Russia Equipment for the Electricity Sector Compiled by: Swiss Business Hub Russia Moscow, September 2008 1. Summary of the Content Russia’s energy sector is in an urgent need of modernization and extension of generation capacity. If Russia does not manage to increase the electricity output in the nearest future, the lack of electricity will slow down the industrial growth. Therefore, the Russian Ministry of Industry and Energy has initiated a program, which plans to increase the generation of gas-fired power by 43%, coal-fired by 244%, hydro power by 53% and nuclear power by 154% by 2020. According to estimates of RAO EES made in 2007, its successor organizations 1 will need to put into force 100 gas turbines, 67 steam turbines and 125 waste heat recovery boilers for gas power stations and 70 steam turbines for coal power stations by 2011. Due to the numerous construction projects of power electricity generating companies, there is a growing demand for equipment in the electricity sector, which can not be met by Russian producers alone. The prices for such equipment have already risen and this has opened the market for foreign manufacturers, whose production is often more expensive than the Russian one. This report was written based on a desk research and interviews dating from the end of 2007/beginning of 2008 when the financial crisis has not yet reached Russia. In the meantime the Russian financial sector has survived hard times and it is quite obvious that the real economy will be affected too. However, only 2009 will show how severe the consequences will be for the ambitious reform and investment plans in the Russian electricity sector. 1 OGK, TGK, IDGS, FSK and SO (see next chapters for details) 1

Upload: amit-joshi

Post on 02-Apr-2015

117 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Russia-Electricity-Equipment-new

Russia Equipment for the Electricity Sector Compiled by: Swiss Business Hub Russia Moscow, September 2008 1. Summary of the Content Russia’s energy sector is in an urgent need of modernization and extension of generation capacity. If Russia does not manage to increase the electricity output in the nearest future, the lack of electricity will slow down the industrial growth. Therefore, the Russian Ministry of Industry and Energy has initiated a program, which plans to increase the generation of gas-fired power by 43%, coal-fired by 244%, hydro power by 53% and nuclear power by 154% by 2020. According to estimates of RAO EES made in 2007, its successor organizations 1 will need to put into force 100 gas turbines, 67 steam turbines and 125 waste heat recovery boilers for gas power stations and 70 steam turbines for coal power stations by 2011. Due to the numerous construction projects of power electricity generating companies, there is a growing demand for equipment in the electricity sector, which can not be met by Russian producers alone. The prices for such equipment have already risen and this has opened the market for foreign manufacturers, whose production is often more expensive than the Russian one. This report was written based on a desk research and interviews dating from the end of 2007/beginning of 2008 when the financial crisis has not yet reached Russia. In the meantime the Russian financial sector has survived hard times and it is quite obvious that the real economy will be affected too. However, only 2009 will show how severe the consequences will be for the ambitious reform and investment plans in the Russian electricity sector.

1 OGK, TGK, IDGS, FSK and SO (see next chapters for details)

1

Page 2: Russia-Electricity-Equipment-new

2. General Industry Development and Policy Russia is the world’s fourth largest generator of electricity with an installed generating capacity of 210 GW. In 2006, the electricity sector accounted for about 5% of Russia’s GDP. The gas-fired thermal power plants generate 43.8% of the electricity production in Russia, coal-fired thermal power plants 22.9%, hydro- and hydro-nuclear power plants 17.8%, nuclear plants 15.5%2. The Russian electricity network is connected by over 2.5 million kilometers of national and regional transmission lines and local distribution lines, including over 145,000 km of high-voltage lines (voltage between 220 and 1150 kW). For the time being Russia’s electricity consumption is growing at a 4.2 percent rate3 reaching about 97 percent of the total capacity. Unfortunately, the rate of installation of new electricity plants is a lot slower than that of the growing demand, and, due to the limited generation capacity, electricity supplies to various regions of Russia, including Moscow and St. Petersburg, are occasionally restricted. The Russian authorities have therefore decided to boost the investments in the electricity sector by a reform program, which was based on the twin principles of the dissolution of the monopoly and the privatization of the assets held directly or through regional companies by the state-run RAO UES. Once the reform was complete, the generation, dispatching management, as well as the transportation and distribution of electricity is organizationally divided and managed by different companies. The generation is carried out by 14 territorial power and heating companies (TGK) and 7 wholesale power-generating companies (OGK), within which the state retains only a small interest. The antimonopoly service restricts the rights of the private owners in order to guarantee that they will not dominate the market. Therefore, a single private owner is not allowed to control more than 20 percent of the generating capacity in one of the defined zones. The infrastructure of the electricity network is shared between 5 interregional distributors (IDGS) and the manager of the unified transport network (FSK), the latter responsible for the maintenance of the transmission lines. Finally, dispatching management is conferred to a systems operator (SO). In July 2008, when RAO UES (which in 2006 accounted for 72% of the installed capacity and 69% of the power production) was liquidated, all except one of the power stations and energy supply companies were privately owned. RAO UES obliged them to fulfill huge investment projects during the upcoming years. Presumably the gradual liberalization of the Russian electricity market, due to be completed in 2011, will allow the producers to charge commercial prices. The state will retain control of the sector through the federal agency “Rosenergo”.4

2 Journal Profile 30.04.2007 3 According to RAO EES Rossii 4 Russia Intelligence. Nr. 65, November 8, 2007

2

Page 3: Russia-Electricity-Equipment-new

Forecast of the shares of the energy holdings for the end of 2008

Energy-holdings

25%

7%

5%

24%

14%

25%

Gazprom + Suek (TGK-1, TGK-3, TGK-12, TGK-13, OGK-2, OGK-6)

KES-Holding (TGK-5, TGK-6, TGK-7, TGK-9)

Norilsky Nikel (OGK-3, TGK 14)

State share (HydroOGK, Rosenergoatom)

Independant energy producers(Tatenergo, Bashkirenergo, Novosibirskenergo, Irkutskenergo, etc.)Foreign companies (TGK-2, TGK-4,TGK-8, TGK-10, TGK-11, OGK-1, OGK-4, OGK-5)

Source: Brokercreditservice Gazprom has become the biggest player in the energy generating sector after the state. Foreign companies investing in the energy sector in Russia include E.ON, Enel, RWE and Fortum. Despite privatization in the sector, the existing conditions of constrained electricity tariffs, escalating fuel costs and government support for nuclear and hydro generation are not fully compatible with commercially driven investments. Furthermore, the entering in the market of domestic gas and coal suppliers with the intention of creating fuel-power vertical integrated holdings rose concerns that these companies could abuse their strong market position. At the present time, the plans of Gazprom and Suek to build a huge energy company that will control about 15% of the generating capacity seem to be put into practice. The future will show to which extent the expectations of the authorities, the investors, the private and corporate consumers can be met. But for the time being the sector can at least profit from the huge investments to modernize and expand the production capacity. Given the rapid development of the Russian economy, the demand for electricity will continue to grow and the need for development in this field is therefore urgent. According to expert estimates, in 2010 a 230 GW capacity will be needed and in 2030 it will grow to more than 300 GW.

3

Page 4: Russia-Electricity-Equipment-new

Source: Russian electricity sector: Reform overview and modeling issues. Evgeny Pogrebnyak. http://www.icss.ac.ru/userfiles/File/MMCEM%202007.pdf The Russian Ministry of Industry and Energy plans to increase the generation of gas-fired power by 43%, coal-fired power by 244%, hydro power by 53% and nuclear power by 154% by 2020. The investment projects intend to modernize the out-dated equipment in use, construct new generating capacities and implement energy saving programs. Due to the seriousness of the problem, efforts must be made in all three areas. According to the estimates of energy experts, the Russian electricity sector should benefit from about 263 billion USD until 2030 to grant the sustainable development of the net. Today the energy sector faces serious problems. Most of the power stations were built back in 1960-1970 and have a very low efficiency ratio of 33-35% in comparison with 40-42% in modern power stations. The equipment and materials that are worn down in the production system account for about 55%. In the distribution system it approaches 75% in rural regions. The modernization of the existing plants is the least expensive way to raise the capacity of the energy sector. Depending on the situation, the equipment can either be repaired and updated or completely renewed.

4

Page 5: Russia-Electricity-Equipment-new

The Ministry of Industry and Energy has already published a scheme of investments to be made until 2020:

Enterprise Activity Investments (bil. RUR) TGK and OGK Energy Generating Holdings 3930Rosenergoatom Nuclear Energy Holding 1860HydroOGK Hydro Energy Holding 1410MRSK Distributors 2384FSK Transport Network 2609 The FSK, for instance, plans to build 63 and modernize 37 substations by 2010, which account for about one fifth of the existing capacity. Furthermore, it plans to construct 11,000 km of power transmission lines (some 19,000 km more should be erected by the MRSK as well as 19,000 km of MegaVoltAmpere transformer capacity). Initial steps for the period leading up to 2011 are planned in the OGKs in the form of the following investments: Company Investments till end 2010 (bil, RUR) Capacity installation (MW) OGK-1 66.8 2260OGK-2 75 1060OGK-3 76.1 1700OGK-4 79.8 2350OGK-5 57.3 2060OGK-6 49.1 1820

Source: Investment company “Finam” Experts underline the important role that new technologies such as circulation fluidized bed plants and gas-fired combined-cycle gas turbines can play to boost the effectiveness of the Russian energy sector. As to energy saving, this is perhaps the most urgent issue. In Russia the loss of energy accounts for 40% of the whole consumption - a fact that is to a great extend caused by very low energy prices, which make energy saving efforts unprofitable. However, the rise of energy prices, as well as the introduction of more severe energy saving regulations is politically very unpopular. While the Russian authorities are still hesitating to take sharp measures, the mechanisms of the Kyoto Protocol allow Russian companies to find foreign investors and to make their energy saving projects commercially profitable. Joint implementation of innovative technologies is becoming increasingly more popular in Russia. The Ministry of Industry and Energy of the Russian Federation estimates the investments needed for energy saving projects up until 2010 to be worth 50-70 billion USD. This may seem to be a large amount, but it is clear that the construction of equal complimentary power generating capacity would be much more expensive. Due to the wide construction projects of the energy plants, there is a growing demand for equipment in the electricity sector, which can not be met by Russian producers alone. The prices for such equipment have already risen and this has opened the market for foreign producers, whose production is often more expensive than the Russian one. 3. Domestic Production During the Soviet times, the USSR had plants to produce all the necessary equipment for the energy generating sector. However, during the last years of the Soviet Union and after the Perestroika years, the plants have rarely been modernized. Therefore, their production is often not up to date and as a rule of low quality. After the Perestroika years many factories

5

Page 6: Russia-Electricity-Equipment-new

operated using outdated machines with low capacity and sold the bulk of their production to developing markets. In addition to these plants, manufacturers of other sectors producing aircraft, train and high-tech military equipment have started to produce for the energy sector. Usually these companies have good technical knowledge and are surprisingly innovative. However, their weak point may be that they sometimes do not pay the necessary attention to the machine building for the civil sector, since it is not their core business. Having started at a very low level, the energy equipment production has been showing a notable growth during the last years in Russia. As the energy sector has huge investment plans, this growth is likely to increase even more in the future. Nevertheless experts confirm that the Russian technology for heavy duty gas turbines, ultra supercritical steam turbines, gasification and burning of solid fuel as well as process control systems are far behind western standards. The main problems of the sector are limited funding for research, outdated production facilities and the lack of qualified personnel. In addition, the plants in the energy equipment sector have to struggle with the lack of quality components produced in Russia. For instance, the hardware components for microprocessors and semiconductors as well as industrial rubber goods have to be purchased on the international market.5 The position of Russian producers is more competitive with respect to the equipment for the 200-1200 megawatt power stations working with different kinds of fuel. In recent years, the Russian authorities have tried to gain influence in the sector by buying (directly or through state owned enterprises) the shares of several companies. In the nuclear sector the companies were consolidated under the roof of OAO Atomenergomash. These measures have allowed the authorities to control the enterprises in order to attempt to optimize their production for the need of the electricity generation companies. A positive example is the national centre for gas transport and gas turbine machine building, initiated and supported by Gazprom. As a result, competitive small and medium gas turbine power stations were developed and General Electrics lost its dominating position in this field. Along with the energy reform and the growing demand of the power generation companies, the equipment producers are trying to modernize their production. Some are attempting to do this with the help of the big Russian industrial holdings, some in cooperation with well known foreign machinery building companies (Pratt & Whithney / Iskra, Alstom / Atomenergomash, Siemens / Power Machines and Technopromexport). For the time being, both ways seem to be equally successful, due to the huge demand for power generation equipment. Most of the Russian companies working in the electricity generation equipment sector are part of one of the big holdings. Power Machines with a market share of over fifty percent is the indisputable leader that unites production, supply, construction, maintenance and modernization of equipment for thermal, nuclear, hydraulic and gas-turbine power plants.6 Many products are manufactured under a license agreement with the German company “Siemens”. The company profiles of fourteen important Russian players in the energy equipment sector are listed below:

5 Expert-Ural 20.05.2006 6 Expert-Ural 20.05.2006

6

Page 7: Russia-Electricity-Equipment-new

Power Machines

Description Address 25a, Protopopovsky pereulok, Moscow 129090, Russia

Contacts e-mail: [email protected]

web-site: http://english.power-m.ru/

phone num.: +7 (495) 725-27-63

fax: + 7 (495) 725-27-42

Head Igor Kostin

Export characteristic

HS CODE 84 - NUCLEAR REACTORS, BOILERS, MACHINERY AND MECHANICAL APPLIANCES; PARTS THEREOF

Field Hardware and Machinery Production equipment for thermal, nuclear, hydraulic and gas-turbine power plants Subsidiaries and related companies Leningradskiy Metallicheskiy Zavod, Zavod Elektrosila, Zavod Turbinnykh

Lopatok, Kaluzhskiy Turbinniy Zavod, Zavod Reostat, CKTI im. Polzunova

OMZ (Uralmash-Izhora Group)

Description Address Russia, Moscow, 119021, Timura Frunze str. 24

Contacts e-mail: [email protected]

web-site: http://www.omz.ru/eng/overview/profile/

phone num.: +7 (495) 662 10 40

fax: + 7 (495) 662 10 41

Head Valery Chernyshev

Export characteristic

HS CODE 84 - NUCLEAR REACTORS, BOILERS, MACHINERY AND MECHANICAL APPLIANCES; PARTS THEREOF

Field Hardware and Machinery Production Atomic equipment, Mining equipment, Special steel, Hoisting-and-handling

equipment, Machinery Manufacturing Services Subsidiaries and related companies OAO Izhorskiye Zavody, OAO Ural Heavy Machine-Building Plant, OMZ

SpecStal, ООО OMZ Gornoe oborudovanie i tehnologii, ZAO Komplekt Atom Izhora, OOO OMZ Sibir, OOO OMZ Russia, Skoda JS, Skoda Hute, Skoda Kovarny, OOO OMZ-Kran, OOO Kartex

7

Page 8: Russia-Electricity-Equipment-new

PJSC EnergoMashinostroitelny Alliance

Description Address 18, Suschevsky Val, Moscow, 127018, Russia

Contacts e-mail: [email protected]

web-site: http://www.em-alliance.com/en/holding/company/

phone num.: +7 (495) 787 31 48

fax: + 7 (495) 787 31 43

Head Oleg Golikov

Export characteristic

HS CODE 84 - NUCLEAR REACTORS, BOILERS, MACHINERY AND MECHANICAL APPLIANCES; PARTS THEREOF

Field Hardware and Machinery Production Coal and gas&oil boilers of steam capacity 50 to 3950 ton per hour with steam

conditions achieving ultrasupercritical values; heat recovery steam generators of steam capacity up to 1000 ton per hour for combined cycle power plants; circulating fluidized bed boilers; boiler island on turn-key basis

Subsidiaries and related companies Boiler-manufacturing plant Krasny Kotelshick, Taganrog Branch of the PJSC EMAlliance, Office of the PJSC EMAlliance in Podolsk, Office of the PJSC EMAlliance in Barnaul, Office of the PJSC EMAlliance in Ivanovo JSC ZIO-Podolsk, JSC EC ZIOMAR

8

Page 9: Russia-Electricity-Equipment-new

„EM-Alliance“

Description Address 4, Building 5, Butikovskiy Lane, Moscow, 119034

Contacts e-mail: [email protected]

web-site: http://www.energomash.ru/english/about.html

phone num: +7(495) 792-39-34

fax: + 7(495) 792-39-49 General Director First Deputy for Sales and Marketing

Pleschev Alexey Gennadievich

Export characteristic

HS CODE 84 - NUCLEAR REACTORS, BOILERS, MACHINERY AND MECHANICAL APPLIANCES; PARTS THEREOF

Field Hardware and Machinery Production electric machines and turbogenerators; transformer equipment; conversion

machinery; high-voltage gears; water turbines and pumps; mechanoerecting production; pipelines; boilers; core-mold casting and forged pieces; hot-pressed production of forming parts; expansion bellows; metalwares plant; mechanoerecting production; recuperative air heaters and gas turbine equipment; combustion chambers; heat-exchange case-shaped and capacitive equipment

Iskra-Energetika Company

Description Address 614038 Perm, Russia, Vedeneev Str., 28

Contacts e-mail: [email protected]

web-site: http://iskra-energy.ru/eng/

phone num.: +7 342 262 60 00

fax: +7 342 262 62 62

Head Anatoly Vasiliev

Export characteristic

HS CODE 84 - NUCLEAR REACTORS, BOILERS, MACHINERY AND MECHANICAL APPLIANCES; PARTS THEREOF

Field Hardware and Machinery Production 2.5-25 MW gas turbine power stations Holding Company Pratt&Whitney

9

Page 10: Russia-Electricity-Equipment-new

JSC «Saturn»

Description State registration number 7610052644 Address CIS, Russian Federation, Central federal district, Yaroslavl region, Ryibinsk,

152903, Ryibinsk, Yaroslavl region, Lenina prospec, 163 Contacts e-mail: [email protected]

web-site: http://WWW.npo-saturn.ru

phone num.: +7 (4855) 296-100

fax: +7 (4855) 296-000 Head Yury V.Lastochkin

Export characteristic

HS CODE 84 - NUCLEAR REACTORS, BOILERS, MACHINERY AND MECHANICAL APPLIANCES; PARTS THEREOF

8803 - Parts of goods of heading 8801 or 8802

8411 - Turbo-jets, turbo-propellers and other gas turbines Field Hardware and Machinery Production Aeroengines, their spare parts, nuclear power station equipment, snowmobiles,

their spare parts, steel-aluminium sliding bearings for crankshafts of diesel engines

Subsidiaries and related companies Saturn, Gazovye Turbiny, Russkaya Mekhanika, OAO PAO Inkar, ZAP Power Jet, SP Volgaero, ZAO Poluevo-Invest, KK Aviator

10

Page 11: Russia-Electricity-Equipment-new

Perm Engine Company

Description Address 93 Komsomolski prospect, Perm, GSP, Russia, 614990

Contacts e-mail: [email protected]

web-site: http://www.pmz.ru/eng/

phone num.: +7 3422 408400

fax: +7 3422 409456 Head Sergei Y. Smolin

Export characteristic

HS CODE 84 - NUCLEAR REACTORS, BOILERS, MACHINERY AND MECHANICAL APPLIANCES; PARTS THEREOF

Field Hardware and Machinery Production Mass production of aero-engines for civil and military aviation and

manufacturing of industrial gas turbines for electric power stations and gas transportation.

Subsidiaries and related companies Perm Motors Group Management Company, OJSC “Aviadvigatel”, OJSC “Perm Engine Company”, OJSC “Reductor-PM”, CJSC “Motorservice-PM”, CJSC “Metallist-PM”, CJSC “Instrumental Plant-PM”, CJSC “REMOS-PM”, OJSC “Energetik-PM”, CJSC “Zheleznodorozhnik-PM”

11

Page 12: Russia-Electricity-Equipment-new

Electroshield

Description Address 443048, Samara, Pos. Krasnaya Glinka, korpus zavodoupravlenie OAO

Elektroshchit

Contacts e-mail: [email protected]

web-site: http://www.electroshield.ru/

phone num.: +7 (846) 276-28-08

fax: +7 (846) 276-29-99

Head Andrey Polovinkin

Export characteristic

HS CODE 85 Electrical Machinery And Equipment And Parts Thereof; Sound Recorders And Reproducers, Television Recorders And Reproducers, Parts And Accessories

Field Hardware and Machinery Production Electrical engineering products of 220-0.4 kV are produced since 1958.

Among them are: - complete transformer substations (CTS) for transforming and distributing of electrical power (CTS of block modernized type 220/110/35 kV) - metalclad switchgears 6(10) kV of various types: K-61M, K63, K59 for indoor and outdoor installation; load breakers, isolators, switchboards, switchyards, distribution panels, boards and units. - complete transformer substations CTS 10(6)/0.4 kV of industrial, urban, kiosk types, etc.

Subsidiaries and related companies OAO Samarskiy Zavod Elektroshchit, ZAO Gruppa Kompanij Elektroshchit, ZAO Samarskiy Zavod Elektroshchit – Stroyindustriya, OOO Russkiy Transformator, Filial Ulyanovskiy Zavod termoisolyacionnykh izdeliy, Filial Zavolzhskij, OAO Elektrozabsibmontazh, SP OAO Uzelektroapparat –Elektroshchit Samara, OOO Torgoviy Dom Elektroshchit Samara, Filial Nizhegorodskoy Elektrosetproekt

12

Page 13: Russia-Electricity-Equipment-new

Moscow plant electrical shield

Description Address 121596, Moscow, ul. Gorbunova, 12-2

Contacts e-mail: [email protected]

web-site: http://www.moselectro.ru/

phone num.: +7 (495) 447-14-14

fax: +7 495 447-25-85

Head Konstantin Sidenko

Export characteristic

HS CODE 85 Electrical Machinery And Equipment And Parts Thereof; Sound Recorders And Reproducers, Television Recorders And Reproducers, Parts And Accessories

Field Hardware and Machinery Production Power Plant Electr Devices: Electrical shields, Switchgear ical

JSC "Roselectroprom Holding"

Description Address 7, Electropultovtsev Str., Saint-Petersburg, 195030, Russia

Contacts e-mail: [email protected]

web-site: http://www.electropult.ru/eng/

phone num.: +7 (812) 527-61-63

fax: +7 (812) 527-38-90

Head Gennadiy I. Lokotkov

Export characteristic

HS CODE 85 Electrical Machinery And Equipment And Parts Thereof; Sound Recorders And Reproducers, Television Recorders And Reproducers, Parts And Accessories

Field Hardware and Machinery Production Generator Subsidiaries and related companies JSC "Electropult-ASU", JSC "Electropult-Energy", JSC "Electropult-

Engineering", JSC "EP-Audit, JSC "Electropult-Complect", JSC "Electropult-Metall", JSC "Electropult-Apparat"

13

Page 14: Russia-Electricity-Equipment-new

NPO Elsib

Description Address 56, Sibiryakov-Gvardeycov Str., Novosibirsk, 630088, Russia

Contacts e-mail: [email protected]

web-site: http://www.elsib.ru

phone num.: +7 (383) 298-91-10

Head Korney K. Gibert

Export characteristic

HS CODE 85 Electrical Machinery And Equipment And Parts Thereof; Sound Recorders And Reproducers, Television Recorders And Reproducers, Parts And Accessories

Field Hardware and Machinery Production Turbo-generators, ydrogenerators, motors, self-oscillating mixer h

OAO Elektrozavod

Description Address 21, Electrozavodskaya str., Moscow, 107023, Russia

Contacts E-Mail: [email protected]

web-site: www.elektrozavod.ru

phone num.: +7-495-777-82-50

fax: +7-495-777-82-50

Head Leonid V. Makarevich

Export characteristic HS CODE 85 Electrical Machinery And Equipment And Parts Thereof; Sound Recorders

And Reproducers, Television Recorders And Reproducers, Parts And Accessories

Field Hardware and Machinery Production High voltage power transformers for electrical lines 110-500 kV, Single- and

three-phase oil-immersed autotransformers for coupling of networks 500, 330, 220 and 110 kV, three-phase oil-immersed generator transformers 110, 220, 330 and 500 kV, three-phase two-winding oil-immersed 220 kV transformers, three-phase two-winding oil-immersed 110 kV transformers, three-phase three-winding oil-immersed 35 kV and 110 kV transformers, single-phase two-and three-winding oil-immersed transformers 220 kV, shunt reactors 10 – 1150 kV, single-phase oil-immersed shunt reactors of 500 up to 1150 kV, three-phase and single-phase oil-immersed shunt reactors 10 kV, 35 kV and 110 kV, transformers for electrical furnaces.

14

Page 15: Russia-Electricity-Equipment-new

OAO Tolyattinskiy Transformator

Description Address ul. Industrialnaya, 1, Togliatti, Samara reg., 445601 Russia

Contacts E-Mail: [email protected]

web-site: http://www.transformator.com.ru/?lang=en

phone num.: +7 8482 269400, +7 8482 727341

fax: +7 8482 296411, +7 8482 221974

Head Igor V. PTITSYN

Export characteristic

HS CODE 85 Electrical Machinery And Equipment And Parts Thereof; Sound Recorders And Reproducers, Television Recorders And Reproducers, Parts And Accessories

Field Hardware and Machinery Production Transformators

Corporation Soyuz

Description Address Obrucheva st., 36 Moscow, 117342, Russia

Contacts E-Mail: [email protected]

web-site: http://www. soyuz-corp.ru

phone num.: +7 (495) 232-20-44

fax: +7 (495) 913-30-63

Head Rodion D. Gimaev

Export characteristic

HS CODE 85 Electrical Machinery And Equipment And Parts Thereof; Sound Recorders And Reproducers, Television Recorders And Reproducers, Parts And Accessories

Field Hardware and Machinery Production Production of electrical equipment, including equipment under license of

leading European producer - AREVA T&D Subsidiaries and related companies OJSC "Neptun", OJSC "Zaporojsky Zavod "Preobrazovatel" and the CJSC

"High-voltage equipment plant "Soyuz"

15

Page 16: Russia-Electricity-Equipment-new

EDS Holding

Description Address Trubnaya str., 28, str. 3, Moscow, 127051 Russia Contacts E-Mail: [email protected]

web-site: http://www. edsholding.ru

phone num.: +7 (495) 621-81-00

fax: +7 (495) 623-18-96

Head Ruben Gevorkyan

Export characteristic

HS CODE 85 Electrical Machinery And Equipment And Parts Thereof:

Field Hardware and Machinery Production Production of electrical equipment Subsidiaries and related companies The Armavir Electrotechnical Works – electrical machines, complete-set,

small capacity drives, transformers, signaling systems. The area of application: power engineering, in industry generally and in the defense industry.

The Karpinsky Electrical Machine-Building Plant – d.c. electrical machines, high-voltage equipment. The sphere of application: the mining industry, railways and public transportation companies.

The Science and Production Amalgamation “Kuzbasselectromotor”– explosion proof electric motors and electromagnetic starters, explosion-proof low-voltage equipment. Areas of application: the mining industry, chemical and petrochemical production plants.

The Leningrad Electromechanical Works – instrumentation, electricity control and metering systems. The area of application: power engineering, the housing sector.

The Riga Electrical Machine-Building Works – electrical equipment for the rolling stock of railways and urban electric transport systems. The sphere of application: transport machine-building, municipal transport.

The Yaroslavl Electrical Machine-Building Works – asynchronous electric motors and complete-set drives. The sphere of application: the housing sector, petrochemical plants, the nuclear industry.

4. Foreign Production The big international energy equipment holdings like Siemens, General Electric, Alstom, ABB, Skoda Power, Schneider Electric, Westinghouse Electric, Mitsubishi Heavy Industries, Ansaldo Energia and Areva have long ago recognized the potential of the Russian market. They are well established and have joint ventures or their own production facilities in Russia. Jenbacher, Wartsilla, Duetz and Caterpillar are very active as well. Other important players are the numerous Chinese companies, which try to enter the market by offering very low prices.

16

Page 17: Russia-Electricity-Equipment-new

The medium foreign companies working in this field and attracted by the huge market potential are also trying to enter the market. For the time being the medium and small companies have mostly limited their business to importing their production to Russia. 5. Trends The energy generating companies will have to invest considerable sums in the modernization of their equipment over the next years. According to estimates made in 2007 by RAO UES, their successor organizations will need to put into force 100 gas turbines, 67 steam turbines and 125 waste heat recovery boilers for gas power stations and 70 steam turbines for coal power stations by 2011. The strongest and most competitive markets are concentrated in the regions of Moscow and St. Petersburg, whereas the growing markets are located in other Russian regions with turnover still significantly lower than that of Moscow and St. Petersburg. Western equipment is usually installed in newly built infrastructure, whereas existing Soviet infrastructure is manly maintained with low-quality Russian equipment and to a smaller extent upgraded with Western devices. The private industry is, wherever possible, installing modern western equipment. With the planned entering of Russia into the WTO, the lowering of customs duties should make foreign equipment more competitive. Industry experts expect the market share of the ‘High-Tech European-Like’ segment to grow, whereas the share of the ‘Low-Cost Made in Russia’ segment is shrinking. On the other hand, Asian and Russian producers are expected to improve the quality of their products. This development will lead on a mid-term basis to a shift in the competition away from quality and towards price. More and more private enterprises, which use a lot of electricity, are considering constructing their own power plants. From a commercial point of view with current relatively low energy prices, it is already today more profitable for these enterprises to build their own plants. The main reason for this is the high price consumers have to pay to be connected to the grid. Another advantage of a private power plant is of course the independence from the state electricity system. But there is also a great risk - the dependence on the very few fuel suppliers with Gazprom having the monopoly in this sphere. As the prices for the export of gas are much higher than for coal, there are major plans to convert gas-fired thermal power station to coal-fired ones. However, there are serious ecological concerns and experts widely agree that coal can substitute gas only in remote areas. Another trend in the energy sector which is currently actively developing is renewable energy sources such as solar, geothermal, bio-fuel and especially wind energy. As for the latter, there is no Russian technology available yet. With the new governmental decree that came into force in May 2007, Russia can participate in projects under the Joint Implementation mechanism. Therefore, alternative energy and energy saving projects become attractive despite the low prices for traditionally produced energy. Especially interesting is the substitution of small diesel generating stations in villages, which are not connected to the general grid, with solar, wind or geothermic stations. Geographically speaking the Krasnodar Region is a centre for alternative energies in Russia, where several pilot projects are already in full force.

17

Page 18: Russia-Electricity-Equipment-new

In the recent years, leasing has become an important promotion instrument in the energy sector in Russia, which is used by foreign as well as Russian companies to make their offer more attractive. 6. Consumers During the Soviet era the energy sector was dominated by a few state enterprises. Today many of them are privatized. Nevertheless, it remains a field where mainly big players rule the game. The newly founded 14 territorial power and heat companies (TGK) and 7 wholesale power generating companies (OGK) are planning to modernize their equipment. They will restructure their organization and optimize their purchasing schemes, which makes this a good opportunity to enter the market. These successor companies of RAO UES have very informative websites, most of them with an English section: OGK 1: http://www.ogk1.com/en/OGK 2: http://www.ogk2.ru/eng/index.wbpOGK 3: http://www.ogk3.ru/engOGK 4: http://eng.ogk-4.ru/OGK 5: http://ogk-5.rbc.ru/en/OGK 6: http://www.ogk6.ru/en/GidroOGK: http://www.gidroogk.ru/TGK 1: http://eng.tgc1.ru/TGK 2: http://www.tgc-2.ru:8101/en/index.shtmlTGK 3: http://www.mosenergo.ru/eng/index.php?sessid=led15f07sinilh0gjric5cam33TGK 4: http://www.eng.tgk-4.ru/TGK 5: http://en.tgc5.ru/TGK 6: http://www.tgc6.ru/index.php?id=news&L=1TGK 7: http://en.votgk.com/TGK 8: http://www.tgk-8.ru/TGK 9: http://www.tgk9.ru/TGK 10: http://www.tgc10.ru/engTGK 11: http://eng.tgk11.com/about/TGK 12: http://www.kuzbassenergo.ru/eng/TGK 13: http://eng.tgk13.ru/TGK 14: http://tgc-14.ru/eng/modules/news/IDGC North-West: http://eng.mrsksevzap.ru/IDGC Ural: http://www.mrsk-ural.ru/eng/company/IDGC South: http://www.mrsk-yuga.ru/IDGC Center: http://www.mrsk-1.ru/IDGC Center and Volga Region: http://www.mrsk-cp.ru/Manager of the unified transport network: http://www.fsk-ees.ru/Rosenergoatom: http://www.rosenergoatom.ru/ The power stations have in their organisation a department dealing with technical support, which often also tries to carry out modernization activities. Officially, they publish tenders for some renovation tasks. But they often decide to make the changes in house, buy the equipment, install it and to construct new power generating capacities, despite the fact that their engineers do not have the necessary qualifications. However, for more complicated tasks the technical support departments cooperate with specialized engineering companies. Unfortunately, these partners are sometimes chosen not

18

Page 19: Russia-Electricity-Equipment-new

due to their qualification, but due to a close relationship with the management of the power generation company, the power station or the engineering company. Experts hope that with the restructuring of the sector, the management of the new companies will centralize the purchasing and tender system and make it more professional as well as call upon the already existing specialized engineering companies, which will be able to carry out the modernization and construction of power stations on a high quality level. The Federal State Unitary Enerprise “Foreign Economic Association Technopromexport” is the most important player in this sector. According to the General Director Sergey Molozhaviy, it will occupy at least 25% of the market for the construction of power stations in Russia in 2010:

Federal State Unitary Enterprise "Foreign Economic Association "Technopromexport"

Description Address CIS, Russian Federation, Central federal district, Moscow, 18/1

Ovchinnikovskaya nab., Moscow, Russia, 115324 Contacts phone num.: +7 (495) 950-15-23

fax: +7 (495) 953-33-73; 951-11-64 e-mail: [email protected]: http://www.tpe.ru

Head Molozhavy Sergey Vladimirovich

Export characteristic HS CODE 2716000000 - Electrical energy

8504 - Electrical transformers, static converters (for example, rectifiers) and inductors

8547 - Insulating fittings for electrical machines, appliances or equipment, being fittings wholly of insulating material apart from any minor components of metal (for example, threaded sockets) incorporated during moulding solely for purposes of assembly, other than insulators of heading 8546; electrical conduit tubing and joints therefor, of base metal lined with insulating material

8535 - Electrical apparatus for switching or protecting electrical circuits, or for making connections to or in electrical circuits (for example, switches, fuses, lightning arresters, voltage limiters, surge suppressors, plugs, junction boxes), for a voltage exceeding 1 000 V

8404 - Auxiliary plant for use with boilers of heading 8402 or 8403 (for example, economisers, super-heaters, soot removers, gas recoverers); condensers for steam or other vapour power units

7304 - Tubes, pipes and hollow profiles, seamless, of iron (other than cast iron) or steel

8406 - Steam turbines and other vapour turbines

8402 - Steam or other vapour generating boilers (other than central heating hot water boilers capable also of producing low pressure steam); super-heated water boilers

8410 - Hydraulic turbines, water wheels, and regulators therefor

Field Electric equipment Production The core activity of Technopromexport is realization of power projects of any

complexity on a turn-key basis: construction of power projects (full service provider from design and survey to project operation); thermal power plants (combined-cycle, gas turbine, geothermal, diesel); hydro power plants; power transmission lines and substations; export of electricity.

19

Page 20: Russia-Electricity-Equipment-new

Other engineering companies in the sector include: E4 Group: http://www.e4group.ru/?id=70Engineering company Quartz: http://www.ec-quartz.ru/Intertekhelektro: http://www.ite-ng.ru/Piter Bell: http://www.piterbel.com/Energoholding: http://www.energoholding.ru/PSM: http://www.powerunit.ru/PKF “Oksana” : http://www.geloks.ru/Tetra Elektrik: http://www.tetra-electric.ru/ Suppliers of components can find potential clients in the “Domestic Production” chapter, where some producers of Russian energy equipment are listed. 7. Trade Channels There are mainly two options of doing business in Russia. You can cooperate with a local importer or act as your own importer and wholesaler. Usually, it is easier to start your business with the support of a local importer, as he can do all the certification and registration work for you, which costs a lot if you are new in the market. Another advantage of working with a Russian partner lies in the specific understanding of the Russian market. Local distributors can contact clients directly and can also arrange information support. It is an important advantage if your distributor is already working within the energy sector. Of course, conducting business through your own importing company also has many advantages. You can decide your own selling strategy and it is easier to control the marketing and the distribution of your product. However, it is absolutely necessary to have very experienced staff, who have been working in this business for a long time. Besides, one should not underestimate the administrational and cultural hurdles which are often insurmountable for foreign companies which try to enter the Russian market on their own. A good strategy to combine the advantages of both ways is the establishment of a representative office, which can support the importer during the process of marketing and the process of acquiring clients. In general, it is recommended to start with the Moscow region. As a rule, Russian distributors continue creating vertically integrated holdings for a better cooperation with the regions, taking into consideration the saturated Moscow market. 8. Agency Questions Surely one of the most important factors for successful business in Russia is the important task of finding a reliable partner, who will be able to help you deal with the authorities and any other problems you might encounter. Having a good partner is essential, because Russia is a country where relationships are of particular importance, and a foreigner will find it hard to work with Russians without fostering personal contacts. In the energy sector, where the number of potential clients is rather limited, it is essential to have good connections. There are different ways to find a business partner. You may consider Russian or foreign trade fairs or consulting agencies. Consulting agencies are the most expensive way to find a partner, but they offer professional and efficient help. Consulting agencies also often help with partner due diligence. It is not so easy to check a potential partner’s background in Russia, because there are almost no open sources (business directories, internet sites). It is not compulsory for Russian

20

Page 21: Russia-Electricity-Equipment-new

companies to publish their financial records, or make their credit history available. Furthermore, Russian accounting standards do not clearly indicate the key numbers and, therefore, do not give reliable information about the past performance of prospective partners. But consulting agencies in Russia know how to access the necessary information. Upon request, the SBH can recommend companies which offer partner search and due diligence. 9. Exhibitions, Conferences, Journals and Internetplatforms Trade Fairs Type Description Location Timing

Exhibition

Atomic Energy & Electrical Engineering, Inconex Company, Control and measurements: ergonomics of management reactor, digital monitoring systems, software, systems of data gathering and other systems of the atomic power station Electric systems: new systems of emergency maintenance with power supply, new high-voltage equipment http://www.inconex.ru/np/eng/

Moscow World Trade Center

7.10.2008-9.10.2008

Exhibition

MIIF. EnergoTech, Bizon-95ST Company, engineering of medium and high voltage, engineering of low voltage, switching equipment, power condensers / components, high-voltage and low-voltage equipment for distribution and control http://www.miif.ru/

Moscow 69th pavillion of All-Russian Exhibition Centre

21.10.2008-24.10.2008

Exhibition Mashex, MVK Company, entire metalworking, machine-building and machine-tools market in a single venue http://www.mashex.ru/defaulteng.stm

Moscow Crocus Expo

18.05.2009-22.05.2009

Conferences Type Description Location Timing

Exhibition &

Conference

POWERTEK, ITE Group Plc, PRIMEXPO Companies, Power Transmission and Distribution, Electrotechnical Equipment http://www.primexpo.ru/power/eng/

Moscow WTC Congress Center

02.12.2008-04.12.2008

Exhibition &

Conference

EMBIZ, Technological concepts and exemplary projects from the energy sector, renewable energy, peripheral energy supply, energy services, sponsorship and possibilities of financing, subject-fixed panels and special events http://www.embiz-moscow.com/english/index.php

Moscow Expocentr

09.12.2008- 12.12.2008

Exhibition &

Conference

Russia Power, Ministry of Trade and Energy of the Russian Federation, Company Pennwell, current state of the Russian electricity sector and the roles of their companies in the sector, technologies needed to deliver adequate energy services http://rp08.events.pennnet.com/fl/home.cfm?Language=Engl

Moscow Expocentr

18.04.2009-30.04.2009

21

Page 22: Russia-Electricity-Equipment-new

Journals Type Description Location Timing

Professional Journal

Power Stations, a technological journal. Print run: 2’000, audience: power plants and heating industry, ISSN 0201-4564 http://www.energy-journals.ru/elst/index.htm

Russian Federation Monthly

Professional Journal

Energetik, a mass market journal, print run: 4’500, 48 pages, audience: diverse groups interested in the electric power industry, ISSN 0013-7278 http://www.energy-journals.ru/energetik/index.htm

Russian Federation Monthly

Professional Journal

Industrial Power, a technological journal, print run: unknown, audience: industrial power services, ISSN 0033-1155 http://www.energy-journals.ru/promen/index.htm

Russian Federation Monthly

Professional Journal

Messages in the Electric Power Industry, an information-analytical journal, print run: unknown, audience: power industry. http://www.energy-journals.ru/vesti/index.htm

Russian Federation Bimonthly

Professional Journal

Energy Market, an information-analytical journal for professionals, print run: unknown, audience: power industry. http://www.e-m.ru/journal.asp

Russian Federation Monthly

Professional Journal

Academy of Power Generation, an information-analytical journal for professionals and interested people, print run: unknown, audience: diverse groups interested in the electric power industry. http://www.energoacademy.ru/ru/

Russian Federation Bimonthly

Professional Journal

Power Generation and Industry, an information-analytical journal for professionals and interested people, print run: 26’000, audience: diverse groups interested in the electric power industry. http://www.eprussia.ru/eng/epr/

Russian Federation Monthly

Professional Journal

Energy control, an information analytical and normative journal for professionals, print run: 26’000, audience: professionals of the electric power industry and processing industry. http://www.en-info.ru/

Russian Federation Quarterly

Professional Journal

Energy. Industry. Regions. Official publishing agency and information partner of the Ministry of Industry and Energy. print run: unknown, audience: diverse groups interested in the electric power industry. http://www.epr-journal.ru/

Russian Federation Monthly

Professional Journal

Market for electrotechnical equipment. An information-analytical journal for professionals, print run: 15 000, audience: professionals the power industry equipment sector. http://www.marketelectro.ru/magazine/

Russian Federation Quarterly

Internetsites http://www.elec.ru/http://www.celec.ru/http://www.cogeneration.ru/http://www.ruscable.ru/http://www.elecab.ru/http://www.electrik.org/

22

Page 23: Russia-Electricity-Equipment-new

10. Tariff rates, other import duties The export and import of goods may be subject to customs duty. Russia uses three types of tariffs: the ad valorem tariff (fixed percentage of the value of the goods), specific tariffs (a specific amount of money per unit) and combined tariffs. Ad valorem tariffs generally range from 5% to 30%, but there are also higher tariffs. Tariffs are set for each class of goods based on the Nomenclature of Goods of Foreign Trade Activity and are calculated based on the customs value of the goods. Imports are further subject to VAT (0, 10 or 18%). Certain goods such as alcoholic beverages are subject to excise tax. A customs processing fee must also be paid. Customs duty, VAT, excise tax and customs processing fees are collectively referred to as customs payments. 11. Import regulations, licenses/documents/formalities Russia uses the classical instruments to control imports and exports, which are regulated by Federal Law No. 164 of December 8, 2003 “On Principles of State Regulation of Foreign Trade Activity” Although most products can be freely imported into and exported from Russia, some products such as pesticides, weapons, self-defence items, explosives, precious metals and stones, radioactive materials, narcotics and psychotropic substances require a license. Foreign goods enjoy national treatment. They are subject to the same technical, pharmacological, sanitary, veterinary, phytosanitary and ecological requirements and the same requirements for mandatory confirmation of their compliance with Russian technical standards (mandatory certification) as those which apply to analogous goods of Russian origin (see below section on standard, technical regulations, labeling). Customs regulations are one of the first and main concerns for companies doing business in the Russian Federation. Russian customs law was substantially reformed with the enactment of a new Customs Code in 2003 (in force since January 1, 2004). Russia is not yet a member of the World Trade Organization. It has signed an Agreement on Partnership and Cooperation with the European Union (after the expiry of its initial ten-year term this Agreement, while still in force, is waiting to be renegotiated). Russia further signed a treaty on a customs union with Belarus (1995), which was later joined by Kazakhstan, Kyrgyzstan and Tadjikistan. In 2000, this customs union was transformed into the Eurasian Economic Community (EurAsSec or EAEC). Uzbekistan joined EurAsSec in 2006. Russia, Belarus and Kazakhstan recently confirmed their intention to implement the customs union and common market within the EurAsSec treaty framework. The classification system used by the Russian Federation (“Nomenclature of Goods of Foreign Trade Activity” or TNVED) is based on the Harmonized Commodity Description and Code System (HS) of the World Customs Organization and the Combined Nomenclature of the European Union. The Russian classification system uses ten-digit numbers. Goods must be declared upon import to Russia in accordance with the customs regime selected (e.g. import for internal consumption, temporary import, etc.). As a rule the goods are declared by the Russian importer or a customs broker. When the goods cross the Russian border the carrier submits to the border authorities basic documentation on the goods, then under customs control the goods continue on (internal transit) to the customs terminal at the destination where they are cleared through customs. The list of documents required can be impressive and their correct preparation requires experience.

23

Page 24: Russia-Electricity-Equipment-new

The main documents are the following: 1. Cargo customs declaration (CCD): The CCD is a uniform document used to declare the goods to Customs and contains basic information on the goods (description, weight, number of units, etc.), the customs regime selected, the importer, consignor and consignee, the class and customs value of the goods, their country of origin and the transportation of the goods. 2. Declaration of customs value: This document confirms the value of the goods which serves as a basis for the calculation of the customs payments. There exist various methods to calculate the customs value, and Customs may request additional documentation depending on the method used. The customs value includes the cost of transport. 3. Transportation documents: These depend on the type of transport (road, rail, air, sea): bill of lading, FIATA bill of lading (combined transport bill of lading), railway bill, airway bill, truck waybill (CMR). 4. Commercial documents: The commercial documents (contract, commercial invoice, pro forma invoice, insurance certificate, etc.) are important for the calculation of the customs value. 5. Certificate of origin: A certificate of origin is required to benefit from preferential customs tariffs. Certificates of origin are issued by special institutions in the country of the manufacturer. 6. Certificate of conformity: For a number of goods the importer needs to submit documents confirming that the goods meet Russian safety standards and technical regulations (see section on certification below). 7. Deal (Transaction) Passport: The deal or transaction passport is a document issued by the Russian bank of the importer and is required under Russian exchange control regulations. Transaction passports are used to monitor cross-border payments. Substantial information can be found on the official site of the Federal Customs Service of the Russian Federation (www.customs.ru). 12. Technical regulations/labeling consumer protection/standards/inspection authorities The Federal Agency for Technical Regulation and Metrology (Rostekhregulirovaniye, formerly Gosstandart, www.gost.ru), an agency of the Ministry of Industry and Trade, manages the GOST R certification system. A dozen other mandatory certification systems, partly managed by other ministries or agencies (fire-safety, weapons, telecommunication, airplanes, etc.), and numerous voluntary certification systems exist. The GOST R certification system consists of hundreds of accredited certification bodies and test laboratories. Historically GOST R standards are based on GOST standards, which were originally

24

Page 25: Russia-Electricity-Equipment-new

developed by the Soviet Government. Today GOST standards are the official standards of the Euro-Asian Council for Standardization, Metrology and Certification (EASC), headquartered in Minsk, which is recognized by ISO (International Organization for Standardization) as a regional standards organization for the CIS. The Russian Federation does not recognize ISO standards. Russian standards still lack clarity and transparency, and Russia continues to rely on product testing as the key element in the product approval process, adhering to redundant practices of further testing of internationally accepted certified products. Federal Law No. 184 "On Technical Regulation" enacted on December 27, 2002, is meant to streamline and overhaul national technical standards and to ensure the passage from a mandatory certification system to a modern system based on self-declaration. The law is planned to be fully implemented by 2011, which particularly means that all GOST standards need to be replaced by published technical regulations. The latter may be enacted exclusively in the interest of safety, health, environmental or consumer protection. The abrogation of technical trade barriers is one of the conditions for Russia to join the WTO. The law distinguishes between:

• mandatory certification (blue certificates); • voluntary certification (yellow certificates).

Mandatory certification mostly takes the form of a certificate of conformity delivered by an accredited certification body based on test results. The certificate of conformity is a pre-requisite for the import of the relevant products to Russia and must be submitted to Customs. Products subject to mandatory certification within the GOST R Certification System may be marked with the GOST R sign or mark of conformity. Voluntary certification systems (as well as mandatory certification systems other than the GOST R system) may register their own mark of conformity. Whether a product is subject to mandatory certification must be established based on the Russian Product Classification (OKP), which is not fully identical to the Foreign Trade Classification (TNVED codes). In cases of doubt, it is possible to obtain a so-called exemption or refusal certificate to confirm that the product is exempt from mandatory certification. Compliance with specific safety or health standards may require additional certification (e.g. hygienic certificate, fire-safety certificate). Such certificates may be a pre-requisite for obtaining a GOST R Certificate of Conformity. Under the Russian Civil Code a commercial seller must guarantee the conformity of the goods to national standards. Non-conformity is considered a defect giving rise to warranty claims. This applies in particular, but not only, to retail sales (Federal Law of 7 February 1992 “On the Protection of the Rights of Consumers”). Russia participates inter alia in the following international certification systems: • Certification of electrical and electronic equipment (IEC or International Electrotechnical

Commission, www.iec.ch, www.iecq.org); • Certification of passenger cars, trucks, buses and other transport vehicles (the 1958

Agreement of the United Nations Economic Commission for Europe concerning the adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts, www.unece.org);

• Testing of hand guns and ammunition (Brussels Convention of 1969, www.com-i-p.com); • OIML Certificate System for Measuring Instruments (www.oiml.org).

25

Page 26: Russia-Electricity-Equipment-new

It is generally easier to certify products locally than from abroad. However, certificates obtained in the name of a local distributor are valid only for use by such local distributor. Therefore, if the foreign manufacturer wishes to control Russian distribution channels it may be worthwhile obtaining the certificate in the name of the foreign manufacturer. It is therefore important to select a professional provider of certification services. Useful links: SGS www.gost.sgs.comROSTEST www.rostest.ruResearch Institute for Certification www.vniis.ruStandardinform, www.standards.ru Importers should further consider legislation on consumer protection which defines requirements for product labeling and the disclosure of other product information to consumers and general product liability, including manufacturer’s liability. 13. Addresses of important public authorities, industry associations, other relevant organizations Ministry of Industry and Trade Kitaygorodskiy proezd 7, Moscow 109074 Tel: +7 495 710-55-00 Fax: +7 495 710-57-22 [email protected] http://www.minprom.gov.ru/eng Federal Energy Agency Kitaygorodskiy proezd 7, Moscow 109074 Tel: +7 (495) 710-55-00 Fax: +7 (495) 710-57-22 [email protected] http://www.minprom.gov.ru/eng Rosatom Federal Agency for Nuclear Energy Ul. Bolshaya Ordynka 24/26, Moscow, Tel: +7 499 949-45-45 E-mail: [email protected] System operator Kitaygorodskiy proezd 7-3, 109074 Moscow Tel: +7 495 627-83-55 Fax: +7 495 627-95-15 e-mail [email protected]. http://www.so-cdu.ru/ Union of Machine constructors Chemezov Sergey Viktorovich President ul. Stromynka 27/3, 107076 Moscow Tel. : +7 495 964-6183, Fax : +7 495 963-2613; +7 495 964-8311 http://www.srmr.ru/about_0.htm

26

Page 27: Russia-Electricity-Equipment-new

Academy of Electrotechnical Sciences of the Russian Federation Ul. Krasnokazarmennaya 17, D-325 Tel: +7 495 673 53 11 Mail: [email protected] 14. Recommendation After the Perestroika years, there was a lack of investment and development in the Russian energy sector, which still has to be compensated. Furthermore, the restructuring of the energy generating sector implies major changes at the organizational level and the supply chain management of the power plants. This makes the current situation a favorable time to enter the Russian market. According to experts it will take the energy generating holdings up to five years to introduce the necessary changes, to reorganize their business and to build new facilities. The new foreign share holders often invite foreign engineering companies for the realization of their projects. These companies are used to foreign equipment, while Russian engineers still tend to use the familiar Soviet equipment. In order to be successful and win new business partners in the Russian market, the following competences (differentiators) are important: - Local presence either with a subsidiary, a representative office or through a reliable partner - Good functioning logistics, generally more important than in the West - Consulting support capabilities for projects in order to win tenders - Customer training In general, the personal contacts to potential clients and decision makers are likely to take much more time than in European countries. Detailed information material in Russian will also be necessary to convince your business partner. Author: Julie Bächtold, Moscow, September, 30 th 2008 Senior Trade Adviser Author’s address: [email protected]

27