantity and the cost of maracuja equipment to be supplied to COVAFGA, with an estimate of the
training cost of cooperative members during production trials (20 persons per cooperative).
Table 3: PPPMER Support to the Maracuja DU (RWF)
PPPMER participation Qty Unit Cost Total Cost
Equipment
Cooking kettles 2 2,575,940 5,151,880
Refractometer 1 138,000 138,000
Bottle sealing machine 1 450,000 450,000
Vinometer 1 54,000 54,000
Electric centrifugal separator 1 1,183,540 1,183,540
Filter press 1 2,513,400 2,513,400
Electric pasteurizer 1 3,481,000 3,481,000
Juice handling tank 1 2,088,600 2,088,600
Juice pump 1 650,000 650,000
2 Dater 2 52,000 104,000
2 Oil extractors 2 100,000 200,000
Training 390,0005
TOTAL (RWf) 16,404,420
Source: PPPMER, Cassava and fruit value chain adviser.
C. Next Steps
11. Next steps to get DUs operational include training of cooperative members during production
trials, identification of interested cooperatives and individual SMEs to be trained during
demonstration sessions, updating business plans, preparation of work plans, training of cooperatives
in management & organization, and support cooperatives to get loans, particularly for marketing
activities.
12. Training. After the DUs have received the equipment, cooperative members will be trained
in commodity processing in order to train other SMEs (cooperatives or individuals) during
demonstration sessions. Training manuals are being finalized by the cassava and fruits value chain
adviser. A training manual in Kinyarwanda will be distributed to all participants. The initial training
will deal with the technical aspect of respective commodities processing, the basic concepts of
hygiene and sanitation in food processing, concepts of standards and quality, good manufacturing
practices, and the basic management. The subsequent training would include the production
of packaged products. A training session will last 5 days. The project will pay the cost up to 90%
whereas beneficiaries will pay 10%.
13. Production trials. Trainings will be conducted during production trials aimed at testing the
quality of equipment received. Non performing equipment should be replaced by the supplier.
UNIDO experts should be involved in the elaborate testing of the equipment, particularly for cassava
and maracuja.
14. Selection of SMEs to be trained. Criteria should be well defined before selecting individual
MER and cooperatives that will attend demonstration sessions. Motivation to be trained and capacity
to acquire similar equipment should be taken into consideration in this process. It is anticipated that
around 20 people will be trained per demonstration session.
5 COVAFGA: 10% or Rwf 39,000. PPPMER: 90% or Rwf 351,000.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
33
15. Demonstrations. People close to the DUs and interested by their processing activities will
be identified in collaboration with local authorities. Demonstration sessions will be regularly
organized using the premises of the DUs. One demonstration session will take 5 days and a
maximum of 20 persons. A training manual in Kinyarwanda will be given to each participant.
Beneficiaries will participate up to 10% in the costs. Trainees will be encouraged to apply for loans
(including project-finance loans through the participating financial institutions) and to replicate the
model of the DU: equipment, organization, management. In particular, loans to get appropriate
packaging are needed for marketing purposes, for both cooperatives hosting DUs and trainees.
16. Business plans. Cooperatives hosting DUs will be retrained in management and organization
before being involved in the preparation/updating of their business plans. This will result in preparing
a work plan for each DU. Monthly reports on the DU progress will also be prepared by each
cooperative.
D. Recommendations
17. Given the delays experienced to make DUs operational, the main recommendation is to
implement the attached schedule of activities per DU. This schedule was agreed upon with the
cassava and fruit value chains adviser. The May 2012 follow-up mission should assess the progress
in implementing these activities. Other recommendations include:
Districts to support COPEBUGA and URUGANGAZI in getting water supply;
MINICOM to restore the roof structure of NYEGANYEGA;
MINICOM to complete cassava fermentation tanks and drying beds for COPEBUGA and
NYEGANYEGA;
Start production, training and demonstration activities in CATM and KIAI DUs, while
waiting for remaining works in the 3 dysfunctional DUs to be completed with the support of
MINICOM and the districts;
Sign MOUs with all cooperatives hosting DUs;
Cooperatives to prepare monthly reports on the progress of DUs;
UNIDO to be involved in the equipment inspection during the elaborate testing;
Organize management refresher courses for key staff of cooperatives hosting DUs;
Prepare/update business plans of all DUs and prepare work plans accordingly;
Clarify ownership status of buildings hosting DUs constructed by the Government; and
Assist DUs and trainees to access to loans, particularly for marketing activities, including
packaging.
34
Attachment 1: Schedule of planned activities6
CATM Cassava DU
Activities and sub
activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Installation solar dryer Solar dryer installed
Training operators Operators trained for one week
Production trial Production follow-up
Census of interested
Coops/individuals to be
trained
10-20 Coops/individuals to be trained
are identified
Organization of demonstration sessions
10-20 Coops/individuals are trained
Writing/updating business
plan
The business plan for the cooperative is
available
Writing action plan
The action plan for the cooperative is
available
Assistance in loan access
Needs are identified and loan application is submitted
KIAI Cassava DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Installation solar dryer Solar dryer installed
Training operators Operators trained for one week
Production trial Production follow-up
Census of interested
Coops/individuals to be
trained
10-20 Coops/individuals to be trained are
identified
Organization of demonstration sessions
10-20 Coops/individuals are trained
Writing/updating business
plan
The business plan for the cooperative is
available
Writing action plan
The action plan for the cooperative is
available
Assistance in loan access
Needs are identified and loan application is submitted
6 The schedule may change due to delayed equipment supply or delayed installation of water for URUGANGAZI and KOPEBUGA
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
35
NYEGANYEGA Cassava DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Installation solar dryer Solar dryer installed
Training operators Operators trained for one week
Production trial Production follow-up
Census of interested
Coops/individuals to be trained
10-20 Coops/individuals to be trained
are identified
Organization of demonstration sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative is
available
Writing action plan
The action plan for the cooperative is
available
Assistance in loan access
Needs are identified and loan application is submitted
URUGANGAZI Cassava DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Installation solar dryer Solar dryer installed
Training operators Operators trained for one week
Production trial Production follow-up
Census of interested
Coops/individuals to be trained
10-20 Coops/individuals to be trained are
identified
Organization of demonstration sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative is
available
Writing action plan The action plan for the cooperative is available
Assistance in loan access
Needs are identified and loan application is
submitted
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
36
COPEBUGA Cassava DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Installation solar dryer
The dryer is installed
Training operators Operators are trained
Production trial Production follow-up
Census of interested
Coops/individuals to be trained
10-20 Coops/individuals to be trained are
identified
Organization of demonstration
sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative is
available
Writing action plan
The action plan for the cooperative is available
Assistance in loan access
Needs are identified and loan application is
submitted
COVAFGA Maracuja DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Installation Equipment
The equipment is installed
Training operators
Operators are trained
Production trial Production follow-up
Census of interested
Coops/individuals to be trained
10-20 Coops/individuals to be trained are
identified
Organization of demonstration
sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative is available
Writing action plan
The action plan for the cooperative is available
Assistance in loan access
Needs are identified and loan application is submitted
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
37
UNICOAPIGI Honey DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Training operators Operators are trained
Census of interested
Coops/individuals to be trained
10-20 Coops/individuals to be trained are
identified
Organization of demonstration
sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative is available
Assistance in loan access
Needs are identified and loan application is
submitted
CAR Honey DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Training operators Operators are trained
Census of interested
Coops/individuals to be trained
10-20 Coops/individuals to be trained
are identified
Organization of demonstration sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative
is available
Assistance in loan access
Needs are identified and loan
application is submitted
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
38
UNICOOPAV Honey DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Training operators Operators are trained
Census of interested Coops/individuals to
be trained
10-20 Coops/individuals to be trained are identified
Organization of demonstration sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative is available
Assistance in loan access
Needs are identified and loan application
is submitted
KOPAKI Honey DU
Activities and sub activities
2011 2012 2013
Expected outcomes M J J A S O N D J F M A M J J A S O N D J F M A M J
Training operators Operators are trained
Production trial Production follow-up
Census of interested Coops/individuals to be trained
10-20 Coops/individuals to be trained are
identified
Organization of demonstration sessions
10-20 Coops/individuals are trained
Writing/updating business plan
The business plan for the cooperative is available
Assistance in loan access
Needs are identified and loan application is submitted
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
39
APPENDIX 2: APPRENTICESHIP SUPPORT
A. Introduction
1. This Appendix reviews the progress made by the project under the rural apprenticeship
training and makes practical recommendations in its support. It provides more details on the
implementation status of the apprenticeship training. The mission visited apprentices who were being
trained in Gakenke and Rulindo districts and post-graduate apprentices who already practice trades in
Gakenke and Musanze districts. In carrying out its tasks, the mission worked in close consultation
with the SPIU staff, districts staff, former CERs and FEs, and master trainers (trainers of apprentices,
formerly called PPs following the French acronym).
B. PPPMER apprenticeship approach
2. The project apprenticeship training approach is unique in Rwanda. It is practical and designed
to reach a large number of beneficiaries in the shortest time possible (usually 6 months). It also
ensures that apprentices get a basic knowledge to enable graduates to practice their newly acquired
skills. PPPMER apprenticeship training approach is a process consisting of targeting the trainees,
choice of training courses, master trainer selection and contracting, training follow-up, post-
apprenticeship trainings, support to finance access for business start-up.
3. Targeting the trainees. The apprenticeship training programme targets rural youth who
abandoned school for vulnerability reasons. The priority is thus given to orphans, child headed
households and young people from very poor families. Annually, local authorities at sector level send
a list of apprenticeship candidates to the project for consideration. These candidates are then
interviewed by the FEs and CERs (in the future this will be done by PROBAs) to verify if they are
effectively part of the project target group. To benefit from the training programme, candidates have
to meet pre-defined criteria including: i) being a resident in the area of the project intervention;
ii) holding a certificate of vulnerability issued by the local authority; iii) having a primary school
level; iv) having no other commitment for the duration of training; v) passing an entry test; etc.
4. Choice of training courses. The project approach is to let beneficiaries decide themselves the
training to attend, based on their interests. Overall, the choice of training topics prioritizes trades with
a relatively big potential of profitability and market in rural areas. From the experience of the last
seven years, tailoring and carpentry trades are the most attended by apprentices (an average of 57%
and 20% of the total apprentices respectively). Standardized training curricula for the seven most
popular courses in the apprenticeship programme (tailoring, carpentry, mechanics, electricity,
miscellaneous repairs, footwear and fine craftsmanship) were established in collaboration with the
Kicukiro Training Center (KTC) of WDA.
5. Trainers selection and contracting. The trainers are selected by the project‟s technical staff
in the field (CERs and FEs), based on predefined criteria including: i) having a work space and
adequate furniture to perform the training; ii) having appropriate equipment, materials and tools;
iii) having an acceptable level of technical skills in the trade; iv) having a trained and experienced
team, consisting of at least 2 to 3 persons; v) motivation to provide training to apprentices;
vi) signing a contract with the project agreeing to all its terms and conditions, etc. The trainers are
rural practitioners in the given trade, close to apprenticeship programme beneficiaries.
6. Training modalities and schedule. Except for training that requires a longer period
(12 months), i.e. auto mechanics, the duration of the training is usually 6 months. Three types of
training courses are adopted by PPPMER as follows:
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
40
Home-based training: Beneficiaries attend the training on weekdays at the area of their
residence and return home in the evening. This cheap training attracts a large number of
apprentices, particularly orphans and child-headed households members;
Learning outside the place of residence: In few cases, trainees are obliged to follow the
training outside their residence. This is the case when trainees are interested in learning a job
with high potential of profitability, but with no skilled trainers available locally. This training
is more expensive than the first one, and the number of apprentices is much more smaller;
Long-term training: Unlike the first two training types, this training is not provided by the
master trainers, but is done in collaboration with specialized institutions, such as Centres de
formation professionnelle des jeunes (CFJ). The beneficiaries stay at the training institutions
for the duration of the training. The long-term training was introduced in 2009 after the Mid-
Term Review.
7. Training follow-up. The project approach foresees a follow-up of the apprenticeship training
programme at least every two weeks, by FEs and CERs. The progress of the programme is reviewed
and a monthly report prepared on achievements based on the training plan. In addition, CERs and
FEs are expected to prepare jointly with PPs mid-term and final evaluations of apprentices to assess
the level attained by each trainee, on the basis of the quality of the product delivered during these
evaluations.
8. Post-apprenticeship trainings. Graduate apprentices acquire other skills in addition to
vocational training. These skills, mainly focused on management, are crucial for new apprentices
who decide to start a business. The following courses are offered: i) management and bookkeeping;
ii) loan application and management of funds; iii) trade policy and entrepreneurship; and iv)
cooperative management.
9. Access to finance. As mentioned above, most apprentices are selected for the training
programme because of their vulnerability. Therefore, these young people cannot afford the basic
equipment required to start their own businesses, at the end of the training. To address these
problems, the apprentices are organized into groups for mutual support, and PPPMER facilitates the
acquisition of equipments through micro finance institutions, with a 50% subsidy. It should be noted
that each apprentice receives RWF 18,000 at the end of the training (equivalent of RWF 3,000 per
month). This amount allows most of apprentices to pay their membership participation to
cooperatives.
C. Achievements to date
10. Apprenticeship training implementation is on track. So far, 8 546 youth (56% of women) have
completed their 6 to 12-month training by rural micro-enterprises in 31 different trades under
PPPMER II, as shown in the table below. If we take into consideration 2 034 apprentices trained
under PPPMER I, the project has contributed to train 10 580 apprentices under PPPMER I and
PPPMER II, as of 30 June 2011. As above mentioned, tailoring and carpentry are the most popular
trades, with 77% of the total number of apprentices trained. Out of 31 trades, 7 are attended by
around 95% of apprentices. These include tailoring, carpentry, hair dressing, repairs, welding, basket
weaving and auto mechanics. From the table below, it is clear that some trades (tailoring, basket
weaving) are mainly women trades whereas other trades (carpentry, welding, mechanics, repairs) are
mostly undertaken by men.
11. To date, long-term training was attended by 320 trainees (see table below) in the following
trades: mechanics, hotel industry (hotellerie), pottery, knitting, construction, carpentry, and
electricity. Women represent only 28% of the total number of youth undertaking long-term training.
This is due to the fact that the most popular long-term training (mechanics) which represents around
50% of the apprentices is almost exclusively attended by men. The same case applies for carpentry
and construction. Long-term trainings mostly attended by women include hotel industry, pottery and
knitting. Electricity training is attended by 50% of men and 50% of women.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
41
12. To date, post-apprenticeship support provided under PPPMER II includes: i) 4 038 graduate
apprentices trained in management and bookkeeping, 2 339 in project preparation and management
of funds, 2 831 in trade policy and entrepreneurship, 1 586 in cooperative formation and
management, and 1 756 supported in acquiring accumulated credit of leasing equipments.
Table 1: Short-term apprentices trained by PPPMER II (from July 2004 to June 2011)
Activity
Year
2004
Year
2005 Year 2006 Year 2007 Year 2008 Y 2009/10 Y 2010/11 Total %
F M F M F M F M F M F M F M F M Tot
Tailoring 95 543 76 912 203 237 44 425 55 916 102 941 284 4069 764 4833 56,55%
Carpentry - 90 4 253 34 343 6 135 1 171 1 274 11 371 57 1637 1694 19,82%
Hair dressing - - 29 36 62 61 16 25 33 23 65 44 52 49 257 238 495 5,79%
Repairs - - - 88 3 131 - 42 - 35 - 24 - 53 3 373 376 4,40%
Welding - - - 33 5 61 3 21 1 17 2 70 - 128 11 330 341 3,99%
Tannery - - - 3 1 1 - 5 - 6 - - - 1 15 16 0,19%
Construction - - - - - 13 - 4 - 8 1 16 3 5 4 46 50 0,59%
Leather works 12 7 9 - 2 1 5 1 6 - 8 9 42 51 0,60%
Sweater weaving - - 8 4 19 - 9 - 7 2 19 1 - - 62 7 69 0,81%
Kitchen - - - - - - - 4 1 0 0 - - 4 1 5 0,06%
Basket weaving - - 60 - 60 14 22 8 6 1 16 0 17 19 181 42 223 2,61%
Auto mechanics - - - 4 - - - - - - 1 87 2 61 3 152 155 1,81%
Sculpture - - - 1 - - - - - - - 7 - 5 - 13 13 0,15%
Iron works - - - - - - - - - - - 2 - - - 2 2 0,02%
Hotel industry - - - - - - - - - - 26 7 - - 26 7 33 0,39%
Electronics - - - 6 - - - - - - - - - 6 - 12 12 0,14%
Pastry - - 1 4 1 1 - - - - 4 2 - - 6 7 13 0,15%
Electricity - - - c - - - - - - 11 26 - 2 11 28 39 0,46%
Pottery - - - - - - - 2 - 3 10 - 1 3 11 8 19 0,22%
Artworks - - - 6 2 - - 3 - - - - - - 2 9 11 0,13%
Embroidery - - 6 - - - 1 - - - - - - - 7 - 7 0,08%
Processing - - 4 6 3 5 3 - - - - - - 1 10 12 22 0,26%
Forging - - - 6 - 2 - - - - - - - 2 - 10 10 0,12%
Batik - - 2 - 1 1 - - - - - - - - 3 1 4 0,05%
Bakery - - 2 5 4 2 - - - - - - 3 - 9 7 16 0,19%
Cheese Making - - - - - 2 - - - - - - - - - 2 2 0,02%
Soap Making - - 4 3 - - - - - - - - - - 4 3 7 0,08%
Ceramics - - 1 2 - - - - - - - - - - 1 2 3 0,04%
Beekeeping - - - 1 - - - - - - - - - - - 1 1 0,01%
Imigongo - - 1 - 8 - - - - - - - - - 9 - 9 0,11%
Tapestry - - 7 - 4 4 - - - - - - - - 11 4 15 0,18%
Total 95 90 672 549 1126 853 297 291 478 327 1073 668 1030 997 4771 3775 8546 100,00%
% (F&M) 51% 49% 55% 45% 57% 43% 51% 49% 59% 41% 62% 38% 51% 49% 56% 44% 100%
Source: PCU (M&E unit)
Table 2: Long-term apprentices trained by PPPMER II (from January 2009 to June 2011)
Trade Year 2009 Year 2010/11 Year 2011/12 Total
Women Men Total Women Men Total Women Men Total Women Men Total
Mechanics 1 55 56 1 92 93 - - - 2 147 149
Hotel industry 23 9 32 26 10 36 - - - 49 19 68
Pottery - - - 10 - 10 - - - 10 - 10
Knitting - - - 12 - 12 - - - 12 - 12
Construction 1 - 1 1 - 1 - 27 27 2 27 29
Carpentry 1 - 1 1 - 1 - 24 24 2 24 26
Electricity 2 - 2 11 13 24 - - - 13 13 26
Total 28 64 92 62 115 177 - 51 51 90 230 320
Source: PCU (M&E unit)
13. A survey realized in the period 2006-2008 on the apprenticeship programme indicates that the
PPPMER II has significantly contributed to job creation and reduced unemployment rates in rural
areas. This resulted in an improvement of the livelihoods of beneficiaries. Out of the total number of
graduate apprentices, 81% had a permanent job, either in their own businesses (36%), or as
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
42
employees in other enterprises (45%), 2% decided to continue the secondary school, 8% were
unemployed, and 9% changed their activities and migrated outside their residence.
D. Apprenticeship training during the extension period
14. The 2-year extension period of PPPMER II started in July 2011. Based on the previous
apprenticeship success, “the extension would serve to develop a government-driven apprenticeship
system, with a view to diversifying the participating trades, linking apprentices to BDS Centres for
apprenticeship training, and possibly a fund for business start-up finance. The system would be
implemented by RDB in collaboration with district authorities and the Workforce Development
Authority”. Main activities foreseen in apprenticeship training during the extension period include: i)
home-based training of 9 500 apprentices (3 500 in year 1 and 6 000 in year 2); training of 280
apprentices outside their residence (140 in year 1 and 140 in year 2); iii) long-term training of 160
apprentices (80 in year 1 and 80 in year 2); and iv) post-apprenticeship training in management and
bookkeeping (2 500 in year 1 and 5 000 in year 2), in trade policy and entrepreneurship (2 500 in
year 1 and 5 000 in year 2), and in project preparation and management of funds (2 500 in year 1 and
5 000 in year 2).
15. Despite previous agreements, the rural apprenticeship training programme, still implemented
directly by the PU, has not yet been integrated in a partner agency. BDS centres are in the process of
privatization with the support of RDB. The latter confirmed that it will not be involved in the
apprenticeship training programme as foreseen by the extension mission. In addition, the mission
found out that all activities related to apprenticeships were not yet transferred to WDA. In the
absence of a partner agency, the apprenticeship training was implemented directly by the project in
year 2011/12, with 1 500 apprenticeships (63% of women) ongoing and 2 000 apprentices in the
process of identification to start in November 2011. Apprenticeship training manuals related to the
7 above mentioned main trades were prepared by KTC/WDA and distributed to 445 participating
training enterprises.
16. Key constraints currently experienced by the apprenticeship programme include training
follow-up, which is not satisfactory at the moment since CERs are overloaded by work in their new
mandate and FEs are no more on board. This will affect the quality of ongoing training if corrective
measures are not taken. FEs used to monitor apprenticeship training at least once in two weeks; this
was followed by a monthly report prepared by CERs on the apprenticeship progress with regard to
action plans agreed upon with the PPs. This is no more feasible for the above mentioned reasons. In
addition, most post-apprenticeship training activities for the 2 027 apprentices graduated in February
and March 2011 are not yet done.
E. Next steps
17. The integration of the apprenticeship training programme in a partner agency is a high priority
to make the programme operational in a sustainable way. During the mission, the Workforce
Development Authority (WDA) expressed its strong interest in working in partnership with the SPIU
to implement the apprenticeship programme. To develop the partnership between the SPIU and
WDA, the following actions were agreed upon:
a) The SPIU to share key project documents (extension design, follow-up and implementation
support reports, apprenticeships strategy, etc.) by 30 October 2011;
b) The SPIU to prepare a concept note on modalities of collaboration with WDA, to be discussed
and finalized by 15 November;
c) WDA to prepare an outline of the apprenticeship programme document (including the planned
accreditation of participating training enterprises and the certification of apprentices,
differentiation between new and experienced apprentices, follow-up by PROBAs to be
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
43
contracted directly by WDA, possibly selected and supervised by its vocational training centres -
VTCs) by 15 December;
d) The SPIU to prepare an MOU with WDA based on the above document, to be signed by
15 January with a view to take over the implementation from the SPIU immediately thereafter;
and
e) WDA to contract PROBAs for apprenticeship follow-up using the voucher system and provide
graduate apprentices with vouchers for post-apprenticeship training.
F. Recommendations
18. The next steps above mentioned constitute a road map that should be implemented on time to
effectively transfer activities related to apprenticeships to WDA. Thus, the main mission
recommendation is for the SPIU and WDA to comply with the above described road map. The
contract signed between RCA and CERs allows the latter to make occasionally a follow-up of
PPPMER activities including apprenticeships. Moreover, FEs also monitor from time to time the
progress of the apprenticeship training on a voluntary basis. This arrangement should be pursued
while waiting for the PROBA Scheme to become operational and the MOU with WDA to be
effective. If for any reason this MOU experiences delays in its signature, then the SPIU should
contract directly PROBAs through the voucher system in order to avoid any shortcoming regarding
the quality of apprenticeships.
19. It should be reminded that during the extension period, the financing rule for the
apprenticeship was foreseen as follows: 50% of the total cost for IFAD, 40% for the Government,
and 10% for the beneficiaries. This was not the case for the current financial year which is the first
year of extension. It should be however be strictly applied for the second year of extension (2012-
2013 AWPB). The 2012/13 AWPB of the MSME Development Project, funded by government and
implemented by the SPIU, which includes support to apprenticeship, should thus be prepared
accordingly.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
44
[Click
here an
d in
sert EB
../../..]
APPENDIX 3: RURAL SME DEVELOPMENT
I. Business Advisory Services for Rural Microenterprise Development
A. Proximity Business Advisory (PROBA) Scheme
Introduction and objectives
1. The SME Policy objective 2 aims at facilitating SMEs
7 access to business development
services. For the rural microenterprise development in Rwanda, there is a sound need for business
development services by a very large number of rural microenterprises, which together with agriculture
constitute the basis of the currently weak rural economy.
2. In response to this unfulfilled need and consistent with the SME Policy, it was observed that
while no central level agency is oriented towards filling this gap, the districts and sectors are well
placed and mandated to facilitate such services. Furthermore, recognizing that some of RSMEs are not
capable to pay business advisory services, and the capacity constraints in local government and
MINICOM‟s intentions of building demand-driven services, service provision by small-scale
businesses in rural areas initially supported through a voucher system presents itself as the system of
choice. In this regard, MINICOM has decided to initiate the Proximity Business Advisory (PROBA)
Scheme through its Single Project Implementation Unit (SPIU) and in partnership with the districts.
Schematic diagram of the PROBA scheme
7In this policy, SME is used to describe micro as well as small and medium enterprises
SPIU
RSME
Facilitator
Rural and Micro
Enterprises
BDC, BDS,
Proximity Business
Advisors
Serv
ices
Vo
uch
ers
District Contract
Propose voucher recipients
District PROBAS
Committee
Sector
SACCO
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
45
PROBA Scheme target group
3. Most generally, the PROBA Scheme aims at getting two actors together: (i) the PROBA
(Proximity Business Advisor) and (ii) the RSME (Rural Small and Micro Enterprise, both individual
enterprises and cooperatives). PROBAs will be small-scale rural entrepreneurs who offer part-time
advice to RSMEs. Through the scheme, the RSME will get business advisory services from the
PROBA of his or her choice. The services will be subsidized through a voucher system.
PROBA Services
4. PROBAs will offer the following services:
Training and coaching in business management e.g. accounting and bookkeeping, taxation,
start-up business management, business plan writing, entrepreneurship, cash management,
use of financial services, and marketing;
Business counseling for RSMEs in districts; and
Technical training depending on the specialization of the PROBA.
PROBA Scheme principles
5. The guiding princples of the PROBA Scheme will be:
Demand-driven: This aims at addressing true needs of the RSMEs based on their own
judgment. The culture of external identification of trainees and their training needs, and
receiving services free of charge will be replaced by the one of the RSME identifying itself a
suitable service provider (that is, the PROBA) and the service required, and negotiate and
pay demanded and delivered services directly.
Negotiation: The RSMEs will be able to negotiate themselves the needed services with a
service provider (PROBA) and exercise independent choice.
Cost based on quality of service: Quality control becomes and remains the responsibility of
the RSMEs. This will ensure a high quality of services rendered to RSMEs.
Feedback. The PROBA will fill in basic information on the service delivered on the back of
the vouchers.
6. The District PROBA Committee will be composed of 6 members: district Vice-mayor in
charge of economic affairs, district Executive Secretary (as district budget manager), RSMEs
facilitator (acting as the committee‟s secretary, non-voting), District Cooperative Officer, one sector
Executive Secretary and one RSME representative, nominated by the local business community in
the district. It will be responsible for:
Approving the PROBA accreditation proposed by RSME Facilitator;
Approving eligible RSMEs voucher recipients proposed by the sectors; and
Evaluating monthly the evolution of the PROBA Scheme and provide guidance to the RSME
Facilitator and the sector administrations.
7. An RSME Facilitator will be hired by each district level on a contract basis. Reporting to the
District Vice-mayor for Economic Affairs, each RSME Facilitator will be responsible for:
a) Establishing the District PROBA Committee and acting as its secretary (to call for
and prepare meetings, information notes, minutes, etc.);
b) Ensure sound general awareness and understanding of the PROBA Scheme in the
district, including the sectors (through publicity campaigns, etc.);
c) Arranging for a call for expressions of interest by operators of well-functioning rural
businesses to become PROBAs;
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
46
d) On an annual basis, assessing the suitability of the applicant RSME operators and
accrediting them as PROBAs (starting with the former formateurs d’entreprise-FEs);
e) Submitting PROBAs for final accreditation to the District PROBA Committee;
f) Constantly up-dating and making accessible to RSMEs the list of accredited
PROBAs in the district, with contacts and specialization in service provision;
g) Guiding the district and sector administration in selecting the RSMEs that are
eligible for buying vouchers;
h) Establishing with the Sector SACCOs the modalities for selling vouchers to eligible
RSMEs, and for buying filled-in vouchers from PROBAs who received these in
payment for services;
i) Investigating any allegations of fraud regarding the voucher system;
j) Maintaining the district database on vouchers distributed and returned, including the
details from the returned vouchers;
k) Providing short monthly analyses to the District PROBA Committee of the
functioning of the PROBAs Scheme on the basis of the district database; and
l) Maintaining links to the SPIU and other RSME Facilitators on the development and
implementation of the PROBAs Scheme, with a view to improving its performance.
8. Payments. All voucher payment processes will be done through Umurenge SACCO: the sale
of the vouchers to eligible SMEs, and the redemption of the vouchers by the PROBAs. Every month,
the participating SACCOs will submit a report of transactions (vouchers sold, vouchers redeemed)
together with an invoice for the services and, of course, the original vouchers redeemed. The SACCO
will receive a commission for this service, with a simple structure easy to administer. It is suggested
that for every voucher redeemed a commission of initially RWF 100 be levied by the SACCO,
payable by the district upon presentation of the report and original vouchers. At the same time, the
balance between the voucher sales price (initially RWF 500) and the voucher redemption value
(initially RWF 5 000) will be paid by the district to the SACCO. The voucher payment services by
the SACCOs will also be included in the MOUs between the SPIU and the districts (see below),
including the nature of transactions, reports and commissions.
9. The SPIU, MINICOM, is the promoter of this new and innovative scheme for rural
business growth and development in Rwanda. The SPIU will finance the PROBA Scheme by
providing salaries and performance incentives for RSME Facilitators, design and print vouchers,
provide subsidies for vouchers, commissions for SACCO services, and running costs for the District
PROBA committee. In addition, it will have the overall responsibility for implementation,
supervision and the success of this new model.
10. The SPIU will draft a standard MOU for the support to the PROBA Scheme, and sign it
with each district. In the MOU, key operational elements such as the district oversight function to be
exercised through the District PROBA Committee, the contracting of the RSME Facilitator and the
quarterly physical and financial reporting by the district will be detailed. The voucher payment
services by the SACCOs will be detailed, and the participating SACCOs will countersign the MOU.
Also, an Annual Addendum to the MOU will specify the annual budget to be transferred to the
district for this purpose, and the annual targets against which the district will report.
Implementation arrangements and timeline
11. The SPIU will prepare the MOUs to be signed with all district authorities before December
2011 to see the system operational in all 30 districts by January 2012. Upon signature, the SPIU will
transfer the current cooperative coaches (former CERs) from RCA to the districts to work as RSME
Facilitators. This activity shall be completed end-December 2011.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
47
B. Setting up a Voucher System
12. PPPMER has already budgeted in its AWPB 2011/2012 an envelope of Rwf 150 million to
be shared among 30 districts for voucher system implementation. According to this plan, eligible
RSMEs will benefit support from PPPMER through a voucher system in respect of specific needed
services.
13. Setting up a voucher system is one way to develop the PROBA market to contribute to SME
Policy objectives on a commercially profitable basis of business services delivery. The
implementation of this new and innovative system will target microenterprises that cannot finance
business advisory services themselves.
14. This scheme brings significant changes in business advisory services functioning. In fact,
with the vouchers, eligible RSMEs (both individual enterprise and cooperative) will be able to contract
themselves the services of a nearby PROBA on a 1-to-1 basis. A PROBA list will be regularly updated
by the RSME Facilitator. This way, the RSME becomes the client buying the services it needs from
who can offer it at the best cost/quality ratio.
15. In collaboration with the sectors, the RSME Facilitator will develop a list of eligible SMEs in
the district. Depending on need, an SME may be identified as needing 2 or more vouchers, which
would be issued one-by-one. The eligible business would be informed of its voucher entitlement, and
receive a list of accredited PROBAs in the district, with their specialization. They will then be able to
purchase the voucher from the Umurenge SACCO at the sales price of RWF 500. The vouchers
would have a face value of RWF 5 000, buying about 4 to 8 hours of service (this needs to be
negotiated between the SME and the PROBA). Drafts of models for the vouchers are presented in
Attachment 1 below.
16. Upon completion of the service, the SME would pay the PROBA with the voucher. The
PROBA would enter the details of the services rendered and some basic data on the client SME on
the voucher, certify that services were provided (with the RSME countersigning) and present it at the
Umurenge SACCO for payment. No other prior or external additional test or verification of service
completed would be required for payment. Yet with his signature on the redeemed voucher, the
PROBA would vouch for the services actually rendered. The payment will be made directly to the
PROBA.
17. The redeemed vouchers will be presented to the district. The RSME Facilitator will then fill in
the information on the back of the vouchers in the PROBA service database, which will inform the
district and the SPIU about the functioning of the system, its outreach and what kind of services are
most in demand. This will be useful for making adjustments to the system, and also to plan appropriate
training courses for the PROBAs.
18. This system will also strengthen and value Umurenge SACCO. For this purpose the districts
will contract Umurenge SACCO to service PROBAs and in return, the SACCO will get agreed
commission on service rendered under PROBAS. This commission shall be negotiated as a fixed fee
per completed voucher redeemed at the SACCO. It is suggested that this commission be set at RWF
200.
C. Training for PROBAs
19. The PROBA Scheme would be set up immediately, with an effective start date of 1 January
2012, with intensive sensitisation campaigns launched before that date. To ensure gender
responsiveness in the system, the campaign messages should be packaged in a way that gives rural poor
women and men confidence to seek for the business advisory services. Initially, the 211 former FEs
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
48
will be accredited, immediately followed by the mobilisation of more PROBAs, aiming at 2-3 PROBAs
per sector.
20. The initial PROBAs will be the proximity advisors (FEs) already working with PPPMER,
mainly in the provision of technical and managerial training and coaching to SMEs. As such, these
initial PROBAs can start working immediately after their familiarisation with the PROBA Scheme.
21. All new PROBAs (and eventually also the initial PROBAs) will require training to provide
quality services, mainly in business management and coaching. For this, the project will build on the
PCU‟s request to the International Labour Organization (ILO) to utilize its SIYB (Start and Improve
Your Business) modules to enhance technical skills of the PROBAs. ILO proposes 4 modules to
reinforce capacities of PROBAs. The modules include:
(i) generate your business (GYB) intended for people without a business plan who
would like to start a business. At the end of the training, participants are expected to
have developed a concrete business idea ready for implementation;
(ii) Start your business (SYB): This is a materials based training program for potential
entrepreneurs with a business idea, who want to proceed and start their own business.
The programme is a combination of training, field work, and after training, SYB
Awareness and SYB planning;
(iii) Improve your business (IYB). This introduces practicing entrepreneurs to good
principles of business management, i.e. marketing, costing, stock control, record
keeping, buying and business planning, relevant examples and exercises enable
entrepreneurs to identify their own business problems and actively engage in solving
them and
(iv) Expand your business (EYB). This gives growth – oriented small and Medium
entrepreneurs the practical tools to implement and realize fast business growth and
profits. SPIU have not matured the partnership with ILO, to provide the electronic
entrepreneurship modules to PPMER for the PROBAs.
22. The SPIU should put in efforts to mature partnership agreement with ILO to access their
modules. The training of the existing 212 PROBAs will be supported by the SPIU and UNIDO in the
framework of the One UN funded project on Livestock Resource Value Chain Development. The SPIU
will be responsible for preparing the training, and catering for all logistical expenses including rental
charges for the training hall, catering services, transport allowances, training materials and many more
as required. UNIDO will provide the trainer (s). These trainings will be split into 3 classes (each group
of at least 74 PROBAs). Each training will take a maximum of 15 days. The planned trainings will to
take place before the end of March 2012.
D. Support to Marketing Skills
23. Marketing is one of the key roles and at the same time one of the key constraints of
cooperatives, where proactive behavior is especially important. The mission notes that many
cooperative leaders rely to a large extend on the support from their coaches (CER). They expect for
instance that CER identify potential market opportunities and buyers and link them up and even
negotiate for them. Market changes are often ignored and in many cases cooperative leaders don‟t find
solutions to cope with negative trends.
24. The case of UCOPROARU: Some 3 handicraft cooperatives in Rulindo district organized in
the recently created union UCOPROARU have collaborated several years with the export-oriented
handicraft company Gahaya Links, which mainly operates in the US market. In 2008, the company has
bought the entire basket production of these cooperatives, which expanded rapidly in order to cope with
an expected increasing demand. According to the union president, Gahaya Links changed its marketing
strategy in the following years and shifted its focus from these baskets to other products. The
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
49
cooperative turnover dropped from RWF 12 million in 2008 to RWF 0.6 million in 2010, which
corresponds with a production period of 2 weeks.
25. 2 years after the cutback the cooperative and union leaders have not yet been able to respond to
the changed market demand. It appears that no significant attempt has been done to systematically
search alternative buyers or to adapt the production (e.g. design) to the changed market demand.
Instead, the leaders expressed their expectation that the Project would take action in linking them up to
other buyers.
Context-specific marketing skills and self-reliance
26. The example shows that these cooperatives are far from being self-reliant and from having
sufficient marketing skills for continued success. It also shows that there is need to adapt the marketing
support strategy for strengthening long-term marketing conditions for RSMEs and cooperatives,
including the need to build pro-activeness in the cooperatives‟ search for markets, clients and the best
products to offer.
27. Marketing support should emphasize training and coaching targeting the development of
context-relevant skills. This means that they can be applied under the given conditions of the targeted
RSME‟s and cooperatives, which are typically characterized by a low level of funds, market
information and by long distances to the target markets.
Marketing coaching by local experts – building up PROBAs expertise in marketing
28. Local marketers, who successfully operate under the same or similar conditions for
example as cooperative managers or entrepreneurs, can play an important role as marketing
coaches. The project should try to make use of and disseminate these skills among the beneficiaries
through the PROBA (Proximity Business Advisors) system currently under development. How ?
The identified marketing experts can either act as PROBAs (which means that they have to be
accredited and supported in the PROBA Scheme) and/or eventually – if the SPIU sees enough
potential – as trainers of other PROBAs. Two specific activities are recommended in this regard:
a) It is suggested that the RSME Facilitators be particularly on the look-out for potential
marketing coaches in the process identifying the additional PROBAs.
b) In addition, an expert workshop facilitated by the project, in which a training and
coaching module will be developed, can produce useful guidelines for marketing
advisory services. These guidelines would take into account the highly participative
and context-specific market support services to be delivered by the PROBAs. The
guidelines should emphasize amongst others:
Organizing market research and monitoring under rural conditions (e.g. high
transport costs and little funds). Among the potential subjects: how to organize
market prospection missions and committees which involve several cooperatives,
unions and RSMEs.
Accessing and managing market information (without Project support!),
including prices, supplier & buyers contacts, new products, markets, trade fairs,
exhibitions.
Improving visibility and communication (e.g. stands and signboards, strategic
positions, key contact management)
New market niches by innovating: suggesting new and innovative products is an
important marketing element, especially in the handicraft and tailoring sectors.
Copying leads to market saturation, new and improved products are the basis for
long-term success. This has to come from the entrepreneurs, which shouldn‟t rely
on Project support. Cooperatives could create product development committees,
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
50
which might test a few new products and/or marketing avenues, and which would
need to be compensated by the cooperative (e.g. compensation for time spent and
raw materials used).
II. Technical Assistance for Masaka Business Incubation Centre (MBIC)
29. RDB has established the Masaka Business Incubation Center (MBIC) to demonstrate
appropriate technologies and provide technical business development services. Of the 12 planned
Business Incubation Centers, so far only MBIC is set up. The centre aims at enabling public and
private Micro, Small and Medium Enterprises. It offers technical business management services with
the opportunity of hands-on, vocational training, coaching and incubation services. The centre is
comprised of four processing units: bamboo, cheese, fruit, and leather goods.
30. It is financed by RDB and other development partners (UNIDO, Chinese Embassy and
IFAD through PPPMER). It is managed by RDB. The management structure is comprised of a
CEO, a Head of Trade & Manufacturing Department, a Centre Manager and Head of technical
unit respectively.
31. Masaka business incubation centre is not fully operational yet With the exception of
leather unit, the other units are not operational at the moment. However, there is a lot going on-
the remaining cheese equipments & utilities have been tendered for; Indian and Kenyan
companies have been contracted to install the equipment for fruit and cheese processing,
respectively. Bamboo, cheese and fruit units are expected to be fully operational by end of 2011
and Thus the center will be completely operational by Jan 2012. The same companies are
contracted to train RDB staff.
32. The mission noted that RDB has not yet employed its own technician(s) for any of the
units. It is rather worrying as to who will be trained on the side of RDB by the contracted
companies. Therefore, it is highly recommended that, RDB should employee Unit technician (s)
who could befit from TA as early as possible so that, the bamboo, cheese, fruit and leather
experts could train them from onset.
33. Under the expired project MOU with RDB to finance fruit processing equipment, the BIC
was to train 100 persons in fruit processing in 2011/12. To conclude the activity, it was agreed to
extend the duration of the MOU until end-2012, and that RDB hire a fruit processing trainer to be
coached by the available technical assistance.
34. Moreover, it was noted that no business strategy for the Centre was in place, and that plans
for weaning entrepreneurs from its services were notional. Such business strategy should include
training plans for experienced and new entrepreneurs, clear rules for the use of the facilities during
and after the training with a cost escalation (for example, it is recommended to allow SMEs to use
the facilities free of charge for 6 months after the training, followed by 6 months at 50% of the
published price, after which the full published price will be charged), a chart of costs for use of the
sub-sections of each unit (the published price, which should be slightly above the normal
commercial charges for similar services), pricing of tools and materials (for sale at full cost, except
during the courses, when the cost should be made known to the trainees), a communication
strategy and an M&E system. This being an urgent need for technical assistance to RDB for the
elaboration of the business strategy to ensure the operationality of the BIC. The business plan
preparation is expected to be completed by early March 2012. It was agreed that this activity will
be supported by UNIDO in the framework of the One UN funded project on Livestock Resource
Value Chain Development.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
51
35. The target clients will be micro-small and medium enterprises. At the beginning, the services
will be offered for free, with an intention of attracting many SMEs to centre, and be able to know
their services. At some stage, clients will be paying a service fee. RDB have made it clear, the service
fee is not met to recover the operating costs of the centre but rather, aimed at encouraging its clients
to have the culture of paying for a culture. This kind of arrangement is very worrying. Service fee is
not yet determined, for how long? For whom? Certification procedure is not yet envisaged, although
this is very important. The training plans and curriculum not developed and there is no operational
plan in place. However, it is planned that, all these details shall be captured within the business plan
to be prepared in partnership with UNIDO by early March 2012. The mission noted that, there is a
lot of local SMEs ready to benefit from the centre. However, one would wonder if there are enough
prospective entrepreneurs to make good use of the facility.
36. In terms of outreach, RDB plans to start by offering free services so that, they get to know
more about the centre (unit) and their respective service package. This will be supplemented by
national advertisements-radio/TV and newspapers calling and informing the SMEs about the centre.
Also, the outreach will be through the existing district cooperative officers, business development
centers (BDCs) and business development service centre(BDSs), district SME facilitators and
proximity business advisors (PROBAs) specifically for the Rural-Micro SMEs. The mechanism on
how best these service providers will be involved is not yet defined.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
52
Attachment 1: Draft models of the RSME Service Vouchers
The models proposed on the next page (Figures 1 and 2) have been developed with reference to the
voucher model used by MINAGRI to provide access to fertilizers and seeds. These vouchers
commonly known as NKUNGANIRE in Kinyarwanda are more secured to avoid fraud while using
them or imitation of the IT system linked to it. Similarly, the RSME Service Vouchers would be
completely translated into Kinyarwanda to facilitate understanding by all concerned parties.
The following would be the key features of the vouchers:
- The front of the voucher: The front of the voucher will be used to enter information on the
RSME operator (the owner or manager), the RSME business location, and the SACCO that
sells the voucher to the RSME operator. It also mentions the basic rules of the voucher use,
and the value of services. The front is to be filled in by the SACCO at the moment of sales.
- The reverse side of the voucher: The back of the voucher will serve to collect information on
the basic data on the PROBA and the RSME recipient; the services rendered, and the further
services needed. It also is signed by both the PROBA and the RSME operator to certify that
the services were actually delivered and received. This side of the voucher is to be filled in
by the PROBA.
- The lower section of the reverse side of the voucher contains information on the redemption
by the SACCO, and is to be filled in by the SACCO operator.
Note: MINAGRI has developed a voucher system for fertiliser and agricultural inputs, and
gathered considerable experience with it. The MINAGRI staff met by the mission has expressed
their availability to assist MINICOM in finalising the RSME Service Vouchers.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
53
Figure 1: Model Front Side of the Voucher
Voucher Serial No. ………….
REPUBLIC OF RWANDA - MINISTRY OF COMMERCE AND INDUSTRY
RSME Service Voucher
This voucher is good for the payment of services only to the RSME mentioned below, and
only by accredited Proximity Business Advisors (PROBAs).
Sales price to the RSME: RWF 500
Name of RSME ……………………………….………… individual or cooperative
Name of RSME operator: ……….…………………………….…… ID No..……………
District ………..…………………………... Sector ………………………………..
Sold by: Name of SACCO ……………………………….… Sales date ………20….
Voucher value RWF 5,000
This voucher may not be sold, transferred or refunded.
Figure 2: Model Reverse Side of the Voucher
Basic Data on Services Provided
Name of PROBA ………………...…………………… Accreditation No.: …………………
Date of service ……… . Duration:…… hours provided at RSME location elsewhere
Year the RSME started business: …… Main activity: ………………………………………
Number of employees now: … men and … women, including apprentices: … m, … w
Estimated annual turnover (last year): RWF …………………..… in 20…..
Details of the services rendered by PROBA:
………………………………………………………………………….………………………
………………………………………………………………………….………………………
Further services required by the RSME, as assessed by the PROBA and RSME:
………………………………………………………………………….………………………
I have delivered the above service fully. Date……… PROBA signature ……………………
I have received the above service fully. Date……… RSME signature ……………………
_________________________________________________________________
Redeemed on ……….. at the SACCO: ………………………………………..
Operator: …………………………. Signature: ..…………………..
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
54
Attachment 2
DRAFT TERMS OF REFERENCE
RSME Facilitator
1. Introduction and objectives The SME Policy objective 2 aims at facilitating SMEs access
to business development services, covering micro, small and medium enterprises. For the rural
microenterprise development in Rwanda, there is a sound need for business development services by a
very large number of rural microenterprises, which together with agriculture constitute the basis of the
currently weak rural economy.
2. In response to this unfulfilled need and consistent with the SME Policy, it was observed that
while no central level agency is oriented towards filling this gap, the districts and sectors are well
placed and mandated to facilitate such services. Furthermore, recognizing that some of RSMEs are not
capable to pay business advisory services, and the capacity constraints in local government and
MINICOM‟s intentions of building demand-driven services, service provision by small-scale
businesses in rural areas initially supported through a voucher system presents itself as the system of
choice. In this regard, MINICOM has decided to initiate the Proximity Business Advisory (PROBA)
Scheme through its Single Project Implementation Unit (SPIU) and in partnership with the districts.
3. PROBAS target group. Most generally, the PROBA Scheme aims at getting two actors
together: (i) the PROBA (Proximity Business Advisor) and (ii) the RSME (Rural Small and Micro
Enterprise, both individual enterprises and cooperatives). PROBAs will be small-scale rural
entrepreneurs who offer part-time advice to RSMEs . Through the scheme, the RSME will get
business advisory services from the PROBA of his or her choice. The services will be subsidised
through a voucher system.
4. PROBAs will offer the following services:
Training and coaching in business management (accounting and bookkeeping, taxation, start-
up business management, business plan writing, entrepreneurship, cash management, use of
financial services, and marketing;
Business counseling for RSMEs in distress; and
Technical training depending on the specialization of the PROBA
5. PROBA Scheme principles:
Demand-driven: This aims at addressing true needs of the RSMEs based on their own
judgment. The culture of external identification of trainees and their training needs, and
receiving services free of charge will be replaced by the one of the RSME identifying itself
a suitable service provider (PROBA) and the service required, nad negotiate and pay
demanded and delivered services directly.
Negotiation: The RSMEs will be able to negotiate themselves the needed services with a
service provider (PROBA) and exercise independent choice.
Cost based on quality of service: Quality control becomes and remains the responsibility
of the RSMEs. This will improve quality of services rendered to RSMEs and payment shall
be consequently applied.
Feedback. The PROBA will fill in basic information on the service delivered on the back
of the vouchers.
6. The District PROBA Committee will be composed of 5 members: district Vice-mayor in
charge of economic affairs, district Executive Secretary (as district budget manager), RSMEs
facilitator (head of operations and PROBAS reporter or secretary), District Cooperative Officer, one
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
55
sector Executive Secretary and one RSME representative, nominated by the local business
community in the district. It will be responsible for:
Approving the PROBA accreditation proposed by RSME Facilitator;
Approving eligible RSMEs voucher recipients proposed by the sectors; and
Evaluating monthly the evolution of the PROBA Scheme and provide guidance to the
RSME Facilitator and the sector administrations.
7. The RSME Facilitators will be hired at the district level on a contract basis. Reporting to
the District Vice-mayor for Economic Affairs, each RSME Facilitator will be responsible for:
m) Establishing the District PROBA Committee and acting as its secretary (to call for
and prepare meetings, information notes, minutes, etc.);
n) Ensure sound general awareness and understanding of the PROBA Scheme in the
district, including the sectors (through publicity campaigns, etc.);
o) Arranging for a call for expressions of interest by operators of well-functioning rural
businesses to become PROBAs;
p) On an annual basis, assessing the suitability of the applicant RSME operators and
accrediting them as PROBAs (starting with the former formateurs d‟entreprise, FEs);
q) Submitting PROBAs for final accreditation to the District PROBA Committee;
r) Constantly up-dating and making accessible to RSMEs the list of accredited
PROBAs in the district, with contacts and specialization in service provision;
s) Guiding the district and sector administration in selecting the RSMEs that are
eligible for buying vouchers;
t) Establishing with the Sector SACCOs the modalities for selling vouchers to eligible
RSMEs, and for buying filled-in vouchers from PROBAs who received these in
payment for services;
u) Investigating any allegations of fraud regarding the voucher system;
v) Maintaining the district database on vouchers distributed and returned, including the
details from the returned vouchers;
w) Providing short monthly analyses to the District PROBA Committee of the
functioning of the PROBAs Scheme on the basis of the district database; and
x) Maintaining links to the SPIU and other RSME Facilitators on the development and
implementation of the PROBAs Scheme, with a view to improving its performance.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
56
[Click
here an
d in
sert EB
../../..]
APPENDIX 4: COOPERATIVE DEVELOPMENT
A. Cooperative management and business skills
1. The project has been supporting 850 cooperatives with coaching and training services. The
basic training services provided to all 850 cooperatives includes cooperative management (3 days),
accountancy (5 days), business and financial planning (4 days), marketing (4 days). The majority of
the selected cooperatives operate in the tailoring (179), the handicraft (161) and the honey sub-sector
(122). 31 cooperatives are engaged in fruit processing, and 6 in cassava processing. More than a third
(328) don‟t operate in the priority value chains, and have been supported before the prioritization of
the above-mentioned sub-sectors. Most cooperatives (827) have a turnover below RWF 1 million per
year. In the year 2010/11, 4 322 members have been trained in cooperative management, which
means that 68% of the planned outputs has been achieved.
2. Some 3 714 members organized in 171 cooperatives have received intensive coaching in
the development of cooperative development plans. The activity, which takes 30 days per
cooperative in average, started in November 2009. Following the agreement with the implementation
support mission in October 2010, more focus has been given to coaching in business planning
including investment and financial planning, concrete activities such as market and technical studies.
3. Special attention has been given to 35 of the cooperatives with high turnover (more than
RWF 1 million) – officials, managers and members have received advanced coaching in accounting,
which should ensure that the members, staff and officials are prepared to deal with the increasing
complexity of their growing business.
4. The simplified and summarized guides for cooperative management and governance have
been distributed to cooperative unions and federations as well as to the CER. However, these
documents are principally required by the cooperatives themselves, in Kinyarwanda. RCA agreed to
distributing the guidelines further, to establish a list of recipients, and to using them in its coaching
programme.
Table 1 : Supported cooperatives with a turnover of less than RWF 1 million /a:
Province Tailoring Handi-
craft Fruit Manioc
Api-
culture
Outside
value chain Total
North 67 51 4 - 44 104 270
South 18 31 11 4 30 46 140
East 37 35 15 2 30 66 185
West 57 44 1 - 18 112 232
Total 179 161 31 6 122 328 827
Table 2: Supported cooperatives with a turnover of more than RWF 1 million /a
Province Tailoring Handi-
craft Fruit Manioc
Api-
culture
Outside
value chain Total
North 1 - 1 - 1 4 7
South 1 - 1 - 2 1 5
East 1 - 1 - - 5 2
West - 1 1 - - 1 2
Total 3 1 4 - 3 11 22
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
57
Table 3 : Cooperatives coached in development plans
Province Cooperatives Trained Members
Female Male Total
North 57 512 700 1 212
South 87 851 750 1 601
East 22 350 300 650
West 5 102 149 251
Total 171 1 815 1 899 3 714
Unions and federations
5. Some 9 cooperative unions and 5 cooperative federations operating in the priority value
chains have been created with project support. The project – through the collaboration with RCA -
assisted in the organization of constituent assemblies for 3 new federations and provided training in
cooperative management to 140 leaders of 14 unions (77% achievement of the AWPB 10/11).
Strengthening proactiveness and self-reliance
6. The mission noted a varying level of performance of the cooperatives and their unions.
Especially business skills and problem solving capacity have to be developed further to reach
operational and economic sustainability of these groups. It was thus agreed to focus in the future on
strengthening pro-activeness and on the development of marketing skills adapted to their specific
context.
7. It is recommended to integrate the principles of pro-activeness in the training modules, using
context-specific examples, and analyzing – in a participative manner – key mandates and constraints of
cooperatives and potential proactive behavior which aims to avoid negative development and to
promote favorite conditions. Thereby the cooperative leaders should be encouraged to bring in their
own experience and to suggest solutions through proactive behavior and self-reliance.
B. Collaboration with the Rwanda Cooperative Agency (RCA)
8. The MoU for the next period is to be signed by November 2011 after approval of the final
report. Therefore the existing draft has to be improved. It should clearly indicate quantified expected
outputs for both years as well as time-bound deliverables and reporting format. It should reflect:
special attention to the cooperatives running the demonstration units (DUs) as agreed in
the extension design report (Paragraph 28).
Pro-activity is anticipating and taking charge of situations by causing something to
happen rather than waiting to respond to it after it happens. In Organizational Behavior
proactive behavior (or proactivity) by individuals refers to anticipatory, change-oriented
and self-initiated behavior in the work place. Proactive behavior involves acting in
advance of a future situation, rather than just reacting. It means taking control and
making things happen rather than just adjusting to a situation or waiting for something to
happen. Proactive employees generally do not need to be asked to act, nor do they
require detailed instructions.
(Whiteley, Paul L.; Blankfort, Gerald (1933), "The Influence of Certain Prior
Conditions Upon Learning", Journal of Experimental Psychology (APA) 16: 843–851)
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
58
the support activities to cooperative unions, federations and apex organizations,
including training, value chain data base, equipment, etc.
that all support to cooperatives, unions and federations be limited to institutions created
before 2012, so as to ensure sufficient time to reach sustainability.
9. The MoU should also reflect
The decision of MINICOM to move towards a more demand-driven service provision.
the day-to-day collaboration between the SPIU and RCA with the objective to transfer
more responsibility and capacity to RCA.
10. The Conseillers d’entreprise rurale (CER) are currently working with RCA, coaching and
training some 150 cooperatives participating in the Crop Intensification Programme (CIP). The
temporary services delivered by the CER are highly appreciated by these cooperatives. The leadership
emphasized the usefulness of the marketing advice and linkages to buyers provided. The CER continue
thereby the PPPMER approach. It appears that there is no concept note or strategy paper or specific
training of CER elaborated or planned for guiding the work of the CER. The agricultural focus of most
of these cooperatives as well as the advanced status of some suggest that the targeting is not fully in line
with the PPPMER objectives of supporting rural microenterprises.
11. It was agreed that the CER will continue to provide intensive coaching to these cooperatives
until the end of 2011. In order to reach long-term effects, the coaches have to concentrate on key
constraints and emphasize proactive business management.
Inspection and audit
12. In order to improve RCA capacity in inspection and audit, 68 staff were trained (90%
achievement of AWPB 2010/11). According to RCA, 258 cooperatives have been inspected since
February 2011. The Project‟s annual report 2010/11 mentions 8 inspections, while 192 were planned
for the same period. The contradictory numbers provided suggest that reporting has to be seriously
improved.
C. Planning, Reporting, MOU
13. The mission notes shortcomings in the reporting format, timeliness and completeness.
Quarterly and annual reports have not been submitted as agreed in the MOU, delays led to
incompleteness of the project‟s annual report. Progress statements are missing for several activities.
The final report of the collaboration period ended in June 2011 has not yet been submitted. It is
agreed that the report be submitted by end-November 2011.
The cooperative KOABIKI in Musanze takes part in the CIP and has received intensive
coaching by the CER during 3 months in 2011. The cooperative buys and sells mainly Irish
potatoes, provides technical advice and to its members and sells inputs, mainly fertilizer. In 2010, the cooperative sold more than 1 300 t of potatoes for about FRW 120 million.
The institutional management and governance structures of KOABIKI are largely in line with
the RCA guidelines for cooperatives. However, the fact that the cooperative president has
been re-elected after a term of 3 years appears to be in contradiction with the guidelines.
KOABIKI governance seems to be transparent and well documented – the bylaws as well as
the minutes of the last 2 meetings, which are mostly organized in a frequency above 3 times per semester, could be presented instantly.
It appears that many of the 75 members cannot be considered poor - the annual quantity
produced by each member ranges from 20 to 200 t of potatoes. A number of members possess lorries, which are regularly hired by the cooperative for produce collection.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
59
The reporting format is to be improved, presenting a cumulative comparison of expected
(according to MoU) and achieved results.
More explicit explanation of activities is required. For instance, training content (e.g. training in
cooperative management, business plans, or marketing) and beneficiaries have to be clearly
defined.
More emphasis should be given to qualitative assessments and comments. Especially when
achievements are significantly below expectations, the related constraints have to be outlined.
A short paragraph including a history of the activities, the objectives and the strategic context
helps in the planning and reporting of activities and facilitates their understanding for other
stakeholders (e.g. partners, support missions and consultants).
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
60
APPENDIX 5: HANDICRAFT AND TAILORING VALUE CHAINS
Support to product development
1. 168 cooperatives and 207 individual enterprises engaged in handicraft and tailoring have
received coaching and training services through the project. The mission notes a varying
performance in the training of artisans - the annual achievements (2010/11) related to training
activities range from 60% to overachievement, which is left without comment in the annual
report. The Project facilitated training in basket weaving for 164 RSMEs, which means an
achievement rate of about 60%. Some 459 persons have been trained in tailoring and weaving
(168% AWPB achievement).
2. A comparison of the turnover of 92 handicraft cooperatives in the years 2008 and 2009
suggests an increase of 45 % and thus a big impact of PPPMER-funded training and other
services. However, limited business skills and pro-activeness hinder many RSMEs and
cooperatives in effectively using the obtained skills for business improvement.
3. Further handicraft and tailoring training should concentrate on businesses that have a
clear vision and a professional business attitude. The delivery of training should be more
demand-driven and be tied to the elaboration of realistic business and marketing plans so as to
increase the efficiency of PPPMER support. The new AWPB 2010/11 foresees training only in
pottery and tailoring. SPIU should be prepared to facilitate other handicraft trainings as
demanded by the target group.
4. Furthermore, the SPIU should make more use of monitoring data so as to analyze
effectiveness and efficiency of support activities, which should guide further planning. Thus it is
vital to continue the monitoring of RSME and cooperative financial figures such as turnover and
profit (also for 2010).
A PPPMER success story: The cooperative COOPAV-Mararo in Musanze runs this shop at the entrance of the national park. Especially international tourists like to buy the handmade baskets, handbags, puppets and carvings. PPPMER assisted amongst others with training and coaching in cooperative management and handicraft techniques as well as marketing advice. Vice-president Marie Rose says: "With the help of PPPMER the cooperative has brought enormous improvements to our lives. Our incomes have multiplied since its creation in 2004."
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
61
Transfer of activities to partner institutions
5. In view of the transition of the Craft industry Secretariat (CIS) to project status, and in
line with the SME policy, further activities as of 1 January 2012 are to be carried out by partner
institutions such as PSF (for marketing support), WDA (for innovation and technical training)
and consultants (for workshops with clearly specified targets). The SPIU should assist and
consult the latter on a day-to-day basis.
Marketing support
6. The mission notes that marketing support is largely limited to beneficiary trade fair
participation, which is of limited effectiveness and very costly. It was agreed that the SPIU put
more emphasis on demand-driven and context-adapted coaching and training in small-scale
marketing, focusing on strengthening self-reliance and pro-activeness among the RSMEs. Local
service providers, such as the PROBAs, should be trained by creative business persons for this
purpose.
7. Kigali show room. The planned Kigali show room is supposed to be used as sales outlet
for the best artisan products of the country. It is planned to be operated by a committee yet to be
nominated. In view of the management constraints in the context of the artisan houses, the
mission does not concur with this proposal. Instead, it recommends working with a private
operator, who would manage the shop as profitable enterprise. Incentives and support would be
provided in the form of business development services through the BDCs or BDSs and temporal
subsidies to shop rent (up to 50% and up to 6 months). The entrepreneur would be invited to
participate in the HEAP committee so as to facilitate constant linkages to master artisans and to
national and international buyers and experts.
8. The Handicraft Excellence Award Program (HEAP). The mission is pleased to note
that the first national handcraft competitions have been successfully conducted. HEAP is to
support artisans, encourage innovation and quality products by supporting the most talented
artisans through specific activities. However, these activities and objectives are yet to be clearly
presented in a concept note, and the communication material to be revised following the
recommendations in the last follow-up report (May 2011, Appendix 3).
9. For the future design of HEAP, it is recommended to emphasize promotion and market
linkages, and to integrate workshops on design and product development, guided by international
designers: workshops with international buyers from inside and outside the country, design
students and/or teachers from arts schools (also students and teachers from Nyundo school can
be invited) from import countries and eventually specialized NGOs and associations working on
innovation in handicraft, as well as a selection of private operators (especially exporters) and
talented artisans (master artisans). (For further details, see follow-up report May 2011,
Appendix 3).
10. The MOUs concerning ownership and use rights of the meanwhile 17 artisan houses and
kiosks have still not been signed by the accordant district authorities, and the handover
ceremonies with all concerned stakeholders are yet to be organized. It was agreed that the
conclusion of these MOUs be a priority activity of MINICOM to be finalized by the end of 2011.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
62
Table 1 : Artisan Houses funded by PPPMER
No Names Province District Purpose
1 Gakenke artisan house North Gakenke Production and sales
2 Rulindo artisan house North Rulindo Production
3 Gicumbi artisan house North Gicumbi Production
4 Musanze artisan house North Musanze Production and sales
5 Burera Kiosque North Burera Trading
6 Gashoba artisan house South Huye Production
7 Gako artisan house South Huye Production
8 Rwaniro artisan house South Huye Production
9 Kinkanga artisan house South Huye Production
10 Nyaruguru kiosque South Nyaruguru Trading
11 Gatsibo artisan house East Gatsibo Production
12 Kayonza artisan house East Kayonza Production and sales
12 Nyagatare artisan house East Nyagatare Production
13 Kayonza kiosque East Kayonza Trading
14 Bugesera East Bugesera Production
15 Karongi West Karongi Production and sales
16 Nyamasheke West Nyamasheke Production and sales
17 Rubavu West Rubavu Production and sales
Planning and reporting
11. In view of the increasingly scarce project resources, it was agreed that the value chain
activities require more rigorous planning, with strategic objectives and a priority afforded to
activities with low costs per client. The plan should include a calendar with quantified
objectives, the roles and responsibilities of the SPIU and its partners.
12. Progress reports. It was agreed that the format of the progress reports be improved in the
sense that quantified targets and achievements are clearly indicated and activities are classified
so that a coherent picture of planned and conducted activities is reflected. The SPIU should
furthermore request the partner institutions‟ progress reports to be submitted on time, and insist
on the SPIU reporting format. Moreover, the SPIU should provide brief feedback on the reports.
AWPB 2011/12
13. There is need to further revise the AWPB for the handicraft and tailoring activities:
The Craft Industry Secretariat (CIS) is - despite its transfer to the SPIU as a project - still
mentioned as key player in artisan promotion. The AWPB should reflect a sound
reorganization of mandates previously planned for the CIS.
It appears that the Support to Hanga Umurimo Program will be provided through the RSME
Development Project and not through PPPMER. It should therefore not be mentioned as a
PPPMER activity in the AWPB.
14. The handicraft sector study related recruitment of a consultancy firm is in its final
stage. The mission finds that related TOR are still too vague to ensure quality results. It was
agreed that the TOR be further elaborated with specific details without changing the scope of the
study, and that a census of handicraft enterprises is not required. A proposed revision of the TOR
is outlined in Annex 3 of the follow-up report May 2011.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
63
Attachment 1: Annual turnover of handicraft cooperatives in the years 2008 and 2009
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
64
APPENDIX 6: FINANCIAL SERVICES FOR RURAL SMES
A. BACKGROUND
1. Rural Small and Micro Entreprises (RSMEs) play a major role in alleviating poverty and
developing a country‟s national economy. Lack of access to finance has been identified in the
Government of Rwanda (GoR) policy for the development of SMEs as one of the biggest challenges
for SMEs. The 2008 FINSCOPE Survey found that 52% of the adults in Rwanda had no access to
financial services either formal or informal. To remove barriers to accessing financial services, the
GoR is implementing the Umurenge SACCO Strategy where a Savings and Credit Cooperative
(SACCO) in each sector of the country is being established and the microfinance industry is also
being formally regulated. Furthermore, the Access to Finance Rwanda (AFR), which aims to provide
coordinated support for improving access to financial services, has been requested by GoR to finance
the formulation of a Rural Finance Policy.
2. PPPMER strengthens rural microenterprises managed by individuals or cooperatives to
modernize them, improve their management and create jobs. One of the main objectives of the
project is to provide entrepreneurs with access to sustainable financial services. Since 2007, the
project has been providing financial services to RSMEs through partnerships with the Banque
Populaire du Rwanda (BPR) and microfinance institutions (MFIs).
3. The section below provides an update on the findings of the mission relating to the project‟s
objective to improve access to financial services through the BPR and MFIs and also provides
recommendations to improve implementation.
B. CURRENT SITUATION AND AGREEMENTS
4. The SME Development Policy sees a lack of harmonization of the different funds
supporting SMEs‟ access finance as they are managed by different entities. Consequently, the
BRD Development Fund (BDF) has been mandated by this Policy to manage funds aimed at
providing finance to SMEs. BDF is a newly established company aiming to support SMEs
through on and off-farm guarantee funds, lines of credit as well as advisory services. It has
begun its operations and the table below illustrates the different guarantee funds it manages.
Table 1: Funds managed by BDF on September 2011
BDF Guarantee Funds Amount (RWF million)
SME Guarantee Fund 3 314.2
Agricultural Guarantee Fund 911.3
Retrenched Civil Servants Guarantee Fund 511.3
Women Guarantee Fund 122.6
Total 4 859.4
5. As previously agreed, the BDF will continue the wholesale management of the PPPMER
credit lines to BPR and the participating MFIs. However, the PCU has not advanced in the
handover arrangements of the credit lines. It was now agreed that the SPIU prepare a wholesale
credit transfer agreement by end-November, specifying that MINICOM will carry the lending
risk and detailing management and reporting obligations, cost recovery and incentives for BDF
services, and eventual reimbursement to MINICOM. The agreement will be signed between
MINICOM and BDF. For the financial institutions, the terms and conditions of the credit lines
will not change, except that the progress reports will need to be submitted to BDF rather than to
the PCU.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
65
6. In addition, in an effort to reduce the retail lending risk, it was agreed that BDF will
expand its range of credit guarantees to also cover SME loan portfolios. For this, it will develop
a concept note describing the terms and conditions of the product, the review procedures, and the
eligibility criteria. To cater effectively for the SME sector, it is critical that simple wholesale
approval mechanism can be found, and that working capital loans be explicitly included in the
guarantee cover.
7. The mission recommends that the SPIU prepare for BDF a note on lessons learnt on its
wholesale credit lines. It is also important that the SPIU‟s Sector Specialist, Access to Rural
Finance, develop a closer working relationship with BDF, directly supporting the planning
processes and thereafter following up on the agreed arrangements.
8. Banque Populaire du Rwanda (BPR) is in partnership with PPPMER to provide access
to financial services through 63 of its branches and sub-branches nationwide. The revolving BPR
credit line has a total amount of RWF 785.6 million. So far, it has financed 1 921 projects
(predominantly tailoring and carpentry ones) for a total amount of RWF 969.2 million.
Table 2: BPR Credit Line on 30 September 2011
Amount (RWF)
Total Credit Line 785,599,635
Number of Projects 1,921
Outstanding Balance 213,194,366
Total Repayment (cumulative) 839,262,276
Arrears Rate 36%
9. Its current outstanding balance of RWF 213.1 million has an alarming overall arrears rate
of 36% that partly reflects high risk, and partly the fact that no loans have been disbursed for
about a year. For instance, the mission visited Busasamana BPR sub-branch and noted that the
last loan was issued in July 2010. Despite the low usage, BPR is interested in a re-launch of the
credit line for this particular target group by developing improvements, including a consistent
collaboration with Credit Analysis and Evaluation Committees (CEACs) and also with the
district-based Access to Finance Forums. The CEAC is a sector-based group that pre-screens
loan applications before the bank‟s review, and also helps to sensitize RSMEs about financial
services and helps with recovery and follow-up. The CEAC is composed of three RSMEs
representatives, a BPR/MFI representative and the sector agronomist. Despite these useful
services, so far most CEACs have never received the premiums stipulated in the BPR‟s credit
agreement with the PCU. It was agreed that regular payments to the CEAC begin immediately,
and that the project support one member per CEAC for coordinator functions.
10. The Access to Finance Forum is a new district-based mechanism to address financial
service issues, including recovery support. The role of the forum is to contribute to reducing
access to finance starting by each district. It aims to develop synergy between development
partners and financial institutions operating at the district and is composed of:
- Vice Mayor in Finance and Economic Development (Chair Person);
- District Police Commander;
- District Representative of the Prosecution;
- District Cooperative Officer;
- District Legal Advisor;
- Representatives of MFIs and SACCOs;
- Representatives of financial institutions (commercial banks, insurance companies etc);
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
66
- Representative of the Private Sector Federation;
- BDS representative;
- Technical Control Unit of SACCOs; and
- Development partners supporting rural finance and microfinance development.
11. With the high levels of non-performing loans, BPR has agreed to provide lists of
defaulters to the forum to facilitate recovery. Close follow-up from the branches and
subbranches in each district will be required to make this partnership function well.
12. The mission noted many reporting issues including reporting delays by BPR
headquarters, poor format adherence by many BPR branches and sub-branches and lack of
feedback to the reports. For instance, the September 2011 report from the Kiramuruzi and the
Rukara BPR sub-branches indicated neither the arrears rate nor the date of the recent repayment
and anticipated date of last repayment. Some branches have not yet received the new reporting
format developed by the project, and it was agreed that BPR improve its reporting and fill its
data gaps, with assistance by the SPIU. In addition, an assessment of BPR‟s statements on the
credit line is planned to establish the current situation by end-November before transferring the
credit line management to BDF.
13. MFIs: The project also works with Duterimbere MFI through a RWF 30.0 million credit
line that has funded 30 RSMEs for a total of RWF 11.4 million, with an arrears rate of 2%.
Problems remain in the accessibility of funds and in reporting (similar to BPR). The total amount
of the credit funds are to be increased by 0.25% monthly, which is however not reported by the
MFI so that the total current amount of the credit funds is not known.
Table 3: Summary of credit line to Duterimbere MFI at 30 September 2011
Amount (Rwf)
Total Credit Line 30,000,000
Number of Projects not known
Outstanding Balance 25,960,615
Total Cumulative Repayment 8,225,271
Rate of Arrears 2%
14. The SPIU will also assist Duterimbere MFI in improving its working relationship with
the CEACs, and the MFI will share information on defaulters with the Access to Finance Forum.
15. The two other MFI credit lines need to be discontinued with urgency. CT Byumba
recently closed down and as a result the recovery process must be initiated immediately. It was
noted that the agreed recovery of the funds from UCAPEC has not begun, and that notice needs
to be given immediately to the SACCOs to repay the credit funds borrowed by UCAPEC. CT
Byumba received a credit line worth RWF 20 million while UCAPEC received RWF 50 million
however it is not clear how much interest was accumulated and the SPIU needs to calculate the
interest together with the MFIs before it initiates the recovery process.
16. The recovery rate of the 14 old MFIs is moving at a slow pace as there has been no
further repayment since the last mission. A total of RWF 13.5 million out of a total RWF 31
million has been recovered. The SPIU should increase its efforts in recovery of these funds.
17. Financial capacity building. Through RCA, the project supports some Sector SACCOs
by building their capacity to provide financial services to RSMEs. A needs assessment was
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
67
conducted and identified the need for capacity building of SACCOs staff on day-to-day
management of SACCOs. Thus far, three manuals and seven modules have been developed and
management training is ongoing including savings mobilization and management, audit and
finance management.
18. The mission noted that the modules are only available in English and it is important that
they are translated to Kinyarwanda. It was agreed that a capacity building work plan for
SACCOs be developed immediately by RCA to guide its support to priority areas.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
68
APPENDIX 7: GENDER INCLUSIVENESS
Gender Mainstreaming in Design and Implementation
1. The project extension design report views gender from a rights-based perspective and
requires “meaningful participation of women” in the interventions. Although no set guidelines or
requirements on how this would be achieved, the mission observed efforts towards inclusion of
women in project activities. This was mainly through “women-only” projects such as tailoring and
basket weaving programmes. However, these women-only enterprises were found to be less lucrative
than men‟s enterprises. It is therefore important to encourage women to venture in traditionally men-
only enterprises for better returns. In the Masaka Business Incubation Centre, for example, it was
observed that in the leather component, there were 15 female trainees out of 50 and only 2 female
trainees out of 20 trainees have completed the three set modules. It was further reported that even the
2 are not currently active in the trade. The project should make deliberate efforts to encourage and
support women to take advantage of the opportunities it avails.
2. In terms gender equality in decision making, the mission noted that women are relatively
well represented in the decision making positions of the cooperatives. The need for continued
enhancement of managerial skills as well as self-confidence for women leaders was however
observed. In one of the cassava demonstration units visited (CATM cooperative), the membership is
made up of 91 members of whom 49 are men and 42 women. The president of the cooperatives was a
woman and she attributed her election to training she had previously received through the project.
Consistent mentoring of the cooperatives will help identify those that need further capacity building
especially in managerial skills.
3. The SPIU needs to institute a mechanism to address issues of gender equality and women‟s
empowerment and assign the responsibility of tracking and overseeing gender to a staff. The
requirement to address gender in all public activities in Rwanda has been endorsed in many
government policy documents (the National Gender Policy - 2010; the Economic Development and
Poverty Reduction Strategy 2008-2012). Promotion of gender equality and equity as a prerequisite
for sustainable development is a fundamental principle within the Constitution of the Republic of
Rwanda, 2003; to which the Government of Rwanda attaches great importance. The Rwanda Vision
2020 regards gender as an important cross-cutting issue. This gender-friendly policy environment has
facilitated gains towards gender equality in different areas (especially the parliamentary
representation). However, there are still gender disparities especially among the rural poor which
must be addressed. In this respect, it is important for SPIU to view gender as a human rights issue but
also (and more relevant to MINCOM) as a developmental issue. Poverty affects men and women
differently, mainly due to existing inequalities in terms of development opportunities, as well as in
the management and control over economic resources. The overall responsibility for gender
mainstreaming at SPIU should be recognized as an institutional responsibility and all staff and senior
management should be accountable for performance in this area. However, it was agreed that the
SPIU appoint a gender focal point who will act as a „champion‟ on gender mainstreaming and be a
catalyst for gender issues in at SPIU. The gender focal person should have a strong commitment to
the goal of gender equality; support development of gender sensitive indicators to allow monitoring
and evaluation as well as promote and support the collection of gender-disaggregated data.
Gender Sensitivity in M & E Systems
4. It is important to monitor project impact on gender relations in order to detect gender
disparities in the distribution of benefits and adjust the course of action accordingly. Currently,
reporting on gender in PPPMER and the SPIU is not an institutional requirement and therefore
depends on individual initiative. The sex disaggregated statistics, which was observed in some
PPPMER reports, need to be backed by qualitative analysis on the reasons behind the numbers and
statistics. This will enhance learning on gender equality, an opportunity which has often been missed
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
69
in the project. The Rwanda Cooperative Agency (RCA) for example, hired a firm which among other
things undertook a training needs assessment to inform the design and implementation of training
programmes for cooperatives. However, there was no effort to assess the gender differentiated
training needs between women, men and the different age categories. Making gender reporting a
routine institutional requirement will ensure that such opportunities are not missed. The M&E
system should have qualitative tools that help analyze the gender differences observed in the
quantitative data. The use of gender sensitive indicators would ensure gender responsiveness in
M&E system as measurement tool for analysis, learning and institutional response on gender. All in
all, gender impact and empowerment should be integrated into monitoring and evaluation.
5. The manner in which gender-related information is presented in monitoring and evaluation
reports needs to be consistent, in order for the SPIU to be able to make comparisons across projects.
Gender-sensitive monitoring and evaluation reveals the extent to which a project has achieved
improvements in the lives and overall social and economic well-being of women and men. It also
improves project performance during implementation, allows for mid-term corrections, and makes it
possible to derive lessons for future projects.
6. The efforts observed in component III (rural finance) to introduce a new reporting format,
which is disaggregated by gender, are commendable. However, even this needs the backing of
qualitative information. It will be important to track social outreach and outcome in this component.
For example, it should compare the total number of active male versus female borrowers (gender
ratio of loan size) or the total number of voluntary savers (gender ratio of savings size). The SPIU
should then use qualitative analysis to understand any differences observed. To mainstream gender in
an inclusive financial sector, it is important to go beyond access alone and consider how access can
enable women and men to challenge and change gender inequality as well as household and
community poverty.
Gender Issues in the Apprenticeship Programme
7. The total number of women supported in apprenticeship is higher than men‟s. However, men
and women are concentrated in different trades according to the „traditional lines‟. For example,
tailoring is almost exclusively dominated by women while carpentry is dominated by men. The
mission noted that women generally dominate trades which are less lucrative than men’s and
recommends that the sensitization campaigns should include messages that encourage women to join
the traditional male trades (such as leather). While the project‟s efforts in supporting women
specific programmes is commendable, the implementation strategies can be improved as the
interventions sometimes leave the women in a worse off position.
8. A case in point is the Rukundani women‟s tailoring group where the young women got
insufficient training in tailoring from the PPPMER apprenticeship training, and are therefore neither
in a position to make a complete garment nor to market their products. Having taken a loan of RWF
100 000 each, they had to repay the loan through other sources as the tailoring business was not
making any income. Further training on tailoring as a business (designing and making of different
garments as well as marketing) will be necessary to make this particular initiative economically
profitable. In general, planned linkage of the apprenticeship component with WDA will ensure a
higher standard in the quality of training provided.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
70
APPENDIX 8: MONITORING AND EVALUATION
1. Rural Small and Microenterprise (RSME) database. PPPMER operates a database with
information on the RSMEs that the project currently supports in all districts of the country. The
database contains information on individuals, associations and cooperatives grouped by name,
location, economic activity, equity, working capital; to name a few. The database however has
limited use as it is currently used as a reporting tool and not for advisory or guiding management
decisions. There has been no progress made in updating the database since December 2010.
Table 1: Coverage of PPPMER database on RSMEs per province, December 2010
Item Western
Province
Eastern
Province
Southern
Province
Northern
Province Total
Individual RSMEs 755 1 286 704 1 216 3 961
Cooperatives and associations 152 301 171 700 1 324
Total RSMEs 907 1 587 875 1 916 5 285
Individual RSMEs 755 1 286 704 1 216 3 961
Cooperative/ association members 3 839 6 433 4 180 9 035 23 487
Total persons 4 594 7 719 4 884 10 251 27 448
2. RSME service database. To satisfy its information needs on business development
services, it was agreed that the SPIU will establish a more comprehensive database on RSME service
provision countrywide, fed with gender disaggregated information from the vouchers of the PROBA
Scheme, to be provided monthly by the districts. Through the PROBA scheme, the vouchers will also
be used as a data collection tool and gather information such as the kind of business services
received, turnover, net profit, marketing used, and innovations introduced by the RSME. This will
allow tracking of progress made by the RSMEs and such information is important for effective
interventions targeted for RSME development. For example, the RSME service database will provide
information on what kind of training is most sought after by the clients, which will be important for
the planning of the kind of further training to be provided to the PROBAs.
3. The information would be gathered by the PROBA advisors and entered into a district
RSME service database which will be connected to the central database managed at the SPIU level.
At the ministry level, data is consolidated from each district and is used for analysis, reporting and
also for providing feedback to the districts. For example, it would be useful for the districts and the
RSME Facilitators to know how their district is faring in the national comparison. It is important that
this system, including the data to be collected on the vouchers and the districts‟ role, include the key
data to be collected by the PCU, and that it be agreed before the PROBA Scheme begins.
4. In Attachment 1 of Appendix 3 (Rural SME Development) is a draft of the PROBA Scheme
vouchers, including the kind of information that could be gathered on them.
5. The RSME service database will not be able to provide data on progress per RSME, as it
would be too difficult to identify the client businesses separately in the data collection. Impact data is
thus not available per business. Nonetheless, a shift in the group of clients served, even per district
and gender disaggregated, will be possible to deduce by analysis of the data.
6. The SPIU is still in its initial stages of setting up an M&E system. Its M&E Specialist is
currently building on existing M&E frameworks of the different projects to create a single M&E
system with planning and reporting templates for all projects. The responsibilities of the M&E
specialist include regular review on performance, design of data collection methodologies for SPIU
interventions, develop an MIS and carry out regular analysis of data. The M&E specialist will also
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
71
provide technical guidance and quality supervision of data collection and data analysis activities and
will spearhead the development of the RSME database through the PROBA scheme.
7. The mission observed that reporting on gender is often haphazard, depending on individual
initiative rather than an institutional requirement. Where there is gender reporting, it normally stops
at sex disaggregated statistics which are not backed by an analysis of the reasons behind the numbers.
As such, opportunities for learning on gender equality are often missed. It was agreed that reporting
on gender will become a routine requirement. Qualitative analysis should be used to explain gender
differences observed in the quantitative data.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
72
APPENDIX 9: PROJECT MANAGEMENT
1. Project management. The mission notes with satisfaction that the establishment of the
Single Project Implementation Unit (SPIU) is well advanced, with only the establishment of the
SPIU accounts, hand-over of the respective PMUs, their audits, the consolidation of procedures
and the induction training of staff to be completed soon. As a harmonisation of the administrative
and finance procedures manual is foreseen with the establishment of the SPIU, it was agreed with
the mission that the harmonised procedures manual be submitted to IFAD for non-objection in
order to comply with section 6.01(c) of the loan agreement. The harmonised procedures manual
will build on the new Project Implementation Manual (PIM) that has been developed for IFAD
projects within the SPIU in MINAGRI.
2. With the advent of the SPIU, the mission is concerned that all projects accounts might be
merged into a single one that was not agreed upon in the loan agreement. It was agreed that the
SPIU maintain the PPPMER special and operations accounts (to be called sub-accounts), while a
combined counterpart fund account will be established for all SPIU projects.
3. The mission notes with satisfaction that, with PPPMER II operating without a permanent
coordinator since February 2011, the newly established MSME program will also coordinate
PPPMER II under its portfolio of projects. It was agreed with the mission that the change of
signatories to the project accounts be submitted to IFAD for non-objection.
4. Financial management capacity. At the time of the mission, the financial management
function of the project is executed by the former PPPMER II finance unit comprising a Director
of Finance and one accountant. However, effective 01 November 2011, this team will hand-over
the overall finance function of PPPMER II in the SPIU Finance Management Services made up
of a finance management specialist, a chief accountant and one accountant. The recruitment of
two additional accountants is also underway. It was agreed that the new finance unit within the
SPIU fully utilize the experience of the former finance unit for training and familiarization with
IFAD loan administration procedures.
5. The PCU has been using TOMPRO as its accounting software since PPPMER I. It has
been recommended between the SPIU consultants and MINECOFIN that this accounting
software is to be used by all other projects currently using other software or an excel-based
system. The mission concurs with this, and current experience in IFAD-funded projects have
shown that the use of TOMPRO responds perfectly to the minimum best practice disclosure of
expenditure per component, per category of funds, in cash flow/sources and uses of funds and in
detailed accounts per cost centre compared with the AWPB.
6. Planning. The 2011/12 AWPB received IFAD‟s no-objection on 16 August 2011. With
the advent of the SPIU, the mission was informed that all project AWPBs will be consolidated
into a single AWPB, for the format of which improvements were suggested by the mission.
More specifically, for better clarity and execution, the mission suggests that the single AWPB
for the SPIU be segregated by project and not by outcome as it is the case currently. Moreover,
there is a need to improve its format by adding columns on financing percentage by each
participating financier. In addition, the mission noted that a number of MOUs with partner
institutions and service providers are still pending for signature. These need to be finalized soon,
after integrating the mission‟s recommendations. It was agreed that the SPIU submit the revised
and consolidated 2011/12 AWPB to IFAD for no-objection to the activities pertaining to
PPPMER only, and subsequently the modified MOUs.
7. Monitoring and Evaluation. The SPIU is still in its initial stages of setting up an M&E
system. Its M&E Specialist is currently building on existing M&E frameworks of the different
projects to create a single M&E system with planning and reporting templates for all projects.
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
73
While there has been no progress in updating the RSME database and filling its data gaps, its use
remained limited. To satisfy its information needs on business development services, the SPIU
will establish a more comprehensive database on RSME service provision countrywide, fed with
gender disaggregated information from the vouchers of the PROBA Scheme, to be provided
monthly by the districts. It is important that this system, including the data to be collected on the
vouchers and the districts‟ role, include the key data collected by the PCU and that it be agreed
before the PROBA Scheme begins.
8. Reporting on gender was observed to be haphazard, depending on individual initiative
rather than an institutional requirement. Where there is gender reporting, it normally stops at sex
disaggregated statistics which are not backed by an analysis of the reasons behind the numbers.
As such, opportunities for learning on gender equality are often missed. It was agreed that
reporting on gender will become a routine requirement. Qualitative analysis should be used to
explain gender differences observed in the quantitative data.
9. Reporting. The PCU periodically reports on its activities through progress reports. The
mission reiterates the previous recommendation that these reports be improved qualitatively by
highlighting key issues and lessons learned, and proposing solutions for the future.
10. Procurement. The mission reviewed the implementation status of the 2010/11
procurement plan and noted some considerable delays in procurement activities. Specifically,
severe procurement delays are noted in the acquisition of equipment for the demonstration units
in fruits processing and beekeeping. More importantly, the mission noted that the performance
guarantee accompanying the latter procurement activities expired on 21 October 2011 and 16
June 2011 respectively. It was agreed that, for delayed procurement, the PCU regularly monitor
such critical contractual elements and ensure that liquidated damages are enforced in case of
late delivery.
11. In response to an audit enquiry, IFAD confirms that all assets procured with project
funds are owned by the government, and that it would be reasonable for the implementing
ministry to continue managing them after project completion.
12. Contract management. The contract register is not updated regularly with some MOUs
included during the period of the mission and columns related to the non-objection and the
Contract Monitoring Forms (CMFs) are not filled in regularly. More importantly, the mission is
concerned with the contract management function as the PCU could not provide the contract
collection in time, thus not allowing the mission to ascertain its completeness. In addition, the
mission noted that the PCU keeps a different format for CMF that does not provide a good
tracking of invoices and performance guarantees. It was agreed that, in order to improve its
contract management function, the project start using the new CMF format and regularly keep
an updated electronic archive of all its contracts and MOUs.
13. Financial progress and status of disbursement. As of 30 September 2011, the project
has disbursed 77% or RWF 8 901 million of the total loan amounting to RWF 11 497 million.
Against the 2011/12 AWPB amounting to RWF 1 968 million, the project disbursements stand at
12.2%. The rate of disbursement stands at 6.5% for component 1 (Capacity building), 13.1% for
component 2 (Support to the SME), 4.7% for component 3 (Support to the MFIs), and 37.7% for
component 4 (Project Management). The preceding AWPB (2010/11) was executed at 75% with
low execution rates noted in Component 1 (18.8%) and Component 3 (52.2%).
14. Status of Liquidity. Based on IFAD records, as at 20 October 2011, the actual total IFAD
loan disbursement up to WA 83 amounted to SDR 9.40 million or USD 15.12 million, representing
88% of the total IFAD loan of SDR 10.65 million. This disbursement includes the special account
allocation of SDR 675 801 equivalent to USD 1 million, and has been reconciled to the IFAD
statement. However, WA 84 amounting to SDR 140.153 is pending in IFAD for settlement and
RWANDA: Rural Small and Micro Enterprise Promotion Project (PPPMER-II)
Follow-up Report
74
WA 85 of SDR 203 760 is yet to be submitted. If these WAs are factored in, the effective loan
disbursement would be SDR 9.74 million or 91 % of the loan. Consequently, the projected effective
Loan Account balance is SDR 912 087 equivalent to approximately USD 1.47 million, at the current
USD/SDR exchange rate. However the funds available to the project as at 30 September 2011 are
about USD 1.92 million, including the balance of the project accounts of USD 447 383.
Table 1: PPPMER loan balance and status of liquidity, 30 September 2011
15. Recovery of the Initial Deposit. The mission noted that the threshold for the recovery of the
initial deposit has been reached as the available balance of SDR 912 087 is less than twice the initial
deposit of SDR 675 801. As the available balance of funds has reached the threshold, it was agreed
that, for future WAs, recovery of the special account starts at 50% to allow for a timely recovery of
the initial deposit.
16. Withdrawal application. The mission carried out a random review of expenditure items
from the SOEs supporting withdrawal applications submitted for replenishment of the special
account (see Attachment 1). The review covered WA 80, 82, 83 and 84 submitted to IFAD during the
year 2011. The sample selected was made up of 10 items with a total value of RWF 68 million or
USD 114 208. The expenditures items selected were tested for eligibility including validation with
supporting documents maintained by the PMU. Overall the mission found that all expenditures items
were eligible for replenishment claims to IFAD and were fully documented with supporting
documents.
17. Counterpart funds. With regard to the 2010/11 AWPB, counterpart funds have been
extremely satisfactory as receipts for 2010/11 stood at RWF 270 million or 90% of its planned
budget. However, cumulatively, as of 30 September 2011, government contribution only stands at
RWF 686 million or 51.7% of its planned budget. The mission was informed that the government
allocation for the fiscal year 2011/12 has been set to only RWF 90 million, with RWF 45 million that
are being processed for payment and the other half to be disbursed towards the third quarter. It was
agreed that, considering a potential budget revision in December 2011, MINICOM advocates for an
increase in government’s budget allocation to PPPMER II in order to allow for a timely execution of
the 2011/12 AWPB and to deliver against government’s commitment in the Loan Agreement.
18. Audit. The mission is pleased to note that the 2010/11 audit mission was undertaken in
October 2011 as planned and that PCU has executed the 2009/10 audit recommendations at a rate of
88% as confirmed by the OAG‟s audit query dated 20 September 2011. However it is noted that the
PCU has not implemented recommendations related to compliance to the cut-off principle of
accounting, the management of the BPR credit line and the reconciliation its reports. It was agreed
that the PCU urgently implement the pending 2009/10 audit recommendations, especially the
supervision of the BPR credit line and the reconciliation of its reports.
19. Loan covenants. The Mission reviewed the compliance of the Loan covenants and confirms
that no contravention was noted (see Annex 5).
Category
Number
Category description Financing %Original
Allocation
Disbursement
up to WA 83
WA 84 pending
payment by IFAD
WA 85 to
be
submitted
Balance Disbursement
%
SDR '000 SDR '000 SDR '000 SDR '000 SDR '000
I Civil works 400 341 7 10 42 90%
II Credit 1,230 966 3 6 255 79%
III Equipment and vehicles 900 491 16 23 370 59%
IV Technical assistance 1,830 1,677 38 82 33 98%
V Training & studies 3,005 2,468 30 29 477 84%
VI Operating costs 835 821 5 21 (12) 101%
VII Service providers 1,100 988 7 3 101 91%
VIII Administrative staff salaries 1,130 966 34 28 102 91%
IX Unallocated 220 0 - - 220 0%
Initial Deposit 676 0 0 (676)
Total 10,650 9,394 140 204 912 91%
1,468
447
1,915
In USD '000
+ Balance of accounts as at 30/09/2011
Available balance in USD '000
75
Attachment 1
Review of the Statement of Expenditures (SOE)
RW
AN
DA
: Ru
ral Sm
all and
Micro
En
terprise P
rom
otio
n P
roject (P
PP
ME
R-II)
Follo
w-u
p R
eport