CONCRETE REPORT Project: MTC Landside Primary and Secondary Roads Project No.: G-0024 Location: Abu Dhabi Airport Engineer: AECOM Main Contractor: CSCEC Pile No.: S1B-B1-PC1- 07 Pile Length Pile Diameter: 1200 Theoretical Volume of Pile Pile Type: Working Pile Date No. Depth 1 7 7.92 7.92 8 2 14 7.92 15.84 8 3 20.9 7.80 23.64 8 4 23.869 3.36 27.00 3 BAUER __________________ CSCEC__________________ Theoritica Quantity (m 3 ) Commulative Theoritical Quantity (m 3 ) Actual Quantity (m 3 ) 5 10 15 20 25 30 0 5 10 15 20 25 30 16, 14 24, 20.9 7.92, 7 15.8, 14 23.64, 20.9 27, 23.8 Depth 8, 7 27, 23.8 Concrete

Upload: naresh-deivasigamani

Post on 15-Dec-2015

19 views

Category:

Documents


0 download

DESCRIPTION

sdgfdgsdfgert

TRANSCRIPT

CONCRETE REPORTProject: MTC Landside Primary and Secondary RoadsProject No.: G-0024Location: Abu Dhabi AirportEngineer: AECOMMain Contractor: CSCECPile No.: S1B-B1-PC1- 07 Pile Length 23.869

Pile Diameter: 1200 Theoretical Volume of Pile 27.00

Pile Type: Working Pile Date 10/25/2014

No. Depth

1 7 7.92 7.92 8 8

2 14 7.92 15.84 8 16

3 20.9 7.80 23.64 8 24

4 23.869 3.36 27.00 3 27

BAUER __________________ CSCEC__________________ ENGINEER_________________

Theoritica Quantity (m3)

Commulative Theoritical

Quantity (m3)Actual Quantity (m3) Cumulative Actual (m3)

5 10 15 20 25 300

5

10

15

20

25

30

Actual

Theoritical

16, 14

24, 20.9

7.92, 7

15.8, 14

23.64, 20.9

27, 23.8

Dep

th

8, 7

27, 23.8

Concrete