Safety Matters for External Contractors

� Work of 1st category

– W.Weingarten TIS/GS STTC

– 29/5/2000

Page 2: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Safety Co-ordination

� Legal basis: European Directive+ European Directive EEC 92/57+ French Law 93-1418 + Safety regulations applicable to the work of contractors at CERN-

ref.CERN/TIS-GS/98-10 may 1998

� Obligation of the Project Leader (owner, maître d’ouvrage) to nominate safety co-ordinators

� Objective: Optimise the integration of safety in the projects:

+ In the conception phase+ During realisation, exploitation, maintenance, dismantling

Page 3: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Some definitions

� 1st category: > 500 man-days with several contractors and interference of works happening on a well delimited work site

� 2nd category: Negation of 1st category work� Project Engineer (representing Project Leader, Maître d'Ouvrage),

staff member � Project Manager (Maître d'Oeuvre), responsible person for designing

and supervising the work from outside or inside CERN� Contractor, outside firm executing the work� GLIMOS, Group Leader in Matters of Safety

Page 4: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Some more definitions

Englishversion

French version Abbreviation Application Remarks andExamples

Risk PreventionPlan

Plan de Prévention 2nd category,>50 man-days

In charge: contractor andSafety Coordinator

Log-book Registre-Journal 1st categorywork

In charge: SafetyCoordinator

Overall Safety andHealth ProtectionCoordination Planand its annexes

Plan Général deCoordination deSécurite et de laProtection de laSanté et sesannexes

PGCSPS 1st category, >500 man-days

In charge: SafetyCoordinator; attached tocall for tenders

File for laterintervention

Dossierd'InterventionUltérieure surl'Ouvrage

DIUO 1st category, >500 man-days

In charge: SafetyCoordinator

Special Safety andHealth ProtectionPlan

Plan Particulier deSeecurité et deProtection de laSanté

PPSPS 1st category,>500 man-days

In charge: contractor

Intercontractors'Committees

CollègeInterentreprises deSécurité, de Santéet de Conditions deTravail

CISSCT(formarly CIHS)

1st category,>10000 man-days

Chaired by SafetyCoordinator, examineaccidents, check whetherrules are implemented,decide on training needs

Page 5: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Tasks of Project Engineer (representing the Project Leader)

� He is the responsible person for safety co-ordination � He assures the integration of the safety co-ordinator into

the course of the project as from the start� Has the CISSCT established

Page 6: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Tasks of safety co-ordinators

� Watch that safety is integrated in the projects� Assist the Project Engineer, the project manager (maître

d’oeuvre), the contractors in matters of safety� Assess risks in particular those stemming from co-

activities and successive activities, in order to avoid accidents, professional illnesses, material damage and environmental impact

Page 7: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Reporting routes of the safety co-ordinators (for dismantling, installation)

+ Is employed by CERN, assigned to TIS-GS, reports to the Project Engineers and their hierarchy and informs TIS

+ Checks safety on the work site, gives recommendations and checks their follow up

+ He gets safety problems solved on a hierarchical level as low as possible; but in case of problems goes up in the hierarchy up till the GLIMOS’ (Benincasa, Schmidt, Leistam, Hilke), the responsible for the dismantling of LEP (Poole), or the LHC Project Safety Officer (Rau/Faugier) or Technical Coordinator (Faugeras) and informs TIS-GS

Page 8: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

State

� Three coordinators for civil engineering work (Phil Ball for CMS zone, Eric Didier-Noël for ATLAS, Gilles Orry for the other)

� Three coordinators for dismantling, installation of LHC accelerator and experiments

+ the first in function since July 1998 is D. Palvadeau/Girard/Weber+ the second (E. Paulat) and third attended for 2000; distribution of

tasks still to be defined concerning ATLAS, ALICE, CMS, LHCb, LEP dismantling and all other LHC works

Page 9: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Among many others tasks, the Project Engineer ...

� is helped by the the Safety co-ordinator to manage safety+ He gets the PGCSPS and its annexes drafted by the safety co-

ordinator+ He gets the DIUO drafted by the safety co-ordinator

� judges on the safety documents to be joint to the PGCSPS and annexes in the call for tender

+ (The document “Safety Regulations Applicable to the Work of contractors at CERN” should always be joint) http://www.cern.ch/CERN/Divisions/TIS/safdoc/other_en.html

+ Proposal: Under certain conditions WEB documents, regularly updated, the concerned persons duly informed of the update, can be declared as the binding ones

Page 10: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Tasks of safety co-ordinator+ Design & conception

Û Participate in technical studies in order to integrate safety during all phases of project (realisation, exploitation, interventions).

Û Draw up PGCSPS, DIUO, Logbook

+ TenderingÛ Update PGCSPS and draft annexes to PGCSPS with Project

Engineer, incorporate in call for tenders, and evaluate offers on compliance with safety

+ Before workÛ Update PGCSPS, DIUO, LogbookÛ Assure that PPSPS is drawn up by contractorsÛ Joint inspection of work site

+ During the workÛ Organises inspections and checks follow upÛ Chairs CISSCTÛ Update PGCSPS, DIUO, Log-bookÛ Assure application of PPSPS

Page 11: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Among many others tasks, the project manager ...

� Receives the inspection results from the safety co-ordinator

� Receives the PGCSPS and PPSPS� Takes part in joint inspections before the start of work

with Project Engineer, Safety Co-ordinator, Contractor� Is a member of CISSCT� Gives his advice on the PPSPS

Page 12: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

Among many others tasks, the contractor ...

� Receives the PGCSPS � Elaborates the PPSPS� Is a member of the CISSCT� Takes part in joint inspections with Project Engineer,

Project Manager, Safety co-ordinator

Page 13: Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000

The CISSCT

� Checks that rules laid down are implemented� Meets at least 4 times per year� Ensures smooth safety co-ordination, decides on training

needs, examines serious accidents� Composition

+ Safety Co-ordinator, Project manager, Contractor (plus wage-earner concerned)