SANTA CRUZ HIGH SCHOOLSanta Cruz City Schools Master Plan
Existing building renovationRemodel existing buildings: new interior finishes (flooring, tackboard, ceilings, paint), new lighting and new cabinetry
School furnishingsNew furnishings at all new and remodeled spaces
HVAC systemInstall new campus-wide HVAC system
Utility infrastructureSite utility replacement/refurbishment; sewer, water, gas, storm sewer
Paint exterior of schoolPaint the entire exterior of all permanent buildings
Re-roof existing schoolRe-roof all existing permanent buildings
Landscape and irrigation improvementsReplace all landscaping with water efficient irrigation system and drought tolerant plants
Upgrade stadium turfReplace existing turf on football field with synthetic turf
Provide new pool buildingConstruct new pool building with locker/changing area, restrooms and storage
Athletic fields concessions and restroom buildingProvide 2 new snack bar/restroom buildings near athletic fields (baseball/football)
Install lighting at parking and trackInstall lighting in parking lot and at the track for improved safety and security
Renovate kitchen and cafeteriaImprove for student and community use
Renovate science labsReplace all finishes, lighting and install new science lab cabinetry, plumbing and equipment
Reconfigure gymReconfigure Gym for improved foyer/entry, concessions and restrooms structure