Page 1 of 12 SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05 SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER SAIC-D-2007 1-Dec-06 MECH- PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO. SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRA SAUDI ARAMCO USE ONLY SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-I A. GENERAL REQUIREMENTS: See Note 1 & Attachment 1 (Use PIPs) A1 IFC Drawings A2 A3 B. VERTICAL VESSELS B1 B2 B3 B4 B5 C. HORIZONTAL VESSELS C1 C2 C3 Equipment Installation - Alignment & Elevation Check (Vertical & Horizontal Vessels) ITEM No. Vessel location and foundation were verified to conform with the coordinates and elevation in the plan drawing. Alignment of flange face of nozzles shall be within 1/2 degree of the specified plane. (PIP-VEFV1100/1102, Page 1, Note 7) SAES-D-001, Par. 3.2 Bolt holes are within 1/8" of the specified location. (PIP-VEFV1100/1102, Page 1, Note 28) SAES-D-001, Par. 3.2 Vertical centerlines and base line of vertical vessel are punched and circled with paint. (VEFV1100/1102Page 1, Note 25) SAES-D-001, Par. 3.2 Orientation line for vertical vessels is based on a directional centerline (e.g.;North, South, etc.) and as referenced on the construction drawings. (VEFV1100/1102, Page 2) SAES-D-001, Par. 3.2 Distance of bottom of base support to the base line of vertical vessel shall be within the tolerance of +0 , - 1/32" per foot of vessel diameter to a maximum of 1/2". (PIP-VEFV1100/1102, Pg 1, Note 12) SAES-D-001, Par. 3.2 Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102 Page 1, Note 26) SAES-D-001, Par. 3.2 Supports located are within the following tolerances: +0", -1/32" per foot of vessel diameter with max of 1/2". (VEFV1100/1102 Page 1, Note 13) SAES-D-001, Par. 3.2 Orientation line for horizontal vessels is based on the vertical centerline. (PIP-VEFV1100/1102, Page 2) SAES-D-001, Par. 3.2 Centerlines (orientation lines) are punch marked and circled with paint. (PIP-VEFV1100/1102, Page 1, Note 25) SAES-D-001, Par. 3.2 Supports of horizontal vessel are located within the tolerance of +0", + 1/8" from the horizontal centerlines. (PIP-VEFV1100/1102, Page 1, Note 22) SAES-D-001, Par. 3.2

Upload: ramesh-palakkad

Post on 27-Oct-2015

66 views

Category:

Documents


13 download

DESCRIPTION

SpecificaTION

TRANSCRIPT

Page 1: SAIC-D-2007 Rev 2

Page 1 of 6

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

SAIC-D-2007 1-Dec-06 MECH-

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIMESAUDI ARAMCO USE ONLY

SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE

A. GENERAL REQUIREMENTS: See Note 1 & Attachment 1 (Use PIPs)

A1 IFC Drawings

A2

A3

B. VERTICAL VESSELS

B1

B2

B3

B4

B5

C. HORIZONTAL VESSELS

C1

C2

C3

Equipment Installation - Alignment & Elevation Check (Vertical & Horizontal Vessels)

ITEM No.

Vessel location and foundation were verified to conform with the coordinates and elevation in the plan drawing.

Alignment of flange face of nozzles shall be within 1/2 degree of the specified plane. (PIP-VEFV1100/1102, Page 1, Note 7)

SAES-D-001,Par. 3.2

Bolt holes are within 1/8" of the specified location. (PIP-VEFV1100/1102, Page 1, Note 28)

SAES-D-001,Par. 3.2

Vertical centerlines and base line of vertical vessel are punched and circled with paint. (VEFV1100/1102Page 1, Note 25)

SAES-D-001,Par. 3.2

Orientation line for vertical vessels is based on a directional centerline (e.g.;North, South, etc.) and as referenced on the construction drawings. (VEFV1100/1102, Page 2)

SAES-D-001,Par. 3.2

Distance of bottom of base support to the base line of vertical vessel shall be within the tolerance of +0 , -1/32" per foot of vessel diameter to a maximum of 1/2". (PIP-VEFV1100/1102, Pg 1, Note 12)

SAES-D-001,Par. 3.2

Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102 Page 1, Note 26)

SAES-D-001,Par. 3.2

Supports located are within the following tolerances: +0", -1/32" per foot of vessel diameter with max of 1/2".(VEFV1100/1102 Page 1, Note 13)

SAES-D-001,Par. 3.2

Orientation line for horizontal vessels is based on the vertical centerline. (PIP-VEFV1100/1102, Page 2)

SAES-D-001,Par. 3.2

Centerlines (orientation lines) are punch marked and circled with paint. (PIP-VEFV1100/1102, Page 1, Note 25)

SAES-D-001,Par. 3.2

Supports of horizontal vessel are located within the tolerance of +0", + 1/8" from the horizontal centerlines. (PIP-VEFV1100/1102, Page 1, Note 22)

SAES-D-001,Par. 3.2

Page 2: SAIC-D-2007 Rev 2

Page 2 of 6

C4Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102, Page 1, Note 26)

SAES-D-001,Par. 3.2

Page 3: SAIC-D-2007 Rev 2

Page 3 of 6

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Equipment Alignment & Elevation Check SAIC-D-2007 1-Dec-06 MECH-

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE

NOTES: Use PIPs during Equipment Alignment & Elevation Checks in the field. See Attachment 1. Use PIP VEFV1100.

REFERENCE DOCUMENTS:

1- SAES-D-001 -- Design Criteria for Pressure Vessels, 31 December 2001

2- VEFV1100/1102 -- Process Industry Practices (Fabrication/Installation Details), 21 April 1999

Contractor / Third-Party Saudi Aramco

Name, Initials and Date:Work is Complete and Ready for Inspection:

Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified

QC Inspector PID Representative

Name, Initials and Date:Performed Inspection Work / Rework May Proceed

Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified

QC Supervisor Proponent and Others

Name, Sign and Date: Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

ITEM No.

REMARKS:

ATTACHMENTS: ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation)

Construction Representative* PMT Representative

Name, Organization,Initials and Date:

Page 4: SAIC-D-2007 Rev 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 2 (Standards Cutoff - December 2005) REV 2 31-Dec-05

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Equipment Alignment & Elevation Check SAIC-D-2007 1-Dec-06 MECH-

ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation)

Page 5: SAIC-D-2007 Rev 2
Page 6: SAIC-D-2007 Rev 2