Santa Maria River Bridges Widening. Project Location. Project Goals. Increase capacity Allow room for more cars Improve operational efficiency Make maneuvering between lanes easier Increase safety The collision rate is twice the statewide average. Project Need. High traffic count - PowerPoint PPT PresentationTRANSCRIPT
Santa Maria River Bridges Widening
Project Location
Project Goals
Increase capacity– Allow room for more cars
Improve operational efficiency– Make maneuvering between lanes easier
Increase safety– The collision rate is twice the statewide average
Project Need
High traffic count
Narrow shoulders
Short on-ramps
Lack of bike facility
Better link between Rtes 135 and 166
Project Purpose
Add additional lanes
Widen shoulders
Increase length of on & off-ramps
Add bike lane
Improve connection between Rtes 135 & 166
Project Description
Widening: Inside and outside of existing bridges– Three 12 foot lanes in each direction– 10 foot inside and outside shoulders
Bike path: – Completely separated from traffic by concrete barrier– next to SB lanes – Connections:
• South end: connects to levee trail• North end: veers west to connect Hutton Road
Schedule
– Begin Construction• Fall 2011
– Complete Construction• Spring 2014
Construction Costs
Anticipated Construction Costs:– Contractor: Flatiron West Inc.– Contract Amount: $30.9 million