saic-d-2007 rev 2
DESCRIPTION
SpecificaTIONTRANSCRIPT
Page 1 of 6
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER
SAIC-D-2007 1-Dec-06 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIMESAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
A. GENERAL REQUIREMENTS: See Note 1 & Attachment 1 (Use PIPs)
A1 IFC Drawings
A2
A3
B. VERTICAL VESSELS
B1
B2
B3
B4
B5
C. HORIZONTAL VESSELS
C1
C2
C3
Equipment Installation - Alignment & Elevation Check (Vertical & Horizontal Vessels)
ITEM No.
Vessel location and foundation were verified to conform with the coordinates and elevation in the plan drawing.
Alignment of flange face of nozzles shall be within 1/2 degree of the specified plane. (PIP-VEFV1100/1102, Page 1, Note 7)
SAES-D-001,Par. 3.2
Bolt holes are within 1/8" of the specified location. (PIP-VEFV1100/1102, Page 1, Note 28)
SAES-D-001,Par. 3.2
Vertical centerlines and base line of vertical vessel are punched and circled with paint. (VEFV1100/1102Page 1, Note 25)
SAES-D-001,Par. 3.2
Orientation line for vertical vessels is based on a directional centerline (e.g.;North, South, etc.) and as referenced on the construction drawings. (VEFV1100/1102, Page 2)
SAES-D-001,Par. 3.2
Distance of bottom of base support to the base line of vertical vessel shall be within the tolerance of +0 , -1/32" per foot of vessel diameter to a maximum of 1/2". (PIP-VEFV1100/1102, Pg 1, Note 12)
SAES-D-001,Par. 3.2
Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102 Page 1, Note 26)
SAES-D-001,Par. 3.2
Supports located are within the following tolerances: +0", -1/32" per foot of vessel diameter with max of 1/2".(VEFV1100/1102 Page 1, Note 13)
SAES-D-001,Par. 3.2
Orientation line for horizontal vessels is based on the vertical centerline. (PIP-VEFV1100/1102, Page 2)
SAES-D-001,Par. 3.2
Centerlines (orientation lines) are punch marked and circled with paint. (PIP-VEFV1100/1102, Page 1, Note 25)
SAES-D-001,Par. 3.2
Supports of horizontal vessel are located within the tolerance of +0", + 1/8" from the horizontal centerlines. (PIP-VEFV1100/1102, Page 1, Note 22)
SAES-D-001,Par. 3.2
Page 2 of 6
C4Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102, Page 1, Note 26)
SAES-D-001,Par. 3.2
Page 3 of 6
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER
Equipment Alignment & Elevation Check SAIC-D-2007 1-Dec-06 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
NOTES: Use PIPs during Equipment Alignment & Elevation Checks in the field. See Attachment 1. Use PIP VEFV1100.
REFERENCE DOCUMENTS:
1- SAES-D-001 -- Design Criteria for Pressure Vessels, 31 December 2001
2- VEFV1100/1102 -- Process Industry Practices (Fabrication/Installation Details), 21 April 1999
Contractor / Third-Party Saudi Aramco
Name, Initials and Date:Work is Complete and Ready for Inspection:
Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified
QC Inspector PID Representative
Name, Initials and Date:Performed Inspection Work / Rework May Proceed
Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified
QC Supervisor Proponent and Others
Name, Sign and Date: Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
ITEM No.
REMARKS:
ATTACHMENTS: ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation)
Construction Representative* PMT Representative
Name, Organization,Initials and Date:
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 2 (Standards Cutoff - December 2005) REV 2 31-Dec-05
SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER
Equipment Alignment & Elevation Check SAIC-D-2007 1-Dec-06 MECH-
ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation)