    Healthcare organisations across Europe are

    responding to the economic crisis by improving

    internal efficiency

    Operating Model Design

    Procurement Cost Reduction

  • 7/28/2019 SAN | WS | DEM | Health Cost Reduction

    3/9

  • 7/28/2019 SAN | WS | DEM | Health Cost Reduction

    4/9

  • 7/28/2019 SAN | WS | DEM | Health Cost Reduction

    5/9

    Copyright 2013 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture.

    Copyright 2013 Accenture All Rights Reserved. Confidential Information.

    1. Patient Flow Optimisation case management model andIntegrated discharge planning Cambridge University Hospital

    2. Optimisation of Operation Theatres using Lean -Leicester University Hospital

    3. Clinical Standardisation to Reduce Procurement Costs Cambridge University Hospital

    Case Examples

  • 7/28/2019 SAN | WS | DEM | Health Cost Reduction

    6/9

    6Copyright 2013 Accenture All Rights Reserved. Confidential Information.

    Copyright 2013 Accenture All Rights Reserved. Confidential Information.

    Case Study 1Patient Flow Optimisation at Cambridge University

    Hospitals

    Client Situation

    1100 beds

    Multi-specialty,

    teachinghospital

    550m budget

    Challenges

    Multiple roles

    through the end-to-

    end acute stay

    Delays in dischargeof patients from

    acute into

    continuing care

    settings

    Cancellations of

    elective surgeries

    Objectives

    Identify the root

    causes

    Define and

    implement asustainable

    solution

    Results

    Predictable

    discharge date and

    time

    Improvedexperience

    30% reduction in

    LOS

    5.3 million saving

    More time for direct

    patient care

  • 7/28/2019 SAN | WS | DEM | Health Cost Reduction

    7/97Copyright 2013 Accenture All Rights Reserved. Confidential Information.Copyright 2013 Accenture All Rights Reserved. Confidential Information.

    Case Study 2Operating Theatre Utilisation Improvement at Leicester

    University Hospitals

    Client Situation

    ENT surgery

    costs and

    waiting listshigh

    Challenges

    Frequent late

    starts

    Low utilisation oftheatre

    Reactive,

    firefighting prior

    to day of

    surgery

    Objectives

    Identify key issues

    & root causes

    using Lean and SixSigma Analysis

    Implement a

    sustainable

    improvement in

    theatre scheduling

    Results

    Reduced cancellation

    Improved throughput

    (18% theatre capacity

    released for moreprocedures)

    Efficient portering service

    Protected teaching time

    for juniors

    Predictable theatre list

    (no firefighting)

  • 7/28/2019 SAN | WS | DEM | Health Cost Reduction

    8/98Copyright 2013 Accenture All Rights Reserved. Confidential Information.Copyright 2013 Accenture All Rights Reserved. Confidential Information.

    Program Objectives

    Develop strategy for

    each category:

    Clinical Product

    Standardisation Price

    equalisation

    Supplier

    rationalisation

    Best price

    evaluation

    Challenges

    Availability of data

    and analytical skills

    Clinical acceptance

    of new products and

    processes

    Case Study 3Smarter Procurement at Cambridge University Hospitals

    Results

    Better equipment

    Standardisation of

    working practices

    10-15% reduction in

    addressable spend

    Client Situation

    Save 7% of

    budget per

    annum whilst

    maintaining and

    improving clinical

    excellence, staff

    morale, patient

    experience, and

    reputation

  • 7/28/2019 SAN | WS | DEM | Health Cost Reduction

    9/99Copyright 2013 Accenture All Rights Reserved. Confidential Information.Copyright 2013 Accenture All Rights Reserved. Confidential Information.

    Engaged and empowered leadership

    Engagement with stakeholders (clinical and

    operational) at different levels of the project

    Enabling change with patient focus and clinicalconsensus

    Key Success Factors

    Rigorous data collection and analysis

    to drive decisions and improvements

    Using appropriate technology and IT

    to support and enable change

    Diligent and metrics driven benefits

    realisation tracking