sanitary sewer system detail drawings pdf - kalispell

13
SEWER SYSTEM CONSTRUCTION NOTES

Upload: others

Post on 22-Mar-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

SEWER SYSTEM CONSTRUCTION NOTES

AutoCAD SHX Text
SANITARY SEWER SYSTEM CONSTRUCTION NOTES: 1. ROOF DRAINS, FOUNDATION DRAINS, STORM SEWERS, SUMP PUMPS AND OTHER CLEAN WATER CONNECTIONS ROOF DRAINS, FOUNDATION DRAINS, STORM SEWERS, SUMP PUMPS AND OTHER CLEAN WATER CONNECTIONS TO THE SANITARY SEWER ARE STRICTLY PROHIBITED. 2. GRAVITY SANITARY SEWER SHALL BE SDR 35 PVC SEWER PIPE CONFORMING TO ASTM D-3034. PIPES SHALL GRAVITY SANITARY SEWER SHALL BE SDR 35 PVC SEWER PIPE CONFORMING TO ASTM D-3034. PIPES SHALL BE CONSTRUCTED MEETING THE MINIMUM PIPE SLOPE REQUIREMENTS OF MONTANA DEQ CIRCULAR 2. 3. ALL PIPE SHALL BE CAPPED OR PLUGGED AT THE END OF EACH WORK DAY. ALL PIPE SHALL BE CAPPED OR PLUGGED AT THE END OF EACH WORK DAY. 4. ALL MANHOLES AND FORCEMAIN VALVE BOXES SHALL HAVE A CONCRETE COLLAR PER CITY OF KALISPELL ALL MANHOLES AND FORCEMAIN VALVE BOXES SHALL HAVE A CONCRETE COLLAR PER CITY OF KALISPELL STANDARDS FOR DESIGN AND CONSTRUCTION. 5. SEWER FORCEMAINS SHALL BE INSTALLED WITH A 12 GAUGE SOLID CORE COPPER TONING WIRE WITH HDPE SEWER FORCEMAINS SHALL BE INSTALLED WITH A 12 GAUGE SOLID CORE COPPER TONING WIRE WITH HDPE OR HMWPE INSULATION APPROVED BY THE MANUFACTURER FOR DIRECT BURY. THE TONER WIRE SHALL BE TAPED TO THE TOP OF THE SEWER FORCEMAIN AT INTERVALS OF NO MORE THAN 5 FT. TONER WIRE SHALL BE EXTENDED TO THE SURFACE AT ALL VALVE BOXES, LIFT STATIONS, AND AT MARKER POSTS. TONER WIRE SHALL BE ACCESSIBLE AT THE SURFACE WITH A MINIMUM 3 FEET OF EXCESS WIRE. 6. ALL WATER AND SEWER CROSSINGS SHALL BE MADE AT PERPENDICULAR ALIGNMENTS. A MINIMUM OF 18 ALL WATER AND SEWER CROSSINGS SHALL BE MADE AT PERPENDICULAR ALIGNMENTS. A MINIMUM OF 18 INCHES OF OUTSIDE PIPE WALL SEPARATION MUST BE MAINTAINED. A MINIMUM OF 10 FEET OF HORIZONTAL SEPARATION MUST ME BE MAINTAINED BETWEEN SANITARY SEWER AND POTABLE WATER MAINS. 7. THE TERMINAL END OF ALL SERVICE STUBS SHALL BE MARKED WITH METAL "T" POST AS INDICATED IN THE THE TERMINAL END OF ALL SERVICE STUBS SHALL BE MARKED WITH METAL "T" POST AS INDICATED IN THE CITY OF KALISPELL STANDARDS FOR DESIGN AND CONSTRUCTION. 8. ALL GRAVITY SANITARY SEWER MAIN SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL GRAVITY SANITARY SEWER MAIN SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL PIPES SHALL BE SET AT CONSTANT GRADE AND ALIGNMENT BETWEEN MANHOLES. 9. SANITARY SEWER PIPE LINE AND APPURTENANCES SHALL BE CLEANED AND TESTED UPON COMPLETION OF SANITARY SEWER PIPE LINE AND APPURTENANCES SHALL BE CLEANED AND TESTED UPON COMPLETION OF BACKFILL OPERATIONS. ALL TESTING SHALL BE UNDER THE SUPERVISION OF THE PROJECT ENGINEER AND REPRESENTATIVE OF THE CITY OF KALISPELL PUBLIC WORKS DEPARTMENT.
AutoCAD SHX Text
SA.1

TYPICAL MANHOLE CHANNEL DETAIL

AutoCAD SHX Text
CHANNEL
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
CHANNEL
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
CHANNEL
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
CHANNEL
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
SHELF
AutoCAD SHX Text
NOTES: 1. SLOPE ALL SHELVES TO CHANNEL AT 1" PER FOOT 2. SEE PLAN-PROFILE SHEETS FOR SLOPE OF CHANNEL.
AutoCAD SHX Text
SA.2

SANITARY SEWER MANHOLE DETAIL

SECTION A-A

AutoCAD SHX Text
SA.3
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
MANHOLE NOTES: 1. ECCENTRIC MANHOLES REQUIRED ON ALL 4 FT DIAMETER MANHOLES GREATER THAN 5 FT IN ECCENTRIC MANHOLES REQUIRED ON ALL 4 FT DIAMETER MANHOLES GREATER THAN 5 FT IN OVERALL HEIGHT UNLESS SPECIFIED OTHERWISE. 2. ALL JOINTS BETWEEN MANHOLES SECTIONS, ADJUSTING RINGS, MANHOLE RING AND TOP SECTION, ALL JOINTS BETWEEN MANHOLES SECTIONS, ADJUSTING RINGS, MANHOLE RING AND TOP SECTION, AND AROUND ALL SEWER PIPE IN MANHOLE SHALL BE WATER TIGHT. JOINTING MATERIAL SHALL BE "RAM-NEK" OR EQUAL FOR ALL JOINTS EXCEPT BETWEEN SEWER PIPE AND MANHOLE WALL. 3. FIELD SET COVER TO GRADE WHEN MANHOLE IS LOCATED WITHIN A STREET OR ALLEY. FIELD SET COVER TO GRADE WHEN MANHOLE IS LOCATED WITHIN A STREET OR ALLEY. 4. SHELVES SHALL SLOPE AT 1" PER FOOT TOWARD CHANNEL. SHELVES SHALL SLOPE AT 1" PER FOOT TOWARD CHANNEL. 5. SEE 6.1.8.E OF STANDARDSSEE 6.1.8.E OF STANDARDS
AutoCAD SHX Text
EXTERIOR RUBBERIZED JOINT SEALS
AutoCAD SHX Text
PRECAST CONCRETE MANHOLE MEETING ASTM C478
AutoCAD SHX Text
ECCENTRIC CONE SECTION
AutoCAD SHX Text
ADJUSTING RINGS 2" MIN. - 12" MAX
AutoCAD SHX Text
TYPICAL MANHOLE COLLAR PER CITY OF KALISPELL CONSTRUCTION STANDARDS
AutoCAD SHX Text
MANHOLE RING AND CASTING, SEE SA.9, OR APPROVED EQUAL
AutoCAD SHX Text
CHIMNEY SEAL
AutoCAD SHX Text
DEFLECTION JOINT, TYPICAL
AutoCAD SHX Text
SLOPE SHELF AT 1 INCH PER 1 FT CHANNEL SHALL CONFORM TO SECTION 6.1.5E
AutoCAD SHX Text
RELINER STAINLESS STEEL PIPE BRACKET SECURED TO STRUCTURE WITH TWO STAINLESS BOLTS. (4' INTERVALS, MINIMUM 2)
AutoCAD SHX Text
EXTERNAL PIPE COUPLER
AutoCAD SHX Text
RELINER INSIDE DROP BOWL SECURED WITH STAINLESS STEEL FASTENERS
AutoCAD SHX Text
DEFLECTION JOINT, TYPICAL

TYPICAL SANITARY SERVICE TO EXISTING MAIN

AutoCAD SHX Text
SA.4
AutoCAD SHX Text
SANITARY SEWER MAIN
AutoCAD SHX Text
INSERTA-TEE AS APPROVED BY PUBLIC WORKS FOR EXISTING INSTALLATIONS
AutoCAD SHX Text
45° ELBOW
AutoCAD SHX Text
PVC BELL AND SPIGOT PIPE, MIN. 4", MIN SLOPE 1/4" PER 12"
AutoCAD SHX Text
SERVICE LINE CAP
AutoCAD SHX Text
5' METAL "T" POST, MIN. 3' BURIED AND 2' ABOVE GROUND, PAINT GREEN
AutoCAD SHX Text
WOOD 2" x 4"
AutoCAD SHX Text
COMPACTED BACKFILL
AutoCAD SHX Text
NOTES: : 1. NO SERVICE CONNECTIONS SHALL BE MADE AT MANHOLES.
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
PIPE BEDDING
AutoCAD SHX Text
6" ABOVE AND BELOW PIPE

TYPICAL SANITARY SEWER SERVICE STUB-OUT

AutoCAD SHX Text
SA.5
AutoCAD SHX Text
SANITARY SEWER MAIN
AutoCAD SHX Text
IN LINE WYE FOR NEW INSTALLATIONS, AS APPROVED BY ENGINEER FOR EXISTING INSTALLATIONS
AutoCAD SHX Text
45° ELBOW
AutoCAD SHX Text
PVC BELL AND SPIGOT PIPE, MIN. 4", MIN SLOPE 1/4" PER 12"
AutoCAD SHX Text
SERVICE LINE PLUG
AutoCAD SHX Text
5' METAL "T" POST, MIN. 3' BURIED AND 2' ABOVE GROUND, PAINT GREEN
AutoCAD SHX Text
WOOD 2" x 4"
AutoCAD SHX Text
COMPACTED BACKFILL
AutoCAD SHX Text
EXTEND BEYOND PROPERTY LINE AND UTILITY EASEMENT
AutoCAD SHX Text
NOTES: : 1. NO SERVICE CONNECTIONS SHALL BE MADE AT MANHOLES.

TYPICAL SEWER MANHOLE MARKER POST

WARNING

SEWER

MANHOLE

BEFORE DIGGINGIN THIS AREA

CALL

AutoCAD SHX Text
SA.6
AutoCAD SHX Text
NOTES: : 1. SEWER TRIVIEW MARKER POSTS SHALL BE INSTALLED FOR ALL MANHOLES LOCATED OUTSIDE OF PAVED OR GRAVEL AREAS.
AutoCAD SHX Text
TYPICAL MANHOLE COLLAR PER CITY OF KALISPELL CONSTRUCTION STANDARDS
AutoCAD SHX Text
TRIVIEW 3 FACE FLEXIBLE MARKER POST GREEN IN COLOR, MARKED SEWER

TYPICAL FORCEMAIN VALVE SECTION DETAIL

AutoCAD SHX Text
SA.7
AutoCAD SHX Text
RESILIENT SEAT, ECCENTRIC PLUG VALVE, WITH STANDARD SQ. WRENCH NUT, SEE PLAN FOR SIZE
AutoCAD SHX Text
CAST IRON, 3 PIECE SLIP VALVE BOX, TYLER 6865 SERIES, OR APPROVED EQUAL MARKED SEWER
AutoCAD SHX Text
COIL TONING WIRE TO INTERIOR OF VALVE BOX
AutoCAD SHX Text
DETECTABLE WARNING TAPE, MIN. 3" IN WIDTH, APWA COLORS
AutoCAD SHX Text
SANITARY SEWER FORCEMAIN,
AutoCAD SHX Text
NOTES: : 1. VALVES 6" AND LARGER SHALL HAVE WORM GEAR VALVES 6" AND LARGER SHALL HAVE WORM GEAR REDUCTION ACTUATOR WITH 2" SQUARE NUT. 2. VALVES INSTALLED WITH WORM GEAR SHALL FLOW VALVES INSTALLED WITH WORM GEAR SHALL FLOW ENTERING SEAT END OF VALVE AND THE PLUG BEING UP IN OPEN POSITION.
AutoCAD SHX Text
TYPICAL VALVE COLLAR PER CITY OF KALISPELL CONSTRUCTION STANDARDS

FORCEMAIN DISCHARGE MANHOLE DETAIL

AutoCAD SHX Text
SA.8
AutoCAD SHX Text
45° BEND WITHPLAIN END, ROTATE IN DIRECTION OF FLOWLINE
AutoCAD SHX Text
FORM SMOOTH CONCRETE CHANNEL TO MANHOLE OUTFALL
AutoCAD SHX Text
FORCEMAIN
AutoCAD SHX Text
FORCEMAIN
AutoCAD SHX Text
STAINLESS STEEL PIPE ANCHOR, DRILL INTO CONCRETE AND EPOXY
AutoCAD SHX Text
AIR VENT RISER
AutoCAD SHX Text
CONCRETE RETRAINING COLLAR FOR HDPE FORCEMAINS
AutoCAD SHX Text
CONCRETE RETRAINING COLLAR FOR HDPE FORCEMAINS
AutoCAD SHX Text
DR 11 HDPE PIPE, OR COATED DI PIPE
AutoCAD SHX Text
FLEXIBLE JOINT BOOT
AutoCAD SHX Text
FLEXIBLE JOINT BOOT
AutoCAD SHX Text
COAT ALL INTERIOR SURFACES OF CONCRETE MANHOLE WITH 100% SOLIDS HIGH BUILD CHEMICAL RESISTANT EPOXY TO RESIST HYDROGEN SULFIDE ATTACK AS APPROVED BY PUBLIC WORKS
AutoCAD SHX Text
EXTERIOR RUBBERIZED JOINT SEALS
AutoCAD SHX Text
CHIMNEY SEAL
AutoCAD SHX Text
6" OF 3" MINUS CRUSH COMPACTED

SANITARY MANHOLE COVER

00377163

3771A1

COVER SECTION

COVER BACK

HEAVY DUTY

MANHOLE COVER

UNDIPPED

SA

NI TARY SEW

ER

CIT

Y OF KAL ISPELL

PICKHOLE DETAIL

AutoCAD SHX Text
SA.9
AutoCAD SHX Text
LOAD RATING
AutoCAD SHX Text
www.ejiw.com
AutoCAD SHX Text
800-626-4653
AutoCAD SHX Text
COATING
AutoCAD SHX Text
MATERIAL SPECIFICATION
AutoCAD SHX Text
PRODUCT NUMBER
AutoCAD SHX Text
CATALOG NUMBER
AutoCAD SHX Text
REFERENCE INFORMATION
AutoCAD SHX Text
GAD
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
LAST REVISED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
07/03/08
AutoCAD SHX Text
N/A
AutoCAD SHX Text
OPEN AREA
AutoCAD SHX Text
MADE IN USA
AutoCAD SHX Text
2007
AutoCAD SHX Text
CONFIDENTIAL: This drawing is the property of East Jordan Iron Works, Inc. and embodies confidential information, trade secret information, and/or know how that is the property of East Jordan Iron Works, Inc. C Copyright East Jordan Iron Works, Inc.
AutoCAD SHX Text
DESIGNATES MACHINED
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
COVER - GRAY IRON
AutoCAD SHX Text
ASTM A48 CL35B
AutoCAD SHX Text
00377720.1C 00377161.LO 00377123.1D
AutoCAD SHX Text
00377163
AutoCAD SHX Text
3771A1
AutoCAD SHX Text
1" LETTERING (RECESSED FLUSH)
AutoCAD SHX Text
1" LETTERING (RECESSED FLUSH)
AutoCAD SHX Text
(2) PICKHOLES (SEE DETAIL)

TYPICAL EXTERIOR GREASE INTERCEPTOR

AutoCAD SHX Text
SEE SAMPLE PORT DETAIL SA.12
AutoCAD SHX Text
NOTES: 1. INFLUENT LINE INFLUENT LINE 2. 6" DIAMETER VENT SLEEVE 6" DIAMETER VENT SLEEVE 3. MINIMUM 24" OPENING WITH RING AND LID MINIMUM 24" OPENING WITH RING AND LID 4. PRIMARY CHAMBER INLET PIPING (MUST EXTEND TO 50% OF PRIMARY CHAMBER INLET PIPING (MUST EXTEND TO 50% OF THE OPERATING LEVEL) 5. PRIMARY CHAMBER OUTLET PIPING (MUST EXTEND TO 18" FROM PRIMARY CHAMBER OUTLET PIPING (MUST EXTEND TO 18" FROM BOTTOM OF CHAMBER) 6. SECONDARY CHAMBER INLET PIPING (MUST EXTEND TO 50% OF SECONDARY CHAMBER INLET PIPING (MUST EXTEND TO 50% OF THE OPERATING LEVEL) 7. SECONDARY CHAMBER OUTLET PIPING (MUST EXTEND TO 18" SECONDARY CHAMBER OUTLET PIPING (MUST EXTEND TO 18" FROM BOTTOM OF CHAMBER) 8. GREASE INTERCEPTOR DISCHARGE LINE GREASE INTERCEPTOR DISCHARGE LINE 9. SAMPLE PORT SAMPLE PORT 10. SAMPLE PORT RING AND LID SAMPLE PORT RING AND LID 11. SAMPLE PORT DISCHARGE LINE TO CITY'S SANITARY SEWER SAMPLE PORT DISCHARGE LINE TO CITY'S SANITARY SEWER 12. PRIMARY CHAMBER (2/3 TOTAL VOLUME) PRIMARY CHAMBER (2/3 TOTAL VOLUME) 13. SECONDARY CHAMBER (1/3 TOTAL VOLUME) SECONDARY CHAMBER (1/3 TOTAL VOLUME) 14. BAFFLE BAFFLE 15. GREASE INTERCEPTOR OPERATING LEVEL GREASE INTERCEPTOR OPERATING LEVEL 16. PIPE SUPPORT PIPE SUPPORT FOR MORE INFORMATION, CONTACT THE INDUSTRIAL PRETREATMENT COORDINATOR'S OFFICE AT 406-758-7817
AutoCAD SHX Text
SA.10

INTERIOR GREASE INTERCEPTOR

AutoCAD SHX Text
SINK
AutoCAD SHX Text
GREASE INTERCEPTOR
AutoCAD SHX Text
VENTED FLOW RESTRICTOR
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
VENTED FLOW RESTRICTOR
AutoCAD SHX Text
VENT
AutoCAD SHX Text
CONCRETE PIT
AutoCAD SHX Text
BELL FITTING TO PROVIDE AIR GAP
AutoCAD SHX Text
FLOOR SINK
AutoCAD SHX Text
SA.11
AutoCAD SHX Text
INTERIOR ABOVE GRADE GRADE INTERCEPTOR
AutoCAD SHX Text
INTERIOR BELOW GRADE GRADE INTERCEPTOR
AutoCAD SHX Text
TO APPROVED SAMPLE PORT
AutoCAD SHX Text
TO APPROVED SAMPLE PORT
AutoCAD SHX Text
GREASE INTERCEPTOR

EXTERIOR GREASE, SAND & OIL INTERCEPTORS

SAMPLE PORT DESIGN & MATERIALS

AutoCAD SHX Text
FRONT
AutoCAD SHX Text
SIDE
AutoCAD SHX Text
TOP
AutoCAD SHX Text
NOTES: 1. SAMPLE PORT RING AND LID SAMPLE PORT RING AND LID 2. GREASE INTERCEPTOR DISCHARGE LINE GREASE INTERCEPTOR DISCHARGE LINE 3. PIPE PENETRATION (EXTEND 1" PAST PIPE PENETRATION (EXTEND 1" PAST THE INSIDE WALL OF THE SAMPLE PORT - MUST BE SEALED TO PREVENT LEAKS. IF USING PVC, A SADDLE MUST BE USED) 4. GROUT (SLOPED TO WASTEWATER GROUT (SLOPED TO WASTEWATER CHANNEL - THE SAMPLE PORT MUST DRAIN COMPLETELY AND NOT HOLD WATER) 5. SAMPLE PORT DISCHARGE LINE TO SAMPLE PORT DISCHARGE LINE TO CITY'S SANITARY SEWER
AutoCAD SHX Text
SA.12
AutoCAD SHX Text
EXTERIOR GREASE, SAND & OIL INTERCEPTOR AND SAMPLE PORT REQUIREMENTS MATERIALS TRAFFIC RATED LOCATIONS 1. CONCRETE GRADE RINGS - 4,000 PSI MINIMUM CONCRETE GRADE RINGS - 4,000 PSI MINIMUM 2. REINFORCED CONCRETE PIPE - 4,000 PSI MINIMUM REINFORCED CONCRETE PIPE - 4,000 PSI MINIMUM NON-TRAFFIC RATED LOCATIONS 1. CONCRETE GRADE RINGS - 4,000 PSI MINIMUM CONCRETE GRADE RINGS - 4,000 PSI MINIMUM 2. HDPE GRADE RINGS HDPE GRADE RINGS 3. BLACK DOUBLE WALL CORRUGATED HDPE PIPE BLACK DOUBLE WALL CORRUGATED HDPE PIPE GROUT AND SEALANTS 1. RAM-NECK OR APPROVED EQUIVALENT MUST BE USED TO SEAL BETWEEN THE RAM-NECK OR APPROVED EQUIVALENT MUST BE USED TO SEAL BETWEEN THE GREASE INTERCEPTOR LID, EACH GRADE RING AND THE MANHOLE RING 2. THE FIRST GRADE RING MUST BE GROUTED TO THE INTERCEPTOR LID. THE FIRST GRADE RING MUST BE GROUTED TO THE INTERCEPTOR LID. COMPOSITE, POLYETHYLENE, AND FIBERGLASS INTERCEPTORS 1. THESE INTERCEPTORS CAN ONLY USE MANUFACTURER SUPPLIED MANHOLE AND THESE INTERCEPTORS CAN ONLY USE MANUFACTURER SUPPLIED MANHOLE AND INSPECTION PORT RISERS. 2. IF LOCATED IN TRAFFIC AREAS, MEASURES MUST BE PUT IN PLACE TO MEET IF LOCATED IN TRAFFIC AREAS, MEASURES MUST BE PUT IN PLACE TO MEET HS-20 LOADINGS FOR ALL APPLICABLE AREAS OF THE SYSTEM. SAMPLE PORTS 1. ALL INTERCEPTORS ARE TO BE INSTALLED WITH A SAMPLING PORT THAT RECEIVES ALL INTERCEPTORS ARE TO BE INSTALLED WITH A SAMPLING PORT THAT RECEIVES FLOW FROM THE INTERCEPTOR'S EFFLUENT. 2. TEE PIPING ON THE INTERCEPTOR'S INTERIOR WILL NOT SUFFICE AS A SAMPLE TEE PIPING ON THE INTERCEPTOR'S INTERIOR WILL NOT SUFFICE AS A SAMPLE PORT. 3. SAMPLE PORTS MUST BE LOCATED IN AREAS PROTECTED FORM VEHICLE TRAFFIC. SAMPLE PORTS MUST BE LOCATED IN AREAS PROTECTED FORM VEHICLE TRAFFIC. 4. SAMPLE PORTS ARE TO BE CLEANED AND INSPECTED DURING ROUTINE SAMPLE PORTS ARE TO BE CLEANED AND INSPECTED DURING ROUTINE INTERCEPTOR PUMPING 5. SAMPLE PORTS WILL HAVE A MINIMUM 10" DIAMETER ACCESS COVER. SAMPLE PORTS WILL HAVE A MINIMUM 10" DIAMETER ACCESS COVER. 6. SAMPLE PORTS WILL HAVE A MINIMUM 6" DROP BETWEEN INLET AND DISCHARGE SAMPLE PORTS WILL HAVE A MINIMUM 6" DROP BETWEEN INLET AND DISCHARGE PIPING 7. SAMPLE PORTS MUST DRAIN COMPLETELY AND NOT HOLD WATER. BOTTOM TO BE SAMPLE PORTS MUST DRAIN COMPLETELY AND NOT HOLD WATER. BOTTOM TO BE GROUTED AND SLOPED. 8. INLET PIPE PENETRATION MUST EXTEND 1" PAST THE INSIDE WALL OF THE INLET PIPE PENETRATION MUST EXTEND 1" PAST THE INSIDE WALL OF THE SAMPLE PORT. PENETRATIONS ARE TO BE SEALED TO PREVENT LEAKS.

TYPICAL SAND/OIL SEPARATOR

AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
ELEVATION VIEW
AutoCAD SHX Text
SA.13
AutoCAD SHX Text
NOTES: 1. INFLUENT LINE INFLUENT LINE 2. 6" DIAMETER VENT SLEEVE 6" DIAMETER VENT SLEEVE 3. MINIMUM 24" OPENING WITH RING AND LID MINIMUM 24" OPENING WITH RING AND LID 4. PRIMARY CHAMBER INLET PIPING (MUST EXTEND TO 50% OF THE PRIMARY CHAMBER INLET PIPING (MUST EXTEND TO 50% OF THE OPERATING LEVEL) 5. PRIMARY CHAMBER OUTLET PIPING (MUST EXTEND TO 33% OF THE PRIMARY CHAMBER OUTLET PIPING (MUST EXTEND TO 33% OF THE OPERATING LEVEL) 6. SECONDARY CHAMBER OUTLET PIPING (MUST EXTEND TO 50% OF THE SECONDARY CHAMBER OUTLET PIPING (MUST EXTEND TO 50% OF THE OPERATING LEVEL) 7. SAND & OIL INTERCEPTOR DISCHARGE LINE SAND & OIL INTERCEPTOR DISCHARGE LINE 8. SAMPLE PORT (MINIMUM 10" DIAMETER, PROVIDE A 6" VERTICAL DROP SAMPLE PORT (MINIMUM 10" DIAMETER, PROVIDE A 6" VERTICAL DROP - SEE DETAIL WW5) 9. SAMPLE PORT RING AND LID SAMPLE PORT RING AND LID 10. SAMPLE PORT DISCHARGE LINE TO CITY'S SANITARY SEWER SAMPLE PORT DISCHARGE LINE TO CITY'S SANITARY SEWER 11. PRIMARY CHAMBER (2/3 TOTAL VOLUME) PRIMARY CHAMBER (2/3 TOTAL VOLUME) 12. SECONDARY CHAMBER (1/3 TOTAL VOLUME) SECONDARY CHAMBER (1/3 TOTAL VOLUME) 13. BAFFLE BAFFLE 14. OPERATING LEVEL OPERATING LEVEL 15. PIPE SUPPORT PIPE SUPPORT FOR MORE INFORMATION, CONTACT THE INDUSTRIAL PRETREATMENT COORDINATOR'S OFFICE AT 406-758-7817
AutoCAD SHX Text
SEE SAMPLE PORT DETAIL SA.12