S.No
Name of Project Service Provided by KSJ ENGINEERING
Year of Commence
ment
Status
1. APH system for KHDS Heaters for IOCL,Haldia
Electrical and Instrument Engineering
Feb-2009 In Progress
2. Trim crude heater CDU, IOC Haldia
Electrical and Instrument Engineering
Feb-2009 In Progress
3. 50 TPD Water Soluble Fertilizer( Urea Phosphate) Plant
Basic and Detailed Engineering, Procurement Assistance, Supervision for Construction, Erection & Commissioning
Feb-2009 In Progress
4. 30 TPD Labsa Plant, (Pakistan)
Design, Engineering, Supply, Supervision for Erection & Commissioning
July-2008 In Progress
5. 30 TPD Activated Bleaching Earth Plant
(Pakistan)
Design, Engineering, Procurement Assistance, Supervision for Erection & Commissioning
Sept.-2007 In Progress
6. 25 TPD Slop Fired Boiler System for Jubilant Organosys Ltd. Gajraula
Fabrication and Erection of Structural, Piping, Tankages and Installation of Slop Fired Boiler System
August-2008
In Progress
7. Expansion of Membrane Cell Based Caustic Soda Plant from 150 to 225 TPD for Gujarat Fluorochemicals Ltd, Gujarat
Basic and Detailed engineering, Procurement assistance, Supervision of Erection and Commissioning.
November-2008
In Progress
8. Study for up -gradation of Existing Caustic Soda and Hypo Plant for Ghion Gas, Ethiopia
Technical Audit of plant and preparation of report on Revamping
September-2008
Completed
9. Liquid CO2 Storage, Refrigeration & Evaporation Systems (Pakistan)
Design, Engineering, Supply, Supervision for Erection & Commissioning
May-2008 Completed
10. Harmonic Filter & Power Factor Improvement System for Caustic Soda Plant
(Pakistan)
Design, Engineering, Procurement Assistance, Supervision for Erection & Commissioning
Oct.- 2007 Completed
11. 30 TPD Chlorinated Paraffin Wax Plant (Thailand)
Design, Engineering, Procurement Assistance, Supervision for Erection & Commissioning
May-2007 Completed
12. 60 TPD (expandable to 100) Caustic Soda Plant for ASM Chemical Industries Ltd., (Bangladesh)
Technical Advisory Services May-2007 Completed
13. Capacity Enhancement from 175 to 200 TPD & Reduction in Emission Level of Sulphuric Acid Plant for Jubilant Organosys Ltd.
Design, Engineering, Procurement Assistance, Supervision for Erection & Commissioning
June-2007 Completed
14. Electrical Engg. Services forIndus Valley International School, Kolkata
Electrical system, Fire Alarm System, Audio-Video System & Networking
June’2007 Completed
15. 150 TPD Cl2 Bottling Plant for Gujarat Fluorochemicals Ltd.
Detailed Engineering, Supervision of Erection & Commissioning
April-2007 Completed
16. DPR for 120 TPD Caustic Soda Plant, MP
Detailed Project Report & Mkt. Survey
Feb’2007 Completed
17. HCU heaters BORP, Bina Pre-bid& Detailed Engineering
May-2007 Completed
18. 2 TPH Labsa Plant Detailed Project Report & Mkt. Survey
Feb’2007 Completed
19. 30 TPD Chlorinated Paraffin Wax Plant
Detailed Project Report Feb’2007 Completed
20.
30 TPD SBP Plant, Thailand
Detailed Project Report Feb’2007 Completed
21. 50 TPD CaCl2 Plant, Saudi Arabia
Detailed Project Report & Mkt. Survey
Jan’2007 Completed
22. H2 Bottling Plant Detailed Engineering, Supervision of Erection & Commissioning
Jan-2007 Completed
23. OHCU heaters IOCL Electrical and Instrumentation Engineering and Site Supervision
July-2006 Completed
24. Heaters for Naphtha Cracker Project IOCL
Detailed Mechanical Design and Drawings
July-2006 Completed
25. 150 TPD Caustic Soda Plant `for M/s. Gujarat Fluoro-chemicals Ltd. Through M/s.Aker Kvaerner Powergas Pvt. Ltd.
Detailed Engineering, Project Management, Inspection, Supervision of Erection & Commissioning
July 2005 Completed
26. 15 TPD capacity spices plant in Noida, India
Project Management ,Execution & Procurement Assistance
Sept 2004 Completed
27. Natural gas compression & cooling system in Bangladesh
Design, Engineering & supply
Feb. 2005 Completed
28. 20 TPH (480TPD) Free Flowing, Iodized, Refined Salt Plant in Bangladesh of M/s. United Salt Ind. Ltd.
Detailed Engineering, Project Management, Procurement Assistance, Inspection, Supervision of Erection & Commissioning
Jan 2005 Competed
29. 40 TPH Capacity Deoiled Cake Handling and Bagging System for Solvent Extraction Plant for M/s. City Vegetable Oil Ltd, Bangladesh
Detailed EngineeringInspection & Commissioning
March 2004 Competed
30. 24 TPD Capacity Caustic Soda Flaking Plant for M/s. Oman Chlorine S.A.O.G., Oman on behalf of M/s. Bertrams Chemical Plants Ltd., Switzerland.
Detailed Engineering, Quantity Survey & Technical Specification
May 2004 Competed
31. 20 TPH (480TPD) Free Flowing, Iodized, Refined Salt Plant in Bangladesh of M/s. City Salt Ind. Ltd.
Basic & Detailed Engineering, Project Management, Procurement Assistance, Inspection, Supervision of Erection & Commissioning
July 2004 Competed
32. 15 TPD Capacity Stable Bleaching Powder Plant in Bangladesh.
Detailed EngineeringSupervision of Erection & Commissioning
March 2003 Completed
33. 6.6 MW Natural Gas Based Captive Power Plant in Bangladesh
Detailed Engineering, Project Management, Procurement Assist.& Erection/Commissioning
Sept 2002 Completed
34. 220 NM3/Hr Capacity Hydrogen Purification & Bottling Plant in Bangladesh
Detailed EngineeringSupervision of Erection & Commissioning
Sept 2002 Competed
35. 35 TPD Capacity Caustic Soda Plant in Bangladesh
Detailed Engineering, Project Management, Procurement, Erection & Commissioning
Sept 2002 Completed