J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd) International House, 24 Holborn Viaduct, London EC1A 2BN [email protected] Sample Report (Project Name Here) // Cover Project Project Name Sample Report (Project Name Here) Project Description CCTV DRAINAGE SURVEY REPORT Start Date 03/05/2017 Project Status Inspection Standard

Upload: others

Post on 18-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Sample Report (Project Name Here) // Cover

Project

Project Name Sample Report (Project Name Here)

Project Description CCTV DRAINAGE SURVEY REPORT

Start Date 03/05/2017

Project Status

Inspection Standard

Page 2: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Table of ContentsDate:

03/05/2017Project Name Project Number:

Sample Report (Project Name Here)

Sample Report (Project Name Here) // Page: I

Scoring Summary .......................................................................................................................................................................................P-1

Project Information .......................................................................................................................................................................................P-2

Project Pictures .......................................................................................................................................................................................P-4

Defect Grade Description (Section) .......................................................................................................................................................................................P-5

Section Profile .......................................................................................................................................................................................P-6

Section: 1; US HOR - MH01 .......................................................................................................................................................................................1

Section: 2; MH01 - SEWER .......................................................................................................................................................................................3

.......................................................................................................................................................................................11

Page 3: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Scoring SummaryDate :

03/05/2017Project Name : Project Number :

Sample Report (Project Name Here)

Sample Report (Project Name Here) // Page: P-1

Structural Defects

Section Pipe Ref Grade Description

2 MH01X 3 Fracture, circumferential, from 02 to 09 o'clock

Grade 3: Best practice suggests consideration should be given to repairs in the medium term.

Grade 4: Best practice suggests consideration should be given to repairs to avoid a potential collapse.

Grade 5: Best practice suggests that this pipe is at risk of collapse at any time. Urgent consideration shouldbe given to repairs to avoid total failure

Service / Operational Defects

Section Pipe Ref Grade Description

2 MH01X 5 Multiple defects

Grade 3: Best practice suggests consideration should be given to maintenance activities in the medium term.

Grade 4: Best practice suggests consideration should be given to maintenance activity to avoid potentialblockages.

Grade 5: Best practice suggests that this pipe is at a high risk of backing up or causing flooding.

Abandoned Surveys

Section Pipe Ref Description

2 MH01X Survey abandoned

Information

These summaries are based on the SRM grading from the WRC.

Page 4: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Project InformationProject Date:

03/05/2017

Client

Company or Site Name: Site/Company Name

Contact: Your Name

Department:

Street: Street Address

Town or City: Town/City & Post Code

Phone: Your Contact Number

Fax:

Mobile:

Email:

CCTV DRAINAGE SURVEY REPORTProject Description:

Project Name: Client's Ref:Sample Report (Project Name Here)

Sample Report (Project Name Here) // Page: P-2

01

Contractor

Company or Site Name: J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)

Contact: 0207 125 0295 - 07946 480 288

Department:

Street: International House, 24 Holborn Viaduct

Town or City: London EC1A 2BN

Phone:

Fax:

Mobile:

Email: [email protected]

Page 5: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Project InformationProject Date:

03/05/2017

CCTV DRAINAGE SURVEY REPORTProject Description:

Project Name: Client's Ref:Sample Report (Project Name Here)

Sample Report (Project Name Here) // Page: P-3

01

Project Notes

This page will have a full description of defects found along with recommendations.

Page 6: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Sample Report (Project Name Here) // Page: P-4

Project PicturesProject Date:03/05/2017

Project Name: Project Number:Sample Report (Project Name Here)

FRONT-HOME-IMAGE

IMG_0891

IMG_0889

IMG_0893

Page 7: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Defect Grade Description (Section)Project Date:03/05/2017

Project Name: Project Number:Sample Report (Project Name Here)

Sample Report (Project Name Here) // Page: P-5

1: Brick: No structural defects.

Pipe: No structural defects.

Acceptable structural condition.

2: Brick: Circumferential cracking; single longitudinal crack; surface mortar loss (depth missing < 15mm);surface damage - slight spalling (breaking away of small fragments from the surface); surface damage -slight wear (increased roughness).

Pipe: Circumferential crack; moderate joint defects (i.e. medium open joint or medium displaced joint);surface damage - slight spalling (breaking away of small fragments from the surface) or slight wear(increased roughness).

Minimal collapse likelihood in the short term but potential for further deterioration.

3: Brick: Medium mortar loss (depth missing 15-50mm) without other defects; more than one longitudinalcrack (at a single location); multiple cracking; single bricks displaced; deformation < 5%; no fracture andonly moderate mortar loss; surface damage - medium spalling (large areas of chipped brick); surfacedamage - medium wear (large area of brick surface is missing).

Pipe: Fracture with no deformation or deformation < 5%; longitudinal cracking or multiple cracking; minorloss of level; severe joint defects (i.e. large open joint or large displaced joint); surface damage - partialarea of pipe surface is missing or worn.

! Collapse unlikely in the near future but further deterioration likely !

4: Brick: Total mortar loss (depth missing > 50mm) with deformation > 10%; deformation up to 10% andfractured; displaced or hanging brickwork; small number of missing bricks; dropped invert (drop > 20mm);moderate loss of level; surface damage - large spalling (entire surface of brick is missing); surface damage- large wear (entire surface of brick is missing).

Pipe: Broken; deformation up to 10% and broken; fracture with deformation 5-10%; multiple fractures;serious loss of level; serious joint defects with voids or soil visible (open joint with > 50mm soil or voidvisible or joint displacement > 25% of diameter); surface damage - entire area of pipe surface is missing orseverly worn.

!! Collapse likely in the foreseeable future !!

5: Brick: Already collapsed; missing Invert; deformation > 10% and fractured; displaced or hanging brickworkand deformation < 10%; extensive areas of missing brickwork.

Pipe: Already collapsed; deformation > 10% and broken; extensive areas of pipe fabric missing; fractureswith deformation > 10%

!!! Collapsed or collapse imminent !!!

Page 8: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Profile

Sample Report (Project Name Here) // Page: P-6

Project Date:03/05/2017

Project Name: Project Number:Sample Report (Project Name Here)

SectionNo.

Upstream Node Downstream Node Date Road Pipe Material ExpectedLength

[m]

Inspected Length[m]

1 US HOR MH01 03/05/2017 GREEN COURT, ORLEYFARM ROAD

Vitrified claypipe (i.e. allclayware)

9.23 9.23

2 MH01 SEWER 03/05/2017 GREEN COURT, ORLEYFARM ROAD

Vitrified claypipe (i.e. allclayware)

14.20 12.16

2 x Circular 100 = 23.43 Expected Length [m] ( 21.39 Inspected Length [m] )

Total: 2 = 23.43 Expected Length [m] ( 21.39 Inspected Length [m] )

Page 9: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Inspection - 03/05/2017 - US HORXDate: Client's Ref : PLR:Weather:

Operator:

Section:

Criticality Grade:Vehicle: Camera: Preset Length [m]:

Pre Cleaned:

Type of Pipe:

Sample Report (Project Name Here) // Page: 1

Town or Village: Middlesex Insp Dir: MH01 <~ US HOR US MH: US HOR

Road: Green Court, Orley Farm Road Inspected Length: 9.23 m US Depth: 450.00 m

Location: Under a permanent buildingTotal Length: 9.23 m DS MH: MH01

Surface Cover: Pipe Length: 0.00 m DS Depth: 600.00 m

Use: Foul Pipe Shape: Circular

Lining Type: Height / Width: 100 / 0 mm

Inspection Purpose: Sample survey to determine asset condition Pipe Material: Vitrified clay pipe (i.e. all clayware)

Year Constructed: Flow Control: No flow control

Comment: AFTER DRAIN CLEARANCE

Recommendation:

1:80 Position m Code Observation Grade

03/05/17 01 No rain or snow

Jamie Snow

1 US HORXYes

Gravity drain/sewer

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade0 0.0 0.0 0.0 1.0 0 0.0 0.0 0.0 1.0

Inspection:

1 8:48Time:

Note: In line with the WRc SRM, plastic pipes are not scored against structural defects.

MH01

Depth: 600.00

US HOR

Depth: 450.00

0.04m // 00:00:01 //

0.04m // 00:00:03 //

6.38m // 00:00:49 //

7.41m // 00:00:55 //

8.25m // 00:01:02 //

0.04 MH Start node type, manhole, reference number: MH01    

0.04 WL Water level, 0 % of the vertical dimension    

6.38 GP General photograph taken at this point    

7.41 GP General photograph taken at this point    

8.25 GP General photograph taken at this point    

9.23 MHF Finish node type, manhole, reference number: USHOR

   

Page 10: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Pictures - 03/05/2017 - US HORX

Sample Report (Project Name Here) // Page: 2

1 US HORX 01Section Number: Inspection Direction: PLR: Client's Ref:

MH01 US HOR

Contractor's Ref:

20170503-084859-snap0000.jpg, 00:00:01, 0.04mStart node type, manhole, reference number: MH01

20170503-084859-snap0002.jpg, 00:00:49, 6.38mGeneral photograph taken at this point

20170503-084859-snap0004.jpg, 00:01:02, 8.25mGeneral photograph taken at this point

20170503-084859-snap0001.jpg, 00:00:03, 0.04mWater level, 0 % of the vertical dimension

20170503-084859-snap0003.jpg, 00:00:55, 7.41mGeneral photograph taken at this point

20170503-084859-snap0005.jpg, 00:01:12, 9.23mFinish node type, manhole, reference number: US HOR

Page 11: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Inspection - 03/05/2017 - MH01XDate: Client's Ref : PLR:Weather:

Operator:

Section:

Criticality Grade:Vehicle: Camera: Preset Length [m]:

Pre Cleaned:

Type of Pipe:

Sample Report (Project Name Here) // Page: 3

Town or Village: Middlesex Insp Dir: MH01 ~> SEWER US MH: MH01

Road: Green Court, Orley Farm Road Inspected Length: 12.16 m US Depth: 600.00 m

Location: Under a permanent buildingTotal Length: 14.20 m DS MH: SEWER

Surface Cover: Pipe Length: 0.00 m DS Depth: 0.00 m

Use: Foul Pipe Shape: Circular

Lining Type: Height / Width: 100 / 0 mm

Inspection Purpose: Sample survey to determine asset condition Pipe Material: Vitrified clay pipe (i.e. all clayware)

Year Constructed: Flow Control: No flow control

Comment: AFTER DRAIN CLEARANCE

Recommendation:

1:52 Position m Code Observation Grade

03/05/17 01 No rain or snow

Jamie Snow

2 MH01XYes

Gravity drain/sewer

Inspection:

2 8:50Time:

MH01

Depth: 600.00

-0.15m // 00:00:01 //

-0.15m // 00:00:03 //

0.08m // 00:00:25 //

0.42m // 00:00:45 //

0.53m // 00:00:57 //

-0.15 MH Start node type, manhole, reference number: MH01    

-0.15 WL Water level, 0 % of the vertical dimension    

0.08 RMJ Roots, mass at joint, 60 % cross-sectional area loss 5    

0.42 GP General photograph taken at this point    

0.53 GP General photograph taken at this point    

1.29 RMJ Roots, mass at joint, 10 % cross-sectional area loss 3    

1.48 CC Crack, circumferential, from 04 to 08 o'clock 2    

1.56 CL Crack, longitudinal, at 07 o'clock 2    

1.98 JDM Joint displaced, medium 1    

2.70 JDL Joint displaced, large 1    

2.70 GP General photograph taken at this point    

3.31 RFJ Roots, fine at joint 2    

3.65 LL Line deviates left    

3.88 RTJ Roots, tap at joint 4    

4.56 RFJ Roots, fine at joint 2    

Page 12: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Inspection - 03/05/2017 - MH01XDate: Client's Ref : PLR:Weather:

Operator:

Section:

Criticality Grade:Vehicle: Camera: Preset Length [m]:

Pre Cleaned:

Type of Pipe:

Sample Report (Project Name Here) // Page: 4

Recommendation:

1:52 Position m Code Observation Grade

03/05/17 01 No rain or snow

Jamie Snow

2 MH01XYes

Gravity drain/sewer

STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade8 40.0 7.6 7.6 3.0 8 15.0 3.9 47.0 5.0

Inspection:

2 8:50Time:

Note: In line with the WRc SRM, plastic pipes are not scored against structural defects.

SEWER

Depth: 0.00

5.97 CC Crack, circumferential, from 03 to 09 o'clock 2    

6.54 CC Crack, circumferential, from 09 to 04 o'clock 2    

7.22 GP General photograph taken at this point    

7.87 CC Crack, circumferential, from 02 to 09 o'clock 2    

8.51 FC Fracture, circumferential, from 02 to 09 o'clock 3    

9.27 GP General photograph taken at this point    

9.27 RFJ Roots, fine at joint 2    

9.88 RTJ Roots, tap at joint 4    

11.17 RM Roots, mass, 70 % cross-sectional area loss 5    

12.16 SA Survey abandoned    

14.20 End of pipe    

Page 13: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Inspection - 03/05/2017 - MH01XDate: Client's Ref : PLR:Weather:

Operator:

Section:

Criticality Grade:Vehicle: Camera: Preset Length [m]:

Pre Cleaned:

Type of Pipe:

Sample Report (Project Name Here) // Page: 5

03/05/17 01 No rain or snow

Jamie Snow

2 MH01XYes

Gravity drain/sewer

Inspection:

2 8:50Time:

Page 14: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Pictures - 03/05/2017 - MH01X

Sample Report (Project Name Here) // Page: 6

2 MH01X 01Section Number: Inspection Direction: PLR: Client's Ref:

MH01 SEWER

Contractor's Ref:

20170503-085059-snap0000.jpg, 00:00:01, -0.15mStart node type, manhole, reference number: MH01

20170503-085059-snap0002.jpg, 00:00:25, 0.08mRoots, mass at joint, 60 % cross-sectional area loss

20170503-085059-snap0004.jpg, 00:00:57, 0.53mGeneral photograph taken at this point

20170503-085059-snap0001.jpg, 00:00:03, -0.15mWater level, 0 % of the vertical dimension

20170503-085059-snap0003.jpg, 00:00:45, 0.42mGeneral photograph taken at this point

20170503-085059-snap0005.jpg, 00:01:19, 1.29mRoots, mass at joint, 10 % cross-sectional area loss

Page 15: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Pictures - 03/05/2017 - MH01X

Sample Report (Project Name Here) // Page: 7

2 MH01X 01Section Number: Inspection Direction: PLR: Client's Ref:

MH01 SEWER

Contractor's Ref:

20170503-085059-snap0006.jpg, 00:01:31, 1.48mCrack, circumferential, from 04 to 08 o'clock

20170503-085059-snap0008.jpg, 00:02:13, 1.98mJoint displaced, medium

20170503-085059-snap0010.jpg, 00:02:42, 2.70mGeneral photograph taken at this point

20170503-085059-snap0007.jpg, 00:01:50, 1.56mCrack, longitudinal, at 07 o'clock

20170503-085059-snap0009.jpg, 00:02:36, 2.70mJoint displaced, large

20170503-085059-snap0011.jpg, 00:03:04, 3.31mRoots, fine at joint

Page 16: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Pictures - 03/05/2017 - MH01X

Sample Report (Project Name Here) // Page: 8

2 MH01X 01Section Number: Inspection Direction: PLR: Client's Ref:

MH01 SEWER

Contractor's Ref:

20170503-085059-snap0012.jpg, 00:03:21, 3.65mLine deviates left

20170503-085059-snap0014.jpg, 00:03:56, 4.56mRoots, fine at joint

20170503-085059-snap0016.jpg, 00:04:34, 6.54mCrack, circumferential, from 09 to 04 o'clock

20170503-085059-snap0013.jpg, 00:03:38, 3.88mRoots, tap at joint

20170503-085059-snap0015.jpg, 00:04:15, 5.97mCrack, circumferential, from 03 to 09 o'clock

20170503-085059-snap0017.jpg, 00:04:49, 7.22mGeneral photograph taken at this point

Page 17: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Pictures - 03/05/2017 - MH01X

Sample Report (Project Name Here) // Page: 9

2 MH01X 01Section Number: Inspection Direction: PLR: Client's Ref:

MH01 SEWER

Contractor's Ref:

20170503-085059-snap0018.jpg, 00:05:05, 7.87mCrack, circumferential, from 02 to 09 o'clock

20170503-085059-snap0020.jpg, 00:05:42, 9.27mGeneral photograph taken at this point

20170503-085059-snap0022.jpg, 00:06:14, 9.88mRoots, tap at joint

20170503-085059-snap0019.jpg, 00:05:29, 8.51mFracture, circumferential, from 02 to 09 o'clock

20170503-085059-snap0021.jpg, 00:05:58, 9.27mRoots, fine at joint

20170503-085059-snap0023.jpg, 00:06:59, 11.17mRoots, mass, 70 % cross-sectional area loss

Page 18: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

Section Pictures - 03/05/2017 - MH01X

Sample Report (Project Name Here) // Page: 10

2 MH01X 01Section Number: Inspection Direction: PLR: Client's Ref:

MH01 SEWER

Contractor's Ref:

20170503-085059-snap0024.jpg, 00:07:38, 12.16mSurvey abandoned

Page 19: Sample Report - Drainage Company London

J Snow Drainage Solutions (T/A JSD Solutions 24/7 Ltd)International House, 24 Holborn Viaduct, London EC1A 2BN

 [email protected]

11