Developed by Toolbox4Planning Physical Progress Status Sheet-
Learn more at http://www.toolboxforplanning.com
Tank Bottom & Roof Field Erection Physical Progress
Material at
Erection
Area
Lay Plate/
Alignment & Fit up
welding
Item GADrawing
Description Quantity(KG)
Manhour
Weighting 5% 35%
1 DWG-01 GA Drawing Tank Bottom 5320 250 0.179 100% 100%
2 DWG-02 GA Drawing Tank Roof 2769 200 0.143 100% 100%
Tank Shell Plate Field Erection Physical Progress
Material at
Erection
Area
Position
Plate/Alignment &
Fit up Welding
ItemGA
DrawingDescription
Quantity
(KG)
Man
hourWeighting 5% 35%
1 DWG-03 GA Drawing Shell Plates 5850 350 0.250 100% 100%
Tank Accessories and Fitting Field Erection Physical Progress
(a) Tank Platform, Rolling Ladders and Spiral Stairways
Material at
Erection
Area
Member Assembly
ItemGA
DrawingDescription
Quantity
(KG)
Man
hourWeighting 5% 85%
1 DWG-04 GA Drawing Tank Platform and Ha 680 130 0.093 100% 100%
2 DWG-05 GA Drawing Spiral Stairways 520 120 0.086 100% 100%
3 DWG-06 GA Drawing Rolling Ladder & Rail 670 125 0.089 100% 100%
(b) Tank Internal Accessories and Nozzles
Material atErection
Area
(Marking & Cutting
for Nozzle holes,
Alignment & Fit up
Welding for all)
ItemGA
DrawingDescription
Quantity
(KG)
Man
hourWeighting 5% 35%
4 DWG-07 GA Drawing Tank Internal Accesso 550 125 0.089 100% 100%
5 DWG-08 GA Drawing Shell and Roof Nozzle 160 100 0.071 100% 100%
GRAND TOTAL 16519 1400 1.000
Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com
http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/ -
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
2/12
xternal Floating Tank Field Erection
Full
Weld/NDT
Field
Blasting/Fin
al Coating
Final
Inspection
45% 10% 5% IndividualProgress
OverallProgress
100% 100% 100% 100% 17.9%
100% 100% 100% 100% 14.3%
Full Welding
both
sides(Front &
Back) /NDT
Field
Blasting/
Final
Coating
Final
Inspection
45% 10% 5%Individual
Progress
Overall
Progress
100% 100% 100% 100% 25.0%
BLANK BLANKFinal
Inspection
0% 0% 10%Individual
Progress
Overall
Progress
0% 0% 100% 100% 9.3%
0% 0% 100% 100% 8.6%
0% 0% 100% 100% 8.9%
Full
Welding/NDT
Field
Blasting/
Final
Coating
Final
Inspection
45% 10% 5%Individual
Progress
Overall
Progress
100% 100% 100% 100% 8.9%
100% 100% 100% 100% 7.1%
100.0%
-
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
3/12
Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com Field Erectio
Item Drawing Description
GA
Drawing
No
Assembly
DrawingMember Type Member No
Weight
(Kg)
1 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA001 450
2 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA002 4503 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA003 450
4 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA004 450
5 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA005 450
6 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR001 400
7 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR002 400
8 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR003 400
9 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR004 400
10 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR005 400
11 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS001 350
12 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS002 200
13 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS003 200
14 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS004 320
15 GA Drawing Tank Roof DWG-02 DWG-02RC Center Deck Plate RC001 450
16 GA Drawing Tank Roof DWG-02 DWG-02RC Center Deck Plate RC002 450
17 GA Drawing Tank Roof DWG-02 DWG-02RC Center Deck Plate RC003 459
18 GA Drawing Tank Roof DWG-02 DWG-02RP Pontoon Plate RP001 380
19 GA Drawing Tank Roof DWG-02 DWG-02RP Pontoon Plate RP002 380
20 GA Drawing Tank Roof DWG-02 DWG-02RP Pontoon Plate RP003 380
21 GA Drawing Tank Roof DWG-02 DWG-02RS Pontoon Stiffener RS001 90
22 GA Drawing Tank Roof DWG-02 DWG-02RS Pontoon Stiffener RS002 90
23 GA Drawing Tank Roof DWG-02 DWG-02RS Pontoon Stiffener RS003 90
Progress Up
Item Drawing Description
GA
Drawing
No
Assembly
DrawingMember Type Member No
Weight
(Kg)
1 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-1st Course SH1-01 450
2 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-1st Course SH1-02 450
3 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-1st Course SH1-03 450
4 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-2nd Course SH2-01 450
5 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-2nd Course SH2-02 450
6 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-3rd Course SH3-01 450
7 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-3rd Course SH3-02 450
8 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-3rd Course SH3-03 450
9 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-4th Course SH4-01 450
10 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-4th Course SH4-02 450
11 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-5th Course SH5-01 450
12 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-5th Course SH5-02 450
13 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-5th Course SH5-03 450
Progress Up(a) Tank Platform, Rolling Ladders and Spiral Stairways
Item Drawing Description
GA
Drawing
No
Assembly
Drawing
Member/Fitting
TypeMember No
Weight
(Kg)
1 GA Drawing Tank Platform and DWG-04 DWG-04V0 Vertical Bracing V03 70
2 GA Drawing Tank Platform and DWG-04 DWG-04V0 Vertical Bracing V04 70
3 GA Drawing Tank Platform and DWG-04 DWG-04H0 Horizontal Bracing H01 50
http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/ -
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
4/12
4 GA Drawing Tank Platform and DWG-04 DWG-04H0 Horizontal Bracing H02 50
5 GA Drawing Tank Platform and DWG-04 DWG-04C0 Column C01 70
6 GA Drawing Tank Platform and DWG-04 DWG-04C0 Column C02 70
7 GA Drawing Tank Platform and DWG-04 DWG-04L01Ladder L01 100
8 GA Drawing Tank Platform and DWG-04 DWG-04L0 Ladder L02 100
9 GA Drawing Tank Platform and DWG-04 DWG-04HR Handrail HR01 50
10 GA Drawing Tank Platform and DWG-04 DWG-04HR Handrail HR02 50
16 GA Drawing Rolling Ladder & R DWG-06 DWG-06RL Ladder RL01 250
17 GA Drawing Rolling Ladder & R DWG-06 DWG-06HR Handrail HR05 7018 GA Drawing Rolling Ladder & R DWG-06 DWG-06HR Handrail HR06 70
19 GA Drawing Rolling Ladder & R DWG-06 DWG-06RT Rail Track RT01 280
11 GA Drawing Spiral Stairways DWG-05 DWG-05L0 Ladder L03 140
12 GA Drawing Spiral Stairways DWG-05 DWG-05L0 Ladder L04 140
13 GA Drawing Spiral Stairways DWG-05 DWG-05L0 Ladder L05 140
14 GA Drawing Spiral Stairways DWG-05 DWG-05HR Handrail HR03 50
15 GA Drawing Spiral Stairways DWG-05 DWG-05HR Handrail HR04 50
(b) Tank Internal Accessories and Nozzles
Item Drawing Description
GA
Drawing
No
Assembly
Drawing
Member/Fitting
TypeMember No
Weight
(Kg)
20 GA Drawing Tank Internal Acce DWG-07 DWG-07PL Pontoon Leg PL01 70
21 GA Drawing Tank Internal Acce DWG-07 DWG-07PL Pontoon Leg PL02 70
22 GA Drawing Tank Internal Acce DWG-07 DWG-07PL Pontoon Leg PL03 70
23 GA Drawing Tank Internal Acce DWG-07 DWG-07DL Center Deck Leg DL01 70
24 GA Drawing Tank Internal Acce DWG-07 DWG-07DL Center Deck Leg DL02 70
25 GA Drawing Tank Internal Acce DWG-07 DWG-07GP Gauge Pole GP01 200
26 GA Drawing Shell and Roof No DWG-08 DWG-08SH Shell Nozzles SHN1 90
27 GA Drawing Shell and Roof No DWG-08 DWG-08RF Roof Nozzles RFN1 70
Tank Bottom & Roof Field Erection Progress Summary by Quantity
Item Drawing Description
GA
DrawingNo
Weight
(Kg)
Material at Erection
Area
Lay Plate/
Alignment
& Fit upwelding
Full
Weld/NDT
1 GA Drawing Tank Bottom DWG-01 5320 100% 100% 100%
2 GA Drawing Tank Roof DWG-02 2769 100% 100% 100%
Tank Shell Side Field Erection Progress Summary by Quantity
Item Drawing Description
GA
Drawing
No
Weight
(Kg)
Material at Erection
Area
Position
Plate/Align
ment & Fit
up Welding
Full
Welding
both
sides(Fro
nt &
Back)
/NDT
1 GA Drawing Shell Plates DWG-03 5850 100% 100% 100%
Tank Accessories and Fittings Field Erection Progress Summary by Quantity
(a) Tank Platform, Rolling Ladders and Spiral Stairways
Item Drawing Description
GA
Drawing
No
Weight
(Kg)
Material at Erection
Area
Member
AssemblyBLANK
1 GA Drawing Tank Platform and DWG-04 680 100% 100% 0%
2 GA Drawing Spiral Stairways DWG-05 520 100% 100% 0%
3 GA Drawing Rolling Ladder & RDWG-06 670 100% 100% 0%
-
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
5/12
(b) Tank Internal Accessories and Nozzles
Item Drawing Description
GA
Drawing
No
Weight
(Kg)
Material at Erection
Area
(Marking &
Cutting for
Nozzle
holes,
Alignment
& Fit up
Full
Welding/
NDT
4 GA Drawing Tank Internal AcceDWG-07 550 100% 100% 100%
5 GA Drawing Shell and Roof No DWG-08 160 100% 100% 100%
Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com
http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/ -
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
6/12
Progress Updating Section- Bottom Plates & Roof Plates
Erection
Finished
Date
Material at
Erection
Area
Lay Plate/ Alignment
& Fit up welding
Full
Weld/NDT
Field
Blasting/Final
Coating where
appropriate
Final
Inspection
Material at
Erection
Area
11-Feb-13 19-Jan-13 20-Jan-13 21-Jan-13 23-Jan-13 11-Feb-13 450
11-Feb-13 19-Jan-13 20-Jan-13 21-Jan-13 23-Jan-13 11-Feb-13 45011-Feb-13 20-Jan-13 21-Jan-13 22-Jan-13 24-Jan-13 11-Feb-13 450
11-Feb-13 20-Jan-13 21-Jan-13 22-Jan-13 24-Jan-13 11-Feb-13 450
11-Feb-13 21-Jan-13 22-Jan-13 23-Jan-13 25-Jan-13 11-Feb-13 450
12-Feb-13 21-Jan-13 22-Jan-13 23-Jan-13 25-Jan-13 12-Feb-13 400
12-Feb-13 22-Jan-13 23-Jan-13 24-Jan-13 26-Jan-13 12-Feb-13 400
12-Feb-13 22-Jan-13 23-Jan-13 24-Jan-13 26-Jan-13 12-Feb-13 400
12-Feb-13 23-Jan-13 24-Jan-13 25-Jan-13 27-Jan-13 12-Feb-13 400
13-Feb-13 23-Jan-13 24-Jan-13 25-Jan-13 27-Jan-13 13-Feb-13 400
13-Feb-13 24-Jan-13 25-Jan-13 26-Jan-13 28-Jan-13 13-Feb-13 350
13-Feb-13 24-Jan-13 25-Jan-13 26-Jan-13 28-Jan-13 13-Feb-13 200
13-Feb-13 25-Jan-13 26-Jan-13 27-Jan-13 29-Jan-13 13-Feb-13 200
14-Feb-13 24-Jan-13 25-Jan-13 26-Jan-13 28-Jan-13 14-Feb-13 320
14-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 6-Feb-13 14-Feb-13 450
14-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 6-Feb-13 14-Feb-13 450
14-Feb-13 3-Feb-13 4-Feb-13 5-Feb-13 7-Feb-13 14-Feb-13 459
14-Feb-13 3-Feb-13 4-Feb-13 5-Feb-13 7-Feb-13 14-Feb-13 380
15-Feb-13 4-Feb-13 5-Feb-13 6-Feb-13 8-Feb-13 15-Feb-13 380
15-Feb-13 4-Feb-13 5-Feb-13 6-Feb-13 8-Feb-13 15-Feb-13 380
15-Feb-13 5-Feb-13 6-Feb-13 7-Feb-13 9-Feb-13 15-Feb-13 90
15-Feb-13 5-Feb-13 6-Feb-13 7-Feb-13 9-Feb-13 15-Feb-13 90
15-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 10-Feb-13 15-Feb-13 90
ating Section- Shell Plates
Erection
Finished
Date
Material at
Erection
Area
Position
Plate/Alignment & Fit
up Welding
Full Welding
both
sides(Front &
Back) /NDT
Field
Blasting/Final
Coating where
appropriate
Final
Inspection
Material at
Erection
Area
30-Jan-13 26-Jan-13 27-Jan-13 28-Jan-13 30-Jan-13 16-Feb-13 450
30-Jan-13 26-Jan-13 27-Jan-13 28-Jan-13 30-Jan-13 16-Feb-13 450
31-Jan-13 27-Jan-13 28-Jan-13 29-Jan-13 31-Jan-13 16-Feb-13 450
31-Jan-13 27-Jan-13 28-Jan-13 29-Jan-13 31-Jan-13 16-Feb-13 450
01-Feb-13 28-Jan-13 29-Jan-13 30-Jan-13 1-Feb-13 17-Feb-13 450
01-Feb-13 28-Jan-13 29-Jan-13 30-Jan-13 1-Feb-13 17-Feb-13 450
02-Feb-13 29-Jan-13 30-Jan-13 31-Jan-13 2-Feb-13 17-Feb-13 450
02-Feb-13 29-Jan-13 30-Jan-13 31-Jan-13 2-Feb-13 17-Feb-13 450
03-Feb-13 30-Jan-13 31-Jan-13 1-Feb-13 3-Feb-13 18-Feb-13 450
03-Feb-13 30-Jan-13 31-Jan-13 1-Feb-13 3-Feb-13 18-Feb-13 450
04-Feb-13 31-Jan-13 1-Feb-13 2-Feb-13 4-Feb-13 18-Feb-13 450
04-Feb-13 31-Jan-13 1-Feb-13 2-Feb-13 4-Feb-13 18-Feb-13 450
05-Feb-13 1-Feb-13 2-Feb-13 3-Feb-13 5-Feb-13 18-Feb-13 450
ating Section- Tank Accessories and Fittings
Erection
Finished
Date
Material at
Erection
Area
Member Assembly BLANK BLANKFinal
Inspection
Material at
Erection
Area
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 50
-
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
7/12
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 50
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 100
08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 100
09-Feb-13 6-Feb-13 8-Feb-13 9-Feb-13 50
09-Feb-13 6-Feb-13 8-Feb-13 9-Feb-13 50
10-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 250
10-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 7010-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 70
10-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 280
04-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 140
04-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 140
04-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 140
05-Feb-13 2-Feb-13 4-Feb-13 5-Feb-13 50
05-Feb-13 2-Feb-13 4-Feb-13 5-Feb-13 50
Erection
Finished
Date
Material at
Erection
Area
(Marking & Cutting
for Nozzle holes,
Alignment & Fit up
Welding for all)
Full
Welding/NDT
Field
Blasting/Final
Coating where
appropriate
Final
Inspection
Material at
Erection
Area
12-Feb-13 3-Feb-13 9-Feb-13 10-Feb-13 12-Feb-13 13-Feb-13 70
12-Feb-13 3-Feb-13 9-Feb-13 10-Feb-13 12-Feb-13 13-Feb-13 70
13-Feb-13 3-Feb-13 10-Feb-13 11-Feb-13 13-Feb-13 14-Feb-13 70
13-Feb-13 3-Feb-13 10-Feb-13 11-Feb-13 13-Feb-13 14-Feb-13 70
14-Feb-13 3-Feb-13 11-Feb-13 12-Feb-13 14-Feb-13 15-Feb-13 70
15-Feb-13 3-Feb-13 12-Feb-13 13-Feb-13 15-Feb-13 16-Feb-13 200
10-Feb-13 3-Feb-13 7-Feb-13 8-Feb-13 10-Feb-13 11-Feb-13 90
11-Feb-13 3-Feb-13 8-Feb-13 9-Feb-13 11-Feb-13 12-Feb-13 70
Developed by Toolbox4Planning
Field
Blasting/Final Coating
Final
Inspection
Learn more at http://www.toolboxforplanning.com
100% 100%
100% 100%
Field
Blasting/Fin
al Coating
Final
Inspection
100% 100%
BLANKFinal
Inspection
0% 100%
0% 100%
0% 100%
http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/ -
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
8/12
Field
Blasting/Fin
al Coating
where
appropiate
Final
Inspection
100% 100%
100% 100%
-
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
9/12
Progress Calculation Section
Lay Plate/ Alignment &
Fit up welding
Full
Weld/NDT
Field
Blasting/Final
Coating
Final
Inspection
450 450 450 450
450 450 450 450450 450 450 450
450 450 450 450
450 450 450 450
400 400 400 400
400 400 400 400
400 400 400 400
400 400 400 400
400 400 400 400
350 350 350 350
200 200 200 200
200 200 200 200
320 320 320 320
450 450 450 450
450 450 450 450
459 459 459 459
380 380 380 380
380 380 380 380
380 380 380 380
90 90 90 90
90 90 90 90
90 90 90 90
Position
Plate/Alignment & Fit
up Welding
Full Welding
both
sides(Front &
Back) /NDT
Field
Blasting/Final
Coating
Final
Inspection
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
450 450 450 450
Member Assembly BLANK BLANKFinal
Inspection
70 70
70 70
50 50
-
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
10/12
50 50
70 70
70 70
100 100
100 100
50 50
50 50
250 250
70 7070 70
280 280
140 140
140 140
140 140
50 50
50 50
(Marking & Cutting for
Nozzle holes,
Alignment & Fit up
Welding for all)
Full
Welding/NDT
Field
Blasting/Final
Coating where
appropiate
Final
Inspection
70 70 70 70
70 70 70 70
70 70 70 70
70 70 70 70
70 70 70 70
200 200 200 200
90 90 90 90
70 70 70 70
-
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
11/12
-
8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection
12/12
Annular Plate
Rectangular Plate
Sketch PlateHandrail
Ladder
Vertical Bracing
Horizontal Bracing
Column
Staircase/way
Shell-1st Course
Shell-2nd Course
Shell-3rd Course
Shell-4th Course
Shell-5th Course
Center Deck Plate
Rail Track
Pontoon Plate
Pontoon Stiffener
Pontoon Leg
Center Deck Leg
Gauge Pole
Shell Nozzles
Roof Nozzles