safal solar erp - safalerp.comsafalerp.com/pdf/safal solar erp.pdf · feasibility study here data...
TRANSCRIPT
SAFAL Solar ERP
Established in 1999 in Ahmedabad, Gujarat, India First in Gujarat certified with ISO/ IEC 27001:2005 and UKAS
accreditation from Bereau Veritas in IT – ERP Industries All India Business & Community Award – Business Excellence
2011 Nominated Leaders of Tomorrow Award – 2012 Specialized in Metal/ Steel, Casting, Engineering, Food, Cement,
Polymer and Infrastructure industries Having thousands of satisfied users around the globe. Presence in overseas market like Malaysia, Canada, Kenya &
Tanzania
SAFAL Infosoft Pvt. Ltd.
MRP-1 (Material Requirement Planning) & MRP 2 (Manufacturing Resource Planning)
Formula Management for Area & Weight Calculation for Various Finish Goods like Sheet & Panel.
Batch Number and Bar Code Generation for Each Finish Goods. RFID Tag Generation with Solar Panel’s Data Properties Machine Installation Management with After Sales Service Data
Management Material Size, Type and Property wise Inventory Management Multi Level Bill of Material Management
Industry Challenges
Features of SAFAL Solar ERP•Converted & regret order summary of marketing department •Currency Gain Loss Utility for Import & Export•Production cycle from order to dispatch •Separate sample & bulk production tracking •Stage wise production planning •Job Card / Work Order / PRC Tracking •Print Dispatch Detail, Inspection Report, IC & Invoice on single click •Daily production reports of all departments •Instant WIP status •Re-work order processing •Alert of delayed production based on expected date commitment •Department wise status of casting stock inventory in production •Department wise rejection analysis with rejection reasons •Inspection reports •Customer wise order tracking •Order status based on delivery date •Raw material (scrap) procurement based on confirm order •Separate inventory management for raw material, semi-finished & finished casting•Inventory based on bottom stock & purchase lead time of individual item as on date•Delivery performance, purchase & sales analysis in graphical presentation
•Marketing & Sales Management •Production Planning on Material /Man / Machine •Scrape Management on process bases and product bases •Inventory Management •Procurement Management •Quality Control Management •After Sales Service Management •Plant Maintenance •Finance Management •Human Resource Management •Calibration Management •Bar Code / RFID Management •MRP 1 Management – Material Requirement Planning•MRP 2 Management – Manufacturing Resource Planning•Schedule wise Production Planning Management •Online Order Integration
Advantages of SAFAL Solar ERP
MARKETING with Dealer Login & MNRE
DESIGN
PURCHASE WITH IMPORT
QUALITY CONTROL (QC)
PRODUCTION with PLANNING
STORE
CALIBRATION
MACHINE MAINTENANCE
SALES WITH EXPORT
HUMAN RESOURCE
SERVICE with CRM
FINANCE
SAFAL Solar ERP MODULES
Forms Description Fields to be used
Lead Management Used for generate and maintain leads Party Details, Item Name, Lead Source, Taken By etc…
Forecasting Used for sales planning and forecasting Category, Item Name, Qty, Amount, From Date, To Date, Customer, Note etc…
Inquiry In this form fill up customer’s Inquiry for your products or services
Category, Inq. Date, Customer, Inq. By, Inq. Ref., Sales Person, Item, Quantity, Specification, Quote Date, Status, Loss Reason, Follow up, Attachments, Reminders etc…
Offer Here company enters their Offer based on customer’s Inquiry
Category, Date, Customer, Est. Delivery Date, Item, Quantity, Rate, Sales Executive, Encl., Basis of Rate, Taxes and Duties, Inspection, Mode of Dispatch, Insurance, Validity, Payment Terms, Delivery Terms, Transportation, Packing Spec. etc…
Customer’s PO Here you can enter customer’s PO details
Category, Date, Customer, Ref No, Customer Specification for Item, Marking, Scope, Pecking, Delivery Period, Shipment Inst., Communication, Quality Docs, Payment Follow ups, Terms and Conditions etc…
Order Acknowledgement
In this form enter final OA data which is given to customer
Category, Customer, Date, OA Type, Rev Date, Login Date, Rev No, Delivery At, Freight, Discount, Dispatch Mode, Contact Person, Credit Terms, Road Permit, Transportation, Attachments, Reminders etc…
Marketing Management
Forms Description Fields to be used
Indent In this form data comes from production planning or department for need of any item which is not in stockHere data can be come from Planning / Manual or based on Minimum Stock Level for inventory items
Category, Date, Department, Item Name, Quantity, Lead time, recommended supplier, Special features of item, available stock, remark etc…
Inquiry In this form company generate inquiry to various suppliers for purchase indent items.
Category, Date, Supplier, Item, Quantity, Availability, Specifications, Attachments, Reminders etc…
Quotation Here enter supplier’s quotation which is received on the base of inquiry
Category, Date, Supplier, Reff No, Item, Quantity, Rate, Amount, Remark, Valid upto, Payment terms, Credit Days, Form Type, Note and applicable charges
Order After judge supplier’s quotation company raise Purchase order to supplier
Category, Date, Supplier, Item, Qty, OrderType(Import/Local), In case of Import then LC Detail, Shipping Detail, For Local Purchase use Purchase Executive, Freight, Discount, Mode of dispatch, Contact Person, Transportation, Road Permit, Excise etc…
Purchase Management - I
Forms Description Fields to be used
Inward After given purchase order material comes at your company’s location here material should be inwardFrom INWARD data might be go to INWARD QC
Category, Date, Supplier, Item, Weight, Book At, Driver Name, License No, LR Date, LR No, Destination, Transporter, Attachments, Document Settings, Packing etc…
GRN – Goods Receipt Note
After Inward OR Inward QC material will come to GRN form. If material is coming from Excisable traders then mfg bill detail will enter here.Deviation procedure is also available for any transaction.
Category, Date, Supplier, Item, Weight, Book At, Driver Name, License No, LR Date, LR No, Destination, Material Name, Quantity, Transporter, Attachments, Document Settings, Packing etc…
Final Purchase Here enter purchase invoice detail for accounting and stock effect
Category, Date, Supplier, Bill No, Bill Date, Item, Rate, Amount, Tax, Other Charges, Purchase Type, Credit Type, Credit Days, Remark etc…
Purchase Return In Purchase Return form enter goods return to supplier entry in case of rejection in qc or over quantity supply etc…
Category, Date, Supplier, Bill No, Bill Date, Item,Quantity, Rate, Amount, Other Charges, Deduction, Reason, Remarks etc…
Purchase Management - II
Forms Description Fields to be used
Feasibility Study Here data comes from marketing Inquiry department when any new product’s requirement comes and top management’s involvement required.
Party Name, Feasibility Type, Inquiry Category, Inquiry Number, Follow-up details, Attachment and reminder facility.
DCR(Drawing Change Request)
Here data comes from marketingdepartment / design department to change in drawing of any existing product / machinery
Date, DCR No, Part Number, Drawing Number, Existing revision number, Description of Part, Reason of Change in Design, Remarks, Attachments, Reminders etc..
DCN(Drawing Change Note)
Here design department will release note after fulfillment of drawing changerequest which was generated by concern department
Date, DCN No, Reference DCR Number, Rework Possibility, Replaceable with Old Revision, Finish Stock,WIP Stock, Part Number, Drawing Number, Existing revision number, Description of Part, Reason of Change in Design, Remarks, Attachments, Reminders etc..
Design BOM With the help of drawing change note concern department will change bill of material of any standard product / machinery
Design Code, Job Number, Design Date, Item Name,Item Code, Drawing Number, Batch Qty, BOM Type, BOM Date, BOM Category, Party Type, Planning, Remarks, Attachments, Reminders etc..
Design Management (R&D)
Forms Description Fields to be used
Production Planning Production Planning will starts form work order generation by this module company design their team and date wise production schedule and generate bought out item list as per minimum item quantity and BOM. Here 3M Planning will be execute,1. Material Planning2. Machine Planning3. Man Power PlanningSelection of Machine or Job work Party for different process.
Category, Date, Department, Planning by, Assembly –Sub Assembly Items, Quantity, Tem, Start Date, End Date, Priority, Bought out items, stock, lead time, Machine, Job work Party etc…
Production Order Production is depends on planning module. In this team wise and date wise production order will be generate as per planning. Batch No for ISO/ batch tracking for traceability. Concept of Theoretical Weight and Actual Weight in production and dispatch. Here Production department can change in BOM dynamically.
Category, Date, Team Name, Batch, Production Item, Row material item, Quantity, Remarks, Note, Stage etc...
Production Management I
Forms Description Fields to be used
ECN – Engineering Change Note
This form will come in picture when there is a change in Bill of Material under the case of Production Order released. Here user can alter the Bill of Material after production order generation
Team Name, Work Order Number, Job Number, Item Name, Production ID, Level, Planning Number, Drawing Number, Pending Quantity, Production Date, Priority, Process, Production Completion Date etc...
Direct Production For those organization who don’t want to go for BOM, Planning, Production Order, Material Issue, Material Receipt. Here user have to mention Material Input and Material Output
Category, Department, Party, Team, Batch No, Input Item Name, Input Item Code, Input Quantity, Input Item Stock, Input Item Location, Output Item Name, Output Item Code, Output Quantity, Output Item Stock, Output Item Location , Attachments, Reminders
Production Management II
Forms Description Fields to be used
Material Requisition Using this form user can request /generate indent of any material withrequired date and required item
Category, Date, Party, Department, Required Date,Required Item Name, Item Code, Required Quantity,Remark, Attachments, Reminders etc…
Material Issue By this form issue material toproduction or any other department orparty
Category, Date, Party, Department, Item, Quantity,Location, Available Stock, Rate, Amount, Remark,Attachments, Reminders etc…
Material Receipt Using this form store departmentreceive material from production or jobwork or from party
Category, Date, Party, Department, Item, Quantity,Location, Available stock, Rate, Amount, Remark,Attachments, Reminders etc…
Material Return Using this form store departmentreceive scrape material / othermaterial which is return fromproduction department or job work orfrom party
Category, Date, Party, Department, Item, Quantity,Location, Available stock, Rate, Amount, Remark,Attachments, Reminders etc…
Job-Work Detail By this form company give job work toout side parties.
Category, Date, Party, Item, Quantity, Rate, Amount,Challan No, Transport Detail, Remark, Attachment,Reminders etc…
Material Rejection In some cases material rejectionpossible for some defected material.
Category, Date, Party, Item, Quantity, Rate, Amount,Challan No, Transport Detail, Remark, Attachment,Reminders etc…
Stock Transfer Transfer Stock form one location toother location
Category, Date, Reason, From location, To location,Item, Stock, Remark, Attachments, Reminders etc…
Store Management
Forms Description Fields to be used
Inward QC In item master for any purchase item if QC required is on then every purchase case Inward QC Required before Inward entry
Category, Date, Inward No, Checked By, Item, QC Parameter, Parameter Value, Reading Reasult, Accept Quantity, Reject Quantity, Conditional Accept Quantity, Aconditional Accepr Reason, Remarks, Attachments, Reminders etc..
Production QC In item master for any production item if QC required is on Production QC comes after assembly wise production entry. Inspection Offer & inspection done by customer or third party.
Category, Date, Production No, Checked By, Item, QC Parameter, Value, Reading Result, Accept Quantity, Reject Quantity, Conditional Accept Quantity, Condition, Remark, Attachments, Reminders etc…
Job-work QC This form comes at the time of job-work receipt entry if job work item QC required is on
Category, Date, Job-work No, Checked By, Item, QC Parameter, Value, Reading Result, Accept Quantity, Reject Quantity, Conditional Accept Quantity, Condition, Remark, Attachments, Reminders etc…
Quality Management
Forms Description Fields to be used
Calibration Using this form you can calibrate you measure your calibrate Limit Gauges, Gauges, Fixers, Multi Gauges and input the readings.
Code of Gage, Type of Gage, Part No. Dimension, Reference, Supervisor, Item wise Parameter/Specification/Obeserval Dimension , Frequency, Inspector, and In-charge
Instrument Calibration Using this form you can calibrate you measure instrument and input the reading of those instrument.
Code of Instrument, Range, Least Count, Make, Type of Instrument, Group, Location, Department, Supervisor, Instrument Master, Steps, Error List and Actual Observation.
Inward - Outward When your measuring instrument going outside from your organization andcoming back to your organization then inward and outward will be given.
Unit From, Unit To, Department From, Department To, Supervisor From, Supervisor To, Code of Instrument, Type of equipment, Range, part No.
Calibration Management
Machine Maintenance
Machine Maintenance Predictive/ Preventive/ Breakdown/ Shutdown MaintenanceChecklists Equipment wise and shift wise. Equipment details with
Tools and tackles required Spares required Procedures Do’s and Don’ts Manpower requirement Man hour requirement
Breakdown analysis Equipment History & Failure Cost Spares Planning Individual Maintenance wise cost Breakdown Cost Calibration of tools and tackles
Check List
Break Down
Recovery
History Card
Forms Description Fields to be used
Dispatch Instruction Serial Number wise dispatch your product to customer.
Category, Date, Customer, Department, Location, Item, Quantity, Packing, Remarks, Attachments and reminders.
Delivery Challan Sales Challan or delivery challan will be generate for transporter to delivery goods at customer’s location
Category, Date, Customer Name, Transporter, Driver, License No, LR No, LR Date, RTO Name, LIC No, Sample detail, Book At, Destination, Packing, Remarks, Attachments, Reminders etc…
Invoice Sales Invoice entry for take account effect of sales and printing TAX/Retail Invoice for party
Category, Date, Customer, Sales Type, Credit Days, Form Type, Form No, Form Date, Item, Rate, Amount, Taxes, Overheads, Discounts, Other Charges, Remarks, Reminders
Sales Return For some cases it is possible that customer will return your sales material at that time you can use this form
Category, Date, Customer, Sales No, Item, Quantity,Rate, Amount, Charges, Return Reason, Remarks, Attachments, Reminders etc…
Sales with Export Management
Forms Description Fields to be used
Machine Installation All the detailed regarding installation of machine at customer site, would be manage in this module.
Category, Installation Date, Customer Name, Location, Item, Installation Status, Remarks, Service Engineer Name, Attachments and reminders.
Machine Trial Detailed regarding commissioning after installation of machine at customer site OR some times customer visit at plant for trial before delivery.
Category, Date, Customer Name, Middle Cone, Ball Tray, Trial Quantity, Trial Parameter, Trial Result, Remark, Attachments, Reminders etc…
Customer Complain All the details regarding any type of complain from any client will be store over this module.
Category, Date, Customer, Complain Type, Complain Parameter, Frequency, Warranty Details, Remarks, Reminders, Attachments, etc…
Solution All the solution or suggestion against each complain will be in this module.
Category, Date, Customer, Complain Type, Complain Parameter, Frequency, Solution Parameter, Service Engineer Name, Warranty Details, Remarks, Reminders, Attachments, etc…
Customer Feedback All the feedback details about delivered product / service will be store in this module.
General feedback fields
Customer Visit Periodically visit at client site from our service engineer will be keep in this module.
Category, Customer Name, Visit Location, Visit Date, Feedback, Negotiation, Attachment, Reminders, etc…
Service Management
HRD & Organization Personnel Payroll & ARS
Man Power PlanningRecruitmentoAdvertisementoConsultantoData Bank (Previous Resumes)oInterview Action PlanoDirect RecruitmentTrainingoInstituteoProgramoTrainingoPlanoExecution
OrganizationPrepare Organization ViewReporting StructureView OrganizationOrganization Chart
AdministrationoEmployee DetailsoLeave EntitlementoLoan/AdvanceoEmployee PFoEmployee ESIInductionoProgram oChecklist (Task Wise)Probationers EvolutionsSeparationoAcceptance LetteroSettlement DetailoExit Interview DetailsoEmployee’s GratuityoEmployee’s SuperannuationTransferAppraisalPromotionSalary IncrementTemporary StaffContractor
Grade Wise Salary StructureEmployee Wise Salary StructureGrade Wise Loan StructureOvertime AllocationArrearsPre Payroll ActivitySalary ProcessingBonus DetailFull Final SalaryLeave EncashmentMedical ReimbursementGrade wise Bonus Processing
ARSShift Employee MasterShift RosterAttendance Uploading Control FileEmployee CalendarManual AttendanceFull AttendanceUpload AttendanceDepartment Wise OTEmployee Wise OT
HR & Payroll Management
Forms Description Fields to be used
Bank In this form use Bank Receipt and Bank Payment entry with cost center, Profit Center, Party Bill Adjustment etc…
Daybook, Date, Voucher No, Ac Name, Amount, Deduction, Cheque No, Voucher Amount, TDS Amount, Cost Center, Profit Center, Bill No, Bill Date, Total Amount, Adjustment Amount, Balance Amount , Remarks, Reminders etc…
Cash In this form use Cash Receipt and Cash Payment entry with cost center, Profit Center, Party Bill Adjustment etc…
Daybook, Date, Voucher No, Ac Name, Amount, Voucher Amount, Cost Center, Profit Center, Bill No, Bill Date, Total Amount, Adjustment Amount, Balance Amount etc…
Journal Voucher For any expense or other voucher entry you can use this form
Daybook, Voucher No, Date, Narration, Account Name, Credit/Debit type, Remarks etc…
Cr / Dr Note Using this form company can give Credit or Debit note to any party
Daybook, Date, Voucher No, From Account, Narration, To Account, Narration, amount, Remarks etc…
Contra For Transfer company’s fund from Bank to Cash, Bank to Bank, Cash to Bank or Cash to Cash
Category, Date, Voucher No, Bank Acc, Cash Acc, Amount, Narration, Remarks etc…
Reconciliation Reconciliation refers to a process that compares two sets of records to make sure they are in agreement.
Category, Date, Voucher No, Bank Acc, Cash Acc, Amount, Narration, Remarks etc…
Account Management
Analytical Reporting
Case Study from SOLAR Industry
HIRAMRUT ENERGIES PVT. LTD. (SUNRAY) - AN ISO 9001:2000 certifiedcompany, is one of the largest manufacturer of eco-friendly & pollutionfree products like solar water heater, solar lighting system & solar cookingsystem. Sunray was using their own in house system which includes manybusiness activities. But it was not central database system. There was noscope for MNRE details as well as dealer & sales executive transactiondetails.
Topsun Energy Ltd. is one of the leading solar power solutionmanufacturers in India & International market. Company has vastexperience in Renewable specific to SPV technology & solutions. TheCompanies strongest areas are solar Telecom power system, KW to MWSPV Power Plant. Topsun was using a international ERP for their businessactivity. Now a days Topsun is using SAFAL Solar ERP for full operations.
Find us here:
SAFAL Infosoft Pvt. Ltd.INDIA: Ahmedabad – Mumbai – Delhi NCR – Hyderabad – Kolkata
OVERSEAS: MALAYSIA – KENYA – TANZANIA www.safalerp.com
©SA
FAL
isa
regi
ster
edtr
adem
ark
of
Safa
lIn
foso
ftP
vt.
Ltd
.A
llo
ther
pro
du
ctn
ames
are
trad
em
ark
of
the
resp
ecti
vem
anu
fact
ure
rs.T
his
do
cum
en
tis
inte
nd
ed
for
info
rmat
ion
pu
rpo
seo
nly
.Co
nte
nt
are
sub
ject
toch
ange
wit
ho
ut
no
tice
and
no
tw
arra
nte
dto
be
erro
r-fr
ee.1
0.1
3