    CHAPTER 1 INTRODUCTION

    1.1 Background of the Study

    Metro Truck Builders Inc. in Dasmarias, Cavite and its other branches is

    known to manufacturer different product for truck body building and assembling

    for its customers of over 5,000 corporations in the country. Since the companys

    warehouse holds large amount of inventory, and every week they need to find out

    how many items or products were lessen from the products they have since the

    first day of the week of transaction, it is more difficult for the employee involved

    in keeping record to remember approximately inventory records and balances.

    With the current situation at the companys warehouse, department uses

    manual file system to manage about 250 items/products. When a new stock is

    added or a new stock is deducted, records are modified with the use of pen and

    paper, which we know can cause of inconsistency.

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    2/21

    1.2 Statement of Objectives

    Using pen and paper to record each transactions have been made has a

    high chance of data inconsistency.

    Misplaced records

    Not enough security for the record items

    Transactions are not quite slow and inaccurate in tracking the

    records

    1.2.1 General Objective

    To design and develop an inventory management system for the

    warehouse of Metro Truck Builders,Inc.

    1.2.2 Specific Objective

    To avoid losing of records

    To provide data Security

    To make transaction easy and accurate in tracking the

    number of inventory

    Metro Truck Builders Inc. Inventory System1-1

  • 8/7/2019 sad 2 revise

    3/21

    1.3 Significance of the Study

    This study is made to make a computerized product inventory

    management for the warehouse of Metro Truck Builders, Inc wherein

    every week they will have a report on all about their products/items.

    Since they have a large amount of inventory, it is necessary for them to

    have a computerized system.

    Using the system, the staffs who are in charge of the process can

    easily determine products which are lessen on how many items are

    purchased, subtracted and added for a week of transaction. Also, the

    company will benefit a lot from the system since if they use the

    proposed system, inventories will accurate. The contractors will be

    easily notified of the items available and items which are not.

    The study aims to develop an inventory management system which

    can be very helpful for the company

    Metro Truck Builders Inc. Inventory System1-2

  • 8/7/2019 sad 2 revise

    4/21

    1.4 Scope And Limitation

    Scopes

    It can do several functions like adding, search, deleting, modifying

    or editing.

    It can tell the levels of inventory, the number of stocks that enters

    and exits the system and the total quantity after those transactions.

    It can print weekly reports of the transactions that has been done.

    Limitation

    Only focuses on tracking and accurate keeping of inventory

    records.

    Metro Truck Builders Inc. Inventory System 1-3

  • 8/7/2019 sad 2 revise

    5/21

    CHAPTER 2.0 Methodology of the Study

    Prototyping is the process that enables the proponents to create a

    model of the software to be built. A prototype is an original type, form, or

    instance of something serving as a typical example, basis, or standard for

    other things of the same category.

    Figure 1.0 Prototyping Model

    The Prototyping has the following phases:

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    6/21

    PLANNING

    In this phase, the proponents plan how to develop the development of the

    inventory system gathers data needed for building the system. The proponents are

    required to conduct series of interviews and research that are needed in the study.

    Analysis

    In the modeled the existing System and carefully analyzed the

    Requirements needed to develop the system.

    Designing

    In the Designing phase, the proponents will construct and study the

    design, structure and components of the system suitable for Metro Truck Builders,

    Inc.

    Implementation

    The developer used Microsoft Visual Basic 6.0 by Microsoft Corporation

    Ensure that the system will be compatible in all standard window based operating

    System.

    Maintenance

    Tested the system by observing, operating and one-by-one testing, in this

    Procedure, we can see the result much better and we could adjust errors if

    Possible, also to ensure the user that the system is functional and well built.

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    7/21

    CHAPTER 3.0 DATA GATHERING PROCEDURE AND OUTPUT

    The interview is the primary technique for gathering information for the

    development of the project. The proponents interviewed the person in charge for tracking

    and keeping inventory records, and gathered all the necessary information that we needed

    creating and developing our proposed system through interviews. The proponents asked

    her several question with regards to their current system and what the problems are they

    encountered. The proponents analyzed each statement that they gave for them to know

    what would be the things they should consider in creating the system.

    These are some of the question that we asked and their response.

    Metro Truck Builders Inc. Inventory System

    How does your system? Semi Manual.

    How long does your system work? Since from the start of this company.

    How do you keep your records? Using a desktop pc.

    Do you encounter problems on

    keeping your records using your

    current system?

    Yes, frequently we do encounter that type

    of problem.

    Do you want to replace your old

    system with a new one?

    Definitely, we want a new system.

  • 8/7/2019 sad 2 revise

    8/21

  • 8/7/2019 sad 2 revise

    9/21

    Physical Environment

    The project will function in very computer that has adequate resources.

    Microsoft Windows 2003 and later will be needed in order to function properly,

    Must have at least 128mb of memory and 32-bit depth of screen resolution.

    The system can only be used by the manager, secretary and the owner of

    The Company.

    Functionality

    The system can do several functions like managing the orders, and

    Managing the available stocks in the warehouse, the user should do some events

    In order to process.

    Resources

    Any person will do maintenance as long as he knows the current flow of

    The system and he knows working on computer software. The system will need a

    Fully qualified computer operator in order to function very well and stable.

    Security

    The information of the system is restricted to people who are connected to

    The company and the person to have a right to alter data entered on the database.

    4.0 The Existing System

    4.1 Company Background

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    10/21

    Founded in 1980, Metro truck builders Inc. roots started in a humble rented shop along

    the comers of Marconi and Dalton streets in Makati City. Armed with only 15,000.00 and

    guts as its starting capital, Nemy Barrameda, president and general manager of MTBI,

    recognized the growing potential of truck body requirements and started the venture

    tapping his previous corporate accounts as his initial customers and developing new

    patrons and emerging commercial enterprise clientele as his target market.

    After one year in operation, the company expanded its manufacturing operation and

    acquired a lot along CAA Rd, Pamplona Las Pinas City. MTBIs products gained

    recognition and demand for its product grew along the years while it expanded acquiring

    another site at IMPEX Industrial Subdivision and J Aguilar Ave. also at Las Pinas City.

    The Three plants produced riveted aluminum vans, high side pickup with roof (HSPUR),Drop side and Jeepney-type bodies for all brands of vehicles.

    In 1991, the company acquired a new site for its expansion program located at km. 28 E

    Mission

    To be the country leading logistic solution provider through innovative truck body

    Design and reliable assembly.Serving its customers with punctual delivery and remarkable quality in its

    workmanship

    To provide its customers quality products through innovation and flexibility in linewith their needs of truck body requirements.

    Vision

    To maintain harmonious and reliable business relationship among its employee

    Business partners and customers

    To remain profitably enterprising in all its business, Activities through flexibility

    and continuous growth

    To become the most preferred supplier of truck body requirement in all industries.

    4.2 Description of the System

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    11/21

    Metro Truck Builders, Inc. Dasmarias, Cavite has a semi manual system in monitoring

    their supplies or materials since when the person in charge in the warehouse start working

    in the said company. Editing records are done with the used of pen and a sheet of paper.

    For example, a number of items are added or subtracted in the warehouse, person in

    charge will just manually compute for the sum or difference and then write in the paper,

    where the records are temporarily kept, that may cause of data loss and lack of data

    security.

    4.3 Data Flow Diagram

    Context diagram

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    12/21

    Data Flow Diagram

    DIAGRAM 0

    4.4 Data Dictionary

    Part Number = {Legal Number}Part Name= {Legal Character}Beginning Inventory= {Legal Character}Purchase= {Legal Character}Withdrawal= {Legal Character}End Inventory= {Legal Character}Date= Month+Day+Year

    4.5 Problem Areas

    The Metro Truck Builders Incorporation encountered a problem regarding in

    updating the previous records in inventory and orders to monitor the records.

    Metro Truck Builders Inc. Inventory System

    CUSTOMER

    1.0

    Parts/Contract

    2.0

    Product

    Availability

    3.0

    Product

    Approval

    Warehouse

  • 8/7/2019 sad 2 revise

    13/21

    5.0 The Proposed System

    5.1 System Overview

    The system is only intended for the use of Metro Truck BuildersInc. Inventory system. It also has data reports of the products.

    5.2 Process Specification5.2.1 Data Flow Diagram

    See at Chapter 4.3

    5.2.2 Data Dictionary

    Part Number = {Legal Number}Part Name= {Legal Character}Beginning Inventory= {Legal Character}Purchase= {Legal Character}Withdrawal= {Legal Character}End Inventory= {Legal Character}

    Date= Month+Day+Year

    5.3 Data Specifications

    5.3.1 Entity Relationship Diagram

    5.3.2

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    14/21

    5.1 Schedule of Activities

    Activities Table 1.0 The Schedule of Activities

    Month June July August September October

    Week 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3Customer

    Communication

    Planning

    Data

    Gathering

    - Interview

    - Research

    Analysis

    Construct

    / modify

    Mock-up

    Design

    - Database

    - Interface

    - ProgrammingTesting and

    debugging

    Documentation

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    15/21

    5.2 Cost Estimation

    Table 1.1 Cost Estimate

    Item Quantity Unit Price Total

    Electricity 216 hours P15.00 /hour P 3240.00

    P.C rentals 10 hours P15.00 /hour P 150.00

    Printings 64 P 3.00 P 192.00

    Folders 8

    P 10.00 P80.00

    Book bind 1 P 40.00 P 100.00

    Total P 3762.00

    CHAPTER 6.0 REQUIREMENT ANALYSIS AND SPECIFICATION

    Metro Truck Builders Inc. Inventory System

    5-1

  • 8/7/2019 sad 2 revise

    16/21

    6.1 Process Specification

    The company uses a manual system. Editing records are done with the use of pen

    and sheet of paper. For example, a number of items are added or subtracted in the

    warehouse, the person in charge will just manually compute for the sum of difference and

    then write in the paper, where the records are temporarily kept, which is, we can say

    could be a cause of data loss and lack of data security.

    Figure 2.0 Data Flow Diagram of the Existing System

    Metro Truck Builders Inc. Inventory System

    PERSON

    In

    Charge

    ADD

    Update

    Update

    MTBI

    MTBI

    Print

    Update

    Pringting

    Update

    Input

    Add

    Record

  • 8/7/2019 sad 2 revise

    17/21

    Figure 2.1 Context Diagram

    Request Deliver parts

    Parts

    List parts reports

    Request Parts

    6.2 Data Specification

    The existing system of Metro Truck Builders, Inc. is the manual way of Inventory

    managing, updating and saving information of their tools and supplies. Base on the

    research and interviews done by the proponents, the following are the attributes included

    in the system.

    Table 2.0 Data Specification

    Data Field Data Type

    Description Text

    Unit Text

    Beginning Balance Text

    Purchase Text

    Metro Truck Builders Inc. Inventory System

    Inventory

    System

    Supplier

    Contractor Secretary

  • 8/7/2019 sad 2 revise

    18/21

    Withdrawal Text

    End Inventory Text

    CHAPTER 7.0 SOFTWARE DESIGN SPECIFICATION

    7.1 Process Specification

    Figure 3.0 Data Flow Diagram

    Metro Truck Builders Inc. Inventory System

    PERSON

    In

    Charge

    ADD Record

    (supplier, item)

    Update Stock

    Search

    Update

    SearchSearch

    Modify

    Database

    Database

    Item

    RecordVerify

    Input AddRecord

    PrintReport

    Update

    Generate

    Re ort

    Print

    6-1

  • 8/7/2019 sad 2 revise

    19/21

  • 8/7/2019 sad 2 revise

    20/21

    In order to use the system the user must have knowledge in MS Visual

    Basic 6.0 because this software is operated by that programming language. It is

    also better to use Intel Pentium 3 with at least 1 Gigabyte hard disk space. The

    Inventory System uses also Sybase Central for the database of the patient record.

    8.2 System Requirements Specification

    8.2.1 Hardware Requirements

    Intel Pentium 3 2.3 GHz

    128 Memory

    At least 1 Gigabyte Hard Disk Space

    Printer

    8.2.2 Software Requirements

    MS Windows XP

    MS Visual Basic 6.0

    Sybase Central

    8.2.3 Human Resources Requirements

    Metro Truck Builders Inc. Inventory System

  • 8/7/2019 sad 2 revise

    21/21

    The user must be computer literate and have the authority to access

    the record. User must be higher than the staff to secure the records.

    8.3 Software Testing

    8.3.1 Testing Activities

    White-Box Testing a test case design method that uses the

    control structure on the procedural design to derive

    test cases.

    Black-Box Testing enables the software engineer to derive sets

    of input conditions that will fully exercise all

    functional requirements for a program.

    8.3.2 Test Case

    Cases Yes No

    1. Is the system has a protection for all the data? 2. Is the system requires full data? 3. Is the system produce the exact reports? 4. Is the system has a unique key for every

    data?

    5. Is the transaction performs quickly?

    8-1