rutgers, the state university of new jersey institutional ... · rutgers, the state university of...

13
Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects

Upload: others

Post on 25-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Rutgers, The State University of New Jersey

Institutional Profile Report

Section J

Major Capital Projects

Page 2: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

U n i v e r s i t y F a c i l i t i e s

STATUS of

s ignif icant Projects

J u n e 2 0 0 7

J o h n S h u l a c k

E x e c u t i v e D i r e c t o r J e f f L i v i n g s t o n

u n i v e r s i t y a r c h i t e c t

A n t o n i o C a l c a d o

V i C e P r e s i d e n t

Page 3: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

J u n e 2 0 0 7

P r o j e c t o V E R V I E W

Si

gn

if

ic

an

t

Pr

oj

ec

ts

B u s c h

K e c k N e u r o s c i e n c e C e n t e r 1

C e n t e r f o r I n t e g r a t i v e P r o t e o m i c s T e c h n o l o g i e s

2

2 . 4 m i l l i o n

5 5 m i l l i o n

3 W r i g h t R i e m a n P o l y m e r & P r o t e i n W e t L a b , R o o m 3 7 1

3 m i l l i o n

P a g e 1

P a g e 2

L i v i n g s t o n

2 4 . 7 m i l l i o n L i v i n g s t o n D i n i n g C o m m o n s 4 P a g e 2

C o o k

E n d o c r i n e R e s e a r c h F a c i l i t y 6 4 . 5 m i l l i o n P a g e 3

D o u g l a s s

D o u g l a s s D e v e l o p m e n t a l D i s a b i l i t i e s C e n t e r

9 4 . 4 m i l l i o n P a g e 5

C o l l e g e A v e n u e

7

I n s t i t u t e f o r H e a l t h S c i e n c e s 8

1 0 m i l l i o n C o l l e g e o f N u r s i n g

2 5 m i l l i o n

P a g e 4

N e w a r k

R u t g e r s B u s i n e s s S c h o o l 10 8 3 m i l l i o n P a g e 5

C u m b e r l a n d C o u n t y

F o o d I n n o v a t i o n C e n t e r 14 7 . 6 5 m i l l i o n P a g e 7

1 5 m i l l i o n L i v i n g s t o n S t u d e n t C e n t e r 5

11

C a m d e n

C a m d e n D i n i n g H a l l R e n o v a t i o n 5 . 3 m i l l i o n

C a m d e n L a w S c h o o l A d d i t i o n & R e n o v a t i o n

12 3 7 m i l l i o n

P a g e 6

C a m d e n R e c r e a t i o n C e n t e r 13 9 m i l l i o n

P a g e 3

P a g e 7

Page 4: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

J u n e 2 0 0 7

P r o j e c t o V E R V I E W

Si

gn

if

ic

an

t

Pr

oj

ec

ts

H i g h T e m p H o t W a t e r I m p r o v e m e n t s ( n o t r e f e r e n c e d o n m a p )

U n i v e r s i t y U t i l i t i e s

H i g h V o l t a g e U p g r a d e : P h a s e 1 15 1 0 . 5 m i l l i o n

16 8 m i l l i o n

C o m p l e t e d P r o j e c t s

Year Completed

C a p e M a y C o u n t y

M u l t i - s p e c i e s A q u a c u l t u r e D e m o n s t r a t i o n F a c i l i t y

2 7 . 8 m i l l i o n 2 0 0 6

B i o m e d i c a l E n g i n e e r i n g B u i l d i n g 1 2 0 0 6 3 3 . 5 m i l l i o n

B u s c h C a m p u s

P a g e 8

Page 5: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

P r o j e c t l o c a t i o n s

Si

gn

if

ic

an

t

Pr

oj

ec

ts

J u n e 2 0 0 7

Page 6: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts B u s c h

K e c k N e u r o s c i e n c e C e n t e r 1

C e n t e r f o r I n t e g r a t i v e P r o t e o m i c s T e c h n o l o g i e s

♦ Construction of a new shared instrumentation re-source and Proteomics research facility, including the Protein Data Bank, between the EOHSI and CABM.

♦ Schematic Design underway.

D A T A

Budget: 55 Million

Design: August 2006 - July 2008

Construction: August 2008 - August 2010

2

P a g e 1

J u n e 2 0 0 7

B u s c h C a m p u s

♦ Renovation of 4,250 gsf of space formerly occupied by the Center for Alcohol Studies on the Busch Cam-pus.

♦ The renovated space includes faculty and staff offices and a state of the art stem cell research laboratory.

♦ Project substantially complete.

D A T A

Budget: 2.4 Million

Design: October 2005 - August 2006

Construction: September 2006 - May 2007

B u s c h C a m p u s

K e y D a t e s

Concept Document: February 2006

Schematic Design: Not Applicable

Bid Award: September 2006

K e y D a t e s

Concept Document: March 2006

Schematic Design:

Bid Award:

Page 7: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts B u s c h

W r i g h t R i e m a n C h e m i s t r y W e t L a b R m . 3 7 1

♦ Reconfiguration and renovation of a 3,000 gsf area to create a state of the art wet laboratory for the Chem-istry Department.

♦ Features will include 24 fume hoods, casework, and a new HVAC system.

♦ Construction is nearing completion

D A T A

Budget: 3 Million

Design: June 2005 - March 2006

Construction: July 2006 - June 2007

3

l I V I N G S T O N

K e y D a t e s

Concept Document: March 2006

Schematic Design: Not Applicable

Bid Award: June 2006

P a g e 2

J u n e 2 0 0 7

B u s c h C a m p u s

L i v i n g s t o n D i n i n g c o m m o n s

♦ A new 43,500 square foot multistoried dining facility on the Livingston Campus adjacent to the existing Livingston Student Center.

♦ Program is underway.

D A T A

Budget: 24.7 Million

Design: November 2006 - April 2008

Construction: February 2008 - August 2009

4

K e y D a t e s

Concept Document:

Schematic Design:

Bid Award: L i v i n g s t o n C a m p u s

Page 8: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts

P a g e 3

J u n e 2 0 0 7

K e y D a t e s

Concept Document: March 2005

Schematic Design: October 2005

Bid Award: September 2006

C o o k

E n d o c r i n e r e s e a r c h f a c i l i t y

♦ Construction of a new 9,200 gsf facility adjacent to the Dairy Barn and Creamery for the expansion of the Animal Science Endocrinology Program.

♦ Features include a new research laboratory, associated offices and support spaces.

♦ Structure is mostly complete. Rough in work in pro-gress. Approximately 40% completed.

6

D A T A

Budget: 4.5 Million

Design: March 2005 - May 2006

Construction: May 2006 - August 2007

L i v i n g s t o n S t u d e n t c e n t e r

♦ Renovation and expansion of the Livingston Student Center to include 19,000 gsf of additional space and renovation of 15,000 gsf of existing space.

♦ Features include increased conference space, meeting rooms and a larger multi-purpose area .

♦ Schematic design is underway.

D A T A

Budget: 15 Million

Design: November 2006 - November 2007

Construction: February 2008 - August 2009

5

K e y D a t e s

Concept Document:

Schematic Design:

Bid Award:

l I V I N G S T O N

L i v i n g s t o n C a m p u s

C o o k / D o u g l a s s C a m p u s

Page 9: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts

P a g e 4

J u n e 2 0 0 7

C o l l e g e A v e n u e

D A T A

Budget: 10 Million

Design: November 2005 - December 2006

Construction: April 2007 - October 2008

♦ Construction of a new 20,785 gsf facility for the Col-lege of Nursing unifying the Nursing School Program into one facility to be located between Paterson Street and Bayard Street.

♦ Features include a large “smart” classroom, teaching space, examination rooms, research space, labs, stu-dent study areas, lounges and pharmacy space.

♦ Project awarded in April 2007. Site work is in pro-gress.

c o l l e g e o f n u r s i n g 7

C o l l e g e A v e n u e C a m p u s

K e y D a t e s

Concept Document: March 2004

Schematic Design: September 2004

Bid Award: April 2007

I n s t i t u t e f o r H e a l t h S c i e n c e s

♦ Construction of a new 58,000 gsf facility adjacent to the College of Nursing and Robert Wood Johnson Hospital in New Brunswick. The complex of the College of Nursing & the Institute for Health shall be known as the Health Sciences Center.

♦ This facility will consolidate the Institute for Health, Health Care Policy and Aging Research, as well as the GSAPP Clinic.

♦ Schematic Design phase complete. Design Develop-ment phase nearing completion.

D A T A

Budget: 25 Million

Design: October 2005 - September 2007

Construction: December 2007 - December 2009

8

K e y D a t e s

Concept Document: November 2005

Schematic Design: March 2007

Bid Award:

Page 10: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts D o u g l a s s

D o u g l a s s D e v e l o p m e n t a l D i s a b i l i t i e s C e n t e r

♦ Construction of a single story 9,000 gross square foot wood frame addition with basement and partial attic to the Douglass Developmental Disabilities Center.

♦ This addition will house classrooms, observation rooms, multipurpose rooms and offices.

♦ Design complete. Bidding in progress.

9

D A T A

Budget: 4.4 Million

Design: May 2006 - May 2007

Construction: September 2007 - August 2008

K e y D a t e s

Concept Document: June 2000

Design Development: October 2000

Bid Award:

P a g e 5

J u n e 2 0 0 7

K e y D a t e s

Concept Document: September 2006

Schematic Design:

Bid Award:

N e w a r k

R u t g e r s B u s i n e s s S c h o o l a t 1 W a s h i n g t o n P a r k

♦ Construction of a two-story plus penthouse pavilion addition to south of the existing recently purchased 17 story office building.

♦ Features of the addition will include a new Rutgers entrance, Trading Room, three lecture halls, renova-tion of 7 floors into classrooms, faculty & staff offices, conference/meeting rooms and the Dean’s suite.

♦ Design development underway.

D A T A

Budget: 83 Million

Design: August 2006 - July 2007

Construction: September 2007 - April 2009

10

C o o k / D o u g l a s s C a m p u s

N e w a r k C a m p u s

Page 11: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts C a m d e n

♦ Renovation of 19,000 gsf of the existing Camden Stu-dent Center Dining Hall facility.

♦ Features include renovated dining entry and servery areas, enlarged dining room, cooking stations and up-grades to mechanical and electrical infrastructure.

♦ Construction is underway.

C a m d e n d i n i n g h a l l

D A T A

Budget: 5.3 Million

Design: June 2006 - January 2007

Construction: May 2007 - August 2007

11

C a m d e n L a w s c h o o l

♦ Project will be built in two phases. Phase 1 consists of 70,000 gsf facility to be built adjacent to the existing Law School facility. Phase 2 consists of renovation of the existing Law School.

♦ Features include classrooms, a Moot Court and of-fices. Student and faculty lounges and a café will be housed in a bridge connecting the new facility to the existing Law School.

♦ Construction is underway, 38% complete. Structural steel is complete, shell is being installed.

D A T A

Budget: 37 Million

Design: April 2005 - February 2006

Construction: March 2006 - August 2008

12

K e y D a t e s

Concept Document: January 2007

Schematic Design: Not Applicable

Bid Award:

K e y D a t e s

Concept Document: March 2004

Schematic Design: May 2005

Bid Award: March 2006

P a g e 6

J u n e 2 0 0 7

C a m d e n C a m p u s

Page 12: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts

c u m b e r l a n d c o u n t y

♦ Construction of a new 23,000 gsf. incubator facility in the City of Bridgeton, New Jersey.

♦ This facility will house state of the art food processing equipment, technical and business support facilities and services and a hub for distance learning and con-tinuing education.

♦ Bid opened March 2007.

D A T A

Budget: 7.65 Million

Design: February 2006 - January 2007

Construction: June 2007 - June 2008

F o o d I n n o v a t i o n C e n t e r 14

K e y D a t e s

Concept Document: October 2002

Schematic Design: June 2006

Bid Award:

P a g e 7

J u n e 2 0 0 7

C a m d e n

♦ Renovation of the 76,000 square foot Camden Rec-reation Center, housing the Athletic and Recreation Departments.

♦ This facility will feature an upgraded natatorium, rac-

quetball/squash courts, gymnasium, administrative offices, storage, training and locker space.

♦ Project is in Design Development; Programmatic phase is complete and Schematic phase is underway.

C a m d e n R e c r e a t i o n C e n t e r

D A T A

Budget: 9 Million

Design: January 2007 - December 2007

Construction: January 2008 - November 2008

13

K e y D a t e s

Concept Document: March 2007

Schematic Design:

Bid Award:

C a m d e n C a m p u s

C i t y o f B r i d g e t o n

Page 13: Rutgers, The State University of New Jersey Institutional ... · Rutgers, The State University of New Jersey Institutional Profile Report Section J Major Capital Projects . U niversity

Si

gn

if

ic

an

t

Pr

oj

ec

ts U n i v e r s i t y U t i l i t i e s

♦ Expansion to the Davidson Road Substation.

♦ Features will include new 69 KV and 26 KV transform-ers and associated switchgear.

♦ 90% construction documents are expected February 2007. NJDEP General Wetlands Permits have been submitted. Freehold soil construction permit to be submitted in March 2007.

D A T A

Budget: 10.5 Million

Design: January 2006 - February 2007

Construction: March 2007 - December 2007

h i g h V o l t a g e s u b s t a t i o n : P h a s e 1 15

H i g h t e m p h o t w a t e r : B u s c h C a m p u s

♦ Replacement of old and failing High Temp Hot Water lines in 15 locations on the Busch Campus. (no map pro-vided)

♦ This project will be completed in phases over a four year period.

♦ Construction is underway. Total project is 25% com-pleted.

D A T A

Budget: 8 Million

Design: N/A

Construction: July 2006 - June 2010

16

K e y D a t e s

Concept Document: May 2005

Schematic Design: Not Applicable

Bid Award: Not Applicable

K e y D a t e s

Concept Document: Not Applicable

Schematic Design: Not Applicable

Bid Award: Not Applicable