    Developed by Toolbox4Planning Physical Progress Status Sheet-

    Learn more at http://www.toolboxforplanning.com

    Tank Bottom & Roof Field Erection Physical Progress

    Material at

    Erection

    Area

    Lay Plate/

    Alignment & Fit up

    welding

    Item GADrawing

    Description Quantity(KG)

    Manhour

    Weighting 5% 35%

    1 DWG-01 GA Drawing Tank Bottom 5320 250 0.179 100% 100%

    2 DWG-02 GA Drawing Tank Roof 2769 200 0.143 100% 100%

    Tank Shell Plate Field Erection Physical Progress

    Material at

    Erection

    Area

    Position

    Plate/Alignment &

    Fit up Welding

    ItemGA

    DrawingDescription

    Quantity

    (KG)

    Man

    hourWeighting 5% 35%

    1 DWG-03 GA Drawing Shell Plates 5850 350 0.250 100% 100%

    Tank Accessories and Fitting Field Erection Physical Progress

    (a) Tank Platform, Rolling Ladders and Spiral Stairways

    Material at

    Erection

    Area

    Member Assembly

    ItemGA

    DrawingDescription

    Quantity

    (KG)

    Man

    hourWeighting 5% 85%

    1 DWG-04 GA Drawing Tank Platform and Ha 680 130 0.093 100% 100%

    2 DWG-05 GA Drawing Spiral Stairways 520 120 0.086 100% 100%

    3 DWG-06 GA Drawing Rolling Ladder & Rail 670 125 0.089 100% 100%

    (b) Tank Internal Accessories and Nozzles

    Material atErection

    Area

    (Marking & Cutting

    for Nozzle holes,

    Alignment & Fit up

    Welding for all)

    ItemGA

    DrawingDescription

    Quantity

    (KG)

    Man

    hourWeighting 5% 35%

    4 DWG-07 GA Drawing Tank Internal Accesso 550 125 0.089 100% 100%

    5 DWG-08 GA Drawing Shell and Roof Nozzle 160 100 0.071 100% 100%

    GRAND TOTAL 16519 1400 1.000

    Developed by Toolbox4Planning

    Learn more at http://www.toolboxforplanning.com

    http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/
  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    2/12

    xternal Floating Tank Field Erection

    Full

    Weld/NDT

    Field

    Blasting/Fin

    al Coating

    Final

    Inspection

    45% 10% 5% IndividualProgress

    OverallProgress

    100% 100% 100% 100% 17.9%

    100% 100% 100% 100% 14.3%

    Full Welding

    both

    sides(Front &

    Back) /NDT

    Field

    Blasting/

    Final

    Coating

    Final

    Inspection

    45% 10% 5%Individual

    Progress

    Overall

    Progress

    100% 100% 100% 100% 25.0%

    BLANK BLANKFinal

    Inspection

    0% 0% 10%Individual

    Progress

    Overall

    Progress

    0% 0% 100% 100% 9.3%

    0% 0% 100% 100% 8.6%

    0% 0% 100% 100% 8.9%

    Full

    Welding/NDT

    Field

    Blasting/

    Final

    Coating

    Final

    Inspection

    45% 10% 5%Individual

    Progress

    Overall

    Progress

    100% 100% 100% 100% 8.9%

    100% 100% 100% 100% 7.1%

    100.0%

  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    3/12

    Developed by Toolbox4Planning

    Learn more at http://www.toolboxforplanning.com Field Erectio

    Item Drawing Description

    GA

    Drawing

    No

    Assembly

    DrawingMember Type Member No

    Weight

    (Kg)

    1 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA001 450

    2 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA002 4503 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA003 450

    4 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA004 450

    5 GA Drawing Tank Bottom DWG-01 DWG-01BA Annular Plate BA005 450

    6 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR001 400

    7 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR002 400

    8 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR003 400

    9 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR004 400

    10 GA Drawing Tank Bottom DWG-01 DWG-01BR Rectangular Plate BR005 400

    11 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS001 350

    12 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS002 200

    13 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS003 200

    14 GA Drawing Tank Bottom DWG-01 DWG-01BS Sketch Plate BS004 320

    15 GA Drawing Tank Roof DWG-02 DWG-02RC Center Deck Plate RC001 450

    16 GA Drawing Tank Roof DWG-02 DWG-02RC Center Deck Plate RC002 450

    17 GA Drawing Tank Roof DWG-02 DWG-02RC Center Deck Plate RC003 459

    18 GA Drawing Tank Roof DWG-02 DWG-02RP Pontoon Plate RP001 380

    19 GA Drawing Tank Roof DWG-02 DWG-02RP Pontoon Plate RP002 380

    20 GA Drawing Tank Roof DWG-02 DWG-02RP Pontoon Plate RP003 380

    21 GA Drawing Tank Roof DWG-02 DWG-02RS Pontoon Stiffener RS001 90

    22 GA Drawing Tank Roof DWG-02 DWG-02RS Pontoon Stiffener RS002 90

    23 GA Drawing Tank Roof DWG-02 DWG-02RS Pontoon Stiffener RS003 90

    Progress Up

    Item Drawing Description

    GA

    Drawing

    No

    Assembly

    DrawingMember Type Member No

    Weight

    (Kg)

    1 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-1st Course SH1-01 450

    2 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-1st Course SH1-02 450

    3 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-1st Course SH1-03 450

    4 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-2nd Course SH2-01 450

    5 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-2nd Course SH2-02 450

    6 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-3rd Course SH3-01 450

    7 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-3rd Course SH3-02 450

    8 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-3rd Course SH3-03 450

    9 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-4th Course SH4-01 450

    10 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-4th Course SH4-02 450

    11 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-5th Course SH5-01 450

    12 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-5th Course SH5-02 450

    13 GA Drawing Shell Plates DWG-03 DWG-03SH Shell-5th Course SH5-03 450

    Progress Up(a) Tank Platform, Rolling Ladders and Spiral Stairways

    Item Drawing Description

    GA

    Drawing

    No

    Assembly

    Drawing

    Member/Fitting

    TypeMember No

    Weight

    (Kg)

    1 GA Drawing Tank Platform and DWG-04 DWG-04V0 Vertical Bracing V03 70

    2 GA Drawing Tank Platform and DWG-04 DWG-04V0 Vertical Bracing V04 70

    3 GA Drawing Tank Platform and DWG-04 DWG-04H0 Horizontal Bracing H01 50

    http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/
  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    4/12

    4 GA Drawing Tank Platform and DWG-04 DWG-04H0 Horizontal Bracing H02 50

    5 GA Drawing Tank Platform and DWG-04 DWG-04C0 Column C01 70

    6 GA Drawing Tank Platform and DWG-04 DWG-04C0 Column C02 70

    7 GA Drawing Tank Platform and DWG-04 DWG-04L01Ladder L01 100

    8 GA Drawing Tank Platform and DWG-04 DWG-04L0 Ladder L02 100

    9 GA Drawing Tank Platform and DWG-04 DWG-04HR Handrail HR01 50

    10 GA Drawing Tank Platform and DWG-04 DWG-04HR Handrail HR02 50

    16 GA Drawing Rolling Ladder & R DWG-06 DWG-06RL Ladder RL01 250

    17 GA Drawing Rolling Ladder & R DWG-06 DWG-06HR Handrail HR05 7018 GA Drawing Rolling Ladder & R DWG-06 DWG-06HR Handrail HR06 70

    19 GA Drawing Rolling Ladder & R DWG-06 DWG-06RT Rail Track RT01 280

    11 GA Drawing Spiral Stairways DWG-05 DWG-05L0 Ladder L03 140

    12 GA Drawing Spiral Stairways DWG-05 DWG-05L0 Ladder L04 140

    13 GA Drawing Spiral Stairways DWG-05 DWG-05L0 Ladder L05 140

    14 GA Drawing Spiral Stairways DWG-05 DWG-05HR Handrail HR03 50

    15 GA Drawing Spiral Stairways DWG-05 DWG-05HR Handrail HR04 50

    (b) Tank Internal Accessories and Nozzles

    Item Drawing Description

    GA

    Drawing

    No

    Assembly

    Drawing

    Member/Fitting

    TypeMember No

    Weight

    (Kg)

    20 GA Drawing Tank Internal Acce DWG-07 DWG-07PL Pontoon Leg PL01 70

    21 GA Drawing Tank Internal Acce DWG-07 DWG-07PL Pontoon Leg PL02 70

    22 GA Drawing Tank Internal Acce DWG-07 DWG-07PL Pontoon Leg PL03 70

    23 GA Drawing Tank Internal Acce DWG-07 DWG-07DL Center Deck Leg DL01 70

    24 GA Drawing Tank Internal Acce DWG-07 DWG-07DL Center Deck Leg DL02 70

    25 GA Drawing Tank Internal Acce DWG-07 DWG-07GP Gauge Pole GP01 200

    26 GA Drawing Shell and Roof No DWG-08 DWG-08SH Shell Nozzles SHN1 90

    27 GA Drawing Shell and Roof No DWG-08 DWG-08RF Roof Nozzles RFN1 70

    Tank Bottom & Roof Field Erection Progress Summary by Quantity

    Item Drawing Description

    GA

    DrawingNo

    Weight

    (Kg)

    Material at Erection

    Area

    Lay Plate/

    Alignment

    & Fit upwelding

    Full

    Weld/NDT

    1 GA Drawing Tank Bottom DWG-01 5320 100% 100% 100%

    2 GA Drawing Tank Roof DWG-02 2769 100% 100% 100%

    Tank Shell Side Field Erection Progress Summary by Quantity

    Item Drawing Description

    GA

    Drawing

    No

    Weight

    (Kg)

    Material at Erection

    Area

    Position

    Plate/Align

    ment & Fit

    up Welding

    Full

    Welding

    both

    sides(Fro

    nt &

    Back)

    /NDT

    1 GA Drawing Shell Plates DWG-03 5850 100% 100% 100%

    Tank Accessories and Fittings Field Erection Progress Summary by Quantity

    (a) Tank Platform, Rolling Ladders and Spiral Stairways

    Item Drawing Description

    GA

    Drawing

    No

    Weight

    (Kg)

    Material at Erection

    Area

    Member

    AssemblyBLANK

    1 GA Drawing Tank Platform and DWG-04 680 100% 100% 0%

    2 GA Drawing Spiral Stairways DWG-05 520 100% 100% 0%

    3 GA Drawing Rolling Ladder & RDWG-06 670 100% 100% 0%

  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    5/12

    (b) Tank Internal Accessories and Nozzles

    Item Drawing Description

    GA

    Drawing

    No

    Weight

    (Kg)

    Material at Erection

    Area

    (Marking &

    Cutting for

    Nozzle

    holes,

    Alignment

    & Fit up

    Full

    Welding/

    NDT

    4 GA Drawing Tank Internal AcceDWG-07 550 100% 100% 100%

    5 GA Drawing Shell and Roof No DWG-08 160 100% 100% 100%

    Developed by Toolbox4Planning

    Learn more at http://www.toolboxforplanning.com

    http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/
  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    6/12

    Progress Updating Section- Bottom Plates & Roof Plates

    Erection

    Finished

    Date

    Material at

    Erection

    Area

    Lay Plate/ Alignment

    & Fit up welding

    Full

    Weld/NDT

    Field

    Blasting/Final

    Coating where

    appropriate

    Final

    Inspection

    Material at

    Erection

    Area

    11-Feb-13 19-Jan-13 20-Jan-13 21-Jan-13 23-Jan-13 11-Feb-13 450

    11-Feb-13 19-Jan-13 20-Jan-13 21-Jan-13 23-Jan-13 11-Feb-13 45011-Feb-13 20-Jan-13 21-Jan-13 22-Jan-13 24-Jan-13 11-Feb-13 450

    11-Feb-13 20-Jan-13 21-Jan-13 22-Jan-13 24-Jan-13 11-Feb-13 450

    11-Feb-13 21-Jan-13 22-Jan-13 23-Jan-13 25-Jan-13 11-Feb-13 450

    12-Feb-13 21-Jan-13 22-Jan-13 23-Jan-13 25-Jan-13 12-Feb-13 400

    12-Feb-13 22-Jan-13 23-Jan-13 24-Jan-13 26-Jan-13 12-Feb-13 400

    12-Feb-13 22-Jan-13 23-Jan-13 24-Jan-13 26-Jan-13 12-Feb-13 400

    12-Feb-13 23-Jan-13 24-Jan-13 25-Jan-13 27-Jan-13 12-Feb-13 400

    13-Feb-13 23-Jan-13 24-Jan-13 25-Jan-13 27-Jan-13 13-Feb-13 400

    13-Feb-13 24-Jan-13 25-Jan-13 26-Jan-13 28-Jan-13 13-Feb-13 350

    13-Feb-13 24-Jan-13 25-Jan-13 26-Jan-13 28-Jan-13 13-Feb-13 200

    13-Feb-13 25-Jan-13 26-Jan-13 27-Jan-13 29-Jan-13 13-Feb-13 200

    14-Feb-13 24-Jan-13 25-Jan-13 26-Jan-13 28-Jan-13 14-Feb-13 320

    14-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 6-Feb-13 14-Feb-13 450

    14-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 6-Feb-13 14-Feb-13 450

    14-Feb-13 3-Feb-13 4-Feb-13 5-Feb-13 7-Feb-13 14-Feb-13 459

    14-Feb-13 3-Feb-13 4-Feb-13 5-Feb-13 7-Feb-13 14-Feb-13 380

    15-Feb-13 4-Feb-13 5-Feb-13 6-Feb-13 8-Feb-13 15-Feb-13 380

    15-Feb-13 4-Feb-13 5-Feb-13 6-Feb-13 8-Feb-13 15-Feb-13 380

    15-Feb-13 5-Feb-13 6-Feb-13 7-Feb-13 9-Feb-13 15-Feb-13 90

    15-Feb-13 5-Feb-13 6-Feb-13 7-Feb-13 9-Feb-13 15-Feb-13 90

    15-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 10-Feb-13 15-Feb-13 90

    ating Section- Shell Plates

    Erection

    Finished

    Date

    Material at

    Erection

    Area

    Position

    Plate/Alignment & Fit

    up Welding

    Full Welding

    both

    sides(Front &

    Back) /NDT

    Field

    Blasting/Final

    Coating where

    appropriate

    Final

    Inspection

    Material at

    Erection

    Area

    30-Jan-13 26-Jan-13 27-Jan-13 28-Jan-13 30-Jan-13 16-Feb-13 450

    30-Jan-13 26-Jan-13 27-Jan-13 28-Jan-13 30-Jan-13 16-Feb-13 450

    31-Jan-13 27-Jan-13 28-Jan-13 29-Jan-13 31-Jan-13 16-Feb-13 450

    31-Jan-13 27-Jan-13 28-Jan-13 29-Jan-13 31-Jan-13 16-Feb-13 450

    01-Feb-13 28-Jan-13 29-Jan-13 30-Jan-13 1-Feb-13 17-Feb-13 450

    01-Feb-13 28-Jan-13 29-Jan-13 30-Jan-13 1-Feb-13 17-Feb-13 450

    02-Feb-13 29-Jan-13 30-Jan-13 31-Jan-13 2-Feb-13 17-Feb-13 450

    02-Feb-13 29-Jan-13 30-Jan-13 31-Jan-13 2-Feb-13 17-Feb-13 450

    03-Feb-13 30-Jan-13 31-Jan-13 1-Feb-13 3-Feb-13 18-Feb-13 450

    03-Feb-13 30-Jan-13 31-Jan-13 1-Feb-13 3-Feb-13 18-Feb-13 450

    04-Feb-13 31-Jan-13 1-Feb-13 2-Feb-13 4-Feb-13 18-Feb-13 450

    04-Feb-13 31-Jan-13 1-Feb-13 2-Feb-13 4-Feb-13 18-Feb-13 450

    05-Feb-13 1-Feb-13 2-Feb-13 3-Feb-13 5-Feb-13 18-Feb-13 450

    ating Section- Tank Accessories and Fittings

    Erection

    Finished

    Date

    Material at

    Erection

    Area

    Member Assembly BLANK BLANKFinal

    Inspection

    Material at

    Erection

    Area

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 50

  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    7/12

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 50

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 70

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 100

    08-Feb-13 6-Feb-13 7-Feb-13 8-Feb-13 100

    09-Feb-13 6-Feb-13 8-Feb-13 9-Feb-13 50

    09-Feb-13 6-Feb-13 8-Feb-13 9-Feb-13 50

    10-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 250

    10-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 7010-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 70

    10-Feb-13 6-Feb-13 9-Feb-13 10-Feb-13 280

    04-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 140

    04-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 140

    04-Feb-13 2-Feb-13 3-Feb-13 4-Feb-13 140

    05-Feb-13 2-Feb-13 4-Feb-13 5-Feb-13 50

    05-Feb-13 2-Feb-13 4-Feb-13 5-Feb-13 50

    Erection

    Finished

    Date

    Material at

    Erection

    Area

    (Marking & Cutting

    for Nozzle holes,

    Alignment & Fit up

    Welding for all)

    Full

    Welding/NDT

    Field

    Blasting/Final

    Coating where

    appropriate

    Final

    Inspection

    Material at

    Erection

    Area

    12-Feb-13 3-Feb-13 9-Feb-13 10-Feb-13 12-Feb-13 13-Feb-13 70

    12-Feb-13 3-Feb-13 9-Feb-13 10-Feb-13 12-Feb-13 13-Feb-13 70

    13-Feb-13 3-Feb-13 10-Feb-13 11-Feb-13 13-Feb-13 14-Feb-13 70

    13-Feb-13 3-Feb-13 10-Feb-13 11-Feb-13 13-Feb-13 14-Feb-13 70

    14-Feb-13 3-Feb-13 11-Feb-13 12-Feb-13 14-Feb-13 15-Feb-13 70

    15-Feb-13 3-Feb-13 12-Feb-13 13-Feb-13 15-Feb-13 16-Feb-13 200

    10-Feb-13 3-Feb-13 7-Feb-13 8-Feb-13 10-Feb-13 11-Feb-13 90

    11-Feb-13 3-Feb-13 8-Feb-13 9-Feb-13 11-Feb-13 12-Feb-13 70

    Developed by Toolbox4Planning

    Field

    Blasting/Final Coating

    Final

    Inspection

    Learn more at http://www.toolboxforplanning.com

    100% 100%

    100% 100%

    Field

    Blasting/Fin

    al Coating

    Final

    Inspection

    100% 100%

    BLANKFinal

    Inspection

    0% 100%

    0% 100%

    0% 100%

    http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/http://www.toolboxforplanning.com/
  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    8/12

    Field

    Blasting/Fin

    al Coating

    where

    appropiate

    Final

    Inspection

    100% 100%

    100% 100%

  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    9/12

    Progress Calculation Section

    Lay Plate/ Alignment &

    Fit up welding

    Full

    Weld/NDT

    Field

    Blasting/Final

    Coating

    Final

    Inspection

    450 450 450 450

    450 450 450 450450 450 450 450

    450 450 450 450

    450 450 450 450

    400 400 400 400

    400 400 400 400

    400 400 400 400

    400 400 400 400

    400 400 400 400

    350 350 350 350

    200 200 200 200

    200 200 200 200

    320 320 320 320

    450 450 450 450

    450 450 450 450

    459 459 459 459

    380 380 380 380

    380 380 380 380

    380 380 380 380

    90 90 90 90

    90 90 90 90

    90 90 90 90

    Position

    Plate/Alignment & Fit

    up Welding

    Full Welding

    both

    sides(Front &

    Back) /NDT

    Field

    Blasting/Final

    Coating

    Final

    Inspection

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    450 450 450 450

    Member Assembly BLANK BLANKFinal

    Inspection

    70 70

    70 70

    50 50

  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    10/12

    50 50

    70 70

    70 70

    100 100

    100 100

    50 50

    50 50

    250 250

    70 7070 70

    280 280

    140 140

    140 140

    140 140

    50 50

    50 50

    (Marking & Cutting for

    Nozzle holes,

    Alignment & Fit up

    Welding for all)

    Full

    Welding/NDT

    Field

    Blasting/Final

    Coating where

    appropiate

    Final

    Inspection

    70 70 70 70

    70 70 70 70

    70 70 70 70

    70 70 70 70

    70 70 70 70

    200 200 200 200

    90 90 90 90

    70 70 70 70

  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    11/12

  • 8/11/2019 Sample ProgressTracking Sheet Tank Farm Mechanical Field Erection

    12/12

    Annular Plate

    Rectangular Plate

    Sketch PlateHandrail

    Ladder

    Vertical Bracing

    Horizontal Bracing

    Column

    Staircase/way

    Shell-1st Course

    Shell-2nd Course

    Shell-3rd Course

    Shell-4th Course

    Shell-5th Course

    Center Deck Plate

    Rail Track

    Pontoon Plate

    Pontoon Stiffener

    Pontoon Leg

    Center Deck Leg

    Gauge Pole

    Shell Nozzles

    Roof Nozzles