SAFETY IS A WAY OF LIFE IN
TATA SPONGE
TATA Sponge -Operation in harmony with nature Presented By :
Mr. M. R. Dutta
TATA SPONGE IRON
LTD. Corporate Office
TATA SPONGE IRON LTD.
▪ In the Orissa province (Eastern part of India)
▪ 275 KMs from the State Capital
▪ Remote mining cum agriculture area
02
COMPANY LOCATION
• Year1982: started as a joint
venture
company between TATA Steel
and
IPICOL, Govt. of Orissa
• 1985: Kiln # 1 commissioned
• Production capacity: 90,000 MTA
• 1990: Capacity enhanced to 120,000
MTA
• 1998: Kiln # 2 commissioned
• Production capacity: 240,000
MTA
• 2001: WHRB Power Plant
• Capacity: 7.5 MW
• 2006: Kiln 3
commissioned
• Capacity: 390,000 MTA
• 2006: 18.5 MW Power
Plant added
• 2007:
220 KV Power GRID
Employee strength : 421 Contractor Workforce: 650
03
Products Facilities available
Annual Production Capacity
Sponge Iron Rotary kiln 3,90,000 MT
Power WHRB Power Plant
26 MW (7.5 +18.5) MW
TPM Award JIPM-2012
OHSAS 18001 Feb, 2009
ISO-14001 March, 2003
ISO 9001 Oct,1994
CDM Benefit from UNFCCC
Indian Coal
based Sponge
Iron Company
to receive
1 st
TATA SPONGE – SAFETY EXCELLENCE JOURNEY
SAFETY AND HEALTH POLICY
The Tata Sponge is committed to providing a safe and healthy working environment and achieving an injury and
illness free workplace. Economic considerations will not have priority over implementation of safety and health
protection measures. While safety is everyone’s prime responsibility, senior leaders are expected to demonstrate
visible commitment through their behaviour. To meet our commitment, we will;
∙ Recognise safety and health as an integral part of our operations; consider safety and health in every decision
we make and in every activity we perform
∙ Comply and endeavour to exceed applicable regulatory safety and health requirements and set the highest
standards.
∙ Impart appropriate training and develop skills by engaging employees to help them work safely
∙ Assess risks and provide controls for safety and health hazards in our operations and use audits to check
compliance
∙ Promptly report incidents, investigate for root causes and ensure lessons learnt are shared and deployed
across group companies
∙ Influence our business partners in enhancing their safety and health standards.
∙ Set safety and health metrics as indicators of excellence, monitor progress and continually improve
performance
We aspire to become industry leaders and be a benchmark in safety and health performance
22nd May, 2015 DP
Deshpande
Managing Director
Policy & Objective:
SAFETY OBJECTIVE – “INJURY & ILLNESS FREE WORK PLACE” 04
SHE OBJECTIVES
Safety & Health Policy Environment Policy
Zero Injury Zero Occupational Health
Hazard Clean Environment
Risk Assessment, safety
inspection, training, Du Pont
safety culture, participation,
R&R, Audit & Review
Health check-up, sanitation,
awareness programmes
Aspect Impact study,
environment management
program, monitoring &
measurement, compliance,
environment audit
Deploy plan & measure
results
Conduct RCA for
gaps
Corrective & preventive
action
BASIC SHE APPROCH
05
6
SAFETY DEPLOYMENT PROCESS
Monitor &
measure Identify Gaps
Analyze Root
Cause
Prepare
action plan Re-Deploy
Computerized Safety Information Management System (SIMS)
Formulate SHE Policy
Prepare Safety Objective
Formulate Safety Committees
Prepare Safety Standards
Deploy Processes, Standards
and Procedures
• Factory Act, Labour Laws, State statutory guidelines
• ISO/OHSAS/DuPont System • Tata values, group policies • Company goals, objectives and
targets • Learning from past • Best practices, Bench Marking
with other national /international industries
•LTIFR
•First Aid
Case
• Violation of
Statutory
norms
Z
E
R
O
INPUT PROCESS STEPS OUTPUT
06
7
Company Objective Dept. Objective KPIs Target Linkage with ABP
INJURY & ILLNESS FREE WORK PLACE
To help the Company to achieve Zero LTIFR
Safety observation by Sr. leader, Management team & Associate team
100% 1.3
Safety fugaies identified vs. solved 100% 1.4
Near miss reported vs. solved 100% 1.16
Implemented corrective action 100% 1.12
To help the Company to achieve Zero First aid case
Training to employee as per plan 100% 2.3
Training to Contractor employee as per plan 100% 2.3
Health check up employee 100% 1.17
Health check up contractor employee 100% 1.17
Testing of all tools, tackles & pressure vessels 100% 2.3
Compliance to Mock drills as per plan 100% 1.11
No. of gaps identified Vrs. closed In mock drill 100% 1.11
% Compliance to inspection plan of all Fire fighting equipment (Extinguishers, hydrant, etc.)
100% 1.9
No. of gaps identified and solved during inspection 1.10
Zero Statutory Violation on account of Factories Act
Statutory compliance through E-enforce 100% 3.1
Compliance of Govt. agencies observation points 100% 3.2
SAFETY KPIs TO ACHIVE OBJECTIVES
07
Key Initiatives: • Adoption of Du Pont safety Management System.
• Safety Tree
• Safety Green Cross
• Tool Box Meeting
• Awareness & Training(Aadhar for Contract Employees, Training on Safety Standard, Awareness to community )
• IT Based Safety Information system.
• Mock Drills at regular intervals
• Improvement & Kaizens
• Reward & Recognition 08
Du Pont Safety Management System:
• Basic Beliefs: i) All injuries can be prevented
ii) All injuries must be reported immediately
Visible Felt Leadership
Safety Organization
• Safety Observations (Interact with people to eliminate unsafe act and enhance safe behavior )
• Contractor Management
1,2,3
, 4 &
5
09
Incident Investigation Process
1
2
3
4
5
Preliminary Incident Report (Prepare by Area In-charge & Submitted to Dept. Head & Head Safety within 24 hr)
Occurrence of Incident (LTI, FAC, NM)
Team Formation (Dept. Head consultation with Safety Head)
Incident investigation & Report generation (IISC approved the report)
Lesson learnt from the incident & Horizontal deployment
Chronology of Event • Event Description • Date, Time
Determining Facts • Samples/ relevant materials • Field photograph, video,
graphics, etc. • Eye-witness interviews • Documents verif ication • Condition of Equipment/
machine • Background data • Any change/ deviation
Why Tree Analysis • Root Cause Failure
Analysis
Determining Key Factors • Physical Factors • Human Factors • System Factors
System to be Strengthened
Process Technology/ Risk Analysis/ SOCP/
Management of Change/ Communication, Training
& Performance/ Contractor Safety/
Emergency Planning & Response/ Observation
& Auditing/ Safety Inspection/ Safety
Leadership
Recommending Actions • Corrective and
Preventive Actions for avoid reoccurrence
Communicating Findings (Lesson
Learnt)
Safety Observation / Tool box talk/ E-mails/ SIMS portal/ Notice Boards/
Departmental Meetings/ Safety Pause/ Corporate Communication/ Circular,
etc.
Follow up • Recommendation
Closure and Deployment Audit
10
Innovation- First aid tree
First aid tree shows first aid free man hrs.
First aid tree grow without first aid First aid tree fall due to first aid case
11
• Safety Green Cross for visual display of safety incidents
• Trousers and shirts for all women employees instead of sarees or loose dress
Best Practices – Safety
12
• Tool Box Meeting prior to start of any job
Awareness and Training: (Contract Employees)
AADHAR : A Training Programme for Contract Workforce Learning & Development
Objectives :
To educate unskilled/contract laborers with the current developments in
industrial operation.
To improve current and potential unskilled laborers’ performance by
increasing their skill and knowledge by changing their attitude towards
their job.
To address their skill needs, by keeping them current with the changing
needs.
To make them aware to be safe in job as well as in their day to day life.
To involve the contract laborers in all basic operational activities of the
company
To motivate and reward and recognize contract workforce in all
achievement by involving them in organizational improvement activities.
To apprise them of their ethical rights and how to exercise the same
To encouraging their involvement in abating carbon footprint
Results:
Tar vs. Act
13
……..continues
Training on Behaviour Safety Safety awareness program at petrol pump
Safety Booklets for Drivers Training to Truck Drivers at
NH Training to Contractor workforce
14
IT based Safety Information Management system:
Mock Drill at regular intervals
15
Theme Problem statement Proposed actions Result / Out comes
Elimination of
Repeated safety
Fugais
During safety observation visit the following natures of fugaies are identified. Drain cover-104 Guard-142 Cable-171 Earthing-63 PPE-28 Isolator-28 JB-18
Theme based safety observation
Assign the responsibility to shift in-charge to solve the problem by analysis & implementation
Implemented award system for reduction of fugaies (department wise)
Implemented measurement slip for contractor job in every day basis
Chain are fixed in all the conveyor guards
Vital few
Useful many
ELECTRICAL
MECHANICAL
CIVIL E & I
Repetitive nature of safety Fuguais.
CABLE
DRAIN COVER
PPE
EARTHING
ISOLATOR
JB
CABLE
ISOLATOR
JB
GUARDING
PPE
PPE
PPE
Cause-Effect
Analysis
Pareto
Analysis
Problem solving
16
Analysis:
KAIZEN Theme :To Ensure safe fabrication in the plant Idea : Provision of fire extinguisher stand with gas cylinder trolley
Activity JH PM KK QM SHE E&T IFC /DM OTPM
Result Area P Q C D S M
Equipment/Area/Location : WORKSHOP
Team :(Name,Emp.No)
•Mr. N.K LOHAR(1147) •Mr. S.B MOHANTY
•Mr. S. K. DASH
Kzn.Start Date :20/12/15
Kzn.Finish Date 26/12/15
Analysis : (Why-Why) :
Problem / Before Improvement:
Countermeasure/After Improvement:
Results :
Benefits : •Safe approach •Operation friendly •Moral boosting. Horizontal deployment At all gas cylinder trolley in workshop
KAIZEN IDEA SHEET
Fire hazard during gas cutting
WHY
Non availability of Fire fighting facility at various locations
WHY
Difficulties to carry fire fighting equipment always
WHY
No provision to fix fire fighting equipment with gas cutting set
WHY
Fixing of fire extinguisher at trolley was not envisaged.
GOOD
No safe approach for taking Fire Extinguisher with Gas
cylinder trolley. Portable f ire extinguisher stand attach with trolley
100%
0
KAIZENS
17
• Photo Identity and PPE are mandatory for the Gate Entry
• Face Detection based employee attendance system to restrict unauthorized entry
• Positive Isolation – before undertaking jobs at site - Lock Out and Tag Out
• Safety Induction Training to visitors and Contractors
OtherBest Practices - Safety
18
• Safety Quiz competition for Contractors
Safety month celebration with Reward & Recognition:
Safety Oath in the celebration Safety Nukad by Employees
Poster competition among children Reward & Recognition
Training to Township ladies
Instant Quiz competition 19
Health Check-up of Contractor workmen
Malaria prevention Activities
Dengu prevention job in progress
Yoga Practice in Progress Dengu awareness Camp. Blood Donation Camp
Regular fogging in township & Plant
Best Practices - Health
20
Health Report Normal Moderate Risk High Risk
BMI 54.49% BMI < 25
39.10% BMI 25 – 30
6.41% BMI > 30
Blood Pressure 41.33%
120/80 or less 49.11%
121-139/81-89 9.56%
> 140/90
Cholesterol 80.30%
< 200mg/dl 13.74%
200-300 mg/dl 5.96%
> 300mg/dl
Sugar Level 73.82%
< 140mg/dl 13.73%
140 – 199mg/dl 12.45%
> 200mg/dl
Health Status as on December 2015
Total Strength of employees at Joda 421
Total (4 criteria) health checkup done 421
Sample Size : 100 %
Avg Co Health Index : 3.35/4
ZERO Malaria cases in TSIL
township since 2011
21
5 6
8
10 9
3
7
1
2
4
Location Dust
Level
(in
µg/m3)
Norm: 2000 µg/m3
1 I.Ore hopper area
619
2 Coal hopper area
883 3. I.Ore crusher area
920
4. Coal Crushere area
1058
5. K-I ISB area 1321
6 K-1 Disch area
791
7 K-2 ISB area
1265
11
KEY INITIATIVES (Dust Mapping at Plant area)
Focused Hazards : Dust
Identified Areas Measures in place
RM Yard Dust suppression through water Tanker, Water monitors, Boundary wall etc.
Coal Circuit Fogging system, Chemical dust suppression system, Enclosed circuit, Cleaning chutes.
Iron Ore circuit Water suppression system, enclosed circuit, cleaning chutes
FP circuit DE system, Enclosed circuit
ISB Areas DE system, Water monitor
Bagging Machine Dust extraction system,
Unloading areas Unloading spouts, Water jacketing with pressurised water
Weighbridge area Road dust suppression
NB: Required PPEs (Nose mask, Safety Goggles, Eye wash shower, etc.) are provided in each area
• State-of-the-art ESP units
• Dust Extraction systems
• Pneumatic conveying systems for all DE and ESP units
• Chemical dust suppression system
• Retrievable unloading spouts with water jacketting system
• Road vacuum cleaning machines
• Water sprinklers on roads, RM yards and Railway siding
• Concreting of major plant areas
• Covering waste mounds and sweet soil and plantation
22
DUST MANAGMENT
23
> 90 dB
Area-PCC
BL 1,,2,3, 89- 85 dB
Area
79 - 75 dB
Area 74-70 dB
Area
84 - 80 dB
Area
Norm : 90 dB for 8 hour exposure
time
KEY INITIATIVES (Noise Mapping at Plant area)
Focused Hazards : Noise
Identified Areas
Measures in place
TG
Enclosure at 18.5 MW TG, Display of Noise level and signage, SOP/Signage in place. PPEs.
PCC Blowers SOP in place
Crusher area
Enclosing the crusher platform with proper material
We are here
Tata Sponge Performance
TATA SPONGE PERFORMANACE-NOW
24
RESULT (Safety)
25
And the Journey Continues
End of Presentation