Page 1: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Safety & Risk Management

Page 2: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

(C) Managing health and safety in construction to all practices

Page 3: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Part IISAFETY AND HEALTH

MANAGEMENT

Page 4: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

IF SAFETY IS NOT MANAGED ………………

Page 5: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Legislation?

Page 6: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS - LEGISLATION

WSH Act (Chapter 354A) • Section 65 The Minister may make

regulations for or with respect to:• (2) (v) the implementation of any safety and

health management system and the duties of any occupier, employer or any other person in relation to the implementation of the safety and health management system

Page 7: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

OSHMS - LEGISLATION

WSH Act (Chapter 354A) • Section 30 (2) (a): The functions of a workplace

safety and health auditor appointed in respect of a workplace shall be to audit, in such manner as the Commissioner may determine, the safety and health management system of the workplace, with a view to ensuring the safety, health and welfare of persons at work in the workplace.

Page 8: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS - LEGISLATION

WSH (SHMS & Auditing) Regulations• Reg 8 (1) The occupier to implement a

safety and health management system (SHMS)

• 2nd Schedule: Any premises which is a worksite

• Reg 8 (2) The SHMS shall be implemented in accordance to any SS, CP or guidance issued by the WSH Council

Page 9: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS - LEGISLATION

WSH (SHMS & Auditing) Regulations• Reg 9 (1) The occupier to appoint a WSH

Auditor to audit the SHMS• 3rd Schedule: Any worksite with a contract

sum of S$30 million or more, at a frequency of at least once every 6 months

• Reg 9 (4) The occupier to implement the auditor’s recommendations without undue delay.

Page 10: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS - LEGISLATION

WSH (SHMS & Auditing) RegulationsPenalty for Occupier:• Regs 8 (1), 9 (1) or (4) – Not more than

$10k, and Not more than $1k per day if the offence continues after conviction.

Page 11: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Standard?

Page 12: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS - STANDARDS• SS CP 79 : 1999 Code of Practice for

Safety management system for construction worksites

• SS 506 : Part 1 : 2009 Occupational safety and health management systems -Requirements (BS OHSAS 18001 : 2007)

• SS 506 : Part 2 : 2009 Occupational safety and health management systems –Guidelines (BS OHSAS 18002 : 2008)

Page 13: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SS CP 79 : 1999 (ACOP)

14 Elements 1. Safety policy2. Safe work practices3. Safety training4. Group meetings5. Incident investigation and analysis6. In-house safety rules and regulations7. Safety promotion

Page 14: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SS CP 79 : 1999 (ACOP)14 Elements 8. Evaluation, selection and control of

subcontractors9. Safety inspections10. Maintenance regime for all machinery and

equipment11. Hazard analysis12. The control of movement and use of

hazardous substances and chemicals13. Emergency preparedness14. Occupational health programs

Page 15: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SS 506 : Part 1 : 2009

• Adopted from BS OHSAS 18001 : 2007• PDCA Management Cycle• Compatible with ISO 9001 & ISO 14001

Standards• Certifiable Standard

Page 16: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

OSH Management System Structure OSH PolicyPlanning• Hazard identification, risk assessment and

determining controls• Legal and Other Requirements• Objectives and ProgrammeImplementation & Operation• Resources, roles, responsibility,

accountability and authority• Competence, Training, and Awareness • Communication, participation and

consultation• Documentation• Control of Documents• Operational Control• Emergency Preparedness & ResponseChecking & Corrective Action• Performance measurement and monitoring• Evaluation of Compliance• Incident investigation, nonconformity,

corrective action and preventive action• Control of Records• Internal auditManagement Review

Page 17: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Development?

Page 18: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

1994FACTORIES (BOWEC) REGS

SAFETYMANAGEMENT SYSTEM

AUDIT

Page 19: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

1995SCAL

GUIDELINESSAFETY MANAGEMENT SYSTEM

Page 20: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

1999SS CP 79

CODE OF PRACTICESAFETY MANAGEMENT SYSTEM

CONSTRUCTION WORKSITES

Page 21: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SAFETY MANAGEMENT SYSTEM (PROJECT BASED)

• SMS - CONTRACT SUM OF S$10 MILLION OR MORE

• SMS REVIEW - CONTRACT SUM OF S$10 MILLION OR MORE BUT LESS THAN S$30 MILLION

• SMS AUDIT - CONTRACT SUM OF S$30 MILLION OR MORE

Page 22: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Safety Management SystemSafety Management System

2. Safe WorkPractices

3. SafetyTraining

4. GroupMeetings

5. IncidentInvestigation &Analysis

6. In-HouseSafety Rules

7. SafetyPromotion

8. Control ofSub-contractors

9. SafetyInspections

10. MaintenanceRegime

11. HazardAnalysis

12. HazardousMaterials

13. EmergencyPreparedness

1. Safety Policy and Leadership

14. OccupationalHealth Program

14. OccupationalHealth Program

Page 23: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2001FACTORIES (SINGAPORE STANDARDS

AND CODES OF PRACTICE) ORDER15 SS CP

(SS CP 79:1999)

Page 24: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2004OHSAS 18001 CERTIFICATION

(COMPANY BASED)

Building & Construction Authority (A Grade contractors)

Page 25: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2004SS 506 Part 1 CERTIFICATION

(COMPANY BASED)

SPRING Singapore(MOM supported)

Page 26: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2007OHSAS 18001 CERTIFICATION

(COMPANY BASED)

Building & Construction Authority (A & B Grade contractors)

Page 27: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2009SS 506 Part 1 CERTIFICATION

(COMPANY BASED)

SPRING Singapore(MOM supported)

Page 28: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

DEVELOPMENT

• 1994 - SMS & Audit Requirements • 1995 - SMS Guideline (SCAL) • 1999 - SS Code of Practice 79 • 2001 - Factories (SS & CP) Order• 2004 / 2007 - OHSAS 18001

Certification• 2004 / 2009 – SS 506 Part 1 Certification

Page 29: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Safety and Health Management System

(SHMS)

Page 30: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS1. POLICY2. PLANNING3. IMPLEMENTATION AND OPERATION4. CHECKING5. MANAGEMENT REVIEW

Page 31: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS1. POLICY2.2.2. PLANNINGPLANNINGPLANNING3.3.3. IMPLEMENTATION AND OPERATIONIMPLEMENTATION AND OPERATIONIMPLEMENTATION AND OPERATION4.4.4. CHECKINGCHECKINGCHECKING5.5.5. MANAGEMENT REVIEWMANAGEMENT REVIEWMANAGEMENT REVIEW

Page 32: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

1. POLICY

Page 33: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS1. POLICY2. PLANNING3.3.3. IMPLEMENTATION AND OPERATIONIMPLEMENTATION AND OPERATIONIMPLEMENTATION AND OPERATION4.4.4. CHECKINGCHECKINGCHECKING5.5.5. MANAGEMENT REVIEWMANAGEMENT REVIEWMANAGEMENT REVIEW

Page 34: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2. PLANNING

Page 35: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2.1 RISK ASSESSMENT

Page 36: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2.2 LEGAL AND OTHER REQUIREMENTS

Page 37: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

2.3 OBJECTIVES AND PROGRAMMES

Page 38: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Class Assignment VI

• In Groups of size 4 - 6 members / 15 mins• Use the Template provided, draft: THREE Safety and Health Objectives• Select a member to record• Select a member to present (<5 mins)

Page 39: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS1. POLICY2. PLANNING3. IMPLEMENTATION AND OPERATION4.4.4. CHECKINGCHECKINGCHECKING5.5.5. MANAGEMENT REVIEWMANAGEMENT REVIEWMANAGEMENT REVIEW

Page 40: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3. IMPLEMENTATION AND OPERATION

Page 41: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.1 RESOURCES, RESPONSIBILITY,

ACCOUNTABILITY, AUTHORITY

Page 42: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.2 COMPETENCY, AWARENESS, TRAINING

Page 43: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.3 COMMUNICATION, PARTICIPATION, CONSULTATION

Page 44: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.4 OPERATIONAL CONTROL

Page 45: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.4.1 SAFE WORK PROCEDURES

Page 46: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.4.2 SELECTION, CONTROL AND MONITORING OF

CONTRACTORS

Page 47: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.4.3 MAINTENANCE REGIME

Page 48: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.4.4 CONTROL OF HAZARDOUS SUBSTANCES

Page 49: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.4.5 OCCUPATIONAL HEALTH PROGRAMMES

Page 50: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.4.6 PROMOTION

Page 51: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

3.5 EMERGENCY PREPAREDNESS

Page 52: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS1. POLICY2. PLANNING3. IMPLEMENTATION AND OPERATION4. CHECKING5.5.5. MANAGEMENT REVIEWMANAGEMENT REVIEWMANAGEMENT REVIEW

Page 53: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

4. CHECKING

Page 54: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

4.1 PERFORMANCE MEASUREMENT AND

MONITORING

Page 55: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

4.1.1 SAFETY AND HEALTH INSPECTION

Page 56: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

4.1.2 IN-HOUSE RULES AND REGULATIONS

Page 57: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

4.2 EVALUATION OF COMPLIANCE

Page 58: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

4.3 INCIDENT INVESTIGATION, NON-CONFORMANCE,

CORRECTIVE AND PREVENTIVE ACTIONS

Page 59: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

4.4 INTERNAL AUDIT

Page 60: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SHMS1. POLICY2. PLANNING3. IMPLEMENTATION AND OPERATION4. CHECKING5. MANAGEMENT REVIEW

Page 61: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

5. MANAGEMENT REVIEW

Page 62: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Class Assignment VII• In Groups of size 4 - 6 members / 30 minsa) Despite the requirement of implementing Safety and

Health Management System for all worksites, why fatal accidents still happened?

b) If your Group were tasked by the Manpower Minister to offer any recommendations to improve construction safety, what TWO RECOMMENDATIONS would your Group recommend (Note: Minister will give your Group power and resources to implement your recommendations)?

• Select a member to record• Select a member to present (<5 mins)

Page 63: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Effectiveness?

Page 64: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

SAFETY MANAGEMENT SYSTEM

1. Establish2. Communicate3. Implement & Maintain4. Monitor5. Review

Page 65: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

EFFECTIVE S&H MANAGEMENT SYSTEM

SUCCESSFUL CASES

Page 66: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (1)

Refinery Plant Project• Safety Award Scheme - Subcontractor

Performance Rating• TBM Observation Report• Permit-To-Work System (Confined

Space, Excavation, Electrical, Hot Work, Radiography)

Page 67: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (2)Refinery Plant Project• Client and Corporate Periodic Audits• Total Safety Task Instruction (TSTI) • Frontline supervisors training on

Hazard Recognition and Communication

• Hazard Register & Action Plan Form• Subcontractors Safety Performance

Index (SPI) - Monthly Assessment

Page 68: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (3)Refinery Plant Project• Safe Task Assignment &

Reinforcement Training (START) Program

• Safety Training Observation Program (STOP)

• Behavioural Accident Prevention Program (BAPP)

• Statistical Analysis on Safety Deviations

Page 69: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (4)

Refinery Plant Project• Safety Task Analysis Risk Reduction

Talk (STARRT)• 100% Fall Protection System - Full

Body Harness with Double Lanyards• Weekly Safety Sampling Survey

Summary Report for Subcontractors

Page 70: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (5)Pharmaceutical Project• Design Safety Team - Hazard Study• Permit-To-Work System (Hot Work,

Cold Work, Excavation, Lifting, Work At Height, Confined Space)

• Color Code System for Lifting Equipment & Lifting Gears & Electrical Tools

• A system of Written Warning, Re-training, Stop-Work and Expulsion

Page 71: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (6)

Pharmaceutical Project• Sticker System for Machinery and

Lifting Equipment• 3-monthly Safety Council Meetings• Disciplinary System - 1st & 2nd

Written Warning and Final Expulsion• Safe Contractor, Supervisor &

Worker of the Month

Page 72: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (7)

Pharmaceutical Project• Daily Risk Assessment Record• Monthly Color Code for LELG• Monthly Sticker for

Machinery/Equipment• Declaration of Hazardous Materials

Page 73: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

CASE (8)Pharmaceutical Project• Client’s SMS subject to 3rd Party

Audit• SMS in line with BS8800• Evaluation of Tool Box Meetings• Analysis of Incidents & Safety

Deviations• Job Safety Analysis Checklist• Quarterly Safety Campaign

Page 74: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Successful Cases (SMS)

• Client Periodic Audits• Client SMS subject to 3rd

Party Audit• Design Team for Safety• START & STOP Program

Page 75: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

EFFECTIVE S&H MANAGEMENT SYSTEMSUCCESSFUL CASESCOMMON FACTORSClient-InitiatedDesign for Safety

Competency & Co-ordinationCulture-Focus

Page 76: Safety & Risk Management - Trent Global · Communication • Hazard Register & Action Plan Form ... • Weekly Safety Sampling Survey Summary Report for Subcontractors. CASE (5)

Part IISAFETY AND HEALTH