    EngineeringDesign &Development

    SM CITY SUCAT

    SMSC Weekly Report | Week 1

    Jan.02Jan.08,2014

    Prepared by:

    Jerome U. Villasanta

    RE

    Reviewed by:

    Julius O. Salacup

    RE

    Noted by:

    Bernabe T. Salazar Jr.

    ROM

  • 8/13/2019 Sample Facilities Weekly Report Template

    2/31

    EngineeringDesign &Development

    Table of Contents1. General Information

    1.1. Photos

    1.2. Basic Information

    1.3. Tenants Information

    2. Technical Reports and Updates

    2.1. Utilities Interruption

    2.2. Utilities Consumptions

    2.2.1. Daily Non-Potable Water ConsumptionMonitoring

    2.3. Equipment Updates

    2.3.1. Genset

    2.3.2. Air Handling Units

    2.3.3. Cooling Towers

    2.3.4. Chillers2.3.5. Elevators/Escalators Repair

    2.3.6. (Any Other Equipment Utilities that undergo

    Major Maintenance/Repair)

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    3/31

    EngineeringDesign &Development

    Table of Contents

    2.4 Lightings

    2.4.1 Mall Lightings2.4.2 Logos

    2.4.2.1 SM Logos

    2.4.2.2 Tenants Logos

    2.5 Rest Rooms

    2.6 Water Leaks

    2.6.1 Photo of the Roof2.6.2 Weather

    3. Materials Withdrawals Monitoring

    3.1. Materials requested within the week

    3.2. Materials withdrawn within the week

    4. RFW

    5. SMR

    6. Issues and Needs List

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    4/31

    EngineeringDesign &Development

    1. General Information

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    5/31

  • 8/13/2019 Sample Facilities Weekly Report Template

    6/31

    EngineeringDesign &Development

    1.2. Basic Information

    Leasable Area : 77,137.17 sq. m

    Common Area : 126,987.92 sq. m

    Percentage of Leasable from Common Area: 60.74 %

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    7/31

    EngineeringDesign &Development

    1.3. Tenants information

    Total Vacant Constructing CFA

    20419 Long Term4 Short Term

    1 54,892.51 sq. m

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    8/31

    EngineeringDesign &Development

    2. Technical Report and

    Updates

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    9/31

    EngineeringDesign &Development

    2.1. Utilities Interruptions

    Utilities Status (Dec.26-Jan.01) Week 53 Status (Jan.02-Jan.08) Week 1

    Power No Interruption No Interruption

    Water No Interruption No Interruption

    Gas No Interruption No Interruption

    EquipmentBreakdowns

    Chiller 3BFor OverhaulingCooling Tower 1BMisaligned FanPulley

    Chiller 3BFor OverhaulingCooling Tower 1BMisalignedFan Pulley

    Numbers ofAAR

    0 0

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    10/31

    EngineeringDesign &Development

    2.2. Utilities Consumptions

    UtilitiesConsumption

    (Dec.26-01) Week 53

    Consumption

    (Jan.02-Jan.08) Week 1

    Power 115, 250 KWH 89,850 KWH

    Potable WaterGeneral use : 3, 192 m3Cooling Tower A & B : 656 m3

    General use : 2,916 m3Cooling Tower A & B : 558m3

    Gas 10, 672 Liters 7,318 Liters

    Diesel

    23Li (W/O-Load test) 3 GensetBldg. A

    15 Li (W/O-Load test) 2 GensetBldg. B

    23Li (W/O-Load test) 3 GensetBldg. A

    15 Li (W/O-Load test) 2 GensetBldg. B

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    11/31

    EngineeringDesign &Development

    Jan.02 Jan.03 Jan.04 Jan.05 Jan.06 Jan.07 Jan.08

    CoolingTower n/a n/a n/a n/a n/a n/a n/a

    TTP(Production)

    n/a n/a n/a n/a n/a n/a n/a

    TTP Make-up water(Potablewater)

    n/a n/a n/a n/a n/a n/a n/a

    Mall (mainMeter)

    n/a n/a n/a n/a n/a n/a n/a

    STPDischarge n/a n/a n/a n/a n/a n/a n/a

    2.2.1. Daily Non-Potable Water Consumption

    Monitoring

    Note: No non-potable water supply in SMSC.

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    12/31

    EngineeringDesign &Development

    2.3. Equipment Updates

    2.3.1. Genset (update/major works)

    GeneratorRunning

    Hours

    Specific Gravity

    VoltsBattery 1 Battery 2 Battery 3 Battery 4

    G1 A 562 1.28GREEN

    1.28GREEN

    1.28GREEN

    1.28GREEN

    24

    G2 A 339 1.27GREEN

    1.27GREEN

    1.27GREEN

    1.27GREEN

    25

    G3 A 270 1.27GREEN

    1.27GREEN

    1.27GREEN

    1.27GREEN

    25

    Building A

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    13/31

    EngineeringDesign &Development

    2.3. Equipment Updates

    2.3.1. Genset (Update/major works)

    Generator Running Hours

    Specific Gravity

    VoltsBattery 1 Battery 2

    G1B 282 1.27GREEN

    1.27GREEN

    25

    G2B 212 1.27GREEN

    1.27GREEN

    25

    Building B

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    14/31

    EngineeringDesign &Development

    2.3.2. AHUs (Major Works/Activities)

    DATE ACTIVITY

    Jan.02 Cleaning of AHU A17GF & A16GF

    Jan.03 Cleaning of AHU A13AGF & A15GF

    Jan.04 Cleaning of AHU A26TF & A21SF

    Jan.05 Cleaning of AHU A26TF & A22SF

    Jan.06 Cleaning of AHU A16SF & A12SF

    Jan.07 Cleaning of AHU A23SF & A24SF

    Jan.08 Cleaning of AHU A16GF & A20SF

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    15/31

    EngineeringDesign &Development

    Cleaning of Cooling Tower

    2.3.3. Cooling Tower

    DATE ACTIVITY

    Jan.02 Cleaning of CT # 4 Bldg. ACleaning of CT # 3 Bldg. B

    Jan.03 Cleaning of CT # 5 Bldg. ACleaning of CT # 1 Bldg. B

    Jan.04 Cleaning of CT # 6 Bldg. ACleaning of CT # 2 Bldg. B

    Jan.05 Cleaning of CT # 1 Bldg. ACleaning of CT # 3 Bldg. B

    Jan.06 Cleaning of CT # 2 Bldg. ACleaning of CT # 1 Bldg. B

    Jan.07 Cleaning of CT # 3 Bldg. ACleaning of CT # 2 Bldg. B

    Jan.08 Cleaning of CT # 4 Bldg. ACleaning of CT # 3 Bldg. B

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    16/31

    EngineeringDesign &Development

    2.3.4. Chillers

    PREVENTIVE MAINTENANCE OF CHILLERS

    Date Chiller No. Remarks

    1/8/2014 4 Swabbing

    1/8/2014 5 Swabbing

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    17/31

    EngineeringDesign &Development

    2.3.5. Elevator/Escalator

    Equipment TotalNon -

    OperationalOn-GoingRepairs

    Target Date ofCompletion

    Cause Remarks

    Elevator 5 0 0 N/A N/A

    Escalator 16 0 0 N/A N/A

    Dumbwaiter 0 0 0 N/A N/A

    PWD Lift 0 0 0 N/A N/A

    Car Lift 0 0 0 N/A N/A

    Moving Walk 2 0 0 N/A N/A

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    18/31

    Engineering

    Design &Development

    2.3.6 Major work done with in the week

    Replacement of busted lights at substation area

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    19/31

    Engineering

    Design &Development

    2.4. Lightings

    2.4.1. Mall Lightings

    Brand # of Busted as

    of January 08

    Average

    Life

    Total # of installed

    lamp (with the

    same brand)

    Connection

    (Vertical/Horizontal)

    Sylvania 0 Vertical

    Karo 0 Vertical

    Osram 1 Vertical

    GE 0 Vertical

    Philips 30 Vertical

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    20/31

    Engineering

    Design &Development

    2.4.2. Logos

    Total Number of Logos Total numberrepaired/replaced lights

    4 0

    Details Location Type# busted lamp

    replaced

    Remarks

    Logo 1 Entrance 1 Bldg A LED 0

    Busted LED alreadyreported to DO

    Logo 2 Entrance 6 Bldg B LED 0Busted LED alreadyreported to DO

    Logo 3 West Parking Bldg B LED 0 Busted LED alreadyreported to DO

    Logo 4 South Parking Bldg B LED 0Busted LED alreadyreported to DO

    2.4.2.1 SM Logos

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    21/31

    Engineering

    Design &Development

    2.4.2.2 Tenants Logos

    Total Number of Logos

    Total number

    repaired/replaced lights

    120 (tenants logo) 0

    Details Location Type

    # busted lamp

    replaced Remarks

    Total Tenant'sLogo

    Bldg. A & Bldg. B LED 0 All Tenant Logo areOperational

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    22/31

    Engineering

    Design &Development

    2.5. Restrooms

    Fixtures

    Total #

    ofFixture

    Total

    Numberrepaired for

    the week

    Total number

    of fixture thatis not

    repaired yet

    Remarks

    Water Closet 61 1 0Declogging water closet at femaleCR 2nd.flr. Bldg. B

    Urinal 49 0 0Repair water leak of flush valve at

    2nd.floor & Repair toilet bowl EMB 2

    Sink 40 0 0Declogging toilet bowl 2nd.flr female

    CR Bldg. B

    Floor Drain 96 0 0Declogging of water closet at

    carpark Bldg. A

    Faucet 40 1 0 Replacement of wash faucet atcarpark

    Wash Tub 12 2 0Declogging of wash tub at carpark &

    2nd.flr. Female CR Bldg. B

    Total number of fixture repaired during the week

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    23/31

    Engineering

    Design &Development

    2.6. Water Leaks

    Location Total number ofwater leaks as

    of January 08

    Total numberrectified

    Total numberschedule to be

    rectified

    (Target date)

    Remarks

    Tenant

    Affiliates

    Common Area

    Utility Room

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    24/31

    Engineering

    Design &Development

    2.6.1 Roof Photo

    Bldg. A

    Bldg. B

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    25/31

    Engineering

    Design &Development

    2.6.2 Weather

    Note: The weather condition on the table is based on Accuweather.com

    ***All temperature are in degrees Fahrenheit.

    Jan.2

    Actual

    Temp

    87 Lo

    74

    Hist.

    Avg.

    86 Lo

    69

    Jan.3

    Actual

    Temp

    86 Lo 73

    Hist. Avg.

    86 Lo 69

    Jan.4

    Actual

    Temp

    87 Lo

    73

    Hist.

    Avg.

    86 Lo

    69

    Jan.5

    Actual

    Temp

    85 Lo 73

    Hist. Avg.

    86 Lo 69

    Jan.6

    Actual

    Temp

    87 Lo 75

    Hist. Avg.

    86 Lo 69

    Jan.7

    Actual

    Temp

    86 Lo 75

    Hist. Avg.

    86 Lo 69

    Jan.8

    Actual

    Temp

    87 Lo 74

    Hist. Avg.

    86 Lo 69

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    26/31

    Engineering

    Design &Development

    3. Materials Monitoring

    3.1 Materials requested within the week.

    MSRS #Material

    RequestedQTY Amount Purpose Remarks

    814292 Electrical tape 3For replacement due to re-arrange of

    kiosk

    Doubledeadlock 1

    For replacement due to defective doubledeadlock at 2nd.flr.Bldg B

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    27/31

    Engineering

    Design &Development

    3.2. Materials withdrawn within the week.

    MSRS # Material Requested QTY Amount Purpose Remarks

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    28/31

    Engineering

    Design &Development

    4. RFW (under TFPI)

    TOTAL

    RFW

    New

    RFW

    Mall

    Related

    Tenant

    Related

    For

    QuotationFor SMR For PO

    Work In-

    ProgressDONE

    DISAPPROVED

    OTHERS

    Remarks

    Previous 21 2 12 9 1 0 1 3 1 9 10

    Current 21 2 12 9 1 0 1 3 1 9 10

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    29/31

    Engineering

    Design &Development

    5. SMR

    Total Completed Cancelled Outstanding Remarks/Status

    PreviousWeek

    56 40 0 16

    Currentweek

    56 40 0 16

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    30/31

    Engineering

    Design &Development

    6. Issues and Needs List (not SMR)

    Description Status Target Date

    SMSC Weekly Report | Week 1

  • 8/13/2019 Sample Facilities Weekly Report Template

    31/31

    Engineering

    Design &

    Thank You!

    SMSC Weekly Report | Week 1