7 Item Report Page 1 of 2 CLIENT ENSCO International Offshore Company FACILITY ENSCO 8504 Semi-Sub rig, Drilling for SHELL offshore Sarawak, Malaysia LOCATION AIR COMPRESSOR ROOM EQUIPMENT AIR COMPRESSOR 3 COMPONENT CONTACT BREAKER, SURVEYOR Anthony R Clouder, [email protected] +60138330093 FIXED DURING SURVEY REMARKS: SEVERITY: SERIOUS FAULT TEMP. 75C. / Overheated by 27C approx. This was fixed and re-checked during the survey, and is now OK. ARC. 10 th March 2014

Upload: anthonyclouder

Post on 28-Jan-2018

18 views

Category:

Services


3 download

TRANSCRIPT

Page 1: Sample item report pages (irp's)

7

Item Report Page 1 of 2

CLIENT ENSCO International Offshore Company

FACILITY ENSCO 8504 Semi-Sub rig, Drilling for SHELL offshore Sarawak, Malaysia

LOCATION AIR COMPRESSOR ROOM

EQUIPMENT AIR COMPRESSOR 3

COMPONENT CONTACT BREAKER,

SURVEYOR Anthony R Clouder, [email protected] +60138330093

FIXED

DURING

SURVEY

REMARKS: SEVERITY: SERIOUS FAULT TEMP. 75C. / Overheated by 27C approx. This was fixed and re-checked during the survey, and is now OK.

ARC. 10th March 2014

Page 2: Sample item report pages (irp's)

8

Item Report Page 2 of 2

CLIENT ENSCO PTY in Miri, Sarawak, East MALAYSIA.

FACILITY ENSCO 105 Jack-up rig, Drilling for SHELL offshore Miri, Sarawak.

LOCATION SCR ROOM

EQUIPMENT DEEP WELL, PORT-LEG, OVER LOAD UNIT

COMPONENT CONTACT BREAKER, TOP LEFT TERMINATION.

SURVEYOR Anthony R Clouder, [email protected] +60138330093

FIXED

DURING

SURVEY

 

REMARKS: 29th December 2013 SEVERITY: VERY SERIOUS FAULT TEMP. 75C. / Overheated by 50C approx. This was fixed and re-checked during the survey, and is now OK.

ARC.

Page 3: Sample item report pages (irp's)

6

CLIENT MAERSK DRILLING

FACILITY MAERSK COMPLETER drilling offshore BRUNEI Darussalam for SHELL

LOCATION VFD Room.

EQUIPMENT LIGHTING PANEL # 875 EL 002.

COMPONENT CONTACT BREAKER, 001

SURVEYOR Anthony R Clouder, [email protected] +60138330093

REMARKS: SEVERITY: VERY SERIOUS FAULT TEMP. 82C. / Overheated by 45C approx. Needed wire cutting-back a bit, and re-terminating.

ARC. 16th Sep. 2015

FIXED

DURING SURVEY

 

Page 4: Sample item report pages (irp's)

7

Item Report Page 2 of 2

CLIENT ENSCO International Offshore Company

FACILITY ENSCO 8504 Semi-Sub rig, Drilling for SHELL offshore Sarawak, Malaysia

LOCATION AIR COMPRESSOR ROOM

EQUIPMENT AIR COMPRESSOR 3

COMPONENT CONTACT BREAKER.

SURVEYOR Anthony R Clouder, [email protected] +60138330093

FIXED

DURING

SURVEY

REMARKS: SEVERITY: INTERMIDIATE FAULT TEMP. 65C. / Overheated by 16C approx. This was fixed and re-checked during the survey, and is now OK.

ARC. 10th March 2014.

Page 5: Sample item report pages (irp's)

7

Item Report Page 1 of 2

CLIENT ENSCO PTY in Miri, Sarawak, East MALAYSIA.

FACILITY ENSCO 105 Jack-up rig, Drilling for SHELL offshore Miri, Sarawak.

LOCATION SCR ROOM

EQUIPMENT MUD PUMP 1 BLOWER STARTER. OVERLOAD UNIT

COMPONENT CONTACT BREAKER, BOTTOM RIGHT TERMINATION.

SURVEYOR Anthony R Clouder, [email protected] +60138330093

FIXED

DURING

SURVEY

 

REMARKS: 29th DECEMBER 2013 SEVERITY: SERIOUS FAULT TEMP. 53C. / Overheated by 27C approx. This was fixed and re-checked during the survey, and is now OK.

ARC.

Page 6: Sample item report pages (irp's)

Item Report Page 1 of 2 CLIENT MAERSK DRILLING FACILITY MAERSK CONVINCER drilling offshore west MALAYSIA LOCATION SCR ROOM EQUIPMENT MUD AGITATOR # 8 COMPONENT TERMINAL BLOCK CONNECTOR B6FF. Centre right connection. SURVEYOR Anthony R Clouder, [email protected] +60138330093

REMARKS: 26th June 2013 SEVERITY: SERIOUS FAULT TEMP. 70C. / Overheated by 40c approx. This was fixed and re-checked during the survey, and is now OK.

ARC.

FIXED

DURING

SURVEY

Page 7: Sample item report pages (irp's)

Item Report Page 2 of 2

CLIENT MAERSK DRILLING FACILITY MAERSK CONVINCER drilling offshore west MALAYSIA LOCATION DRILL-FLOOR MCC ROOM EQUIPMENT EMERGENCY LIGHTING PANEL 876EL009 COMPONENT CONTACT BREAKER Bottom Left Termination. SURVEYOR Anthony R Clouder, [email protected] +60138330093

FIXED

DURING

SURVEY

REMARKS: 27th June 2013 SEVERITY: SERIOUS FAULT TEMP. 50C. / Overheated by 25c approx. This was fixed and re-checked during the survey, and is now OK.

ARC.

Page 8: Sample item report pages (irp's)

WASTE HEAT BOILER & TRANSFERLINE BOTH SIDES, & TOP.

Three anomalies were found on this system, as arrowed.

Page 9: Sample item report pages (irp's)

REFORMER CONVECTION MODULE WALL

NORTH-SIDE

Possibly a problem, but there could also be a Thermo-reflection from the heat-source above the light unit, As per the photograph, there appears to be a problem with panel above the light.

Page 10: Sample item report pages (irp's)

REFORMER CONVECTION MODULE WALL

NORTH-SIDE

Page 11: Sample item report pages (irp's)

STEAM REFORMER F-1201

NORTH‐WALL(WESTERN‐END)

The more serious anomalies are arrowed. Some of the others may warrant closer inspection.