sap bi-a

41
] SHERRYANNE MEYER [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 ANUP MAHESHWARI [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2008 AJAY VONKARERY [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 How PG&E implemented SAP BI-A and did performance tuning Darin Lemos PG&E Bjarne Berg Director SAP BI Comerit Inc.

Upload: cbap

Post on 24-May-2015

2.955 views

Category:

Documents


2 download

DESCRIPTION

To give your and intro to the benefits with SAP BI-A

TRANSCRIPT

Page 1: SAP BI-A

]

SHERRYANNE MEYER[ASUG INSTALLATION MEMBER MEMBER SINCE: 2000

ANUP MAHESHWARI[ASUG INSTALLATION MEMBER MEMBER SINCE: 2008

AJAY VONKARERY[ASUG INSTALLATION MEMBER MEMBER SINCE: 1999

How PG&E implemented SAP BI-A and did performance tuning

Darin LemosPG&E

Bjarne BergDirector SAP BI

Comerit Inc.

Page 2: SAP BI-A

Real Experience. Real Advantage.

[

2

Learning Points

See a practical example from PG&E and understand what you can expect on your implementation

Learn how BI-A works

Explore benefits and limitations of the tool

Page 3: SAP BI-A

Real Experience. Real Advantage.

[

3

Agenda

Introduction Pacific Gas & Electric Project Overview What is SAP BI-A

Overview Building aggregates Benefits

How we implemented BI-A Sizing the environment Team organization and project plan Testing

BI-A Limitations PG&E - Our top-10 Lessons Learned Wrap-up

Page 4: SAP BI-A

Real Experience. Real Advantage.

[

4

 We will look what SAP NetWeaver BI Accelerator can—and cannot—do to optimize dashboard performance.

Explore how we PG&E planned, and implemented SAP NetWeaver BI Accelerator.

Examine performance benchmarks for SAP NetWeaver BI Accelerator

Explore the top 10 lessons learned from the project team and see a sample work plan and an organization chart from this project as a reference for your own SAP NetWeaver BI Accelerator initiative…

In this session.

Page 5: SAP BI-A

Real Experience. Real Advantage.

[

5

Agenda

Introduction Pacific Gas & Electric Project Overview What is SAP BI-A

Overview Building aggregates Benefits

How we implemented BI-A Sizing the environment Team organization and project plan Testing

BI-A Limitations PG&E - Our top-10 Lessons Learned Other Query Performance tricks Wrap-up

Page 6: SAP BI-A

Real Experience. Real Advantage.

[

6

PG&E Company Overview

 Pacific Gas and Electric Company, incorporated in California in 1905, is one of the largest combination natural gas and electric utilities in the United States.

There are approximately 20,000 employees who carry provide natural gas and electric service to 15 million people throughout a 70,000-square-mile service area in northern and central California.

Page 7: SAP BI-A

Real Experience. Real Advantage.

[

7

PG&E Company Overview

SAP since 1996

Currently on SAP ERP 4.72, upgrade to ECC 6.0 in 2009

8,500 users for all back office and field operations–Finance/Controlling–HR Org/Benefits/Personnel/Payroll–Employee Self Service: 20,000 employees; 18,000 retirees–Manager Self Service–Supply Chain Management --Materials Management &

Supplier Relationship Management–Equipment/Work Order Management in Plant Maintenance–Business Warehouse

First major go live was a 50,000 person day project in October 2007

Page 8: SAP BI-A

Real Experience. Real Advantage.

[

8

PG&E SAP Project Overview

Aug 04 - Nov 04 Feb 05 – Oct 05 Nov 05 – Sep 06

Roadmap Phase

• Vision and Strategy• “To-be” business capabilities• Build business case for change

Design Phase

• Design Level 1 and Level 2 processes

• Application architecture• Design “To be” organization

to enable future business processes and technology

Detailed Design Phase

• Design the foundation for the deployment of new processes and tools

• Design SAP customizations• Design training and performance support

Oct 06 –

Foundational Release: Build, Test, and Deployment Phases

• Build Customizations• Build Procedures and Training• Convert master and transactional data• Assembly Test• Product Test • Deployment

Page 9: SAP BI-A

Real Experience. Real Advantage.

[

9

PG&E Project Scope - EAM WRM

Financials(FI)

Account number and budget information

Work Management

(PM)

Asset Management

(PM)

Resource Management & Scheduling Tool

(e.g. CLICK)

Customer web application

Short Cycle Mobile

Supply Chain(MM)

As builts, material reqs, s’ment rules

CUs and design standards

IGISGIS work initiation

Design / Work Order

Initiate Request

Plan & Design

Resource Management and

Scheduling

Perform and Close

WR

M_I

_14

Des

ign

and

asse

t dat

a

Wor

k or

der t

asks

Pla

n an

d fo

reca

st D

ata

Employee skills and availability master data updates

Planned maintenance and inspection

SAP

Sta

tus

chan

ges

& u

pdat

es

Sta

tus

chan

ges

HR

Material availability & Service Contracts

Project Systems(SAP PS)

Time reporting / payroll

Large capital projects

CATS

Contracts / Non Energy Bills

(SD)

Customer contracts

Wor

k st

atus

& c

lose

/ca

ncel

Mark and Locate

Initi

ate

NB

/WR

O

Wor

k

Initi

ate

Cas

e ID

Wor

k ca

ncel

latio

n

WR

M_I

_15

Des

ign

and

asse

t dat

a

Initiate M&L work

FLEETTBD

Lock appt on schedule

User Appt Availability

Graphic Work Design Tool(e.g. ITRON)

Outage

Customer Billing System

GIS

Application for Service

Page 10: SAP BI-A

Real Experience. Real Advantage.

[

10

PG&E Project - Scope and Modules

SAP Modules & Versions

PG&E has used SAP for almost 10 years in various forms

R/3 4.7 utilized- (PM, PS, MM, SD,SRM) Modifications to existing FI and HR-CATS functionality Integration with third party applications:

ClickSoftware (ClickPlan, & ClickSchedule), ITRON LD-Pro and ESRI GIS

SAP BI 7.0

Impacted Audience

8,500 (1,500 core EAM, rest for supply chain)

Page 11: SAP BI-A

Real Experience. Real Advantage.

[

11

PG&E Project Benefits

Page 12: SAP BI-A

Real Experience. Real Advantage.

[

12

PG&E Project BW and History - Performance Needs

Delivering High Performance Analytics to a potential user community of 8,500 users requires special considerations for design, technical architecture and hardware.

I the spring of 2008, PG&E therefore started an examination of BI-A as potential tool for increasing performance of the financial dashboards in SAP BI.

The scope of this effort was primarily finance, but the benefits were also intended to benefit a larger user community.

Delivering High Performance Analytics to a potential user community of 8,500 users requires special considerations for design, technical architecture and hardware.

I the spring of 2008, PG&E therefore started an examination of BI-A as potential tool for increasing performance of the financial dashboards in SAP BI.

The scope of this effort was primarily finance, but the benefits were also intended to benefit a larger user community.

Page 13: SAP BI-A

Real Experience. Real Advantage.

[

13

Agenda

Introduction Pacific Gas & Electric Project Overview What is SAP BI-A

Overview Building aggregates Benefits

How we implemented BI-A Sizing the environment Team organization and project plan Testing

BI-A Limitations PG&E - Our top-10 Lessons Learned Wrap-up

Page 14: SAP BI-A

Real Experience. Real Advantage.

[

14

Why BI-A? Disk speed is growing slower than other HW components

In-memory data stores

Multi-channel UI, high event volume, cross industry value chains

Application-aware and intelligent data management

Disk based data storage

Simple consumption of apps (Fat client UI, EDI)

General-purpose, application-agnostic database

1990 2009

Architectural Drivers

Improvement20091990

216 Addressable Memory

425x8.51MB/$

0.02MB/$

Memory

166x8.30MIPS/$

0.05MIPS/$

CPU

Technology Drivers

400MBPS

5MBPS

Disk

Data Transfer

80x

100 x10Gbps

100Mbps

Network Speed

264 248x

Source: 1990 numbers SAP AG

2009 numbers Dr. Berg

Physical hard drive speeds only grew by 80 times since 1990. All other hardware components grew faster.

Page 15: SAP BI-A

Real Experience. Real Advantage.

[

15

BI Accelerator Works by Indexing InfoCubes in Hardware memory

BI Accelerator has been simple to install and operate for established SAP BI teams

You use process chains to maintain the BI-A engine after each data load

IBM, Sun, HP & Fujitsu have standard solutions ranging from $32K to $300K+

that can be installed and tested in as little as 2-4 weeks (+ SAP license fees)

SAP

BW

Any

tool

32 GB Blades are certified by SAP

Page 16: SAP BI-A

Real Experience. Real Advantage.

[

16

BI Analytical Engine’s Query executing priorities

Query ExecutionWithout BI Accelerator

Query ExecutionWithout BI Accelerator

Query ExecutionWith BI Accelerator

Query ExecutionWith BI Accelerator

Information Broadcasting /Precalculation

Information Broadcasting /Precalculation

Query CacheQuery Cache

AggregatesAggregates

InfoProviderInfoProvider

Information Broadcasting /Precalculation

Information Broadcasting /Precalculation

Query CacheQuery Cache

SAP NetWeaver BI AcceleratorSAP NetWeaver BI Accelerator

Aggregates can be replaced with BI-A, while the memory cache is still useful.

Page 17: SAP BI-A

Real Experience. Real Advantage.

[

17

BIA Currently reads data from InfoCubes. DSOs & InfoObjects are still read from base/physical tables (even when the InfoObject is indexed as part of master data).

Performance is Near-Linear: Benchmarks

BIA’s strength resides in its near-linear scalability

Performance is measured in terms of:

1. BI-A index creation time

2. Multi-user throughput per hour

3. Average report response time

4. Average number of records touched by each report

Page 18: SAP BI-A

Real Experience. Real Advantage.

[

18

Many companies, have spent 2-5 days in BIA training (total for 1-2 administrators) and a work through a single interface:

RSDDBIAMON (Checks available at: RSRV)

Most customers have found BIA Admin to be minimal

The training & admin to run BI Accelerator has proven to

be minimal. Training is included in the SAP courses:

BW310, BW360 and in the online course BW361

In the past, SAP has also offered a 2 day workshop called “BI Upgrade & Accelerator” (WNABIA)

Page 19: SAP BI-A

Real Experience. Real Advantage.

[

19

Agenda

Introduction Pacific Gas & Electric Project Overview What is SAP BI-A

Overview Building aggregates Benefits

How we implemented BI-A Sizing the environment Team organization and project plan Testing

BI-A Limitations PG&E - Our top-10 Lessons Learned Wrap-up

Page 20: SAP BI-A

Real Experience. Real Advantage.

[

20

SAP has integrated key sizing parameters for BIA in the new QuickSizer. You can give it a try at: http://service.sap.com/quicksizer

Sizing was critical, but good tools were available to help

Customer with existing BI systems and data loaded can get good sizing estimates by running the SAP program available in SAP Note: 917803

Page 21: SAP BI-A

Real Experience. Real Advantage.

[

21

The hardware implementation is done by the vendors. Be prepared for lead times on delivery of large systems (Made-to-Order is common).

Some Hardware options we looked at

Operating Systems and StorageSUSE Linux 64-bit, Intel basedMemory based and file storage (no database for Accelerator)

Available Hardware PlatformsHP (HP ProLiant and HP StorageWorks)IBM (IBM Blade Center and IBM Total Storage)FujitsuSiemens (FSC Blade Server and EMC Storage)SUN Microsystems (SUN Blade Server and StorageTek)

Page 22: SAP BI-A

Real Experience. Real Advantage.

[

22

We found that the BIA should be sized for critical applications. Most companies use BIA only for Production, while others have a complete landscape

PG&E - Our Initial Hardware sizing (July 2008)Environment Area Recommended size IBM example*Production Blade servers 14 Blades BladeCenter HS21 -8853G6U Production Memory 2x8 GB (2x4) DDR2 total 16 GB 39M5797Production Processors 2 x Quad Core Intel Xeon Processor 2 x Quad Core Intel Xeon Processor Production Processor speed 3.00 GHz+ 3.00 GHzProduction Network cards 2 x Gigabit Cisco cards 32R1760Production External storage Dedicated disks (500 GB+) DS-4800Production File system General Parallel file system (GPFS) GPFSProduction Chassis 14 blades capacity H-series (rack-mount/9U) 88524XU QA Blade servers 14 Blades BladeCenter HS21 -8853G6U QA Memory 2x8 GB (2x4) DDR2 total 16 GB 39M5797QA Processors 2 x Quad Core Intel Xeon Processor 2 x Quad Core Intel Xeon Processor QA Processor speed 3.00 GHz+ 3.00 GHzQA Network cards 2 x Gigabit Cisco cards 32R1760QA External storage Dedicated disks (500 GB+) DS-4800QA File system General Parallel file system (GPFS) GPFSQA Chassis 14 blades capacity H-series (rack-mount/9U) 88524XU Development Blade servers 4 Blades BladeCenter HS21 -8853G6U Development Memory 2x8 GB (2x4) DDR2 total 16 GB 39M5797Development Processors 2 x Quad Core Intel Xeon Processor 2 x Quad Core Intel Xeon Processor Development Processor speed 3.00 GHz+ 3.00 GHzDevelopment Network cards 2 x Gigabit Cisco cards 32R1760Development External storage Dedicated disks (300 GB+) DS-4800Development File system General Parallel file system (GPFS) GPFSDevelopment Chassis 14 blades capacity H-series (rack-mount/9U) 88524XU

Page 23: SAP BI-A

Real Experience. Real Advantage.

[

23

PG&E - Our Query Performance Improvments

QueriesCurrent

performance (seconds)

With BIA

Improvement

CS Expense - 5 Year History 169.25 14.54 1064%Charges to Partners via Orders - Units 243.40 21.37 1039%Charges to Partners via Orders $ 171.39 18.28 838%Std Cst Var - PCC Count 136.84 15.72 770%ActPlan vs Target by MWC - Summary 179.09 21.25 743%BU Expense - 5 Year History 201.90 25.23 700%CR - Expense Order Cost In 166.37 24.59 577%Labor Cost In Hours 84.66 14.39 488%24 Month Rolling FC - Amounts 173.60 29.82 482%ActPlan vs Target by MWC - Expense 122.91 21.40 474%SR_RCC_Order Costs by Planning and Actual Orders 171.31 29.86 474%Labor Prod ST Hours 91.01 18.12 402%CWIP - LOB 45.06 9.43 378%Paid OT Hours 83.37 17.55 375%ActPlan vs Target by MWC - Non Earnings 96.28 23.52 309%PCC Labor $/Qty by CE, Plan, Act - Mid-Year 69.32 17.73 291%ActPlan vs Target by MWC - OBS 107.86 28.58 277%CR - PCC Costs Billed Out 163.16 45.07 262%Annual Amt by MWC 100.94 28.18 258%Monthly Run Rate vs Annual EOY 98.82 29.56 234%Monthly Run Rate by Primary Cost Elem 62.01 19.35 220%Activity Price Report (KSBT) 52.59 17.52 200%PCC Non-Labor $ by CE, Plan, Act - Mid-Year 32.99 11.44 188%Month/YTD/Annual Amt by MWC 76.94 28.46 170%Actual Cost Line Items for Cost Centers (Material & Service) 24.48 9.55 156%CR - PCC Costs 62.43 24.49 155%ActPlan vs Target by MWC - Capital 108.49 42.84 153%CR - PCC Costs Billed Out to CC 46.38 18.86 146%Order: Actuals since Inception 25.87 11.09 133%Paid Labor Hours (excludes Overtime) 27.39 11.83 132%SR_PCC Costs_In_Out - Graph 42.83 18.98 126%Actual Cost Line Items for Orders (Other CO Postings) 36.18 16.51 119%Actual Cost Line Items for Cost Centers (Non-PO Invoices) 24.60 11.34 117%Billable Hours 26.55 12.54 112%PCC Std Cst Var Plan - Mid-Year 21.98 10.60 107%PCC Billable Hrs, $ by Actv, Plan, Act - Mid-Year 20.51 10.09 103%

The slowest queries that spent most of their time on the database side benefited the most

Overall 36 of 70 queries were at least twice as fast….

Page 24: SAP BI-A

Real Experience. Real Advantage.

[

24

PG&E - Our Query Performance Improvments

58 of 70 queries were at least 50% faster

Before BIA the average query execution took 58.8 seconds, after BIA the average query took 17.9 seconds

(295% faster).

QueriesCurrent

performance (seconds)

With BIA

Improvement

Actual Cost Line Items for Cost Centers (CATS & Order Confm) 21.17 10.74 97%Actual Cost Line Items for Cost Centers (Other FI Postings) 38.13 19.44 96%Summary Removal Costs 11.36 5.90 93%Cost Report by Order/Cost Element (PORR/PORY) 63.62 33.55 90%SR_PCC Costs by Cost In and Cost Out 34.33 18.28 88%SR_PCC Costs by Cost In and Cost Out 34.33 18.34 87%SR_PCC Costs_In_Out - Graph 17.00 9.19 85%PCC Activity Prices 16.66 9.18 81%Spend - Tracked/Not Tracked 14.79 8.23 80%Savings % 8.23 4.58 80%Actual Cost Line Items for Orders (NEBS) 32.81 18.35 79%Actual Cost Line Items for Orders (Material & Service) 30.41 17.12 78%PCC Detail Planning Report (KSBL) 49.62 28.09 77%Actual Cost Line Items for Orders (Other FI Postings) 32.81 18.86 74%PCC Headcount by Month - Classification 21.39 12.34 73%SR_PCC Costs by Cost In and Cost Out - 12 Months 17.66 10.51 68%Actual Cost Line Items for Orders (Non-PO Invoices) 27.19 16.25 67%Actual Cost Line Items for Cost Centers (Other CO Postings) 17.18 10.43 65%Actual Cost Line Items for Cost Centers (NEBS) 24.89 15.33 62%Actual Cost Line Items for Orders (CATS & Order Confm) 24.48 15.59 57%Actual Cost Line Items for Cost Centers (CO Reposting) 18.34 11.90 54%Actual Cost Line Items for Orders (CO Reposting) 25.43 16.55 54%Conforming % 6.68 4.50 48%Activity Type Planning 24.52 16.68 47%Conforming % 6.01 4.23 42%PCC Headcount by Month - Classification (Graph) 15.43 11.58 33%Removal Costs 6.15 4.77 29%Resource Report by PCC/Activity Type (PORV) 39.63 35.42 12%PCC FTE Count by Planning Version - Mid-Year 17.80 15.91 12%CWIP - LOB & Orders 93.04 85.98 8%Savings $ 4.57 4.29 7%Savings $ 4.10 4.02 2%Savings % 3.63 3.94 -8%Conforming % and Savings % 10.37 11.99 -14%

Page 25: SAP BI-A

Real Experience. Real Advantage.

[

25

0

5

10

15

20

25

10 15 20 25 30 35 40 45 50 55 60 70 80 90 100 110 120 140 160 180 200 220 240 260

Query execution time after BI-A

PG&E - Query Performance Improvments OVERALL

The major improvement was to make query execution more predictable and overall faster

0

1

2

3

4

5

6

7

8

9

10

10 15 20 25 30 35 40 45 50 55 60 70 80 90 100 110 120 140 160 180 200 220 240 260

Query execution time before BI-A

Seconds

Seconds

Page 26: SAP BI-A

Real Experience. Real Advantage.

[

26

PG&E - Workbook Performance Improvments with BIA

Average performance improvement for workbooks was 363% faster

Current performance

(seconds)

With BIA (seconds)

Improvement

1 ORD205 Actual+Plan by MWC W/Plng Orders 614.63 94.75 649%2 SR_RCC_202 -Order Costs by planning and Actual Orders 171.31 29.86 574%3 ORD225 - Actuals since Inception 25.87 11.09 233%4 Forecast Model (Summary Reports) 438.34 113.01 388%5 ORD418 - Compliance & Savings 58.38 45.78 128%6 ASM001 - CWIP (LOB, MWC, Order) 155.61 106.08 147%7 ORD201 Reports 76.94 28.46 270%8 ORD207 - 5 year historical & FCST 100.94 28.18 358%9 PMG008_24Mo PRJ Fin by Area/Div/RCC/MWC/Ord/PrjMngr/Mo 173.60 29.82 582%

10 PMG005 Reports 63.62 33.55 190%11 ORDPMG001-PORV 39.63 35.42 112%12 ORD230 - Line Items for Order 209.31 119.23 176%13 PCC130 - Line Items for Cost Center 168.79 88.73 190%14 PCC016 - PCC Detail Planning Report (KSBL) 126.73 62.29 203%15 PCC018 - Mid-Year PCC Planning Assumptions for SLSR 179.26 74.95 239%16 PCC116 - Standard Cost & Labor Trend for SLSR Groups 136.84 15.72 870%17 SR_PCC_102 - PCC Costs by In-Out Costs 94.82 47.77 198%18 RCC209A - BU/CS Expense: 5 year history 371.15 39.77 933%19 SR_PCC_401 - Charge-Out Cost Center Type A or E 815.92 165.53 493%20 ORD209 - Plan vs Actual By MWC and primary CE 160.83 48.91 329%

Average run times (same selection criteria) 209.13 60.95 363%

Top 20 Workbooks

Page 27: SAP BI-A

Real Experience. Real Advantage.

[

27

Performance Info – PG&E BI-A Indexes build times

232,298,392 records in 23 infocubes were indexed in 90.56 minutes.

On average we were able to build indexes on 2.56 million records per minute

Infocubes No of Records Time to build Indexes ( sec) ZMIM_C04 19,867,026 327ZMIM_C03 19,200,412 196ZMIM_C01 2,287,483 95ZKCC_C26 125,570 15ZKCC_C13 16,287,318 138ZKCC_C12 32,808,858 208ZKCC_C09 1,509,754 68ZKCC_C06 25,346,239 341ZKCC_C04 2,936,394 71ZKCC_C03 35,154,491 615ZKCC_C02 33,985,298 225ZKCC_C01 27,747 26ZFAA_C02 6,611,084 1520ZFAA_C01 765,838 113KOD_C208 28 10KOD_C207 3,059,811 148KCC_C508 1,036,593 63KCC_C408 3440 11KCC_C407 1,350,169 84KCC_C23 3,058,715 677KCC_C22 20,745,219 149KCC_C208 3,346,213 168KCC_C207 2,784,692 166Total 232,298,392 90.56 minutes

average 2,565,132 records indexed per minute

Page 28: SAP BI-A

Real Experience. Real Advantage.

[

28

1. We had a small team of 3 people dedicated to the BIA project supported by one basis person, and the rest of the BW team

2. Hardware team supported by the vendor was also involved in a part-time capacity.

3. Overall the effort was combined with a performance tuning project that also included building of aggregates, caching and query redesigns.

Team organization at PG&E

Page 29: SAP BI-A

Real Experience. Real Advantage.

[

29

1. We had testers and requirements gathered from the finance community. The goal was at least 50% faster on the 38 web dashboards.

2. We achieved:

a)363% faster for workbooks on average

b)70% faster for queries on average

c)58 of 70 queries were at least 50% faster

d)Index builds took about 1.5 hrs

PG&E - Testing

Page 30: SAP BI-A

Real Experience. Real Advantage.

[

30

Agenda

Introduction Pacific Gas & Electric Project Overview What is SAP BI-A

Overview Building aggregates Benefits

How we implemented BI-A Sizing the environment Team organization and project plan Testing

BI-A Limitations PG&E - Our top-10 Lessons Learned Wrap-up

Page 31: SAP BI-A

Real Experience. Real Advantage.

[

31

1. Plan to order hardware early - lead times can be long

2. Make sure you have a committed project sponsor

3. Create benchmarks for workbooks, queries and cockpits to document success

4. Update to latest service pack

5. Involve your basis team and environment management team early

PG&E - Top 10 Lessons Learned

Page 32: SAP BI-A

Real Experience. Real Advantage.

[

32

6. Be realistic, not all queries will benefit equally from SAP BIA

7. Plan for testing and gradual rollout of BIA to key users

8. Make sure failovers and spare blades are part of your hardware sizing

9. Create a small dedicated team with access to external expertise as needed

10. Perform query tuning and potential redesign as part of a larger system performance tuning effort.

PG&E - Top 10 Lessons Learned

Page 33: SAP BI-A

Real Experience. Real Advantage.

[

33

Agenda

Introduction Pacific Gas & Electric Project Overview What is SAP BI-A

Overview Building aggregates Benefits

How we implemented BI-A Sizing the environment Team organization and project plan Testing

BI-A Limitations PG&E - Our top-10 Lessons Learned Wrap-up

Page 34: SAP BI-A

Real Experience. Real Advantage.

[

34

Currently, the BIA performs aggregation and data selection for the query, all other processing is done by the OLAP analytical engine. Not all query processing will be dramatically faster…

In the next SAP NetWeaver release the BIA will handle more of the analytics processing such as “top-5 products sales” which is currently done in the OLAP analytical engine.

SAP BIA is not used when the result set exceeds 3 million records (max. default). When the result set is less, the data is sent as one large data package to the application server (need fast network).

How does it work in reality??

Page 35: SAP BI-A

Real Experience. Real Advantage.

[

35

Once you exceed a few hundred critical users and/or 3-4 TB of data you should seriously consider SAP BIA

BIA is becoming mainstream

BIA is no longer something exotic.

Many of the large BI systems have already implemented BIA and

many more projects are under way in Europe and in the Americas.

NikeNike

Some of SAP reference clients

Page 36: SAP BI-A

Real Experience. Real Advantage.

[

36

The Future SAP BI-A RoadMap

2009/20102008

SAP NetWeaver BI Accel-

erator

Prior to 2008

Analytic Capabilities (e.g. top n)

DataStore Object Acceleration

Standalone BIA for source-independent acceleration via Business Objects

Agile BI: Local and source-independent innovation space for departments

Analytic Capabilities (e.g. top n)

DataStore Object Acceleration

Standalone BIA for source-independent acceleration via Business Objects

Agile BI: Local and source-independent innovation space for departments

Accelerator for InfoCube Read Times

Low Cost of Operations

High Availability / Backup & Recovery

Accelerator for InfoCube Read Times

Low Cost of Operations

High Availability / Backup & Recovery

Optimized BusinessObjects Webl integration on top of SAP NetWeaver BI/BIA

BusinessObjects Polestar integration: Self-Service BI based on search paradigm

Optimized BusinessObjects Webl integration on top of SAP NetWeaver BI/BIA

BusinessObjects Polestar integration: Self-Service BI based on search paradigm

Page 37: SAP BI-A

Real Experience. Real Advantage.

[

37

Agenda

Introduction Pacific Gas & Electric Project Overview What is SAP BI-A

Overview Building aggregates Benefits

How we implemented BI-A Sizing the environment Team organization and project plan Testing

BI-A Limitations PG&E - Our top-10 Lessons Learned Wrap-up Question and Answers

Page 38: SAP BI-A

Real Experience. Real Advantage.

[

38

Key Learnings

BI-A is a useful tool for performance tuning, but it is not a ‘solve-all’ solution for poorly made queries

It was easy to implement (very quick)

Look at how your queries are executing (i.e. database or application server usage) when estimating benefits of implementing BI-A

Once you exceed a few hundred critical users and/or 3-4 TB of data you should seriously consider SAP BIA

The administration of BI-A is simple and anyone can learn it in a few days

Plan on waiting for hardware, we found that most was made-to-order

Make sure you have redundancies and check that what you order is what got shipped.

Page 39: SAP BI-A

Real Experience. Real Advantage.

[

39

Dr. Bjarne Berg's web page -- 85+ presentations, tutorials & articles http://csc-studentweb.lrc.edu/swp/Berg/BB_index_main.htm

Large scale testing of SAP BI Accelerator on a NetWeaver Platformhttps://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b00e7bb5-3add-2a10-3890-e8582df5c70f

Resources

Page 40: SAP BI-A

Real Experience. Real Advantage.

[

40

Questions and Answers

How to contact us:Dr. Bjarne Berg Darin Lemos

[email protected] [email protected]

Page 41: SAP BI-A

Real Experience. Real Advantage.

[

41

[

] Thank you for participating.

SESSION CODE:

INSERT SESSION CODE

Please remember to complete and return your evaluation form following this session.

For ongoing education on this area of focus, visit the Year-Round Community page at www.asug.com/yrc