Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 2 of 105 

Document Control 

 Issue Approval 

Mr. Virender Gupta Senior Associate Director 

  

23.08.2007 

 

 Signature 

Date 

Mr. T.R.Perumal Chetty,  Dy.General Manager(Safety) 

   

23.08.2007 

  Signature  Date 

Register of Amendments 

This summary table will accompany amendments.  Discard the previous Table and replace it with the latest version. 

Date Of Issue  Section(s)  Amendment No.  Description 

June,2007  ‐  Revision‐ 0  Approved by Associate Director. 

23 Aug, 2007  18 & 19  Revision ‐ 1  Approved by Senior Associate Director. 

Dec, 2008  9,13,14,15,16,17,  Revision‐2  Approved by Senior Associate Director. 

Abbreviations 

EHS  Environment, Health & Safety 

OHS&E or HS&E   Alternative common terms for Environment, Health & Safety 

PM  Project Manager  

AM  Asst. Manager – Projects 

PC  Project Coordinator 

CBRE  CB Richard Ellis 

 

Page 3: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 3 of 105 

Contents                                  Page   

Document control                  2                                         Issue Approval                      2                               Register of Amendments                         2                 Abbreviations                    2                                  

1. Introduction                    6                            2.EHS Policy                    7                        3.Safety Instructions and Procedures                       9                              4.Roles and Responsibilities                9 5.Communication                  11                                6. Monitoring                    12   7.Documentation                  12                     8.Project Safety Committee                12     9.Applicable Statutory Acts, Rules & IS Codes            13                              9.1 Project Compliance Check‐list              16                               10. Non‐Compliance of Safety and Health provisions          19                                   11. Disciplinary Action                  19                                12.Environment                   20                             12.1 Noise                    20                                 12.2 Material Safety Data Sheets (MSDS)            21                  12.3 Waste Disposal                  21                            12.4 House –Keeping                  21                         12.5 Public protection                  21                      13.Health                    21                                 13.1 First‐aid                    21                                     13.2 Contents of First‐aid box                23                            13.3 Drinking Water                  24                                  13.4 Latrines and Urinals                24                                  13.5 Anti‐Malarial Precaution                24                            14. Safety                    24                              14.1 Excavation                   24                                   14.2 Pilling                    25                       14.3 Mobile Plant                  25                              14.4 Concrete Vibrators                 26                           14.5 Concrete Mixture                  26                            14.6 Hoists, Cranes                  27                           14.7 Motor Vehicles                  27                      14.8 Trucks                    28                            14.9 Traffic                    28                           14.10 Fire Protection                  28                          14.11 Ladders                    29                          14.12 Scaffolding/Staging                29                           14.13 Form Work                  30                         14.14 Concrete Construction                30                          14.15 Barricades                  31                         14.16 Demolition                  31                          14.17 Painting                    31                          14.18 Welding and Gas cutting                32                          14.19 Grinding                    33                            

Page 4: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 4 of 105 

14.20 Work in Radiation Area                33                          14.21Work in and around Water bodies             33                           14.22 Guide lines and General procedures for use of Electricity at site      33                            14.23 Installation                  34                           14.24 Portable Electrical Equipment              36                 15.General                    36                              15.1 EHS Trainings                  36                               15.1.1 EHS Induction                  36                       15.1.2 Periodical training programmes              36                              15.2 Hazard Identification &Control measures            37                            15.2.1 EHS Inspections                  37                           15.2.2 EHS audits                  37                        15.2.3 Risk Assessment                  38                                 15.3 Safe Work Permit System                38                                15.4 Blasting Permit                  39                               15.5 Excavation Permit                  42                              15.6 Work at height Permit                44                            15.7 Hot‐work Permit                  46                          15.8 Confined space Permit                48                             15.9 Isolated area Permit                50                           15.10 Accident reporting & Investigation            51                             15.11 Educating Labour                 51                                   15.12 Reporting of accidents                51                               15.13 Emergency Evacuation Plan              51                          15.14 Personal Protective Equipment              52                         15.15 Project EHS‐Status                52                      15.16 Site Entry process                 53                             16  Formats                    53                             16.1 Site Safety Rules                  53                           16.2 EHS Responsibility & Accountability for Contractors         55                               16.3 EHS Induction                  56                         16.4 Safety Pep‐talk                  57                            16.5 Incident/Accident Investigation Report            58                               16.6 EHS Inspection                  59                     16.7 On the job safety Communications              60                             16.8 EHS Status Report                  61                          16.9 Safety Committee meeting               62                        16.10 EHS Penality                  63                              17. Safety Check‐Lists                  64                            17.1General Safety                  64                           17.2 Daily Inspection check‐list for Safety measures at site        66                             17.3 Site‐Layout                  68                         17.4 Personal Protective Equipment              69                          17.5 Material Handling                  70                            17.6 Material Storage                  71                          17.7 Fire Prevention & Control                72                             17.8 Excavation                   73                        17.9 Demolition                   75                          17.10 Scaffoldings                  76                         17.11 Confined Space                  77                       17.12 Radiography                  78                         

Page 5: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 5 of 105 

17.13 Painting                    79                     17.14 Work at Height                  80                        17.15 Electrical                    82                        17.16 Hot‐work                   83                     17.17 Form‐work                  85                           17.18 Fall Prevention & Protection              86                         17.19 Hand tools                  87                       17.20 Vehicles,Equipment & Eart moving equipment          89                           17.21 Cranes                    90                       17.22 Tower Cranes                  92                      17.23 Builders Hoist                  96                       17.24 Transit Mixer                  98                      17.25 Diesel Generator                  99                          17.26 Motor Vehicles and Traffic              100                     17.27 Plant & Mobile equipment              101                  17.28 House‐Keeping                  103                     18. Project Safety Documents                104                          18.1 List of Project Safety Documents tobe maintained by CBRE        104                        18.2 List of Welfare Documents required for Inspection          105   

                             

Page 6: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 6 of 105 

1 INTRODUCTION 

 The meaning of safety  is  ‘Freedom  from unacceptable  risks’ or  ‘Freedom  from danger’. Safety  in all construction  activities  is  a prime  requisite, but  is often neglected,  ignored on work  sites. With  the enormous  growth  of  construction  industry  and  the  advancement  of  ‘Construction  Technology’  the need  for proper attention  to Safety aspects has become essential  for human,  social, economic and other  considerations.  The  complex  techniques with wide  range of  construction  and other  activities have lead to new challenges in Safety.  The content aims is to explain the ways and means to create a safe and healthy work environment at our construction project sites for the protection of all personnel  involved  in the project construction activities from associated risks.  The  EHS  plan  is  structured  for  effective  implementation  of  EHS  standards  as  per  the  Factories Act 1948, Amendment act 1987, Building and Other Construction Workers Act ‐1996 (BOCW Act‐1996) and other relevant State and central Acts of Govt., of India.  The purpose of the EHS Plan is to make all our employees, contractors, consultants, workmen aware of minimum safety standards to be adhered in the process of execution of construction activities for the noble cause of accident prevention and to protect all from associated risks.  The overall objective of  the plan  is  to  ensure  effective  implementation of Company  standards  and comply with all statutory provisions related to Environment, Health and Safety (EHS) and also to meet client’s specific EHS requirements  Proper precautions based on risk assessments should be taken to improve Safety on construction sites to mitigate and minimize loss of limb, life, suffering and damage resulting from preventable incidents / accidents. 

CONTRACTUAL RESPONSIBILITES & MANAGEMENT COMMITMENT: 

It  is  the  prime  responsibility  of  project management  to  prevent  /  control  all  risks  involved  in  the process of project construction. All contractors/Sub‐contractors and their staff and workmen  must co‐operate in implementation of EHS rules and regulations mentioned in EHS plan without any excuse in the  interest  of  safe  guarding  Environment  health  and  safety  at  protect  site.  It  is  of  contractual responsibility of  all  concerned  to maintain  client’s  reputation and  to  take  care of workers  safety & welfare  as  a  social obligation. The basic  requirement of plan  is  to  achieve  EHS goals  for  successful completion of project.  

Page 7: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 7 of 105 

  

2 EHS POLICY 

Management  of  CB  Richard  Ellis  South Asia  Pvt  Ltd  is  vitally  interested  in  Safety  and Health  of  its employees  and  attaches  utmost  importance  to  safeguard  the  employees  from  injury,  occupational disease  and  environment. Management  shall make  every effort  to provide  a  Safe, Healthy working Environment.    Ensures  that  the  plant, machinery,  equipment  are  safe  for  use  in  compliance with established safe working procedures and practices.  The company has made it a requirement that all who work with us, visit us or do business with us must comply with CBRE‐ EHS policy.  It  is  in  the best  interest of practices  to consider Environment, Health and  Safety  in  every  activity.  Commitment  to  Health  and  Safety  forms  an  integral  part  of  this organization from management to the workers.  We shall operate our projects in such a way that the Safety and Health of our employees, contractors, visitors  local  residents and Environment, are ensured and  they will not be exposed  to unacceptable risks.   

2.1* Company’s Health, Safety and Environment Policy is Enclosed 

Page 8: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 8 of 105 

Page 9: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 9 of 105 

  SAFETY ORGANISATION 

  *   Safety Organization chart.  

3 SAFETY INSTRUCTIONS AND PROCEDURES 

• Clear safety  instructions and procedures are the basis  for  functioning of all at site. These safety instructions and procedures are the minimum safety requirements to be followed by all always at site.   

• Every  employee,  contractor  and  visitor  is  responsible  for  fulfilling  all  safety  instructions  and procedures. 

• Report unsafe conditions, situations and handlings to the Project Manager. • Safety  instructions  from Management,  Safety  team  and  site  conditions,  generated  are  to  be 

followed. • First Aid, Fire section, concerning Safety and Health care are to be followed always. 

4 ROLES AND RESPONSIBILITIES 

The  Project Manager  CBRE  shall  be  totally  responsible  for  compliance,  implementation  of  Health, safety and Environment Policy.  

1. Project Manager 

• Responsible  for  the overall management of  safety,  safety planning and organization on  this site. 

• The  Project Manager  is  the  team  leader  and  should  be  the  role  model  for  all  staff  and employees to follow. 

• Prepare and  instigate safety policy and procedures on site, delegate responsibilities to other competent persons, then check these roles and responsibilities are fulfilled. 

• Fix the roles and responsibilities in writing and ensure they are fulfilled for each staff member so as each person is aware of and complying with his role. 

• Attend all safety meetings. • Review Safety Plans and Workplace Risk Assessments prepared by the contractors prior to that 

trade being given commitment and starting on site. • Review preliminary design and drawings for potential safety risks and advise the Consultants 

of these and remedies for same. • Carry  out  informal  and  formal  safety  inspections when  on  site  and  report  findings  to  the 

Contractor for rectification. • Set a personal example of implementing the Project Safety Policy. • Educate contractors  to be  fully conversant with all CB Richard Ellis  safety  requirements and 

incorporation of safe work practices in their operations. • Ensure contractor Safety Plans are implemented and modified as necessary on site. 

In connection with Indian Standards and Regulations the tasks and responsibilities of Safety and Health Manager as well as the Design‐engineer are defined at the design & construction phase: 

Page 10: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 10 of 105 

Safety Manager‐At Design Phase: 

• Co‐ordination of general aspects with respect to Safety, Health and Welfare. • Taking  care  of  EHS  plan  setup  in  “Draft”.  Putting  together  Safety  Health  &                

Environment files. • Handover EHS plan in draft and filed to the client for the construction phase. 

Safety Manager—At Construction Phase: 

• Organizing, coordinating and Co‐operation between contractors. • Co‐coordinating Safety, Health, Welfare measures by the contractors. • Co‐coordinating Supervision; to meet the joint facilities. 

Consultants 

• To  be  briefed  and  educated  by  the  Project  team  on  their  responsibilities  with  regards  to ‘designing in safety’. 

• To be educated and shown safety problems with  their design on site so as not  to make  the same mistakes again. 

• To nominate, areas requiring special procedures or practices to reduce accident potential. • To be briefed by  the site  team on  the proposed construction methods and be subsequently 

updated. • To take a pro‐active role in safety as part of the ‘Project Team’. 

Contractors and Their Employees 

• Safety  representative  from each  company  to be nominated  to  attend  safety meetings on a weekly basis.  The days of the meeting will be nominated by CB Richard Ellis. 

• The nominated person for the company will be responsible for all details and safety issues of the meeting and to be related back to fellow workers. 

• Any chemicals, plant and equipment  that are  to be used on site  the contractor must supply Material  Safety Data  Sheet  ( MSDS)    and  the Manager  or  Principal  of  the  contractor  is  to ensure  his men who  are  using  the  chemical  have  been  trained with  the  correct  handling procedure for the use of this chemical. 

• Maintain a full safety kit on site at all times. • The  Manager  or  Principal  of  the  contractor  is  to  provide  evidence  that  the  men  he  has 

employed have had adequate  training  to be able  to work safely with  the duties  that will be performed on site. 

• Any  lost  time  injuries  the  contractor  is  to  notify  CB  Richard  Ellis  and  provide  all  necessary details. 

• Contractors to supply risk analysis sheets and safety plan for review before work commences on site for critical activities identified. 

• Contractor to inform CB Richard Ellis of any known hazards that may occur during their scope of works. 

    

Page 11: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 11 of 105 

5 COMMUNICATION 

Kick‐off Meeting: 

• The kick‐off meeting should be seen as a start meeting, preliminary to the general or project oriented activities. 

Prior  to starting of project activities a meeting with all consultants, contractors will be organized  in order to make all concerned aware of the EHS rules & procedures to be adopted by team during the construction of project. The Project Manager who is In charge of the project will chair the meeting and the following take part in the meeting. 1) Regional Manger‐EHS/Project EHS‐Coordinator 2) Site In charges of all Contractors/Sub‐contractors  3) Consultants   4) EHS coordinators of Contractors/Sub‐contractors    In  the meeting  the  EHS  plan meant  for  the  project  will  be  disclosed  and  discussed  for  effective implementation.  The client’s representative may also present in the meeting wherever possible  The points discussed will be recorded and minutes will be distributed to all concerned  The document which speaks  the “Responsibility and Accountability “of Contractors/Sub‐ contractors would be issued and acceptance would be obtained by duly signed and acknowledged. (Annexure‐1) 

• In the kick‐off meeting beside technical relevant  information pay attention to the aspects of Health, Safety and Environment in general. 

Safety Meeting: 

Specific appointment e.g. Action points as result of consultation between safety technicalities related to the project is discussed. Weekly meeting  shall  be  conducted  by  contractors  for  the  entire work  force with  specific  agenda under observation from the Project Managers safety team. 

Pre‐Job Meeting / PEP talks: 

The Pre‐Job Meeting is meant for consultation before activities start.  A part of the meeting is a review to make detail appointment  for  specific plan on  location directed  to Health and Safety matters and actual deviation of the normal situation.  At this meeting the “pre‐job checklist” shall be handed over and worked out with all persons involved. 

• This  is  to be conducted at once  in week by  respective EHS coordinators of contractors/Sub‐contractors. 

• These are meant for developing safety awareness and to remind the various safety measures and rules to be followed by the working group  

• During  the  talk  the  safety precautions  for various activities and general EHS  rules would be highlighted. 

• Ensure active participation, interaction of workmen and encourage them to share their similar experiences of other sites 

•  The records of Pep talks are to be maintained and a copy of the same is to be sent to Project –EHS coordinator  

    

Page 12: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 12 of 105 

Tool Box Meeting:  

Toolbox meetings are CBRE’s internal matter. With this kind of consultation, executing employees will be informed about the actual work. This information can be appointments, instructions, which are the result of above‐mentioned meetings. A toolbox meeting is a medium to inform executing employees. 

• The  meetings  will  be  organized  by  Contractors/Sub‐contractors  at  their  respective  work locations daily . 

• The meeting would be held with the concerned staff /workmen involved in the specific job. In the meeting the safety measures and the procedures to be adopted would be conveyed to all concerned after discussing/assessing associated risks prevailed in the work activity. 

• The meeting  would  be  held  on  need  basis  and  conducted  by  Site  Engineer/Foremen/EHS coordinator as and when changes of procedure/machinery and for new teams. 

• The records of Tool Boxes are to be maintained and a copy of the same is to be sent to Project –EHS coordinator  

Progress Meeting: 

• The progress meeting is meant for the daily / weekly consultation between the client and the main contractor  

• EHS part in this meeting, should be a fixed item on the agenda and following discussed. • Measures as a  result of  finding  from  risk analysis, which are  related  to  interaction between 

different disciplines. • Findings as a result of inspection observation on incident. • Explanation on procedures, instruction and special measures. 

6 MONITORING 

Arrangement  shall  be made  for  Safety  and  Health monitoring  of  the  site  on  a  regular  basis.  For example  a  few  of  this  shall  include  ensuring  safety  of  scaffoldings,  excavations,  plant,  equipment matters such as hazardous dusts, fumes, noise etc. Project Manager shall ensure periodical inspection by visiting the site along with Safety Manager / Officer and Engineers. 

7 DOCUMENTATION 

CBRE shall ensure that all state notifications, examination and  inspections are carried out. Except for plant  used  exclusively  by  individual  contractor,  all  record  shall  be  kept  and  updated  by  Project Manager. 

8 PROJECT SAFETY COMMITTEE 

As prescribed by the Building construction act, 1996 a site safety committee has to be constituted. The Committee shall comprise of client representatives, project management representatives and equally represented by contractors. The Project Manager shall totally be responsible for compliance with this EHS plan and code. CBRE shall appoint a EHS Manager/Officer and form a safety committee along with operatives from sub‐contractors.   Project Manager shall chair safety Committee and report once  in a month to Project Controller. The Project Manager shall take suitable measures to ensure the effective 

Page 13: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 13 of 105 

co‐ordination of the works from all contractors at site.  He should ensure that he is kept informed on a day‐to‐day basis of progress and problems. Clear line of communication shall be set up between each contractor and Safety Manager / Officer of CBRE.  Operatives shall know to contact over safety, health matters  requiring  action  on  a  decision.  Safety  committee  reports  shall  be  submitted  to  Project Controller in every project meeting. 

• A Project EHS committee will be constituted for the project to discuss, review and resolve all EHS matters of the project  

• The  project Manger/In  charge would  be  the  Chairman  of  the  committee  and  Project  EHS coordinator would be Secretary of the committee.  

• The Site In charges of contractors/Sub‐contractors and their safety coordinators would be the members of committee  

• The meeting would be held once in week/fortnight. • In  the meeting all EHS  issues would be discussed and  resolved  for necessary measures. The 

performance and effectiveness of EH&S Plan would be reviewed for achieving desired level of performance. 

• The  minutes  of  meeting  would  be  circulated  to  all  concerned  and  to  Regional  EHS Manager/Coordinator. 

9 APPLICABLE STATUORY ACTS, RULES & IS CODES: 

CBRE and all contactors shall comply with client rules and procedures, National legislation codes etc. 

Statutory Provisions 

• The Factories Act 1948, Amendment Act 1947 • The Environment Act 1986 • Workmen’s Compensation Act, 1938   • Building and Other Construction Workers  • (Regulation of employment and condition of service) Act, 1996 • Buildings and Other Construction Workers Welfare Act, 1996 • Payment of wages Act, 1936 • Equal remuneration Act, • Minimum wages Act.1948 • Employers liability Act, 1938 • Industrial dispute Act, 1947 • Maternity benefit Act, 1961 • Contractor labour Act, 1970 • (Regulation and abolition) • Provident fund Act, 1952 • Payment of gratuity Act, 1972   • Indian Explosives Act and the explosives Rules. • The Gas Cylinder Rules, 1981 • Static and Mobile Pressure Vessels (Unfired) Rules. • The Indian Electricity Act 1910 and Indian Electricity Rules 1956 • The Atomic Energy Act, • The Radiation Protection Rules. • NFPA, • National Building Code etc. 

 

Page 14: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 14 of 105 

Indian Standard (IS) Codes related to E&HS 

                         The main contractor and all sub‐contractors are to comply with client specific riles and procedures, the National legislations and codes in particular the following: 

IS: 4081 ‐1986   Safety code for Blasting and Related Drilling operations                                                      

IS: 3764 ‐1992   Safety code for excavation work 

IS: 5121 ‐1969  Safety code for pilling and other deep foundations 

IS: 2750 ‐1964  Specification for steel scaffoldings 

IS: 3696           (Part‐I)‐1987 

Safety code for scaffolds and Ladders: Part‐ I Scaffolds 

IS: 3696            (Part‐II) ‐1991 

Safety code for scaffolds and Ladders: Part –II Ladders 

IS: 4082 ‐1977  Recommendations on stacking and storage of construction materials at site (First revision)           

IS: 4130‐1976  Safety code for demolition of building (First revision) 

IS: 4912‐1978  Safety requirements for floor and wall openings, railings and toe boards             (First  revision)                     

IS: 5916‐ 1970  Safety code for constructions involving use of hot bituminous materials 

IS: 7205 ‐1974  Safety code for erection of structural steel work 

IS: 7969 ‐1975  Safety code for handling and storage of building materials 

IS: 8989 ‐1978  Safety code for erection of concrete framed structures 

IS: 7293 ‐1974  Safety code for working with construction machinery 

IS: 2212 ‐1991  Pipe lines –Identification –Colour code 

IS: 5216 ‐1982   Recommendations on safety procedures &practices in Electrical works               (Part ‐I &II)                       

IS: 875 ‐1964  Code of practice for structural safety of buildings and loading standards 

IS: 10386 ‐1983  General aspects Part‐1 ‐1983, Part‐2 ‐1982, Part‐6 ‐1983, Part‐10 ‐1983‐ Amenities, Protective clothing and equipment, construction, storage, handling, detection  and Safety measures for gases, chemicals and flammable liquids 

IS: 10500‐1991  Drinking water (Specification) 

IS: 10291 ‐1982   Code of dress in civil engineering works 

Page 15: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 15 of 105 

IS: 2925‐1984 

 

Safety helmets 

IS: 1179‐1967  Welding helmets 

IS: 7524 ‐1979 (Part‐I) 

Safety goggles 

IS: 9167 ‐1979  Ear muff /Ear plugs 

IS: 6994 ‐1973  (Part‐I) 

Canvas hand gloves, Cotton hand gloves, Chrome leather gloves 

IS: 4770 ‐1991   Rubber hand gloves tested for 15,000 volts 

IS: 3521 ‐1999  Full body safety harness 

IS: 11057 ‐1984  Specification for Industrial safety nets 

IS: 13415 ‐1992  Protective Barriers in & around buildings (Code of safety) 

IS: 13416 ‐1992  Preventive measures against Hazards at work places‐Recommendations part‐I Falling materials hazards Prevention part‐I 

IS: 13416 ‐1992  Preventive measures against Hazards at work places‐Recommendations part‐II Fall Prevention  

IS: 5914 ‐1970  Safety shoes 

IS: 12254 ‐1993   Poly vinyl chloride (PVC) industrial boots 

IS: 5557:2004  Industrial and Protective Rubber knee and Ankle boots  

IS: 2878 ‐2004   Co2 Type fire extinguisher 

IS: 2171 ‐1999   Dry chemical powder fire extinguisher 

IS: 13849 – 1993   Fire extinguisher for ABC fires 

IS: 10204‐2001  Mechanical Foam type extinguisher  (Foam used shall conform to IS: 4989 ‐1974 and Co2 cartridge shall conform to IS: 4947 ‐1985) 

IS: 3786 ‐1983  Methods for computation of Frequency rate and Severity rates for Industrial injuries and classification of Industrial accidents (First revision)                                         

 

    

 

 

Page 16: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 16 of 105 

9.1     PROJECT STATUTORY COMPLIANCE CHECK‐LIST 

 

S. No  Description of Approval/Licence  YES/No           Remarks 

1  Labour licence / Registration(Form‐IV) by Client     

2  Form‐V issued to contractors     

3  Labour licence by Contractor     

4  Contract agreements(b/w Clients & Contractors)     

5  CAR Policy taken by Contractors     

6  Provident Fund Coverage     

7  ESI for all vendors(where ever is applicable)     

8  Notice board at  project site     

9  Documents to be maintained by all contractors     

 

DOCUMENTS TO BE MAINTAINED BY ALL CONTRACTORS 

 

1. Under the Contract Labour (Regulation & Abolition)Act,1948     

a) Obtain a Licence under the Act (Apply in Form ‐IV along with a certificate from in Form‐ V) + Requisite fee and security deposit. A licence to be obtained by the contractor for each and every establishment and also for each and every establishment and also for the branch offices of the same establishment, in case if the branch officers are in more than one address.                              Applicable only if employed 20 or more (per branch of) the company.                   Yes/No 

b) Ensure that the licence is renewed at least 60 days before expiry of licence.         Yes/No 

The following Registers/Returns to be maintained and submitted for verification: 

1  Combined Registers in Form‐ T  Yes/No 

2  Wage slips in Form‐ XIX  Yes/No 

3  Issue of employment card in Form‐XIV  Yes/No 

4  Send a Notice of commencement /completion of contract work in Form‐VIA  Yes/No 

5  Whether the half‐yearly return in Form‐XXIV is being sent every half year?  Yes/No 

6  Whether the leave card (in Form‐H) has been issued to the employees deployed?  

Yes/No 

 

7  Whether leave with wages register in Form‐F has been maintained for those deployed? 

Yes/No 

 

 

Page 17: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 17 of 105 

2. Under Payment of Bonus Act‐Produce the following for verification 

1  Bonus has to be paid to all the employees whoever has completed at least 30 days of service with the contractor during a financial year. 

Yes/No 

2  Whether bonus is paid to all those deployed in the company in the presence of company’s representative 

Yes/No 

3  Whether Bonus register in Form A&B is maintained?   Yes/No 

4  Whether C register under Bonus Act is maintained for the those deployed in the company? 

Yes/No 

5  Annual return in Form –D has to be sent with in a month of paying Bonus to all 

Yes/No 

6  Whether copies of C register & annual return Form –D has been submitted for verification?  

Yes/No 

 

3. Under Employees State Insurance Act,1948  

1  Whether all the coverable employee deployed in the company are covered under ESI? 

Yes/No 

2  Whether ESI card has been obtained for all the coverable employees?  Yes/No 

3  Whether ESI challans have realized before 21 st of every month?   Yes/No 

4  Whether Form‐6 –Half‐yearly return  has been submitted in time                  (12 th May/ 11 th Nov) 

Yes/No 

5  Whether ESI challan copies are given every month?  Yes/No 

6  Whether the total gross wages shown in the salary register is 60% of the total billing last month if the services are only labour oriented? 

Yes/No 

7  Whether the total gross wages shown in the salary register is 25% of the total billing if the services are both labour &material? 

Yes/No 

 

4. Under Employees Provident Fund Act 

A  Whether PF number has been allotted to all those deployed in the company? 

Yes/No 

B  Whether PF challans have realized before 15 th of every month?  Yes/No 

C  Whether monthly returns in Form‐5,10 &12 A are filled before 25 th of every month? 

Yes/No 

D  Whether PF annual returns were filed by on 30 th April of every year?  Yes/No 

E  Whether PF slips in Form ‐23 are issued to all the employees till the last year? 

Yes/No 

 

 

Page 18: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 18 of 105 

5  Labour Welfare Fund has been paid to all those deployed in the company?  Yes/No 

6  Minimum wages to be paid to all the employees  Yes/No 

7  Leave with wages to be extended to all the employees  deployed ( AL‐15,CL‐12‐Total=27 

Yes/No 

8  National &Festival holidays to be given to all those contract employees(Total 10 days which includes 5 National holidays & 5 Festival holidays) 

Yes/No 

9  In case if the employees are required to work during National/Festival holidays, they shall be paid in double for those days(or)shall be given another compensatory holiday. 

 

Yes/No 

10  Leave with wages /NFH/Overtime/Com.holiday etc to be mentioned in the Muster roll 

Yes/No 

11  Over time register has to be duly filled up as and when a employee works more than 8 hours of work. They should be paid double the wages 

Yes/No 

12  Over time has to be mentioned on the salary register and ESI must be paid on the same. This would enable the contractor employee to get ESI benefits such as ESI leave /Maternity leave and also pension benefits in case of fatal accidents 

 

 

Yes/No 

13  The employees have to be issued Wage slips at least 24 hours before the disbursement of payment in respective companies 

Yes/No 

14  The salaries/Bonus/Overtime to be paid in the presence of the employer representative and the same shall be certified by the representative. 

Yes/No 

15  Whether employees are given weekly off on the 7 th day as per Law?  Yes/No 

16  Whether appointment orders are given to all employees (in form Q under S&E Act?)  

Yes/No 

17   Whether the employees work more than 10.5 hrs including the break shift timing in any day? 

Yes/No 

18   Please submit  the following along with  Xerox copy of the current month bills to the HR/Admin.department every month 

Yes/No 

A  Attendance register Xerox copy of the current month it was billed  Yes/No 

B  Salary register (duly authorised by representative) copy of the previous month of billing 

Yes/No 

C  ESI challan of the previous month  Yes/No 

D  EPF challan of the previous month  Yes/No 

E  Profession tax challan of the previous month, if any body paid more than          Rs 3000/‐ per month 

Yes/No 

F  Half‐yearly return under the ESI Act along with  the May & November  month bills 

Yes/No 

G  Half‐yearly return under the Contract Labor Act along with the Jan.& July month bill 

Yes/No 

H  Annual return under the EPF Act along with the April month bill  Yes/No 

Page 19: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 19 of 105 

I  A copy of Bonus annual return in Form‐D submitted to the Labour department on or before November every year. A copy of the same to be given to the company 

 

Yes/No 

J  Proof of sending Labour  welfare fund return by the contractor‐ copy of 

 Form‐D 

 

Yes/No 

 • All the above mentioned documents must be self attested /certified by the authorised 

signatory. 

 

 

 

10 NON‐COMPLIANCE OF SAFETY AND HEALTH PROVISIONS: 

The compliance of the Safety and Health provisions are utmost  important to CBRE.   The prospective contractors  shall  take  note  of  statutory  requirements.  CBRE  will  take  a  serious  view  of  any  non‐compliance  report of  Safety  committee  and  EHS Manager/Officer.   Based on  the  safety  committee report or EHS Manager/Officer, CBRE has the right to order stoppage of work till rectification is carried out to the satisfaction of the Safety committee and EHS Manager/Officer.  All stoppage on this account will be at the entire risk cost and consequence of the erring individuals/contractors.  

11 DISCIPLINARY ACTION: 

Non‐compliance of Safety and Health and Environmental provisions will result in disciplinarian action. 

  Violations: 

  First time  ‐  Oral warning   Second time  ‐  Written warning   Third time  ‐             Monetary fine   Fourth time  ‐             Removal from site  

• Immediate removal from site by all violations wherein the offender brings himself or others in direct life threatening situations are where he/she creates a large material loss. 

• The contractor who regularly, repetitively violates the provisions will be removed from the site.  

  

Page 20: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 20 of 105 

 

12. ENVIRONMENT 

12.1‐Noise 

NOISE: 

                        Noise is defined as any unwanted sound produced while working with machines, tools (air operated/fuel operated), vehicles etc. 

Noise is measured with ‘Sound Level Meter’ and the unit of noise measurement is ‘decibels’ (dB) 

                  Permissible Exposure Limit Value (PEL) for continuous Noise exposure:                                                           (As per Building and other Construction workers Act, 1996 and Rules made there under Schedule VI) 

Average sound pressure level dB(A)  Maximum exposure 

90  8 hours 

92  6hours 

95  4 hours 

97  3 hours 

100  2 hours 

105  1 hour 

110  30 minutes 

115  15 minutes 

 

Recommended measures to control noise: 

a) Enclosure of machinery using plywood boarding or steel sheets 

b) By substitution of quieter machinery and equipment 

c)  Reducing noise at source e.g. Using bearings, Lubrication etc 

d) Staggering the work to lean parts of the day i.e. when workmen are minimum 

e) Regular and effective maintenance of plant and machinery. 

f) Ultimately, using ear muffs and ear plugs. 

Page 21: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 21 of 105 

 

 

12.2‐Material Safety Data Sheets (MSDS) 

CBRE shall  inform risks and dangers  in handling chemicals and hazardous substances brought on the site.  MSDS shall be made available by OEM/contractor to the EHS department. 

12.3‐Waste Disposal: 

Arrangements for proper collection and disposal of wastes such as food drop outs, combustible and other miscellaneous debris is to be made by respective company /contractors at their work area. Disposal of such wastes at periodical intervals are to be ensured.  

12.4‐ House‐Keeping: 

• General house‐keeping in working places. • Regular collection and disposal of waste/trash. • Pathways/Walkways shall be clear as far as possible. • Adequate illumination provided. • All sanitary facilities shall be maintained and cleaned. • Water leakages and over flows shall be contained. • The contractor shall at all time keep his work site, site office and surroundings clean and tidy 

from rubbish, scrap, surplus materials and unwanted tools and equipment. • Welding and other electrical cables shall be so routed as to allow safe traffic by all concerned. • No materials on any of the sites of work shall be so stacked or placed as to cause danger or 

inconvenience to any person or the public. • At the completion of the work, the contractor shall ensure removal from the work premises all 

scaffoldings, surplus materials, rubbish and all huts and sanitary arrangements used/installed for workmen on the site. 

• The contractor shall at all time keep his work site, site office and surroundings clean and tidy from rubbish, scrap, surplus materials and unwanted tools and equipment. 

• Welding and other electrical cables shall be so routed as to allow safe traffic by all concerned.   

12.5‐Public Protection 

The contractor shall make all necessary provisions to protect the public.  He shall be held responsible for defense of every action of other proceedings at law that may be brought by any person for injury sustained owing to neglect of any precaution required to be taken to protect the public.   13. HEALTH 

13.1 First‐Aid 

Trained First‐Aid person 

Main contractor shall provide appropriate number of suitable trained persons in the circumstances for rendering First‐aid to their people if they are injured or become ill at work.  Provisions for medical care 

Page 22: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 22 of 105 

are made available for every employee covered by the regulation. Near by dispensary, clinic/hospital in the proximity to the work site is provident. Emergency Vehicle for transportation of injured persons to a physician or Hospital shall be provided.  In order to ensure  first aid  to the personnel  in case of  injury or suffering the  first Aid kits are made available at designated locations  It should be ensured by the all concerned In charges that the trained First Aider is always available at their respective work area to care of first aid in case of any injury to the employees 

 o Electrocution – Switch off the mains/detach using non conductive material like wooden stick/ 

rubber material if the victim is still struck to the electrical source. o Fire – Extinguish the fire with the help fire extinguisher available nearby. o Fall ‐ Make the victim comfortable; raise his legs to keep the blood circulation to head. o Chemical Injury – Use lots of water to wash off. o Take the help of first Aiders available at site          o  Maintain silence and arrange to send the victim to the hospital for further treatment. 

First‐Aid Kit 

Regardless of  the  number  of  people,  first‐aid  center  shall  be  provided  on  site by main  contractor.  Every trained first‐aider has easy access to first‐aid equipment and provision made for every person to have  reasonably  rapid  access  to  first‐aid.    First‐aid  kit  is  checked  regularly  and  contains  sufficient quantity of suitable first‐aid materials. 

First‐aid Centre 

Suitably staffed and equipped first‐aid center shall be organized near the area of work.   The first‐aid centre shall be under the charge of an occupationally trained first‐aider.  Readily available trained first‐aider shall render first‐aid.  First aid center shall be suitably illuminated, ventilated and cleaned regularly.                     

Page 23: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 23 of 105 

13.2­Contents of a First­aid box                                                                                                                                               

                                        (As per The Building & Contractors, Act‐1996)  

1) A sufficient number of eye‐wash bottles filled with distilled water or suitable liquid clearly indicated by a distinctive sign which shall be visible at all times. 

2) 4% xylocaine eye drops, and boric acid eye drops and soda bicarbonate eye drops. 3) 24 – Small sterilized dressings. 4) 12 – Medium size sterilized dressings. 5) 12 – Large size sterilized dressings. 6) 12 – Large size sterilized burn dressings. 7) 12 – (Fifteen cms) packets of sterilized cotton wool. 8) (200 ml) bottle of centrimide solution (1%) or suitable antiseptic solution. 9) One (200 ml) bottle of Mercurochrome solution (2%) solution in water. 10) One (120 ml) bottle of salvolatile having the doses and mode of administration indicated on 

the label. 11) One pair of Scissors. 12) One roll of adhesive plaster (6 cm x 1metre). 13) Two rolls of adhesive plaster (2 cm x1 metre). 14) 12 pieces of sterilized eye pads in separate sealed packets. 15) A bottle containing 100 tablets (each of 325 mg) of aspirin or any other analgesic. 16) 12 – roller bandages 10 cms wide. 17) 12 – Roller bandages of 5 cms wide. 18) One tourniquet. 19) A supply of suitable splints. 20) 3 packets of safety pins. 21) Kidney tray. 22) A snake bite lancet. 23) One (30 ml) bottle containing potassium permanganate crystals. 24) Copy of First‐aid leaflet issued by Director General. 25) 6 – Triangular bandages. 26) 2 pairs of suitable, sterilized, latex hand gloves. 

 

 

           

Page 24: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 24 of 105 

13.3‐Drinking Water 

In every work place, sufficient amount of potable drinking water shall be provided.  No  drinking water  supply  points  shall  be  situated within  6 meters  of  any washing  place,  urinal  or latrine. 

13.4 Latrines and Urinals 

Latrines and Urinals shall be provided at the work places.  Shall be under a cover and portioned off as to secure privacy and shall have proper doors and fastenings.  Clear notices in regional languages / English shall be displayed to understand “For Men only” and “For Women only” as the case may be.  These  latrines  and  urinals  shall  be  adequately  illuminated  and  shall  be maintained  in  a  clean  and sanitary condition. 

13.5‐Anti‐Malarial Precaution 

CBRE  shall  conform  to all anti‐malarial  instructions  given  to by  client  including  the  filling up of any narrow pits which might have been dug by Safety. 

14. Safety 

14.1‐Excavation 

Excavation is the essential element of the construction process for making foundations, drainage work and site re‐grading of all kinds. 

In carrying out excavations the soil condition can vary widely, often in short distances. No soil whatever its nature can be relied upon to support its own weight for any length of time. Even a small fall of earth is capable of inflicting serious injury even if it does not kill. Unless and until the excavation is battered, the sides need supporting to prevent the possibility of collapse. 

The following safety measures are to be ensured before and during excavation. 

• Check for underground utilities like electrical / telephone cables, sewage, water lines and proper care has to be exercised to protect and prevent damage to it  

• Proper and adequate slope is maintained while excavating  • Adequate shoring or sheeting is done wherever require to prevent soil sliding  • Safe access through ladder or steps for exit & entry to excavation • No material /excavated soil is  kept within one meter from the edge  • Safe way is planned and provided for movement of HEM /transport equipment near 

excavation  • Safety helmet and shoes/gum boots are provided and worn by the workmen at excavation 

works   • Barricading is provided at excavated pits • Danger signs /Caution  boards are displayed at work spot   • Dewatering arrangement is made where water seepage is prevailed. • Stop blocks are provided to avoid vehicles reversing into the excavated trenches 

Page 25: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 25 of 105 

 

14.2‐Piling 

It is the first and foremost activity of construction where load bearing capacity of soil is inadequate for foundation. The working condition of piling rig and  other associated tackles is a significant contributing factor for prevention of equipment failure during operation. 

 Ensure the following precautionary measures before starting piling works 

• Inspection of piling equipment by responsible person for its condition before initiating piling operation. 

• Testing and its certification wire ropes, slings, D‐shackles , chain pulley blocks using in the process of piling work by competent person   

• Adequate support and secured foundation of the piling equipment to avoid toppling  • Hoses should be lashed and adequately secured  • Proper work platform is to be provided on piling frame  • Safe work procedures and close supervision to prevent unsafe acts of operators/any unsafe 

conditions that may arise  • Only experienced and trained operators are engaged for the piling operation  • Provision of Personal Protective Equipment (PPE) like safety shoes/gumshoes/safety 

helmet/safety belt etc and its use by their workmen. • Special care and precautions If  work is near electrical live cables/ electrical equipments  • Cordoning of work area to prevent un authorized entry  • Guarding of revolving parts • Specific measures to prevent over turning of pile driver/missing of hammer/ hammer 

movement out of range  

14.3‐Mobile Plant 

Mobile plant including tractors, trailers, dumpers, excavators, bulldozers, road rollers etc. for earthmoving purpose, concrete mixers, concrete transit mixtures, concrete pumps etc for concreting purpose are extensively used in construction Industry. Due to the very nature of their function and movement in difficult terrains, congested areas, working in tandem with manual work and other operations the danger is inherent. 

Many potentially hazardous situations and accidents could be avoided by the application of known safety principles and procedures  

Safety measures: 

1. Where movement around site is involved , routes should be planned, obstruction free and well maintained  

2. Observe specified speed limits 3. Operating personnel should be aware of associated risks and its preventive measures  4. Only  experienced,  trained  and  authorized persons with  valid  license  (wherever  applicable  ) 

should operate the mobile equipments/vehicles 5. Provide and use Warning lights and reverse horn for cautioning the people around  6. Operation should be on level and stable ground with adequate working clearance. 7. Loading of out riggers/stabilizers should be well within safe ground bearing capacity  8. No person should be on equipment or vehicle during loading and unloading of material  9. Operators should be protected by warning barriers or  switching off power when working  in 

close proximity of over head power lines  

Page 26: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 26 of 105 

10. The equipment /vehicles should be well maintained and provided with effective brake system and other safety devices (wherever require) 

11. Rotating parts of equipment should be adequately guarded  12. Provide  necessary  personal  protective  appliances  and  ensure  its  use  by  the  operating 

personnel  Ensure  effective measures  at  source  to  control  harmful  emissions,  dust,  fumes contaminating  atmosphere  and  cause  health  hazards  to  the  operators  and  people  in  the vicinity.  

13. No overloading/over stressing of vehicles/plant is allowed 14. Hoses,  pipes,  and  receivers  gauges  and  valves  involved  in  carrying  out  hydraulic  fluid/ 

compressed air should be checked for leaks and tested prior to operation. 15. Adequate safe clearance for swing and movement is to be judged during operation   16. Concrete mixture :   17. Setting  of machine  on  firm  and  level  ground with wheel  locked  to  prevent movement  of 

machine  18. Proper  instructions  and  Special  precautions  are  to  be  ensured  to  prevent  entry  in  to  the 

danger zone of projectile of bucket while dropping bucket  19. Operator  leaving  work  spot  should  ensure  that  the  equipment/vehicle  is  kept  in  neutral 

position and place on firm and level ground. 20. The hand brake should be kept in position and block road wheels as additional safety measure 21. Blades/buckets should be kept low while moving  22. The dozer blades should not be used as brakes except in emergency 23. The ground  should be examined  for  its bearing  capacity and general  safety especially when 

operating road roller at the edges of slopes, embankments. 24. The roller should not be moved down hill with the engine out of gear  25. If operating near excavations the following precautionary measures are to be ensured 26. Barricading, edge protection to prevent  fall of persons/vehicles over running while reversing 

etc. 27. Suitable support system and adequate allowance to avoid the danger of side collapsing  28. Experienced  signaler  /attendant  should  be  always  accompanied  with  operator/driver    for 

proper direction /signal and also  to caution others  in  the working Zone during   operation of mobile plant 

14.4‐Concrete Vibrators 

 • Revolving parts/belt drives should be adequately guarded and Vibrating unit shall be completely    

enclosed  • Electrically operated compact Vibrators is of completely enclosed type having suitable overload 

relays and effectively  earthed  • Ensure sufficient length of cable to the Vibrator. • Ensure electric starters and other accessories are firmly fixed adequately supported  • Ensure locking of needle load while inserting needle in to the vibrator,  • Ensure periodical lubrication and maintenance 

14.5‐Concrete mixture  

• Setting of machine on firm and level ground with wheel locked to prevent movement of machine  

• Proper  instructions  and  Special  precautions  are  to  be  ensured  to  prevent  entry  in  to  the danger zone of projectile of bucket while dropping bucket 

 

Page 27: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 27 of 105 

 

Safety during material TRANSPORTATION  

 • Consider weight, dimension,  capacity of  the  carrier,  center of gravity of  load,  clearance  required etc 

while loading material for transporting  • Load is adequately packed and lashed before transportation. • The vehicle /trailers are in good working condition especially the brakes/lights, Horns and other warning 

signals  • No overloading /projecting of material above the height of side panel or beyond the side panels.  (May 

be allowed maximum projection of 1 to 1.5 mts at the back of deck. Display of red caution flag or red lamp in the nights on the projected end. 

• Observe prescribed speed limits and road safety rules for railway level crossing/turnings, overtaking etc.. • No get in and down from a moving vehicle. • No person should sit near or over the load and on side panels/top of driver’s cabin. 

• Ensure survey of route, If materials are transported in wagons/trailers, preventing possible fouling with any fixed structure/object/Overhead electrical Cable /another wagon etc. 

• In  case  of  transporting  hazardous  nature  of materials  like  petroleum  products/chemicals  and compressed gas cylinders the prescribed safety measures are taken as per the relevant Acts. 

• Vehicle should be operated by only authorized driver having valid driving  license and the vehicle should be provided with RC and other relevant prescribed certificates and insurance coverage 

14.6‐Hoist, Cranes 

• Manufacturer’s recommendations on operating conditions shall be followed. • Rated load capacities, operating speeds shall be followed • Lifting studies shall be made in concurrence with client if the load is more than 10 tones. • Standard hand signals shall be followed. • Accessible areas within the swing of rotating superstructure of crane shall be cordoned off. • For  tower  crane, adequate  clearance  shall be maintained between  the moving and  rotating 

structures, fixed objects. • Employees require to perform duties on horizontal booms of tower crane shall be protected 

against falling by guard rails or fall protection. • Safe Working Load (SWL) for tower crane shall be conspicuously displayed on each side. • Only trained and authorized operator shall operate the tower crane. 

14.7‐Motor Vehicles 

• Control of all traffic on the site and movement of materials, parking shall be planned and executed according to space availability. 

• Motor equipment left unattended at night near areas where work is in progress shall have appropriate light, reflectors or barricades to identify the equipment. 

• JCB’s scrapper blades or similar equipment shall be either fully lowered or blocked while being repaired or when it is not in use. 

• All controls shall be in neutral position and motor stopped and brake set. • Other standard accessories of vehicles, equipments such as seat belts, rear view mirrors and 

safety latches and operating levers shall be in accordance with standard vehicle codes and state‐inspected where appropriate. 

  

Page 28: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 28 of 105 

14.8‐Trucks 

Trucks used on site, traffic procedures shall be taken care of.  A reasonably smooth traffic surface shall be provided.  If practicable a loop road shall be provided to permit continuous operation of vehicles to eliminate their backing.  Backing operation shall be controlled by a banks man positioned so as to have a clear view of the area behind the truck.  Movement of workmen and plant shall be routed to avoid crossings as much as possible.   

14.9‐Traffic 

The contractor shall organize operations by taking approval to use the existing roads, if any, from Client.  The contractor shall exercise full care to ensure that no damage is caused by him or workmen, during the operation, to the existing water supply, sewerage, power or telecommunication lines or any other services or works.  The contractor shall provide and erect before construction, substantial barricades, guardrails, and warning signs.  He shall furnish, place and maintain adequate warning lights, signage’s, etc., as required by Project Managers. 

14.10‐Fire Prevention 

• Electrical wiring equipment for heating, height on power shall be installed in compliance with statutory requirements.   

• Internal combustion engine powered equipment shall be located with exhaust well away from combustible materials. 

• Smoking is prohibited on the site. • No smoking signboards shall be posted consciously at appropriate locations • Storage areas shall be free from accumulation of unnecessary combustible materials. • Sufficient number of fire extinguishers shall be installed at all temporary buildings and 

storages. • All flammable liquids, gas cylinders and other inflammable materials stored properly and 

separately. • Flame cutting and welding take hot work permit. 

Preventing the spread of fire: 

• Waste accumulation in hoist shafts etc will be regularly removed. • Separate metal  containers  for oil  rags, paint  rags, paint  scrapings, waste  flammable  liquids, 

wood warnings and off‐cuts provided. • All wastes will be regularly cleaned /cleared. 

Means of Escape: 

• All gangways, stairs, platforms shall be free from obstructions. • Everyone  on  the  site  shall  be  trained  and  shown  the  way  how  to  escape  safely  in  an 

emergency (Emergency drills/Exercise shall be conducted periodically). 

Fire Fighting: 

• All fire extinguishers are checked regularly and recharged. • Fire extinguishers shall be provided at vintage points for easy accessibility. 

Page 29: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 29 of 105 

• Fire fighting training shall be imparted to staff and literate contractors.  

Class of Fire  Suitable Type of Appliances 

A ‐ Fires in ordinary combustible (wood, vegetable fibers, paper and the like)  

Chemical extinguishers of Soda – acid Gas / expelled water and anti – freeze types, and water buckets. 

B – Fires in flammable liquids, paints, grease, solvents and the like. 

Chemical extinguishers of foam, carbon dioxide and dry powder  

 Types, and water buckets. 

C‐ Fires in gaseous substances under pressure Chemical extinguishers of Dry powder & Carbon‐dioxide types  

D‐ Fires in reactive chemicals, Active metals etc. Special type of dry powder extinguishers and sand buckets 

E‐ Fires in Electrical Equipments Chemical Extinguishers of Carbon Dioxide & Dry Chemical Powder Sand buckets 

 

14.11‐Ladders 

Work activities situated above 2.5 meters from ground floor: 

Precaution shall be taken to avoid  from  falling down.   For work above 2.5 meters from ground floor level proper scaffolding/staging shall be erected. 

Use of Ladders: 

• Ladder shall be fixed near the top if practicable or near the bottom and secured. • Ladder shall be placed on a firm level base. • Ladder shall be intermediately secured to prevent swaying and sagging. • While working on ladder above 2.5 meters, fall protection shall be used. • Ladders shall extend at  least 1.05 meters, above any  landing place beyond  the highest  rung 

from which a person shall work or have a nearby hand hold of equivalent height. • Ladders shall be placed so that there is space behind each rung for proper foot hold    (No rung 

shall coincide with scaffold/staging tubes). 

14.12‐Scaffolding / Staging 

Work activities above 2.5 Meters from ground floor level: 

• Proper scaffolding/staging shall be erected for works above 2.5 mts .high above the floor level. • Ladder properly secured shall be used. 

  

Page 30: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 30 of 105 

Supervision of work and inspection of material: 

• Scaffolding/Staging shall be erected, altered or dismantled only under a competent supervisor as far as possible. 

• All scaffolding/staging materials shall be inspected before use. • All inspected scaffolding/staging shall bear a sign “Ready for Use”. 

Material and construction: 

• Sufficient sound material shall be provided for a scaffold/staging strong enough for the job. • Scaffolding/staging tubes and fittings shall not be bent, distorted and unduly rusted. 

Defective Material: 

• Scaffolding/Staging  tubes,  couplers,  fittings  bent  or  unduly  rusted  or  distorted  shall  be rejected. 

• All  scaffolding/staging  components  shall  be  properly  stored  when  not  in  use  and  kept separately from other building materials. 

Maintenance of Scaffolding/Staging: 

• Scaffolding/Staging  shall  be  kept  in  good  condition  and  every  effort made  to  prevent  the accidental displacement of any parts. 

Partly erected or dismantled scaffolding/Staging: 

• If  any  scaffolding/staging  is partly erected or partly dismantled  and  is  still  capable of being used  to some extent, shall have a warning notice  fixed and all access blocked/barred at  the point beyond which it cannot be safely used. 

Mobile Scaffolding/Staging: 

• Shall be stable, weighted at the base. • Used only on flat and leveled surface. • Have the wheels locked to prevent movement while in use. • Pushed/Pulled only at the base when moved. 

14.13‐Form Work 

• Formwork shall be designed taking  into considering spans, settling temperatures of concrete, dead load and working load supported by safety factor for the material used. 

• All  timber  formwork  shall  be  carefully  inspected  before  use  and  member  having  cracks, excessive knots shall be discarded. 

• Vertical supports shall be adequately braced or secured not to allow falling. • All centering works shall be finally inspected for its soundness. 

14.14‐Concrete Construction 

 Handling of Plant: 

• All gears, chains and roller of mixer shall be properly guarded. 

Page 31: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 31 of 105 

• Railings shall be provided on the ground to prevent any one walking under the skip while it is being lowered. 

• All cables, clamps, hooks, wire ropes, gears, clutches etc. of mixer, shall be checked, cleaned, oiled, greased and services once in a week. 

• While cleaning the inside of drums and operating power shall be de‐energized, locked off and fuses removed.  A suitable notice shall be hung at the place. 

14.15‐Barricades 

• Barricades  shall be erected, maintained  required  in connection with concerned Engineers  in order to protect people at hoisting areas. 

• Contractors  Supervisors  shall  become  acquainted  with  Project  Manager  and  EHS Manager/Officer and barricading practices and shall respect the provisions there of. 

Guarding of Floor Openings: 

• Floor  openings  shall  have  railings  or  constantly  attended  by  supervisors,  appointed  by contractor/concerned site Engineer. 

• Floor opening covers of adequate strength shall be  in place.   When the cover  is not  in place, the  floor  opening  shall  be  constantly  attended  by  someone  or  shall  be  protected  by  a reasonable railing. 

• A railing shall guard every floor hole into which a person can accidentally fall. • Every  ladder way, floor opening or platform shall be guarded by guard railing on all exposed 

sides. • Every open  sided  floor or platform  level  shall be guarded by120 Cms high  railings. All open 

sides where there is entrance to ramp, stairway shall be provided with fixed ladder. The railing shall be provided beneath the open sides wherever. 

14.16‐Demolition 

Before any demolition work is commenced and also during the progress of the work: • All roads and open area adjacent to the work site shall either be closed or suitably protected. 

Appropriate warning signs shall be displayed for cautioning approaching persons. • Before demolition operations begin, the contractor shall ensure that the power on all electric 

service lines is shut off and the lines cut or disconnected at or outside the demolition site.  If it is necessary to maintain electric power during demolition operation, the required service lines shall be adequately protected against damage.   Persons handling heavy materials/equipment shall wear safety shoes. 

• No floor, roof or other part of the building shall be overloaded with debris or materials as to render it unsafe. 

• Entries to the demolition area shall be restricted to authorized persons only. 

14.17‐Painting 

The Contractor shall not employ women on the work of painting with products containing lead in any form.   Only men  above  the  age  of  18  years  shall  be  employed  on  the work with  lead  paint.    The following precautions shall be taken during the work: 

• Supply air respirators for use by the workers when paint  is applied  in the form of spray, or a surface having lead paint is scraped. 

• The workmen shall use overalls and adequate facilities shall be provided to enable the painters to wash at the cessation of work. 

Page 32: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 32 of 105 

• All painting jobs, especially those  in which  lead paints are used shall be kept under  industrial hygiene surveillance. 

Smoking, open  flames or  sources of  ignition  shall not be  allowed  in places where paints and other flammable  substances are  stored, mixed or used.   A  caution board, with  the  instructions written  in national/regional language, “SMOKING‐STRICTLY PROHIBITED” shall be displayed in the vicinity where painting is in progress or where paints are stored.  Symbols shall also be used for caution boards. Suitable fire extinguishers/sand buckets shall be kept available at places where flammable paints are stored, handled or used. When painting work  is done  in a closed  room or  in a confined  space, adequate ventilation  shall be provided.  If adequate ventilation cannot be provided, workers shall wear suitable respirators. Epoxy resins and their formulations used for painting shall not be allowed to come in contact with the skin.  The workers shall use plastic gloves or suitable barrier creams. Adequate ventilation shall be provided especially when working with hot resin mixes. Increased  personal  hygiene  shall  be  practiced  to  control  inadvertent  contact  with  the  resin  and eliminate its effects. Workers  shall  thoroughly  wash  hands  and  feet  before  leaving  the  work.    Work  clothes  shall  be changed and laundered frequently. 

14.18‐Welding And Gas Cutting 

• Welding and gas cutting operations shall be done by qualified and authorized persons and as per IS specifications and code of practice. 

• Welding and gas  cutting  shall not be carried out  in places where  flammable or combustible materials  are  kept  and  where  there  is  danger  of  explosion  due  to  presence  of  gaseous mixtures. 

• Welding and gas  cutting equipment  including hoses and  cables  shall be maintained  in good condition. 

• Barriers  shall be erected  to protect other persons  from harmful  rays  from  the work.   When welding  or  gas  cutting  is done  in  elevated  positions,  precautions  shall  be  taken  to  prevent sparks or hot metal falling on persons or flammable materials. 

• Suitable type of protective clothing consisting of fire resistant gauntlet gloves, leggings, boots and  aprons  shall  be  provided  to workers  as  protection  from  heat  and  hot metal  splashes.  Welding shields with filter glasses of appropriate shade shall be worn as face protection. 

• Adequate  ventilation  shall  be  provided  while  welding  in  confined  space  or  while  brazing, cutting or welding zinc, brass, bronze, galvanized or lead coated materials. 

• Welding and gas cutting shall not be done on drums, barrels, tanks or other containers unless they  have  been  emptied,  cleaned  thoroughly  and  it  is  made  certain  that  no  flammable material is present. 

• Fire extinguisher shall be available near the location of welding operations.  Fire safety permit shall  be  obtained  for  working  at  vulnerable  areas  and  operating  areas  before  flame cutting/welding is taken up. 

• For electric (Arc) welding the following additional safety precautions shall be taken: 1. When  electrical  welding  is  undertaken  near  pipelines  carrying  flammables,  such 

pipelines shall not be used as part of earth conductor, but a separate earth conductor shall be connected to the machine directly from the job. 

2. Personnel contact with the electrode or other live parts of electric welding equipment shall be avoided. 

3. Extreme  caution  shall be exercised  to prevent accidental  contact of electrodes with ground. 

4. The welding cable shall not be allowed to get entangled with power cables.  It shall be ensured that movement of materials does not damage the cables. 

Page 33: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 33 of 105 

14.19‐Grinding 

• All portable grinders shall be used only with their wheel guards  in position to reduce the danger from flying fragments should the wheel break during the use. 

• Grinding wheels of specified diameter only shall be used on a grinder ‐portable or pedestal  in order not to exceed the prescribed peripheral speed. 

• Goggles shall be used during grinding operation. 

14.20‐Work In Radiation Area 

The  contractor  shall  follow  the  stipulated procedure  regarding work  in  the  radiation  are  and other works related with radiography. 

14.21‐Work In and Around Water Bodies 

When  the  work  is  done  near  any  places  where  there  is  risk  of  drowning,  all  necessary  rescue equipment such a life buoys and life jackets shall be provided and kept ready for use and all necessary steps  taken  for  prompt  rescue  of  any  person  in  danger  and  adequate  provision  shall  be made  for prompt first‐aid treatment of all injuries likely to be sustained during the course of the work.  Persons who do not know swimming shall not be engaged alone for any work where risk of drowning exists.  Sufficient number of life buoys or life jackets shall be provided. 

14.22‐Guidelines and General Procedures for Use of Electricity At Site 

 GENERAL 

Following safety requirements shall be complied with before the contractor uses the power supply. • The contractor shall submit a list of licensed electrical staff to be posted at Site. • It shall be the responsibility of the contractor to provide and maintain complete installation on 

the load side of the supply point with regard to the safety requirements at Site.  All cabling and installation shall comply with the appropriate  latest statutory requirements given below and shall be subject to approval of the Engineer‐in‐Charge: 

o Indian Electricity Act. o Electricity (Supply) Act. o Indian Electricity Rules. o National Electricity Code. o Other relevant rules of Local Bodies and Electricity Boards. 

The power supply shall be regulated as per the terms and conditions of the supply of the respective electricity boards. 

• Where  distribution  boards  are  located  at  different  places  the  contractor  shall  submit schematic  drawing  indicating  all  details  like  size  of  wires,  Over  head  and  Cable  feeders, earthing etc.  The position and location of all equipment and switches shall be given. 

• The contractor shall make his own arrangement for main earth electrode and tapings thereof.  The existing earth points available at  site  can be used at  the discretion of Client with prior permission.    Method  of  earthing,  installation  and  earth  testing  results  shall  conform  to relevant I.S. Specifications (IS‐3043). 

• All  three  phases’  equipment  shall  be  provided with  double  earthing.    All  light  fixtures  and portable equipment shall be effectively earthed to main earthing. 

• All  earth  terminals  shall  be  visible.   No  gas  pipes  and water  pipes  shall  be  used  for  earth connection.  Neutral conductor shall not be treated as earth wire. 

• The contractor shall not connect any additional load without prior permission of Client. 

Page 34: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 34 of 105 

• Joints  in  earthing  conductors  shall  be  avoided.    Loop  earthing  of  equipment  shall  not  be allowed.  However, tapings from an earth bus may be done. 

• The  entire  installation  shall  be  subjected  to  the  following  tests  before  energisation  of installation including portable equipment: ‐ 

o Insulation resistance test. o Polarity test of switches. o Earth continuity test. o Earth electrode resistance. 

The test procedures and their results shall conform to relevant standards. 

Electrical Shock:  

Flow of electric current  through human body  is  the cause of electrical shock. On  receiving electrical shock a person may be bodily injured being thrown away on the same level or  due to fall from height as he lose his balance when working at height.  If electrical path is through heart, the accident can be fatal  

Burns:  

• Burns are caused by electrical  flashes  if a body part comes with  in  flashing distance of high voltage current. 

• Burns may be caused due to short circuit also. • Short circuit may lead to electrical flashes causing burns  

It is therefore important to adhere to all safety measures for prevention of Electrical hazards.  

• Only authorized and qualified persons should undertake electrical repairs and other electrical works. 

• Treat all circuits are live unless ensured after testing to be DEAD • Use Standard switches sockets and other fittings of adequate rating required for the operation  • Use double insulated 3 core cables and ensures cables are free from insulation failure • All electrical supply is controlled through circuit breakers and the same is periodically checked 

by competent person for its effective operation. • Ensure all electrical appliances and Electrical portable tools are effectively earthed. • Do not allow unsafe temporary connections, naked joints/wiring  • Don’t work on electrical equipments in wet environment /on wet floors • Don’t over load electrical point/equipment  • Don’t crowd things near electrical mains /switches and keep access free from obstructions. • Don’t make trail & errors and short cuts. Follow safe procedures 

14.23‐Installation 

Following guidelines are provided for general observations: ‐ • Only  persons  having  valid wireman’s  license/competency  certificate  shall  be  employed  for 

carrying out electrical work and repair of electrical equipment, installation and maintenance at site.  A qualified licensed Supervisor shall supervise the job. 

• Electrical equipment and  installations shall be  installed and maintained as to prevent danger from contact with  live conductors and  to prevent  fires originating  from electrical causes  like short circuits, overheating etc.  Installation shall not cause any hindrance to movement of men and materials. 

• Materials  for all electrical equipment  shall be  selected with  regard  to working voltage,  load and working environment.  Such equipment shall conform to the relevant standards. 

Page 35: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 35 of 105 

• The minimum clearance to be maintained for all overhead lines along roads and across roads shall be as per the statutory requirements. 

• Grounding conductor of wiring system shall be of copper or other corrosion‐resistant material.  An  extra  grounding  connection  shall  be made  in  appliances/equipment  where  chances  of electric shock are high. 

• Electric fuses and/or circuit breakers installed in equipment circuits for short circuit protection shall be of proper rating.  It is also recommended that high rupturing capacity (HRC) fuses are used in all circuits.  For load of 5 kW or more earth leakage circuit breaker shall be provided in the circuits. 

• Wherever cables or wires are  laid on poles, a guard wire of adequate size shall be run along the cables/wires and earthen effectively.  Metallic poles as a general rule, shall be avoided and if used shall be earthen individually.  Anti climbing guards and danger notices shall be provided on poles.  Each equipment shall be an individual isolating switch. 

• Wires  and  cables  shall  be  properly  supported  and  an  approved method  of  fixing  shall  be adopted.  Loose hanging of wires and cables shall be avoided.  Lighting and power circuits shall be kept distinct and separate. 

• Reinforcement rods or any metallic part of structure shall not be used for supporting wires and cables, fixtures, equipment, earthing etc. 

• All cables and wires shall be adequately protected mechanically against damages.  In case the cable  is  required  to be  laid under  ground,  it  shall be  adequately protected by  covering  the same with bricks, Plain Cement Concrete (PCC) tile or any other approved means. 

• Using  suitable  cable  glands  shall  properly  terminate  all  armored  cables.    Using  cable lugs/sockets  shall  connect multi‐stranded  conductor  cables.    Cable  lugs  shall  preferably  be crimped.  They shall be of proper size and shall correspond to the current rating and size of the cable.  Twisted connections will not be allowed. 

• All  cable  glands,  armoring  and  sheathing  of  electric  cable, metal  circuits  and  their  fittings, metallic  fittings and other non‐current  carrying parts of electrical equipment and apparatus shall be effectively grounded. 

• All the Distribution Boards, Switch Fuse Units, Bus bar chambers, ducts, cubicles etc. shall have MS enclosures and shall be dust, vermin and waterproof.   The Distribution Boards, switches etc. shall be so fixed that they shall be easily accessible.  Changes shall be done only after the approval of the Project Manager. 

• The  contractor  shall  provide  proper  enclosures/covers  for  protection  of  the  entire switchboard,  equipment  etc.  against  rain.    Exposed  live  parts  of  all  electrical  circuits  and equipment  shall be  enclosed permanently.   Crane  trolley wires  and other  conductor which cannot be completely  insulated shall be placed such that they are  inaccessible under normal working conditions. 

• Ironclad industrial type plug outlets are preferred for additional safety. • Open type distribution boards shall be placed only in dry and ventilated rooms; they shall not 

be placed in the vicinity of storage batteries or otherwise exposed to chemical fumes. • Isolating  switches  shall be provided  close  to  equipment  for  easy disconnection of  electrical 

equipment or conductors from the source of supply when repair or maintenance work has to be done on them. 

• In front of distribution boards a clear space of 90 cm shall be maintained in order to have easy access during an emergency. 

• Adequate  working  space  shall  be  provided  around  electrical  equipment,  which  requires adjustment or examination during operation. 

• As far as possible electrical switches shall be excluded from a place where there  is danger of explosion.   All electrical equipment such as motors, switches and  lighting  fittings  installed  in workroom where there is possibility of explosion hazard shall be explosion proof. 

Page 36: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 36 of 105 

• All connections to lighting fixtures, starters or other power supplies shall be provided with PVC insulate, PVC  sheathed  twin/three/four core wires  to have better mechanical protection  for preventing possible damage  to equipment or  injury  to personnel.   Taped  joints  shall not be allowed  and  the  connections may  be made  in  looping  system.    Electric  starter  of motors, Switches  shall  not  be  mounted  on  wooden  boards.    Only  sheet  steel  mounting  or  iron framework shall be used. 

• All the  lighting fixtures and  lap holders shall be of good quality and  in good condition.   Badly repaired or broken holders, etc. shall not be used. 

• Only PVC  insulated and PVC  sheathed wires or armored PVC  insulated and  sheathed  cables shall  be  used  for  external  power  supply  connections  of  temporary  nature.   Weatherproof rubber wires shall not be used for any temporary power supply connections.   Taped  joints  in the wires shall not be used. 

• The bulbs/lamps used for illumination and testing purpose shall have cover or guard to protect them  from accidental breakage.   Only 24 V supply system shall be used  for hand  lamps etc. while working inside metallic tanks or conducting vessels. 

14.24‐Portable Electrical Equipment 

• Portable electrical equipment  shall be  regularly examined,  tested and maintained  to ensure that  the  equipment  and  its  leads  are  in  good  order.    Register  shall  be  maintained  for inspection, recording the testing dates and results of the equipment. 

• All portable appliances shall be provided with three‐core cable and three‐pin plug.   The third pin of  the  plug  shall  invariably  be  earthen.    It  shall be  ensured  that  the metal  part of  the equipment shall be effectively earthen. 

• All  connections  to  portable  equipment  or  machines  from  the  panel/distribution board/extension board shall be taken using 3 core double insulated PVC flexible copper wires in one  length.   No  joints shall be allowed  in this flexible wire.    In case single  length of wire  is not  sufficient  for  a particular  location  then  the  supply  can be  tapped by providing  another extension board comprising of switch and socket. 

• Flexible  cables  for  portable  lamps,  tools  and  apparatus  shall  be  regularly  examined,  tested periodically and maintained to ensure safety. 

15. GENERAL 

15.1‐EHS Trainings: 

15.1.2‐EHS induction:  

It  is mandatory  to  provide  Induction  training  to  each  and  every  person working  inside  the  project irrespective of cadre and trade.  During  induction  training  the  project  EHS  rules  and  regulations would  be  highlighted  and Dos  and Don’ts of EHS would be explained and made them understood the general risks and measures to be taken by each and every one. 

15.1.2‐.Periodical training programmes: 

Specific  training  programmes  for  the  following  activities  will  also  be  organized  to  promote  EHS education for respective trades/ supervisors/ technicians  

1. Safety in Welding and gas cutting operation  

Page 37: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 37 of 105 

2. Working at height (Staging/ladders 0E 3. Safety in operation of Power and hand tools  4. Fire hazards and control  5. First Aid  6. Electrical safety  7. Personal protective Equipment   

All the above specific trainings would be organized and scheduled on an average one programme in a month  

15.2‐Hazard Identification & Control Measures 

The Hazard identification is basic requirement for the Accident Prevention.  The techniques which are include Inspections, Audits and Risk assessment etc. 

15.2.1‐EHS inspections: 

The Site safety inspection during work by EHS Coordinator and also by project coordinators in the site play a key role in eliminating unsafe conditions and unsafe acts/unsafe practices by the workmen. Any EHS violations during inspection should be immediately brought to the notice of concerned site in charge for immediate corrective measures to ensure safe working. Until and unless prevailed unsafe condition or deviation is corrected the work activity should not be allowed to continue. EHS  inspection checks (General)  is to be kept  in mind during  inspection for hazard  identification  is  in Annexure  

15.2.2‐EHS audits: 

Apart from regular site  inspection by EHS coordinator, periodical EHS Audit will be done by Regional EHS  Coordinator  or  Project  EHS  personnel  to  assess  the  EHS  performance  and  to  suggest  for improvement. The techniques applied for the safety inspection/Audit can be as follows. 

� Preparation   ‐ Select areas of greatest hazard or activity to audit   ‐ Use toolbox talks to set objective / standards for the workforce   ‐ Set a good personal example. � Observations   ‐ Take time to watch an activity or situation.   ‐ Concentrate on people.   ‐ Look for unsafe acts, violation of safety rules or unsafe conditions.   ‐ Recognize good as well as bad practices. � Discussion   ‐ Discuss with the workforce how the job could be done more safely   ‐ Encourage them to identify hazards & to suggest improvements ‐ Ensure that all unsafe acts & conditions are discussed   ‐ Honour the good safety practices. � Follow – up   ‐ Check at random for repetition of safety violations   ‐ Give formal written warnings for repeated violations by individuals 

‐ Contractor / Subcontractors auditors are to report their findings on a weekly basis to principal client together with action. 

 

Page 38: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 38 of 105 

15.2.3‐Risk assessment: 

Risk Assessment  is an ongoing activity throughout the  life of the project.  It  is used  in developing the Safe Work Method Statement – SWMS (or also called Job Safety Analysis). The SWMS  requires  the work method  to be presented  in a  logical sequence. The hazards  / dangers associated with  each  process  are  to  be  identified  and  person who  is  responsible  to  take  remedial measures shall be specified for controlling these hazards. Safe work method statements must include the following provisions as a minimum. 

• The sequence of activities or work tasks to be carried out (ie. Job steps  involved  in doing the work) 

•  Identification & assessment of the risk arising from those activities or tasks in relation to the site  and  any  person  likely  to  be  affected  by  them  (ie.    Identify &  assess  potential  hazards associated with each job step). 

•  The way(s)  in which  the  identified  risks will be  reduced  to  an  acceptable            level  ie.  The controls that will be put in place to eliminate or minimize      the potential hazards identified). 

• The management system used to monitor compliance with the agreed safe system of work. • The way in which the progress of the work will be reviewed for the     purpose of EHS in order 

that any necessary modifications and   improvements to the system of work can be identified and introduced. 

15.3‐Safe Work Permits System: 

A   Work permit  system  is used  to ensure  safe working by eliminating possible associated high  risks such  as  blasting,  excavation,  working  at  height,  hot  works(welding,  gas  cutting),confined  space ,working isolated areas ,electrical shock, chemical exposure, fire hazard during the process of work. Safe work Permit is required to be obtained for the following works  

1. Blasting works 2. Excavation 3. Hot work (welding and gas cutting operations) where the risk of fire is involved  4. Height work ( for the works above 2mts height ) 5. Confined space 6. Electrical works (when working on over head line/ transformers or major electrical works )  7. Any Hazardous nature of job in isolated areas  where high risk is prevailed  

Work permit should be obtained before starting of the activity by the designated issuing authority of the Project after inspection and ensuring recommended safety measures given by EHS Coordinators.   

 

 

 

 

 

 

 

Page 39: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 39 of 105 

15.4 BLASTING PERMIT 

 

Project:                                                                                                                            Date:                                                 

No. of the Blasting:                                                                                                                                                               

Location of the Blasting:                                                                                                                                                          

Name of the Licenced Blaster/Shot Fierier:                                                                                                                      

Name of the Contractor:                                                                                                                                                          

Starting time of drilling operation:      

 

 

ISSUING AUTHORITY: 

The precautions & safe conditions mentioned below have been verified and blast can be carried out. People shall be evacuated from danger zone and warning sirens shall be blown before the blast. 

 

PERMIT IS VALID from……………hrs to……… hrs     

Name & Signature of issuing authority: ………..                                           

 

 

 

 

 

 

 

 

 

 

 

 

Page 40: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 40 of 105 

Blasting Check‐list: 

S. No  Description      Yes     No  Remarks 

1  Whether the detonators are checked individually for continuity and resistance 

     

2  Do all the detonators belong to the same manufacturer       

3  Whether the explosives and cartridges selected for use are of correct size 

     

4  Whether the explosives and cartridges are of approved quality 

     

5  Whether the condition of lead/leg wires are checked?       

6  Whether sockets in the blasted area are flushed with air & water and plugged 

     

7  Whether the bore holes are cleared of all the debris before explosives are inserted 

     

8  Whether all the excessive cartridges are removed from work spot 

     

9  Whether it has been counted that the number of persons involved in the operation have come out of the spot after loading? 

     

     10  Whether the environmental conditions are considered? 

(Rain/Sunny/Wind/Thunders/Lightning) 

     

      11  Are electronic items /radios/mobile phones/pagers prohibited in the location? 

     

     12  Whether the danger zone is suitably cordoned and flagmen posted at important points 

     

     13  Whether suitable warning boards are displayed at site?       

     14   Whether no of entry  points identified and access control is established 

     

     15  Whether blaster’s shelter is available in good condition?       

     16  Whether proper signaling system is established to prevent trespassers entering the blasting zone, siren or hooter is available. 

     

     17  Whether all the drillers have been provided with ear plugs, helmets. goggles and gumboots? 

     

     18  Whether a record has been maintained in separate register indicating 

a) Date & Time of blast b) Number of holes charged c) Type of explosive used d) Amount of charge per hole e) Firing pattern & sequence 

     

Page 41: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 41 of 105 

     19  Record a) Quantity of explosive brought from magazine b) Quantity of explosive used c) Quantity of explosive returned to magazine 

 

     

     20  Any Electrical /Telecom line or Cables near by? 

If so, specify the distance & Voltage……… 

     

     21  Whether the circuit has been checked 

Specify the resistance ……….. 

     

 

I have checked the above points and found conditions suitable to undertake the blast. 

Name & Signature of the Permittee: 

 

Check points after blasting: 

S. No  Description       Yes       No  Remarks 

1  Whether any mis‐fire detected, If yes 

Give the no. of holes: ……….. 

Brief  of action taken: 

 

     

2  Whether’ ALL CLEAR’ siren is blown &mention the time of ‘ALL CLEAR’ siren. 

Time: 

 

     

 

Name & Signature of Permitee: 

Name & Signature of Issuing Authority:  

 

Permit Closure: 

Permit is closed on: 

Date& Time: 

Name & Signature of Issuing Authority: 

 

Page 42: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 42 of 105 

15.5EXCAVATION PERMIT 

 

Permit No:                                                                                                                      Date:                                              

Project Name:                                                                                                                                                              

Contractor’s name:                                                                                                                                                                         

Sub‐contractors name: 

 

Excavation details: 

Purpose: 

Area/Location:         

Proposed date and time: 

Proposed date & time of completion: 

Equipment and Tools used: 

Excavation length …………….. in m 

Excavation width ……………… in m  

Excavation depth…………….. in m 

 

Preparations: 

S. No  Description  Yes/ No 

1  Underground cables, pipelines, electrical lines etc checked   

2  Personal Protective Equipments to be used: a) Safety shoes b) Safety helmets c) Gloves d) D0Eye protection e) Ear protection f) Dust mask 

 

 

                                    

 

 

Page 43: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 43 of 105 

 

Safety precautions: 

S.No  Description  Yes/ No 

1  Proper access made with required no. of exits   

2  Provide and use proper PPE   

3  Barricade the area, display caution boards    

4  Ensure good house‐keeping   

5  Use certified equipment and machinery   

6  Check for underground services   

7  Check operators licence   

8  Check for reverse horn for the equipment   

9  Ensure constant supervision   

     

 

Checked by: 

Contractor’s Safety Officer: 

Name& Signature: 

Date: 

 

PERMIT ISSUING AUTHORITY: 

PERMIT IS ISSUED & VALID UPTO: 

 

Permit is Re‐validated for a period of: 

 

PMG Safety Officer: 

Name & Signature: 

Date: 

 

 

 

Page 44: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 44 of 105 

15.6WORKING AT HEIGHT PERMIT   

                                                                                                     Permit no:                                                       

  Job description: 

  Location: 

  To be carried out by:                                                                                                                                 

Safety Precautions: 

   S. No  Description  Yes / No 

  Scaffolding:   

1  Scaffoldings of good construction ,adequate with 600 mm width walkways, toe‐boards 

 

2  Scaffold secured with stairways, wide enough to pass 2 persons at a time, hand rails,(should be of metal scaffolding) 

 

3  Maintain good housekeeping at work locations   

  Safety nets:   

1  Safety nets fixed at the bottom of scaffold to prevent bodily injuries  in case of fall 

 

  Ladders:   

1  Strong  materials used and well maintained   

2  Ladder not placed against loose boxes, round materials. objects, near electrical installation  

 

3  Ladder of sufficient height  used, on top tied and positioned at the foot of ladder 

 

4  Safety foot ware provided at base   

5  Ladder placed at an angle of 70 ‐75 degrees    

6  Area of the work barricaded so that no person can walk under the ladder 

 

  Personal Protective Equipment:   

1  Safety harness provided and worn   

Above safety precautions have been taken. 

 

Name & Signature of permittee: 

Date: 

 

 

Page 45: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 45 of 105 

 

Permission issued from ……….. hrs to ……….hrs 

Date: 

Name & Signature of issuing authority: 

 

Permit closure: 

This permit is closed on …………  hrs. 

Name & Signature of permittee: 

Date: 

 Name & Signature of issuing authority: 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 46: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 46 of 105 

15.7 HOT‐WORK PERMIT 

 

Permit No:                                                                                                        Date:    

Location: 

 

Nature of the job:         

The area of work has been examined, precautions checked mentioned below have been taken to prevent    fire. 

 Safety precautions:     

a) The technician must inspect the proposed precautions taken to prevent fire. 

Electrical Isolations: 

a) Electrical isolation required for equipments isolated. b) Electrical cables covered. 

General Precautions: 

a) Fire extinguishers are in service. b) Cutting and welding machines are in good condition. c) Area technician notified. 

Precautions near area of work: 

a) Near by area swept clear of combustibles. b) No combustible, flammable liquids  are near by. 

Fire watch:  

a) To be provided during operation. b) Supplied with fire extinguishers. c) Trained in use of equipment for fire fighting. 

I, have personally examined the area and certify, precautions have been taken for the above mentioned area. 

 

Name & Signature of the technician: 

 

 

 

Page 47: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 47 of 105 

PERMISSION ISSUING AUTHORITY: 

Permission issued for this work from ……….hrs to …… hrs. 

Permit expiry date: 

 

Name & Signature of issuing authority: 

 

Name &Signature of the permittee: 

 

 

 

Permit Closure: 

Date & Time ………….. this permit is closed. 

 

Name & Signature of Permittee. 

Name & Signature of issuing authority: 

 

 

 

 

 

 

 

 

 

 

 

 

Page 48: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 48 of 105 

15.8 CONFINED SPACE PERMIT 

                     (To prepare safe working practices related to working inside a confined space /                 vessel/plant/equipment) 

 

A. Permitee (The person taking the permit) to fill: 

1. Location of the confined space: 

2. Identity of the confined space: 

3. Purpose of entering the confined space: 

4. Date & Time: 

 

5. Check‐list: 

a)  Has the Vessel/Equipment/Space has been cleaned, purged, isolated  Yes/No 

b)  Have all electrical/air/hydraulic equipment/drives been disconnected  Yes/No 

c)  Are the persons required to enter the confined space are trained in dealing with the specified hazards 

Yes/No 

d)  Personal protective equipment  provided  Yes/No 

e)  Is the rescue team equipped with emergency rescue devices put on as stand by 

Yes/No 

f)  Is 24 V hand lamp provided for use inside?  Yes/No 

g)  Is forced ventilation provided? (Exhaust/Fresh airflow fan)  Yes/No 

 

6. Tests required: 

1) Oxygen level (19.5% to 23.5%) 2) Explosivity (0%) 3) Carbon monoxide level (50ppm max.) 4)  Carbon di‐oxide level (1200 ppm max.) 5) Temperature 6) Air‐flow 7) Others 

 

 

7.  List of authorised persons to work inside the confined space& the rescue team.                                                       (List to be enclosed) 

Page 49: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 49 of 105 

     I have checked the above points and found the conditions are suitable to undertake the work. 

 

Name & signature of the Permitee:                                                                                                                                 (Site Engineer)                                                                                                                                                              Designation: 

A. Permit issuing authority(The person giving permit) to fill:  The safety precautions and safe conditions mentioned above have been verified and work 

can be started. 

 

Name & signature of Safety Officer:                                                                                                          

Name & signature of issuing authority:                                                                                                                        (Section in‐charge)    

  

B. Permit closure:  Date & Time …………. this permit is closed. 

 

Name &signature of Safety Officer: 

Name &signature of issuing authority: 

 

• Note: The scope of this permit is limited to entering into confined space. Relevant work permits shall be obtained for carrying out activities inside the confined space along with this permit. 

 

 

 

 

 

 

 

 

Page 50: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 50 of 105 

15.9 PERMIT FOR WORKING IN ISOLATED AREAS    

Permit No: 

Date: 

Location: 

Time: 

 

ISSUE: 

Nature of jobs identified:   

1) …………………………………………………… 2) ………………………………………………….. 3) ………………………………………………….. 4) ………………………………………………….. 

 A. Safety measures to be provided and followed: 

a) ……………………………………….. b) ……………………………………….. c) ……………………………………….. d) ………………………………………… 

I hereby authorize Mr.: …………………………………. to carry out the above work. 

 

Name & signature of Site Engineer: ……………………………. 

B. Acceptance: 

 I have understood the hazards and safety precautions /requirements to carry out the above mentioned work and I accept to undertake the work. 

 

Name & signature of Contractor’s Engineer: …………………………      

 

C. Name& signature of issuing authority: 

Date& Time: 

 

 

Page 51: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 51 of 105 

15.10   Accident Reporting & Investigation 

Recording & Reporting: All incidents or accidents shall be recorded, investigated and reported to Project manager. Occupation  illness  and all  incidents of  fire, explosion,  implosion,  release of hazardous  substance or other  near‐miss  incidents,  which  have  potential  to  cause  harm  to  environment,  shall  also  to  be reported within following shift / day. The  first hand  information of Accident/Incident should be sent  in writing  to EHS coordinator  for his investigation and further action  

         15.11 Educating Labour: 

• Safety Posters/sign boards to be installed at site at different locations. • Safety Officer to conduct safety meet periodically and hold pep talks with workmen. 

 • No materials on any of the sites of work shall be so stacked or placed as to cause danger or 

inconvenience to any person or the public. • At the completion of the work, the contractor shall ensure removal from the work premises all 

scaffoldings, surplus materials, rubbish and all huts and sanitary arrangements used/installed for workmen on the site. 

15.12 Reporting Of Accidents: 

• All  accidents  leading  to  personal  injuries  or  property  damage  shall  be  reported  to  the concerned authorities e.g., Client, Regional Office, Head Office, Police and Insurance Company. 

• Monthly Safety statistics shall be submitted detailing the accidents, nature of  injury  including disability, number of man‐days  lost, and medical treatment provided and extent of property damaged. 

15.13 Emergency Evacuation Plan 

o Remove the injured person from the disaster area if they are in further danger. o Do not move the injured person or ask him to stand if there is no further danger. o Advise all unaffected persons to move out of the site. o Escape  through  Fire  Exit  routes  to  the  Designated  Assembly  Points  e.g.:  Security  gate  or 

Terrace or any other location indicated in Emergency Plan) for further Action o Maintain silence and quickly move out but do not run.  o Designated  In  charge  as  indicated  in  emergency  plan  would  be  the  chief  of  emergency 

operations  in case of the evacuation and  in his absence Security Guard would be responsible for evacuation.  

o Render First Aid to the victims through trained first Aider and then shift them to the nearest hospital for treatment  

Information of Key personnel:      In order keep informed all concerned the following information is to be prominently displayed at 

main Entrance of project  • Name and Contact Number of Project In charge  • Name and contact Number of Nearest Police station  • Name and contact Number of Nearest Fire Station  • Name and contact Number of Nearest Hospital  • Name and contact Number of nearest ambulance center  • Name and contact Number of First Aider available at site 

Page 52: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 52 of 105 

• Name and contact Number of Security Incharge • Name and contact Number of EHS Incharge 

15.14 Personal Protective Equipment (PPE) 

Personal  protective  equipment  play  significant  role  in  reducing  the  intensity  and  preventing  injury incase  of  any  accident during  the  course  of  construction  activities.  The  PPE  should  be  of  standard make and confirm to IS specifications.   The PPE should be checked and ensure its good condition before use   The following general personal protective equipment/Safety appliances are to be provided wherever  required and should used religiously   1. Safety helmets      :  All persons at site 2 Safety shoes           :  All persons at site  3 Safety belt              :  Men working at height and life line should be anchored to a fixed                                         point at above chest level. The life line should not be less than ¾”                                         dia and 2M long. 3. Hand gloves          :   Persons doing material handling jobs, gas cutting, electrical works,                                         welding or operating paving breakers, vibrators, handling concrete                                         mixing of asphaltic materials, lime mortar, cement etc.                                                         It should of correct type for specific activity. 4. Safety goggles      :   Persons involved in the activity of gas cutting, brick dressing,                                        welding, grinding, operating pavement breakers,                                        mixing of asphaltic materials, lime mortar, cement etc ,  5. Safety nets, canvass sheets: Protect people falling from height, and the material falling on people  6. Ear plug or Ear muffs           : workmen where exposed to noise level above 90 dB. .7 Face/Nose masks.                 : Persons engaged for spray painting or rubbing / scrapping of dry                                                          lead paint, cement and dust emission during chipping and                                                         breaking and demolishing activities in work area  . 

      In order  identify  the employees of different categories and department  it  is common practice  to provide different colour coding to safety helmets as given below:  Workmen                                                         ‐ Yellow. Electrical staff                                                  ‐ Red  Safety officer or staff of safety dept              ‐ Green .or White with green colour band Rigger/foreman/Supervisor                            ‐ Blue  Project coordinators /Engineers/Mangers    ‐ White. Visitors                                                            ‐ White  

15.15 Project EHS‐Status 

 Following information to be displayed at the entrance  

  • Project Name  • Status date • Number of Man hours as on date  • Cumulative Man hours completed as on date 

Page 53: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 53 of 105 

• Number of reportable accidents  • Loss of Man hours due to accidents • Total number of Safe Man hours clocked 

 

15.16 Site Entry Process 

 All  those  involved  in  project  activities would  be  allowed  only  through  valid  ENTRY  PASS which 

should be the personal identification of the individual.   The passes are  issued by  the  respective company/contractor. The Entry pass  is only valid  if,  the 

individual has undergone EHS Induction and ear marked on Pass as “EHS INDUCTED”.   The Company/Contractor engaging manpower for working inside project has to seek permission in 

prescribed requisition form from Security In charge of the project. After checking the passes and duly entered  the  information  in  security  register  the  security  allows  personnel  to  enter  the  project premises  

  The ENTRY PASSES posses the following general information.  PROJECT:  Pass Number:                                Date of Issue: NAME:                                          Designation:  EHS Induction given on :   Signature of Issuing Authority: Name of Company/contractor: Prescribed requisition format for seeking permission to enter project is in Annexure  Similarly “Visitor’s Pass” and “Material Gate pass” would be introduced for security control. 

16. FORMATS 

16.1 Site Safety Rules 

You are advised to follow all the time the DOs and DON’Ts given below for the safety of every one working in project. Warning: Deliberate ignorance of these safety rules will be viewed seriously and liable for penalty/ removal from site. 

DOs 1. Under go EHS induction Training before entering into project site/ ensure all your employees 

received EHS induction Training 2. Provide and ensure proper use of PPE such as Safety shoe, Safety helmet, Safety shoes, Safety 

gloves, Safety belt (when working at height) etc by all the employees in the project 3. Comply with method statement wherever applicable 4. Ensure  “Work  Permit”  prior  to  start  of  activities  such  as work  at  height,  Hot work,  Deep 

excavation etc., 

Page 54: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 54 of 105 

5. Ensure all activities  related  to Electrical energy  is handled by competent person/authorized electrician only 

6. Ensure that proper lugs are provided to welding cables 7. Ensure  that proper wedging/locking of wheels  is done  for mobile scaffold/Concrete Mixer / 

Transport vehicles before starting the work activity 8. Ensure proper barricading/ covering where there is a danger of fall of persons/ fall of material 

from top. 9. Check front, back and bottom of the vehicle before starting to move the vehicle 10. Watch vehicle movement and cautions while walking in the project area. 11. Clean and kept workplace neat and  tidy and  remove all wastage/scrap  from  the work  spot 

after completion of each work without delay.  DON’Ts 

1. Smoke in the project premises 2. Drink liquor in the project premises  3. Use open place for Toilets (Use Toilets provided in the project site) 4. Run the vehicle beyond 10 Kmph speed 5. Play with Hazardous chemicals 6. Interfere in others work 7. Enter areas not of your concern without permission 8. Work at height and under HT lines during raining, lightening and heavy wind 9. Dress Lungi/ half pant during working at project (Wear full pant and shirt). 

 I have read and I abide with the rules  Name:                                     Signature 

Page 55: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 55 of 105 

16.2 EHS Responsibility & Accountability for Contractors 

 (This document will be issued with Tender documents) The  following  specific  responsibilities  are  assigned  to  you with  respect  to Environment, Health  and Safety (EHS) 

You shall ensure that 1. Inspection of your area and corrective actions against deviations immediately  2. Good housekeeping of your area and at work spot 3. Work permit system (wherever applicable) is followed by all your workmen /supervisors/Sub‐

contractors. 4. All your employees/supervisors/Managers are trained in safety, first Aid and supervisors. 5. All  portable  tools  are  double  insulated  /properly  earthed/adequately  guarded  as  per 

standards and in good working order  6. The  concerned  employees  /trainees/managers  receive  EHS  Induction  as well  as on  the  job 

training  as  and  when  require  (if  new  machines  are  installed  or  working  procedures  are changed ) 

7. Safe work practices are adopted by all your employees at project site 8. All employees are provided with required Personal Protective Equipment (PPE) and its proper 

usage and adhered to other EHS rules at project site.  9. Inspection/checking of all Tools and tackles being used by your personnel and ensure safety 

measures during operation of the same  10. The Authorized Test certificate from competent person in respect of crane, chain pulley blocks 

and  Lifting  tackles  such  as  wire  ropes,  chains,  slings  etc  being  used  by  you  in  the  work activities. 

11. All  electrical  operated  equipment/tools/appliances  are  drawn  supply  through  ELCB  (Earth Leakage Circuit Breaker) to prevent Electric Shock hazard  

12.  Investigation  of  Incidents/Accidents  and  implementation  of  remedial  measures  and  its record. 

13. Rendering  of  First  Aid  and  reporting  of  Accident  to  Project  Manager/EHS  coordinator immediately.  

14. All your employees are covered with valid insurance.  15. Your  drivers/operators  posses  Valid  driving  License/Experience  Certificate  (wherever 

applicable).  16. All vehicles/motorized equipment have valid “C” book and insurance coverage.  17.  The effective supervision  through out the work activity to ensure safe practices  in order  to 

prevent Unsafe conditions/Unsafe Acts of workmen  Please  acknowledge  the  receipt  of  this  document  by  signing  on  duplicate  copy  as  a  token  of acceptance of the said responsibilities assigned and return the same for record  

 Date;                                                         Project Manger /EHS Coordinator To  M/s  

 Received the copy of “EHS Responsibility and Accountability for Contractors” and I hereby accept and acknowledge the same. 

  

Name and Signature of Contractor’s Project In charge   

Date: 

Page 56: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 56 of 105 

16.3 EHS –Induction  

 PROJECT:                                                  DATE:                             TIME:  

The following safety topics have been made understood by us in respect of Safety at project 1 EHS rules at project site     2  Housekeeping    3  Reporting of Hazards  4  Electrical safety 5 Safety while work at height    6 Ladder & scaffold safety               7 Importance of PPE & its use  8 First Aid & Fire prevention     9 Welding &Gas cutting   

   

SNO NAME  DESIGNATION COMPANY/CONTRACTOR  SIGNATURE

       

       

       

       

       

       

       

       

       

       

CONDUCTED BY:    NAME:                                               DESIGNATION:                                                                       SIGNATURE:          

Page 57: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 57 of 105 

16.4 Safety Pep Talk 

PROJECT:                                                                      DATE:                   TIME:  Topics highlighted in the pep talk:    1                                                                              4    2                                                                              5    3                                                                              6    

S.no. Name  Designation  Company/Contractor  Signature 

         

         

         

         

         

         

 CONDUCTED BY:   NAME:                                            DESIGNATION:                                                                   SIGNATURE 

Page 58: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 58 of 105 

16.5  Incident / Accident Investigation Report        

 

Name of Contractor/Sub contractor          : Name of Accidentee or Person Involved   : DATE & TIME                                                  : Location                                                          : Description of Incident/Accident  (Brief narration how it occurred)               :    Nature of Damage /Injury                           :  Witness (if any)                                             :             Observation                                                   :         CAUSE OF ACCIDENT/INCIDENT               :         Corrective action taken/suggested for           : Prevention of recurrence                                                                                                              Signature      :    Date:                                                                                                Name             :                                                                                                           Designation  :    

Page 59: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 59 of 105 

16.6 EHS Inspection 

To:                    Date:  Observed the following unsafe conditions/Unsafe acts during site inspection today                       

           Findings:                                      Action required:    Kindly arrange for corrective action on priority.                  Thanking you,                                                                                     EHS‐Manager/ Coordinator 

Page 60: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 60 of 105 

16.7 On The Job Safety Communications 

Project:                  Date:                                    Time:                                                              :                                                                 Name Of contractor/Sub‐contractor    :                           Location                                                      :     Brief description of Safety violation      :                            Safety advice / Instruction Given           :    Instruction Given by   Signature:  Name:     Instruction Received by  Name:    Signature:   

Page 61: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 61 of 105 

16.8 EHS Status Report                                                                                 

                                                                              Date:        PROJECT:                                                           Month:                                                                                         Observations/Corrective Actions :( NCR) 

SNO      Nature of Violation         For the month    Cumulative as on date: 

             Observed Corrected Observed Corrected

1  Non‐Use of PPE          

2  Unsafe Acts    

3  Unsafe Conditions    

4  Unsafe  practice    

5  House keeping          

 Safety Education & Awareness Programmes:   

SNo                           

Deatails of programme      

DATE      No .of         

participants No. of  

programme during month  

Cumulative as on Date 

Staff  Workers     

1  Safety committee meeting   

         

2  Training  on a) 

b) c) 

 

3  Safety Pep talk  on  a) b) c) 

         

4  Demonstration on a) b) c) 

 

 REMARKS    EHS ‐INCHARGE                                                                     PROJECT INCHARGE 

Page 62: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 62 of 105 

16.9  Safety Committee Meeting  

PROJECT:  DATE:                                         TIME:                                          VENUE:  

SNO                     NAME  Organization/contractor  Signature 

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

       

 

Page 63: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 63 of 105 

16.10 EHS Penalty 

Project:                                                                                            Date: To     M/s       

Through: The Project Manger   

 Sub:  Penalty towards Violation of EHS rules at Project site ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ A penalty of Rs.                 (Rupees                               ) is imposed on you for violation of EHS rules by 

your staff/workmen at Project site.  Details of Violation: Name of Person:   Date:                                                   Time:            AM/PM  Location:  EHS Violation:                                                                                  Project EHS‐ coordinator  CC  to Project Coordinator  (concerned for the location ) 

Page 64: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 64 of 105 

17 SAFETY CHECKLISTS 

17.1 General safety 

General Construction Safety Checklist cum Audit Report 

PROJECT : 

LOCATION :                                                                                                                    DATE : 

INSPECTION CONDUCTED BY : 

S.NO 

General Construction Safety Checklist cum Audit Report 

YES  NO  REMARKS 

  MANAGEMENT COMMITMENT     

1  Is there a safety policy?     

2  Is the safety policy displayed at site?     

3 Is everyone aware of the contents of the safety policy? 

   

4  Are there safety plans and safety procedures?     

5  Are the employees aware of the safety plans?     

6  Is there a safety organisation?     

7 Is there a competent safety professional available at site? 

   

8  Is there a safety committee?     

9 Is project management actively participating in HSE Programs? 

   

  SAFETY TRAINING & AWARENESS PROGRAMS     

1  Are employees given safety orientation?     

2 Are employees given  specialised training where needed? 

   

3  Are tool box talks regularly conducted?     

4  Are the bulletin boards at site?     

5  Are safety material displayed at site?     

6  Are there site safety instructions to various trades?     

7  Are method statements made for critical activities?     

Page 65: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 65 of 105 

8  Is SPA made for routine and new activities?     

9  Are workers participating is formulating SPA?     

  EMERGENCY RESPONSE     

1  Is there a first aid centre at site?     

2 Is the First Aid Centre equipped with the required medicines and accessories? 

   

3  Is there a qualified doctor/nurse available at site?     

4 Is there any arrangement with hospital for emergency treatment? 

   

5  Is there an emergency response team?     

6 Is the team trained on emergency response procedures? 

   

7  Are workers aware of the emergency procedures?     

8 Are employees aware of the actions to be taken in case of : 

   

  Accidents     

  Fire     

  Gas Leakage     

  Gas Cylinders on fire     

  Snake/ Scorpion bites     

  Sun Stroke     

  Electric shock     

9  Are emergency telephone numbers displayed?     

10  Is emergency vehicle/ ambulance available at site?     

11  Are trained first aids available at site?     

12  Are there assembly points available?     

13  Is there an effective communication system?     

14  Are mock drills conducted at regular intervals?     

       

 

 

Page 66: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 66 of 105 

17.2 DAILY INSPECTION CHECK‐LIST FOR SAFETY MEASURES AT SITE 

PROJECT : 

LOCATION :                                                                                                                    DATE : 

INSPECTION CONDUCTED BY : 

S. No                  Description     Yes      No       Remarks 

1  Are all persons entering site wearing Safety helmets and Safety shoes? 

     

2  Are persons working above 2 meters, wearing safety harness with life line anchored to a rigid support?  All works over 2 meters must be carried out on good working platforms which are built acceptable to safety standards. 

     

3  Are special electrical equipment required for electrical works available? 

     

4  Are safety guards for moving parts of machines in position?  

     

5  Are openings/pits covered, barricaded and warning signs displayed? 

     

6  Is house‐keeping in order, materials are stacked properly in marked areas? 

     

7  Is the work area polluted with dust, fumes, gases etc for which safety appliances are provided or not? 

     

8  Are fire extinguishers available at site?       

9  Are fire extinguishers hanged on wall with proper clamps or placed on ground? 

     

10  Is validity of refilling extinguishers displayed on the body of extinguisher? 

     

11  Are fire buckets available at site?       

12  Are fire buckets filled with water and sand?       

13  Is earthing provided to all equipments?       

14  Does the earth conductor continued up to the distribution board? 

     

15  is ELCB provided to all electrical circuits?       

16  Is the access and working platforms properly illuminated? 

     

17  Is insertion of loose wires in sockets without plug sockets present?  

     

18  Is improper joining of cables and wires prevailing at site? 

     

Page 67: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 67 of 105 

19  Is proper cover for DB, PDB etc provided with locking arrangement? 

     

20  Are lifting equipments and tackles in good working condition and recently load tested? 

     

 

 

                                                                                                                  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 68: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 68 of 105 

17.3 Site layout 

         

Site Layout Plan 

PROJECT : 

LOCATION :                                                                                                                       DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Site Layout Plan  YES  NO  REMARKS 

1  Is perimeter fencing arranged?          

2  Is the access at the site entrances clearly visible?          

3 Is the access wide enough to allow plant and personnel?          

4  Is there a proper access control system?          

5  Is there sufficient lighting at the entrance?          

6 Are there proper arrangement for storage of plant and material? 

        

7  Are there off loading facilities?          

8  Are there scrap dump areas?          

9 Are there special storage areas for petrol, flammable materials, explosives etc…? 

        

10 Are access roads suitable for the movement of plant and vehicles? 

        

11  Is car parking area adequate?          

12  Are sanitary facilities suitably located?          

13 Are welfare facilities like canteens, rest rooms etc.. Are provided? 

        

14 Is the Ambulance room/ emergency vehicle suitable located? 

        

              

 

Page 69: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 69 of 105 

17.4 Personal Protective Equipment (PPE) 

 

         

Personal Protective Equipments 

PROJECT : 

LOCATION :                                                                                                                                              DATE : 

INSPECTION CONDUCTED BY : 

         

S.NO  Personal Protective Equipments  YES  NO  REMARKS 

1  Are all persons wearing safety helmets while on site?       

2 Are the workers using the chin strap of their safety helmets? 

     

3  Is everyone wearing safety shoes while on site?       

4  Is everyone wearing safety goggles where needed?       

5 Are the workers wearing suitable hand gloves while handling rough objects, chemicals etc..? 

     

6 Are workers wearing full body safety harness while working at heights? 

     

7  Are the workers anchoring their safety harnesses?       

8 Are workers wearing respirators when exposed to dust, harmful chemicals and poisonous gases etc..? 

     

9  Are workers using suitable PPE as per the hazards?       

10  Are there sufficient stocks of PPE?       

11 Are the PPE regularly inspected for there good condition? 

     

12  Are PPE properly handled and stored?       

         

 

Page 70: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 70 of 105 

17.5 Material handling 

         

Material Handling 

PROJECT : 

LOCATION :                                                                                                                      DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Material Handling  YES  NO  REMARKS 

1 Is safe method of lifting manually being followed by the workmen? 

     

2 Are proper lifting accessories for manual handling provided? 

     

3 Are personnel using body mechanics when lifting and carrying? 

     

4  Are the workers lifting excess loads?       

5 Are the workmen using personal protective equipments while handling materials? 

     

6  Are workmen trained in material handling?       

7 Are lifting and carrying accessories provided for manual handling? 

     

8 Are workmen moving near moving machinery, pinch points etc.. Where they may get injured? 

     

9  Are the workmen lifting excess weights?       

         

 

Page 71: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 71 of 105 

17.6 Material storage 

         

Material Storage 

PROJECT : 

LOCATION :                                                                                                                                   DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Material Storage  YES  NO  REMARKS 

1  Are materials stored in an orderly manner?       

2 Is proper flooring done with adequate load bearing capacity? 

     

3 Is there adequate place for bulk storage of construction materials? 

     

4 Is there proper access provided for removing/ storing material? 

     

5  Are the stacks protected from collapse?       

6 Are stacking properly done with cross layers for bricks, concrete blocks, cement bags etc..? 

     

7  Is material protected from weather and rain?       

8  Are adequate precautions taken against fire hazard?       

9  Are the projected ends properly protected?       

10 Are the contents of the containers properly identified and labelled? 

     

11  Is there adequate ventilation?       

12 Are fire precautions tkaen where flammable materials stored? 

     

         

 

Page 72: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 72 of 105 

17.7 Fire prevention & control 

         

Fire Prevention & Control 

PROJECT : 

LOCATION :                                                                                                                                   DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Fire Prevention & Control  YES  NO  REMARKS 

1 Is waste accumulating in hoist shafts, corners etc…? 

     

2 Are waste bins provided at appropriate locations? 

     

3 Are safe ash trays provided where smoking is allowed? 

     

4  Are wet clothes kept near heaters for drying?       

5  Are any electrical circuits overloaded?       

6  Are flammable materials stored separately?       

7  Are there fire extinguishers available at site?       

8 Are the fire extinguishers suitable for the nature of fire? 

     

9 Are the fire extinguishers placed near the source of fire and are easily accessible? 

     

10  Is rubbish burnt in controlled manner?       

11 Is flame cutting and welding taking place with proper fire precautions? 

     

12 Are all blow lamps and heating appliances being used correctly? 

     

13 Is the site entrance always clear for fire engines to get in? 

     

14  Are there trained persons to fight fire?       

15  Are there fire water and fire hoses at site?       

 

Page 73: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 73 of 105 

17.8 Excavation 

         

Excavation & Trenching 

PROJECT : 

LOCATION :                                                                                                                 DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Excavation & Trenching  YES  NO  REMARKS 

1  Is method statement made for excavation?       

2 Are the position, depth and size of underground structures and service lines clearly been identified? 

     

3  Is excavation permit taken where needed?       

4 Are the excavations sloped/ step back or shored properly? 

     

5 Are the access /egress ladders /ramps/steps properly provided? 

     

6  Is there a safe access provided for vehicles?       

7 Is the excavated material kept 1m away from the edge of excavation? 

     

8  Is the excavation edge free from falling material?       

9  Are the excavations properly barricaded?       

10 Is heavy equipment operated only on stable ground? 

     

11  Is dewatering done where needed?       

12 Are the excavation machineries identified and inspected for proper working condition? 

     

13 Is there an accumulation of poisonous gases in the pit? 

     

14 Is gas test done before allowing persons to enter the pits? 

     

15 Are precautions taken against tipping of vehicles into the pits? 

     

16 Are precautions taken against material falling on the persons working in the pits? 

     

17 Are adequate precautions taken to prevent workmen hitting against the vehicles? 

     

18 Are cross over bridges provided for every 20 ft interval in case of long trenches? 

     

19 Are adequate precautions taken against electrical hazards? 

     

Page 74: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 74 of 105 

20  Is there adequate lighting in case of night work?       

21  Are warning lights provided where necessary?       

22 Are the adjacent structures protected where needed? 

     

23 Is the movement of vehicles controlled to prevent earth collapse due to vibration? 

     

24  Is there any undercuts on the sides of excavation?       

25 Are the excavations frequently inspected for cracks particularly after rains? 

     

26 Is the entry of water into the pits checked and controlled? 

     

27 Are adequate precautions taken while removing the timber, supports etc..? 

     

              

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 75: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 75 of 105 

17.9 SAFETY MEASURES FOR DEMOLITION OF STRUCTURES 

 

PROJECT : 

LOCATION :                                                                                                                 DATE : 

INSPECTION CONDUCTED BY : 

 

S. No                          Description  Yes     No   Remarks 

1  Are danger signs displayed all round the structure?       

2  Are barricades provided around the structure?       

3  Are two (2) exists provided for workmen to escape?       

4  Check whether red lights are provided around the barricades? 

     

5  Make sure there is no entry for trespassers       

6  Switch off  electric power and disconnect lines       

7  Prevent uncontrolled collapse of structure       

8  No demolition work after sunset       

9  Is sufficient place available for worker for carrying out demolition works? 

     

     10  Are sufficient personal protective equipment used by worker. e.g. Safety harnesses? 

     

     11  Are sufficient fire fighting equipment available at site during gas cutting? 

     

     12  Any other safety issues: 

 

     

 

 

 

 

 

 

 

 

 

Page 76: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 76 of 105 

17.10 SAFETY CHECK‐LIST FOR SCAFFOLDINGS/LADDERS 

 

PROJECT : 

LOCATION :                                                                                                                 DATE : 

INSPECTION CONDUCTED BY : 

 

S. No  Description  Yes  No  Remarks 

1  Design tall scaffold       

2  Provide scaffold of sound material       

3  For tubular scaffold ,diameter should not be less than 48 mm and  wall thickness  less than 2.3 mm  

     

4  Check whether each scaffold is securely supported or suspended and properly strutted or braced 

     

5  Check whether  all scaffolds and  working platforms are securely fastened to the building or structure and braced or guyed properly 

     

6  Provide a regular plank stairway wide enough for 2 persons to pass and provide hand rails on both sides 

     

7  The length of the ladders should not be more than 4 meters 

     

8  Check for  fall of loose materials, bracings and other parts off scaffold  

     

9  Check whether  un‐ insulated electric wires exist near working platforms, gangway etc of a scaffold 

     

      10  Any other safety issues: 

 

 

     

 

                                                                                                         

 

 

 

 

 

Page 77: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 77 of 105 

17.11 Confined spaces 

         

CONFINED SPACE 

PROJECT : 

LOCATION :                                                                                             DATE : INSPECTION CONDUCTED BY : 

S.NO  CONFINED SPACE  YES  NO  REMARKS 

1 Is the confined space free from toxic gases and oxygen deficiency? 

     

2 Is the confined space clear of contents and well ventilated? 

     

3  Is there proper access for entry and exit?       

4 Is there any possibility of toxic gases/ chemicals entering the confined space? 

     

5  Is gas test conducted?       

6 Is there sufficient oxygen(i.e.20%) in the atmosphere? 

     

7 Are confined space entry procedures followed? 

     

8 Is the confined space entry permit system in place? 

     

9 Is the job done under the supervision of a competent person? 

     

10 Are the workmen trained to work inside confined space? 

     

11 Are they physically fit to work inside confined space? 

     

12  Is there a proper rescue arrangement?       

13 Are the required rescue equipments available? 

     

14 Is a register maintained to enter the names while entering and leaving the confined space? 

     

15 Are trained personnel waiting outside to rescue the persons in case of emergency? 

     

16 Is there proper communication system for the person working inside? 

     

         

 

Page 78: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 78 of 105 

17.12 Radiography 

         

Radiography 

PROJECT : 

LOCATION :                                                                                             DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Radiography  YES  NO  REMARKS 

1 Are there required permits from the authorized person? 

     

2 Is the radiographer aware of the safety precautions to be taken? 

     

3 Is the effective area cordoned off to a particular distance? 

     

4  Is the radiographer using the following:       

  Collimeter       

  Radiation survey meter       

  Film badge       

  Pocket Dosimeter       

5 Is the radiographer having a valid license from BARC? 

     

6 Is there valid documents for the movement of the source? 

     

7 Is notice issued in advance to other agencies working in the nearby areas? 

     

8 Is proper access provided for the location where radiography being done? 

     

9  Is the source pit approved by BARC?       

         

 

Page 79: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 79 of 105 

17.13 Painting 

         

Painting 

PROJECT : 

LOCATION :                                                                                                                      DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Painting  YES  NO  REMARKS 

1 Are the painters using required PPEs like chemical cartridge type mask, hand gloves etc..? 

     

2  Are there sufficient ventilations in the painting area?       

3 Are the fumes and gases affecting the other workers in the surrounding area? 

     

4 Are the painting areas properly barricaded and marked? 

     

5 Are the materials like thinners and paints stored in a safe area? 

     

6 Is the area clear from sparking producing equipments? 

     

         

 

Page 80: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 80 of 105 

17.14 Work at height 

         

Work at Height 

PROJECT : 

LOCATION :                                                                                                                                           DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Work at Heights  YES  NO  REMARKS 

  Ladders:       

1 Are the ladders checked and inspected before use and at regular intervals? 

     

2  Are the defective ladders removed from site?       

3 Are the ladders placed as per safety requirement ie. At an angle of 75 degrees with the horizontal? 

     

4  Are the ladders secured properly?       

5  Is the ladder extending 1m above the landing step?       

6  Are the ladders properly stored?       

7  Are persons ascending and descending the ladder in a safe manner?       

8  Are the ladders obstructing the passages?       

9  Are the ladders likely to be hit by movement of persons/vehicles?       

  Scaffolds and working platforms:       

1  Are the scaffolds designed as per the load requirement?       

2  Are scaffolds erected under the supervision of a trained person?       

3  Are the scaffolding material suitable for the purpose?       

4 Are the scaffolds erected on level ground with proper sole boards and base plates? 

     

5  Are the scaffolds plumb with adequate cross bracings?       

6  Are sufficient tie ins provided for the tower scaffolds?       

7  Are platform boards inspected and are in good condition?       

Page 81: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 81 of 105 

8  Are the platforms fully boarded without openings?       

9  Are hand rails, mid rails and toe boards fixed for the platforms?       

10  Is there a proper access to reach the platforms?       

11  Are workers protected from falling objects?       

12  Is the base to height ratio maintained at 1:4?       

13  Are they inspected and tagged by competent person?       

14  Is the scaffold permit taken before using?       

15  Are red/green tags attached as per the conditions of the scaffolds?       

16  Are the castor wheels of mobile scaffolds properly locked?       

17  Are the mobile scaffolds stable?       

         

 

Page 82: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 82 of 105 

17.15 Electrical 

         

Electrical 

PROJECT : 

LOCATION :                                                                                                                   DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Electrical  YES  NO  REMARKS 

1 Is electrical installation made as per the load requirement? 

     

2  Are the installations made of industrial type fittings?       

3 Is the installation suitable for the weather conditions? 

     

4  Is the installation certified by licensed supervisor?       

5  Are ELCBs/ MCBs provided in the circuit?       

6 Are the distribution boards protected from rain and water? 

     

7  Are the cables protected from mechanical damages?       

8 Are cables located at overhead positions with sufficient head clearance? 

     

9  Are the joints on the cables lying on the ground?       

10 Are the cables lying on the ground causing trip hazard? 

     

11 Are electrical equipment provided with proper earthing? 

     

12  Are ELCBs and MCBs tested periodically?       

13 Are there single insulated electrical wires instead of double insulated PVC cables? 

     

14 Are the insulations regularly inspected and records maintained? 

     

15  Are lock out/tag out procedures followed?       

16 Are the accesses to the panels free from obstructions? 

     

17 Are required fire extinguishers provided near the electrical panels? 

     

18 Is there any artificial resuscitation charts displayed near electrical panels? 

     

         

Page 83: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 83 of 105 

17.16 Hot work 

         

Hot work (Welding, Gas cutting and Grinding) 

PROJECT : 

LOCATION :                                                                                                                                DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Hot work (Welding, Gas cutting and Grinding)  YES  NO  REMARKS 

1  Are there damaged welding cables ?       

2  Are lugs used for cable connection?       

3  Are cables getting over heated, damaged?       

4  Are the cables creating tripping hazard?       

5  Are welding transformers properly earthed?       

6 Are power cables and welding cables protected from mechanical damage? 

     

7 Are welders using welding hoods attached to safety helmets? 

     

8  Are welders using required PPE?       

9 Are temporary screens provided to protect others from welding rays, grinding sparks? 

     

10 Are fire precautions taken against falling of welding sparks and spatters? 

     

11 Are gas cylinders stored properly in vertical position and secured? 

     

12 Is there safe distance between and oxygen and acetylene cylinders? 

     

13 Are gas cylinders provided with wall protection caps when not in  use? 

     

14 Are the gas cylinders provided with flash back arresters while using? 

     

15  Is gas starch with flash back arresters?       

Page 84: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 84 of 105 

16 Is the area clear of combustible materials around gas cylinder storage? 

     

17 Are fire extinguishers provided where welding, gas cutting is in progress? 

     

  SHOT  BLASTING       

1 Is the air compressor tested and test certificate available? 

     

2  Are the high pressure hoses in good condition?       

3 Are chains provided across the couplings of the high pressure hoses to prevent whiping action? 

     

4  Is shot blaster using sand blasters hood?       

5  Is emergency stop valve provided?       

6  Are there any openings in the shot blasters shed?       

7 Are the workers provided with dust respirators when they are exposed? 

     

         

 

Page 85: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 85 of 105 

17.1 7 Formwork 

 

PROJECT : 

LOCATION :                                                                                                                    DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Formwork/False work & Concreting  YES  NO  REMARKS 

1  Has the false work been designed by a competent person?       

2  Has the design been rechecked by the engineer concerned?       

3 Is there any change in the loading program after the design approval? 

     

4 Is the horizontal lacking and diagonal bracing adequate to resist lateral loading? 

     

5 Will there be any additional load on the false work due to plant and storage of materials? 

     

6 Is the design capable of withstanding dynamic load due to dumping loads, shock loads, surge loads, vibrations etc..? 

     

7 Are the foundations designed according to soil conditions, point loads of verticals, water flooding etc..? 

     

Is the consideration given to horizontal forces from surge loads, concrete discharge from skips, expansion of concrete, non verticality of supports, deflections of horizontal members, settlement of foundations etc…? 

     

9  Is there adequate access for the vehicles?       

10  Is there a proper electrical connection for the vibrators?       

11  Are the workers using PPE?       

12  Are they using Gum boots while working on wet concrete?       

13  Is there a proper access for concrete cutting?       

14  Are the workers using safety harness while stripping the forms?       

15  Is there a proper walkway provided over the reinforcement bars?       

16  Are the open edges properly barricaded?       

         

 

Page 86: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 86 of 105 

17.18 Fall prevention & protection 

         

Fall Prevention & Protection 

PROJECT : 

LOCATION :                                                                                                      DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Fall Prevention & Protection  YES  NO  REMARKS 

1 Is there a site specific fall protection plan in place? 

     

2 Are workers trained in the fall protection procedures? 

     

3 Are open edges and floor cut outs properly barricaded? 

     

4  Are staircases provided with temporary railings?       

5  Are caution boards fixed at danger points?       

6  Are workers using full body harness?       

7 Have the workers anchored safety harness to a strong anchoring point? 

     

8 Are lifelines provided where anchoring points are not available? 

     

9 Are fall arresters provided while climbing rope ladders? 

     

10  Are safety nets fixed where needed?       

11  Are sfety nets securely fixed?       

12  Are debris on the safety nets regulary cleaned?       

13  Are safety nets subjected to fire hazards?       

         

                   

 

 

Page 87: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 87 of 105 

17.19 Hand tools 

         

Hand Tools & Power Tools 

PROJECT : 

LOCATION :                                                                                        DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Hand Tools & Power Tools  YES  NO  REMARKS 

1 Are the hand tools in good working condition? 

     

2  Are they stored in a proper manner?       

3  Are damaged tools removed from use?       

4  Are appropriate tools available for the job?       

5 Are tools being used only for their proper intended use? 

     

6 Are grinding machines provided with guards over the wheels? 

     

7 Are the grinding wheels inspected for the expiry date? 

     

8 Is ring test done for abrasive wheels before fixing? 

     

9 Are the wheels suitable for the speed of the machine? 

     

10 Are the power tools provided with earth connection? 

     

11  Are the power tools handled properly?       

12 Are the handles of the tools free from splits and cracks? 

     

13 Are there mushroomed heads over the hammers, chisels and other impact tools? 

     

14 Are the edges for tooth of cutting tools kept sharp? 

     

Page 88: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 88 of 105 

  PNEUMATIC TOOLS       

1  Is there misuse of compressed air?       

2  Is horseplay with compressed air forbidden?       

3 Are persons dusting their clothes with compressed air? 

     

4 Are the joints in the air lines made with purpose made connections? 

     

5 Are the pneumatic tools checked for faulty governors which may result in over speeding? 

     

6 Is air supply to the tool disconnected when the tool is left unattended? 

     

         

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 89: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 89 of 105 

17.20 Equipment fitness report for Vehicle and Equipment &Earth moving Equipment 

PROJECT : 

LOCATION :                                                                                                      DATE : INSPECTION CONDUCTED BY :  

Name of the site:                                                                                   Make/Model:                                          Job. No:                                                                                                   Identification No:/Reg.No:                  Date:                                                                                                        Asset code No (If applicable)               Inspected by                                                                                           Owned by: 

S. No:  Check points  Observation  Remarks 

1.  Engine condition     

2.  Clutch/Brake     

3.  Hydraulic system     

4.  Guards/ Covers/ Doors     

5.  Fastener lock pins/Keys     

6.  Horn/Reverse horns/ Lights     

7.  Indicators/ Wiper blades     

8.  Operators fitness     

9.  Tyre pressure     

10.  Condition of battery/Lamps     

11.  Operating levers/  Steering     

12.  Gauges & Warning devices      

13.  Swing alarm provided     

14.  First‐aid box provided     

15.  Fire extinguisher provided     

The Vehicle/Earth moving equipment has been checked for above points and                                                              Found fit for deployment                                     Found UNFIT for deployment 

 

 

     (P&M Engineer)                                                                                                (Site Safety Officer) 

 

 

 

 

Page 90: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 90 of 105 

17.21 Crane check list 

PROJECT : 

LOCATION :                                                                                                      DATE : INSPECTION CONDUCTED BY : Descriptio of Crane :                                                                                     Make:  Registration No: 

 

S.No.  Check points  Observation      Remarks 

1  Hook and Hook Latch     

2  Over‐Hoist Limit Switch     

3  Boom Limit Switch     

4  Boom angle Indicator     

5  Boom‐Limit Cut off Switch     

6  Condition of Boom     

7  Condition of Ropes     

8  No. of Load Lines     

9  Size and Condition of the sling     

     10  Swing brake & lock     

     11  Propel brake & lock     

     12  Hoist brake and Lock     

     13  Boom brake and lock     

     14  Main clutch     

     15  Leakage in hydraulic cylinders     

     16  Out triggers fully extendable     

     17  Tyre Pressure     

     18  Condition of Battery and Lamps     

     19  Guards of moving and rotating parts     

     20  Load Chart Provided     

     21  No. and position of pendant ropes     

     22  Reverse Horn     

     23  Load Test Details     

     24  Swing alarm provided     

     25  Operator Fitness     

     26  First Aid box     

Page 91: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 91 of 105 

     27  Fire Extinguisher in operator cabin     

       

This Crane has been Checked for the above points and, 

Found FIT for deployment                  Found UNFIT for deployment  

 

(Checked by P&M Engineer)                                                                               (Site Safety Officer) 

 

Page 92: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 92 of 105 

 17.22 SAFETY CHECK‐LIST FOR TOWER CRANES 

PROJECT : 

LOCATION :                                                                                                      DATE : 

INSPECTION CONDUCTED BY :                                                                    Type of Maintenance: Weekly          

Description: Tower Crane:                                                                           Crane No:                                                                                  

 

 

S. No  Check points  Inspection result (Y/N) 

Remarks 

       OK/YES  Not OK/NO 

 

  Ropes:       

1  Rope condition       

2  Rope lubrication       

  Trolley:       

1  Trolley condition       

2  Trolley lubrication       

  Counter weight:       

1  Counter weight pin condition       

2  Counter weight  stability       

  Pins:       

1  Pins correctly located       

2  Split pins       

3  Check plates       

4  wear       

5  Boom pins       

  Crane structure(Deformation, 

Rust, Damage etc): 

     

1  Tower       

2  Boom       

3  Frame       

  Rope Sheaves and Wear pads:       

1  Condition       

2  Sheaves rotate       

Page 93: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 93 of 105 

3  Wear pads/Rollers(Boom/Jib 

Protection) 

     

4  Rope keeper bar/ Plate on        

5  sheaves       

6  Bar clearance correct       

  Bolts:       

  Tower bolts:       

1  Bolts tightened       

2  Bolts of correct type       

  Slew Ring :       

1  Bolts tightened       

2  Bolts of same type       

3  Washers       

  Counter Weight:       

1  Fixed –will not sway       

2  Moving‐ Connecting bolts       

  Other Structural/Mech :       

1  Fluid leaks       

2  Hook‐latch       

3  Fixing angle deformation       

  Guarding(Accessible areas):       

1  Guards provided       

2  Guards fixed       

  Load Indicator  & Rated Capacity Limiter: 

     

1  Load indicator operational       

2  Load indicator calibrated       

3  Cut‐Off operates       

4  SWL displayed at main jib       

  Other Indicators:       

1  Radius Indicator       

2  Wind Indicator       

  Limit Switches:       

1  Hoist limit switch       

2  Trolley limit switch       

Page 94: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 94 of 105 

3  Slewing limit switch       

4  Load limit switch       

5  Emergency  stop  switch       

  Crane cabin:       

1  Seating       

2  Visibility       

3  Noise       

4  Fire extinguisher       

  Load charts:       

1  Load chart provided       

2  Load chart displayed       

  Tower Access:       

1  Ladders       

2  Platforms for guardrail       

3  Hand rail pins       

  Boom/Jib access:       

1  Walkway       

2  Trolley platform       

  Communication:       

  Lightning Arrestor:       

1  Condition of earth cable       

2  Condition of earth resistance       

  Brakes:       

1  Trolley brake       

2  Hoist brake       

3  Swing brake       

4  Brake liner condition       

5  Air gap       

6  Gear Box:       

7  Trolley gear box       

8  Abnormal noise       

9  Oil level       

10  Any  oil leakages       

         

Page 95: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 95 of 105 

1  Specific Points noticed: 

 

 

 

 

 

 

(P&M Engineer)                                              (Plant Manager)                                          (Safety Officer) 

 

Note: 

1)  In ‘remarks ‘column details of activities carried out against each task with observations to be mentioned.  For ex:                                                                                                                                      

          Maintenance task‐ Grease water pump‐Remarks –Greased                                                        

          Maintenance task‐ Clean air cleaner element‐ Remarks –Cleaned                                                       

          Maintenance task‐ Check battery – Remarks – Checked, electrolyte level topped up,  

          Sp.gravity is…     

2) In ‘Specific points noticed’‐ mention any specific defect/damage/problem noticed during the   

 maintenance, which needs action for repair/rectification/replacement of parts.  

 

                                                                               

 

 

 

 

 

 

 

 

Page 96: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 96 of 105 

17.23 BUILDERS HOIST CHECK‐LIST 

PROJECT : LOCATION :                                                                                                       DATE : Registration No:                                                                                             Make: INSPECTION CONDUCTED BY :  

 

S. No  Description  Yes/No  Remarks 

1  Check for verticality of the hoist mast     

2  Is anchorage for the mast and supporting structure adequate? 

   

3  Is end mast piece is provided?     

4  Is over hoist limit switch working?     

5  Condition of ropes and diversion pulleys     

6  Is hoist position safe, free from falling material hazard? 

   

7  Is Winch platform strong, provided with hand rail & toe‐board? 

   

8  Is hoist break checked?     

9  Operator’s visibility to all unloading platforms and vice verse 

   

10   Are warning signals established& used?     

11  Is hoist protected from unauthorised operations?     

12  Is earthing provided?     

13  Are rotating parts of hoist adequately guarded including finger guard for bucket movement? 

   

14  Is ground level entry to winch area is restricted with wicket gate? 

   

15  Is protection against tripping hazards due to railing of ropes provided? 

   

16  Are signaling system functioning (Light & Bell)?     

17  Are daily check procedure followed?     

18  Check  operators fitness     

19  Are authorised operators are allowed all the time? 

   

20  SWL displays in terms of load, materials etc     

21  Restriction on the size &loading in the bucket     

Page 97: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 97 of 105 

22  Any other safety issues:     

 

    P&M Engineer                                                                                         Signature of Safety Officer 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 98: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 98 of 105 

17.24 CHECK‐LIST FOR TRANSIT‐MIXER  

Description: Transit‐mixer                                                                        Type of Maintenance: Weekly               Transit‐mixer No:                                                                                        Manufacturer name:                                                      Transit‐mixer Model:                                                                                                              Date:                                                     Description: Transit‐mixer(AL/TATA/STETTER‐AM‐6 SH) 

S. No  Maintenance Tasks         Remarks 

1  Check and adjust the valve tappet clearance       

2  Clean the complete fuel line and diesel tank       

3  Tight all the ‘U’ clamp bolts of leaf springs       

4  Check air intake line & gasket to turbo charger for leaks and rectify if any leak found 

     

5  Clean the breather of differential housing , gear box and engine 

     

6  Check the tyres for uniform wear & do wheel alignment if wear is uneven front  tyres 

     

7  Check steering mounting bolts/nuts and gear box mounting bolts 

     

8  Check the chassis cross members & side members for loose bolts 

     

9  Specific points noticed: 

 

 

 

     

 

(P&M Mechanic/Technician)                                                                                      (P&M Engineer) 

Note: 

1) In ‘Remarks’ column details of activities carried out against each tasks with observations to be mentioned for ex: 

Maintenance task‐Grease water pump‐Remarks –Greased Maintenance task –Clean air cleaner element –Remarks –Cleaned Maintenance task –Check battery –Remarks‐ Checked, electrolyte level topped up,      Sp.gravity is……  

2) In ‘Specific points noticed’‐ mention about any specific defect/damage/problem noticed during the maintenance which needs action for repair/rectification/ replacement of parts. 

                                                                            

 

Page 99: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 99 of 105 

17.25 DIESEL GENERATOR (DG) INSPECTION CHECK‐LIST 

Project /Site name:                                                                                                 Inspected by:                                                       Asset code:                                                                                                                              Date:                                                   

S. No.                Check points      Yes      No  Remarks 

1  Whether continuity and tightness of earth conductor are checked? 

     

2  Mention the gauge of earth conductor used       

3  Whether earth resistance is measured?       

4  Mention the earth resistance       

5  Is DG provided under shed/cover?       

6  Whether entry is restricted in to the DG room? 

     

7  Are cable trenches covered?       

8  Is insulation provided on the battery terminals? 

     

9  Is thermal insulation provided to the DG exhaust? 

     

10.  Whether stack height is maintained as per Environment requirements given in procedure manual? 

     

11  Whether DG exhaust is diverted outside the shed? 

     

12  Are all rotating parts of DG guarded (Coupling, Radiator fan)? 

     

13  Whether any leakage of fuel/oil beneath and around the DG? 

     

14  Whether DG surrounding area is free from flammable material? 

     

15  Whether fire extinguisher/fire buckets with dry sand are provided? 

     

16  Whether DG is fitted with acoustics and silencer insulations? 

     

 

(DG Operator)                                               (P&M Engineer)                                                     (Safety Officer) 

Page 100: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 100 of 105 

17.26 Motor Vehicles and Traffic 

         

Motor Vehicles and Traffic 

PROJECT : 

LOCATION :                                                                                                                                            DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Motor Vehicles and Traffic  YES  NO  REMARKS 

1  Are vehicles inspected and the license is current?       

2  Are there broken windshields or lights?       

3  Are seat belts provided and are in use by the users?       

4 Do brakes, reverse alarms and horns etc… are in good working condition? 

     

5  Are all operators and drivers have valid licenses?       

6  Are speed limit boards displayed at site?       

7  Are the movements of vehicles controlled?       

8 Are workers travelling on the body of the vehicles or passengers travelling in drivers cabin is not allowed? 

     

9  Are workers riding on loaded trucks?       

10  Are persons boarding or alighting moving vehicles?       

11  Are parking brakes applied when vehicles not in use?       

12  Are wheels chocked when parked on inclined grounds?       

13 Are the vehicles properly covered while carrying loose materials/ 

     

  TYRES       

1 Are adequate precautions taken while removing damaged wheels and detachable flanges etc…? 

     

2 Is the inflation of tyres done by trained persons and the tyres are kept in tyre cages? 

     

3 Is the tyre pressure maintained at manufacturers recommendations? 

     

4  Are the servicing ramps properly designed for the purpose?       

5  Is there suitable access to get in and get out of the pits?       

6  Are the pits properly barricaded when not in use?       

Page 101: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 101 of 105 

 

17.27Plant & Mobile equipment 

         

Plant & Mobile Equipment 

PROJECT : 

LOCATION :                                                                           DATE : 

INSPECTION CONDUCTED BY : 

S.NO  Plant & Mobile Equipment  YES  NO  REMARKS 

1  Are the moving parts guarded?       

2  Are the operators trained?       

3 Are the machineries maintained in good condition? 

     

4 Are the workers protected from noiseand fumes? 

     

5  Are concrete mixers set on firm ground?       

6 Is there adequate space around the machinery? 

     

7 Are the bull dozer blades, scraper blades, end load buckets etc… lowered when repaired? 

     

  OTHER MACHINERIES       

  COMPRESSORS AND AIR RECEIVERS       

1 Are they examined and tested by a competent person? 

     

2 Are the V‐belts and pulley drives well guarded? 

     

3 Are the air receivers marked with safe working pressure? 

     

4 Are they fitted with safety valve, pressure gauge and drain cock? 

     

  DRILLING MACHINES       

1 Are the bench mounted drilling machines firmly secured to a strong and stable bench? 

     

2  Is the bench firmly fixed to the floor?       

3 Is correct chuck key used and not left in the chuck? 

     

4  Is small work piece held in vice or clamp?       

Page 102: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 102 of 105 

5 Are operators wearing loose clothing and gloves etc.. while operating the machine? 

     

6 Are the operators contained their long hair in a net or cap to eliminate the risk of entanglement? 

     

  GRINDING MACHINES       

1  Are the wheels adequately guarded?       

2 Are precautions taken against flying fragments of disintegrated wheel? 

     

3 Are the wheels fitted as per the designed speed and correctly fitted on the spring wheel? 

     

4 Is the rpm clearly marked on the machine? 

     

5 Is the surrounding area kept neat and tidy and free of obstructions? 

     

6 Are the operators using PPE to protect against flying particles? 

     

7 Is the gap between the wheel and the job rest properly adjusted? 

     

  WOOD WORKING MACHINES       

1  Is there guard over the circular saw?       

2  Is the guard in place while working?       

3 Is a riving knife provided to prevent kick back? 

     

4  Is the operator using a pust stick?       

5 Is the area around the machine neat and tidy? 

     

6 Are the wooden shavings, dust and chips regularly cleared? 

     

7  Is there good ventilation?       

8  Is the operator using required PPE?       

         

 

Page 103: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 103 of 105 

17.28 Housekeeping 

         

 HOUSE KEEPING 

PROJECT : 

LOCATION :                                                                                                                      DATE : 

INSPECTION CONDUCTED BY : 

S.NO  House Keeping  YES  NO  REMARKS 

1  Is the site kept neat and tidy?       

2 Is there a proper arrangement for regular collection and disposal of waste materials? 

     

3  Are walkways clearly defined and unobstructed?       

4  Are materials and equipments stored properly?       

5  Is local scrap yard provided?       

6  Are there any projecting nails on the timbers?       

7 Is adequate lightings provided for work areas and passages? 

     

8  Are the toilets regularly cleaned?       

9  Is there adequate water supply for sanitation?       

10 Are the upstanding rebar, pegs protected from fall hazard? 

     

11 Is there an easy access to Electrical control panels, Fire extinguishers, First Aid boxes etc…? 

     

         

 

Page 104: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 104 of 105 

18. Project Safety Documents 

18.1‐List of Project Safety Documents maintained by CBRE 

Safety Documents  Generated  Maintained Checked 

(document) & Permitted 

Daily inspections          Check list  CBRE  CBRE    Intimation cards  CBRE  CBRE    Incident records and investigation register  CBRE  CBRE    Accident record and investigation record  CBRE  CBRE    Safety committee – Agendas & MOM  CBRE  CBRE    PPE register (CBRE indents, consumptions & rejection)  CBRE  CBRE    Test certificates of tools and tackles  Contractor  CBRE    Inspection & maintenance register for tools & tackles  Contractor  CBRE    Training  CBRE  CBRE    Work permits  Contractor  CBRE  CBRE ELCB test record register  Contractor  Contractor  CBRE Electrical hand tools inspection & maintenance register  Contractor  Contractor  CBRE Diesel generator / substation log book  Contractor     CBRE Safety Audits  CBRE  CBRE    Authorized personnel  Contractor  CBRE  CBRE Method statements including risk assessment  Contractor  CBRE  CBRE Equipment commissioning record  Contractor  Contractor  CBRE Firefighting equipment record  Contractor  Contractor  CBRE First aid registers.  Contractor  Contractor  CBRE 

Page 105: Safety Manual (CBRE)

 

Issue Date: December, 2008                                                                                                              Rev: 2                                     Page 105 of 105 

18.2‐List of Welfare Documents required for Inspection 

• Copies of relevant licenses 

• Wage register 

• Muster roll 

• Overtime register 

• Payment register 

• Advance register (Client to contractor to sub contractor) 

• Fines register 

• Inspection book containing issue of employment cards wages slips 

• Copies of abstract of relevant statutes