THIS IS AN ABRIDGED VERSION OF THE FULL VERSION
OF THIS PLAN. YOU WILL ALWAYS SEE THE CAPTION
******SOME TEXT MISSING******
THEREIN BECAUSE I DELIBRATELY DELETED THOSE
TEXT JUST TO SHOW YOU PART OF THE START-UP
PLAN.
THE FULL-VERSION IS WELL DETAILED AND IS
APPROXIMATELY 4,000 WORDS LONG. IT ALSO
CONTAINS THE CONTACT OF THE SACHET MACHINE
FABRICATOR AND THE POLYETHYLENE
MANUFACTURER/PRINTER.
THIS ABRIDGED VERSION WHICH IS ONLY ABOUT 1400
WORDS LONG IS ONLY A TIP OF THE ICEBERG.
MY INTENTION IS TO SHOW YOU PART OF THE
DOCUMENT IN ORDER TO CLEAR ALL DOUBTS.
THE FULL VERSION OF THIS START-UP PLAN IS
AVAILABLE AT A PRICE.
www.NAI
RAMAN
.com
2 +2348065008899
CALL +2348065008899 to order.
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
NAFDAC GUIDELINES Below are some of the NAFDAC Guidelines you will find in the report:
******SOME TEXT MISSING******
...A successful application attracts a Certificate of Registration with a validity period of 5 (five) years
whereas products with Listing status has a validity of 2 (two) years...
... payments to the Agency should be in Bank Draft payable to National Agency for Food and Drug
Administration and Control (NAFDAC).
• Water in sachet Thirty thousand naira (N30, 000:00) + 5% VAT.
• Water in bottle Fifty thousand naira (N50, 000:00) + 5% VAT...
******SOME TEXT MISSING******
www.NAI
RAMAN
.com
3 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
REQUIREMENTS FOR THE BUSINESS
Registration of business with Corporate Affairs Commission (CAC)
Registration with NAFDAC
Accommodation: NAFDAC recommends that the factory must not be residential nor
share compound with residential ones. Floor of production room and store must be
tiles; pallets must be on the floor of the store.
Two Dyna Trucks
Good Bore hole well
Nylon sachets
Sacheting machine
7.5 KVA Generating set
Other Consumables
These requirements are detailed later on in this report.
******SOME TEXT MISSING******
www.NAI
RAMAN
.com
4 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
HUMAN RESOURCES FOR THE BUSINESS
1. Production Manager: This ideal candidate must be well experienced and qualified.
A degree holder in related fields such as microbiology, food and drinks, e.t.c.
Especially someone who has previously worked with a sachet water company.
2. Administrative Manager: Who must be experienced and qualified in administration
of business. You can fit in here with the help of the Production Manager.
3. Machine operators
4. Parkers/Loaders/Supervisors
5. Cleaners
6. Drivers
CHALLENGES OF THIS BUSINESS 1. Meeting the NAFDAC requirements. NAFDAC is the main regulatory agency you
must meet its requirement before and after your products are approved.
2. Generating effective marketing strategies that would transform into money.
3. During the rainy season, demand for pure water may drop drastically.
4. How to get responsible, honest and reliable workers.
5. Since generating constant power is a problem in Nigeria, you have to plan your
business on generating set.
www.NAI
RAMAN
.com
5 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
FACTORY BUILDING PLAN The building to be used has been specified by the regulatory agency – NAFDAC as follows:
The building must be spacious, with many rooms. It must not be close to a cemetery, abattoir, petrol
station, refuse dump, sewage system, saw mill, or any source of pollution.
The building compound shall be strictly used for the water production only and shall not
share compound with any residence.
Every building to be used must be approved before commencement of production. The building must
make provision for:
1. Water Sacheting Machine room.
2. Cloak room.
3. Packaging materials room.
4. Finished product room
5. Offices.
******SOME TEXT MISSING******
www.NAI
RAMAN
.com
6 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
FACTORY OPERATING PLAN A typical sachet-water factory setting consists of a storage system (tanks), a conveyance
system (piping), a decentralized water treatment system (filters, UV disinfection units), and a
packaging system. The sachet water production follows this same order. The packaging is
done by making use of automatic liquid filling and packaging machines, also commercially
know as “automatic liquid packaging machines”, “form, fill and seal machines”, “form, fill,
seal, vertical (flow) sachet machines” or simply “sachet machines”.
******SOME TEXT MISSING******
Typical sachet-water factory set-up (Water Sacheting Room)
Filter
www.NAI
RAMAN
.com
7 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
The filters used for the factories that were surveyed included yarn (strung wound) filters,
granular carbon filters, and fiber matrix carbon filters. The filter cartridges and housings
come in two sizes, 20’’ and 10’’ sizes, which corresponded to the filter lengths.
Figure A: Sand and carbon filters.
Filter media in cylinders
Sand Filter Carbon Filter
Water Pump
www.NAI
RAMAN
.com
8 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Figure B: Series of yarn, fiber, granular carbon and carbon matrix filters.
Arrow shows flow direction
Yarn filter cartridge(used)
Fibre filter cartridge(used)
Matrix carbon filter
cartridge (used)
Figure C
www.NAI
RAMAN
.com
9 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
******SOME TEXT MISSING******
Figure D: Loading of polythene rolls in sachet machine
www.NAI
RAMAN
.com
10 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Figure E: Polythene rolls adjusted by folding on base board of bag former
www.NAI
RAMAN
.com
11 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Figure F: 0.5m of sachet rolls sealed longitudinally and at one end
Heat sealing plates “Transverse Sealing”
Heat sealing plates “Longitudinal Sealing”
www.NAI
RAMAN
.com
12 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Figure G: Final adjustment of roll and trimming below seal
www.NAI
RAMAN
.com
13 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Figure H: UV-bulb in sachet machine used to disinfect polythene roll
UV bulb used to disinfect polythene roll
www.NAI
RAMAN
.com
14 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Figure I: Automatic Counter(Indicated by Red Circle)
Figure J: Automatic Counter (Shown blown up)
www.NAI
RAMAN
.com
15 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Table Of Approximate Capital Cost Required For Sachet Water Factory
******SOME TABLE VALUES MISSING******
Item Unit Unit Cost
(Naira)
Approximate
Quantity
Cost
(Naira)
Sachet Filling and Packaging
Machine
No. 500,000 1 500,000
GRAND TOTAL 1,174,180
www.NAI
RAMAN
.com
16 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Operation and Maintenance Costs
******SOME TABLE VALUES MISSING******
Item Units Per Time Unit Cost
(Naira)
Approximate
Quantity
Cost
(Naira)
Electricity
Fuel Litres per day 2,340 30 70,200
Total Costs Per Month 696,730.83
www.NAI
RAMAN
.com
17 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Computation of cost of printing polythene bags used in sachet-water production
One roll of polythene weighs 13.8kg, including 1kg of an inner support the polythene is
rolled on. The weight of the polythene alone is thus 12.8 kg. The cost of printing 2 colours on
the polythene is approximately ******SOME TEXT
MISSING******
.
One roll of polythene (12.8kg polythene) is able to produce *** bags of sachets, with 20
individual sachets per bag. This is therefore equivalent to *** individual sachets per kg.
The equivalent cost a printed polythene bag for one individual sachet is thus N *** per
individual sachet.
These bags may be printed outside the State, so additional costs for transportation may apply.
Since the sachets were packaged in bigger bags of 20 individual sachets, the cost of the
bigger bag is factored into the N *** for individual printed bags calculated above. The
packaging bags cost N *** per 100 bags. This amounted to N *** per bag, and is equivalent
to N *** per individual sachet. Hence, the total packaging cost per individual sachet was thus
calculated as N ***. The total amount required per month for packaging material is therefore
N *** for the production of *** sachets per month (*** individual sachets per day).
Sachet-water Quantities Produced
www.NAI
RAMAN
.com
18 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
The number of sachets produced by factory should vary from approximately *** sachets per
day (*** litres/day) during the rainy and cold seasons to approximately twice as much (***
sachets or *** litres/day) during the dry and hot seasons. The quantities is summarised in the
table below:
Quantity of sachet water produced per day by sachet-water factories
Description Rainy Season Dry Season
Production per day
(Individual Sachets)
No. of Individual sachets
per bag
Production per day
(bags)
Volume
(litres produced/day)
******SOME TEXT MISSING******
Each bag of pure water sachet goes for as low as N 50. So if we are to use the rainy season
numbers to estimate the expected sales amount, the calculation will be as follows:
Number of bags sold daily=***
Cost per bag = N 50
Total Daily Sales = N 50 X *** bags
= N ***
Total Monthly Sales = N *** X 26 days
= N *****
Estimated Monthly Profit = Total Monthly Sales – Total Monthly Expenses
= N ******* - N *****
= N 428,000
www.NAI
RAMAN
.com
19 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
MARKETING TECHNIQUES There are various marketing techniques that can be applied. You must direct all your techniques
toward sales generations.
1. Price: Good pricing mechanism is one marketing technique you must have. Your products
must not be the cheapest; otherwise it ******SOME TEXT
MISSING******.
2. Promos: ******SOME TEXT MISSING******.
3. Use of promotional materials: ******SOME TEXT
MISSING******.
4. Donation: ******SOME TEXT MISSING*****.
5. Advertisement: ******SOME TEXT
MISSING******. Remember to inform NAFDAC of any advertising plans you may have.
APENDIX I
Sachet Machine
www.NAI
RAMAN
.com
20 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Schematic Diagram of a Sachet Machine (Front)
www.NAI
RAMAN
.com
21 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Schematic Diagram of a Sachet Machine (Back)
www.NAI
RAMAN
.com
22 +2348065008899
www.NAI
RAMAN
.com
SATCHET WATER PLAN (Designed By NAIRAMAN ©2011)�
http://www.NairaMan.com Page
Key To The schematic diagram of the sachet machine