San Diego TrolleySan Diego Trolley
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.QuickTime™ and a
TIFF (Uncompressed) decompressorare needed to see this picture.
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
![Page 2: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/2.jpg)
• Current• Current/future expansion• Propose extension
![Page 3: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/3.jpg)
San Diego has had a long history of public transportation
Open air street car drawn by mules or horses (1886)
electric street cars (late1880’s)
![Page 4: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/4.jpg)
OverviewOverview
San Diego Trolley inaugural run took place on 15.9 miles of the “South Line” b/w U.S. International Border and Downtown San Diego
Cost of $86 million Trolley has been
operation since July 26, 1981
![Page 5: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/5.jpg)
Two lines make up the trolley Two lines make up the trolley systemsystem
![Page 6: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/6.jpg)
The system has 48-miles of trackTop 3 stations– San Yisdro Station– 12th and Imperial Station– Old Town Station
![Page 7: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/7.jpg)
Blue LineBlue Line
![Page 8: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/8.jpg)
The Blue Line was the first to serve the residents of San Diego
Runs from Mission San Diego to the International Border via Downtown San Diego
![Page 9: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/9.jpg)
Orange LineOrange Line
![Page 10: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/10.jpg)
The Orange Line was the second line to come into service
Runs from Santee to Downtown San Diego via El Cajon and Lemon Grove
![Page 11: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/11.jpg)
StatisticsStatistics
![Page 12: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/12.jpg)
![Page 13: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/13.jpg)
![Page 14: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/14.jpg)
For the year 2003 the average weekday ridership was74,674
Total rider for 2002 was 25 million
![Page 15: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/15.jpg)
Current Projects Current Projects
Mission Valley East (MVE)Mid-Coast Corridor
![Page 16: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/16.jpg)
Mission Valley EastMission Valley East
![Page 17: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/17.jpg)
Project StatusProject Status
First imagined more than 25 years ago
Project is 70% completeService to begin May 2005Provide direct connection to SDSU
campus
![Page 18: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/18.jpg)
RouteRoute
5.9 mile extension linking Blue and Orange lines
Green Line will connect Old Town with Santee
Adjacent to interstate 8– The LRT segment will include elevated and
ground-level sections and a tunnel under SDSU.
![Page 19: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/19.jpg)
StationsStations
Four new stations
![Page 20: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/20.jpg)
Grantville
![Page 21: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/21.jpg)
SDSU
![Page 22: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/22.jpg)
![Page 23: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/23.jpg)
![Page 24: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/24.jpg)
Alvarado Medical CenterAlvarado Medical Center
![Page 25: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/25.jpg)
70th St70th St
![Page 26: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/26.jpg)
Cost and FundingCost and Funding
500+ million to complete projectAnnual operating cost: 7 millionFunding– TransNet– State– Federal
![Page 27: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/27.jpg)
Other FactorsOther Factors
Benefits– Access to SDSU, Cox Arena, Alvarado
Medical Center, Mission Valley’s Major activity centers, and Old Town
Ridership forecast (2015)– 10,800 average weekday boardings– 7,400 daily new riders
![Page 28: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/28.jpg)
Mid-Coast Corridor (Phase one)Mid-Coast Corridor (Phase one)
Old Town to Balboa ave.
3.4 miles extension Cost $104.6 million Annual operation
cost $54.7 million
![Page 29: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/29.jpg)
Rideship Forecast (2015)– 22,599 daily boardings– 10,256 daily new riders
3 new stations– Tecolote Rd.– Clairemont Dr.– Balboa ave.
![Page 30: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/30.jpg)
Environmental and preliminary engineering work has been completed by MTDB
Construction will begin when MVE is complete
Opening of the Balboa LRT extension (2008)
![Page 31: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/31.jpg)
Phase TwoPhase Two
The Mid-Coast LRT Project, University City Segment extends north from Balboa Avenue through UCSD and into the University City area.
This present planning study is refining the technical and planning work on the LRT alignments in the UCSD/University City area.
![Page 32: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/32.jpg)
Depending on funding availability, the University Segment could open 2013
![Page 33: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/33.jpg)
Proposed ExtensionProposed Extension
![Page 34: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/34.jpg)
UCSDUCSD
![Page 35: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/35.jpg)
![Page 36: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/36.jpg)
CarsCars
Winter
2002
Winter
2003
Winter
2004
Gilman Dr.
5,878 6,423 6,754
Villa La Jolla Dr.
5,637 5,766 5,496
Info from UCSD parking and Transportation Services
![Page 37: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/37.jpg)
Why Our Proposed ExtensionWhy Our Proposed Extension
AccessibilityMobility Physical Factors
![Page 38: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/38.jpg)
AccessAccess
Easy accessibility for a high density community– UCSD students: 25,000– Faculty: 19,000
Connectivity b/w communities of San Diego– Better access to shopping, Restaurants, Residential
areas, High-tech employment centers
![Page 39: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/39.jpg)
Increases housing options for community of UCSD
Three major universities connected (UCSD, USD, SDSU)
![Page 40: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/40.jpg)
MobilityMobility
Increase mobility of the UCSD campus and surrounding area
Relieve traffic congestion– Interstate 5– Genesee ave.– Nobel Drive– La Jolla Village Drive
![Page 41: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/41.jpg)
Other FactorsOther Factors
Topography– Trolley can not exceed 1% grade
![Page 42: San Diego Trolley. Current Current/future expansion Propose extension](https://reader036.vdocument.in/reader036/viewer/2022062322/5697bfbc1a28abf838ca18e0/html5/thumbnails/42.jpg)
First half is on existing rails which cuts cost
Second half will consists of elevated rails and a tunnel
Line will provide benefits that will