PROCEDURES TO CREATE A PURCHASE REQUISITION FOR AN OUTSIDE VENDOR MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > PURCHASING > PURCHASE REQUISITION > ME51N CREATE OR Type ME51N in the “COMMAND FIELD” OR DOUBLE CLICK on ME51N in your SAP FAVORITES folder. CLICK on CLOSE button. REVISED 5/22/06 BY C BLACK 1

Upload: dinhduong

Post on 26-Mar-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PROCEDURES TO CREATE A PURCHASE REQUISITION FOR AN OUTSIDE VENDOR

MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > PURCHASING > PURCHASE REQUISITION > ME51N CREATE

OR

Type ME51N in the “COMMAND FIELD” OR

DOUBLE CLICK on ME51N in your SAP FAVORITES folder.

CLICK on CLOSE button.

REVISED 5/22/06 BY C BLACK 1

Page 2: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

NB PURCHASE REQUISITON IS THE DEFAULT.

REVISED 5/22/06 BY C BLACK 2

Page 3: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

To type in the HEADER area click on the EXPAND BUTTON (next to the word HEADER). Click in the typing area and type your note. Click on the COLLAPSE BUTTON to save message.

REVISED 5/22/06 BY C BLACK 3

Page 4: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Click on ITEM OVERVIEW to get the purchase requisition screen.

REVISED 5/22/06 BY C BLACK 4

Page 5: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the PERSONAL SETTINGS button.

REVISED 5/22/06 BY C BLACK 5

Page 6: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the DEFAULT VAULES TAB and then on MORE FIELDS button.

REVISED 5/22/06 BY C BLACK 6

Page 7: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on PLANT and PURCHASING GROUP fields under the HIDDEN FIELDS column. Once these lines are highlighted click on the arrow pointing left. This will move those 2 columns to the DISPLAY FIELD column.

REVISED 5/22/06 BY C BLACK 7

Page 8: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the CHECK COPY button. This will save as a default.

REVISED 5/22/06 BY C BLACK 8

Page 9: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

The DEFAULT TAB now shows the new values.

REVISED 5/22/06 BY C BLACK 9

Page 10: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PURCH GROUP = 550ALWAYS PROPOSE = CHECKED ITEM CATEGORY = STANDARDPLANT = 55REQUISITIONER = REQUISITIONER’S INITIALS example CLB

CLICK on the DISKETTE icon at the bottom of the box to save the defaults.

These fields will default in on all of your purchase requisitions that you create. See the following page for example.

REVISED 5/22/06 BY C BLACK 10

Page 11: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

SAMPLE screen with defaults set.

REVISED 5/22/06 BY C BLACK 11

Page 12: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the SELECT LAYOUT icon.

REVISED 5/22/06 BY C BLACK 12

Page 13: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

VERIFY that SSHE PR Default – do not change is the DEFAULT SETTING. This setting is used for creation of purchase requisition for outside vendors. If you need to change the default setting then you will have to HIGHLIGHT the correct layout and then CLICK on the GREEN CHECK MARK at the bottom of the SQUARE. You will only need to change the default if Mansfield University creates an unique default for the university.

REVISED 5/22/06 BY C BLACK 13

Page 14: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

STATUS COLUMN – You DON’T enter anything in this column. This column is a “STATUS” column for the line item you are on.

REVISED 5/22/06 BY C BLACK 14

Page 15: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

ITEM COLUMN – DON’T enter anything in this column. SAP automatically assigns a # to each line for example Line 1, Line 2, etc.

REVISED 5/22/06 BY C BLACK 15

Page 16: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

ACCOUNT ASSIGNMENT CATEGORY COLUMN – Enter one of the following codes:

K = Cost CenterG = GrantP = Capital Project.

You can just enter the letter or you can use the dropdown box. If you use the dropdown box then you MUST CLICK on the GREEN CHECK MARK. You can also insert the most common ones into a PERSONAL LIST by using the PERSONAL LIST icon.

IMPORTANT: NEVER SELECT “A” FOR ASSET BECAUSE YOU WILL GET AN ERROR MESSAGE. Purchasing will change the account assignment category if the purchase is for a fixed asset.

NOTE: If you are ordering a piece of equipment > $4999.99, the item will be classed as a fixed asset. If you are ordering more than one item when the item is a fixed asset, a line item must be created for each item rather than having one line item with a quantity > 1. This must be done this way in order for each fixed asset to have its own assigned number.

REVISED 5/22/06 BY C BLACK 16

Page 17: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

ITEM CATEGORY COLUMN – LEAVE BLANK

REVISED 5/22/06 BY C BLACK 17

Page 18: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

MATERIAL GROUP – Enter the appropriate description from the drop down list. The list is sorted numerically; however, you can sort alphabetically by CLICKING on the header MATERIAL GROUP DESCRIPTION.

CLICK on the MATERIAL GROUP you want and then CLICK on the GREEN CHECK.

You can also create a PERSONAL LIST for this section as well by using the PERSONAL LIST icon.

REVISED 5/22/06 BY C BLACK 18

Page 19: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

SHORT TEXT COLUMN– Enter a short description of purchase. Enter a NARRATIVE DESCRIPTION not a NUMERIC DESCRIPTION. Example: PRINTER rather than ITEM XN-452.

QUANTITY COLUMN – Enter the quantity you are ordering.

UNIT COLUMN – Enter unit of measurement from the dropdown list by CLICKING on the correct unit and then CLICK the GREEN CHECK. NOTE: The dropdown can be sorted alphabetically by the MEASUREMENT UNIT TEXT column. Also you can create a PERSONAL LIST as well for this area.

REVISED 5/22/06 BY C BLACK 19

Page 20: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

DELIVERY DATE – Enter the date the material or service is required. This is more than likely a projected date.

VALUATION PRICE – Enter the price per unit.

TOTAL VALUE – Will automatically complete.

REQUISITIONER - Will default if you have set up your defaults as previously described.

REVISED 5/22/06 BY C BLACK 20

Page 21: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

DESIRED VENDOR – Enter the desired vendor number. If you don’t know the vendor # then you can search for a vendor by several different options. To get a display of SEARCH OPTIONS, CLICK on the DESIRED VENDOR field. Normally the VENDORS PURCHASING search option will come in. There are several different ways to search. To get a listing, CLICK on the PAPER WITH LINES icon or you can CLICK on the right and left arrow key icons to look at the different search tabs.

CLICK on the search option that you want to use. In this example I am using VENDORS PURCHASING.

REVISED 5/22/06 BY C BLACK 21

Page 22: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Type in the vendor name with beginning and ending *’s. By using the *’s you will get a listing of vendors with that name or with that search word in their name. You can change the MAXIMUM # OF HITS to whatever # you want. Leaving it at 500, you will get a listing up to 500 vendors if there are that many vendors with that search term in its name.

CLICK on the GREEN CHECK to execute your search.

REVISED 5/22/06 BY C BLACK 22

Page 23: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

HIGHLIGHT the correct vendor and CLICK on the GREEN CHECK. This will populate the DESIRED VENDOR field. Please be aware that purchasing has the right to change the desired vendor when they generate a purchase order.

IMPORTANT NOTE: THE VENDOR # MUST START WITH A # 1 when ordering from an outside vendor.

As with other areas, you can create a PERSONAL LISTING of your frequently used PURCHASING VENDORS by using the PERSONAL LISTING icon.

REVISED 5/22/06 BY C BLACK 23

Page 24: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PURCHASING ORGANIZATION – Enter LOCL or use dropdown list.

You can now see that the TOTAL VALUE field is populated and that the ACCOUNT ASSIGNMENT TAB is open to enter information into it.

REVISED 5/22/06 BY C BLACK 24

Page 25: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

ACCOUNT ASSIGNMENT TAB – Enter the following information.

G/L ACCOUNT # - This is equivalent in meaning to the Datatel system object code. The G/L ACCOUNT # is 6 digits.

BUSINESS AREA – 55 for Mansfield University

COST CENTER – This is equivalent in meaning to the Datatel system Fund and Cost Center. The COST CENTER # is 10 digits.

NOTE: If creating a purchase requisition for a GRANT, then a WBS ELEMENT will be asked for on the ACCOUNT ASSIGNMENT tab. The WBS ELEMENT can be up to 16 characters.

After entering the REQUIRED FIELDS, CLICK on the MATERIAL DATA TAB.

REVISED 5/22/06 BY C BLACK 25

Page 26: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what should be entered on the MATERIAL DATA TAB.

CLICK on the QUANTITIES/DATES TAB.

REVISED 5/22/06 BY C BLACK 26

Page 27: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what should be entered on the QUANTITIES/DATES TAB.

CLICK on the VALUATION TAB.

REVISED 5/22/06 BY C BLACK 27

Page 28: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what should be entered on the VALUATION TAB.

CHECK the following boxes: GOODS RECEIPT and INVOICE RECEIPT. DO NOT CHECK the GR NON-VALUATED box.

CLICK on the ACCOUNT ASSIGNMENT TAB.

REVISED 5/22/06 BY C BLACK 28

Page 29: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what the ACCOUNT ASSIGNMENT TAB will look like for a purchase from an outside vendor in which an ACCOUNT ASSIGNMENT of “K” was used. Please notice that other fields are now completed.

Also, EARMARKED FUNDS field would need to be completed in special cases.

NOTE: If you need to enter MULTIPLE ACCOUNT ASSIGNMENTS for this line item then CLICK on the MULTIPLE ACCOUNT ASSIGNMENT icon. You can then enter other account assignments but you CAN NOT mix COST CENTER and WBS ELEMENTS on the same line item.

CLICK on the SOURCE OF SUPPLY TAB.

REVISED 5/22/06 BY C BLACK 29

Page 30: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what should be entered on the SOURCE OF SUPPLY TAB.

CLICK on the STATUS TAB.

REVISED 5/22/06 BY C BLACK 30

Page 31: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what the STATUS TAB should look like.

CLICK on CONTACT PERSON TAB.

REVISED 5/22/06 BY C BLACK 31

Page 32: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what should be entered on the CONTACT PERSON TAB. Everything should have filled in from prior entries.

NOTE: You can enter something in the REQUISITION TRACKING NO field if you want. This is not a required field. This field is used to group requisitions together. For example, Acquisitions or Periodicals could be entered here. This field can be used as a search field and to track a requisition through the entire procurement cycle. MANSFIELD UNIVERSITY IS OPTING NOT TO USE THIS FIELD.

CLICK on the RELEASE STRATEGY TAB.

REVISED 5/22/06 BY C BLACK 32

Page 33: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

The RELEASE STRATEGY TAB indicates who is responsible for approving this particular purchase requisition. In most instances it will be the requisitioner.

CLICK on the TEXTS TAB.

REVISED 5/22/06 BY C BLACK 33

Page 34: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

There are several different areas that you can type in text. Some areas the text will print on the purchase order and other text areas will not print. IMPORTANT: after typing in the ITEM TEXT area, CLICK on any of the other TEXT options in order to SAVE the ITEM TEXT.

ITEM TEXT WILL PRINT. ITEM NOTE WILL NOT PRINT.

CLICK on the DELIVERY ADDRESS TAB.

REVISED 5/22/06 BY C BLACK 34

Page 35: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on ADDRESS DETAILS on the DELIVERY ADDRESS TAB.

REVISED 5/22/06 BY C BLACK 35

Page 36: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Enter BUILDING NAME AND ROOM # where items are to be DELIVERED. Enter your TELEPHONE #.

CLICK on the GREEN CHECK and you will get the following screen.

REVISED 5/22/06 BY C BLACK 36

Page 37: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

REVISED 5/22/06 BY C BLACK 37

Page 38: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

On the SAP TOOLBAR, select PURCHASE REQUISITIONS and then CHECK. This process will check your purchase requisition for errors.

REVISED 5/22/06 BY C BLACK 38

Page 39: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

NOTE: The message “NO MESSAGES ISSUED DURING CHECK” is displayed in the STATUS BAR if there are no errors.

If you get a MESSAGE SCREEN, (like the example on the following page) then you will need to address the errors. If the Message type is a WARNING BELL, then you can save the purchase requisition as is. If the Message type is a RED STOP SIGN, then you need to fix your errors before saving.

REVISED 5/22/06 BY C BLACK 39

Page 40: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Sample MESSAGES SCREEN. Since these messages are just YELLOW BELLS, you can proceed with SAVING the purchase requisition.

CLICK on the GREEN CHECK MARK inside the MESSAGE BOX to continue.

REVISED 5/22/06 BY C BLACK 40

Page 41: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Once you know that the purchase requisition is correct, then CLICK on the SAVE icon (diskette). You will get a purchase requisition number. See the STATUS BAR on the next page.

REVISED 5/22/06 BY C BLACK 41

Page 42: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

NOTE: The message “PURCHASE REQUISITION # CREATED” will be displayed on the STATUS BAR.

SUGGESTION: MAKE A NOTE OF YOUR PURCHASE REQUISITION #’S SOMEWHERE UNTIL YOU GET USE TO USING SAP! ONCE YOU ARE FAMILIAR WITH SAP, YOU CAN LOOK UP A REQUISITION WITHOUT KNOWING THE #.

CONGRATULATIONS, YOU HAVE NOW COMPLETED A PURCHASE REQUISITON!

REVISED 5/22/06 BY C BLACK 42

Page 43: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PROCEDURES TO CHANGE A PURCHASE REQUISITION FOR AN OUTSIDE VENDOR PRIOR TO RELEASE

MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > PURCHASING > PURCHASE REQUISITION > ME52N CHANGE

OR

Type ME52N in the “COMMAND FIELD”

OR

DOUBLE CLICK on ME52N in your SAP FAVORITES folder.

REVISED 5/22/06 BY C BLACK 43

Page 44: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

SAP will pull in the last purchase requisition that you created. If this is not the purchase requisition that you want to change then you will need to do as follows.

REVISED 5/22/06 BY C BLACK 44

Page 45: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the DOCUMENT OVERVIEW ON button.

REVISED 5/22/06 BY C BLACK 45

Page 46: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

You will get a listing of your created and not released purchase requisitions. You may need to do the following steps the first time in order to get this listing.

CLICK on SELECTION VARIANT icon.

REVISED 5/22/06 BY C BLACK 46

Page 47: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on MY PURCHASE REQUISITIONS.

REVISED 5/22/06 BY C BLACK 47

Page 48: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

You will now have a listing of YOUR purchase requisitions that can be changed.

DOUBLE CLICK on the purchase requisition # that you want to change. SAP will bring in that requisition in DISPLAY mode.

REVISED 5/22/06 BY C BLACK 48

Page 49: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

DISPLAY mode is used just so you can verify that this is the correct purchase requisition that you want to change.

REVISED 5/22/06 BY C BLACK 49

Page 50: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the DISPLAY/CHANGE icon (glasses with a pencil). This icon takes you from CHANGE TO DISPLAY and from DISPLAY TO CHANGE.

You will then be in CHANGE mode.

REVISED 5/22/06 BY C BLACK 50

Page 51: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Once you are in CHANGE mode, you may make changes to any WHITE fields. You CAN NOT change any GRAY fields.

In this example, I am going to change the QUANTITY and VALUATION PRICE on the purchase requisition and will only be showing you the fields or tabs that have changed.

REVISED 5/22/06 BY C BLACK 51

Page 52: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

I will only be showing you the print screens of the fields or tabs that I affected with the change.

REVISED 5/22/06 BY C BLACK 52

Page 53: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

QUANTITIES/DATES TAB: QUANTITY changed.

REVISED 5/22/06 BY C BLACK 53

Page 54: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

VALUATION TAB: VALUATION PRICE and TOTAL VALUE changed.

REVISED 5/22/06 BY C BLACK 54

Page 55: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

On the SAP TOOLBAR, select PURCHASE REQUISITIONS and then CHECK. This process will check your purchase requisition for errors.

NOTE: The message “NO MESSAGES ISSUED DURING CHECK” is displayed in the STATUS BAR if there are no errors.

If you get a MESSAGE SCREEN, then you will need to address the errors.

REVISED 5/22/06 BY C BLACK 55

Page 56: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Once you know that the purchase requisition is correct, then CLICK on the SAVE icon (diskette).

NOTE: The message “PURCHASE REQUISITION # CHANGED” will be displayed on the STATUS BAR.

See the STATUS BAR on the following page.

REVISED 5/22/06 BY C BLACK 56

Page 57: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

You have now successfully CHANGED a purchase requisition prior to release.

IMPORTANT: ONCE A REQUISITION IS RELEASED, CHANGES CAN NOT BE MADE.

REVISED 5/22/06 BY C BLACK 57

Page 58: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PROCEDURES TO DISPLAY A PURCHASE REQUISITION FOR AN OUTSIDE VENDOR

MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > PURCHASING > PURCHASE REQUISITION > ME53N DISPLAY

OR

Type ME53N in the “COMMAND FIELD”

OR

DOUBLE CLICK on ME53N in your SAP FAVORITES folder.

REVISED 5/22/06 BY C BLACK 58

Page 59: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

SAP will pull in the last purchase requisition that you created. If this is not the purchase requisition that you want to display then you will need to do as follows.

REVISED 5/22/06 BY C BLACK 59

Page 60: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the DOCUMENT OVERVIEW ON button.

REVISED 5/22/06 BY C BLACK 60

Page 61: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

You will get a listing of purchase requisitions. You may need to do the following steps the first time in order to get a listing of your requisitions.

CLICK on SELECTION VARIANT icon.

REVISED 5/22/06 BY C BLACK 61

Page 62: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on MY PURCHASE REQUISITIONS.

REVISED 5/22/06 BY C BLACK 62

Page 63: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

You will now have a listing of YOUR purchase requisitions that can be displayed.

DOUBLE CLICK on the purchase requisition # that you want to change. SAP will bring in that requisition in DISPLAY mode.

REVISED 5/22/06 BY C BLACK 63

Page 64: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

DISPLAY mode is used for viewing a purchase requisition.

REVISED 5/22/06 BY C BLACK 64

Page 65: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PROCEDURES TO COPY A PURCHASE REQUISITION

Locate the purchase requisition that you want to copy by using ME51N - CREATE PURCHASE REQUISITIONS.

CLICK on the purchase requisition that you want to COPY.

CLICK and DRAG to the SHOPPING CART.

REVISED 5/22/06 BY C BLACK 65

Page 66: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

You will get a COPY of the purchase requisition that you chose.

Change applicable fields at LINE ITEM and at ITEM DETAIL tabs.

In this example, I changed the following: QUANTITY, DELIVERY DATE, and VALUATION PRICE at the LINE ITEM LEVEL. I then went to the ACCOUNT ASSIGNMENT TAB and changed the G/L ACCOUNT # and COST CENTER.

See the next screen.

REVISED 5/22/06 BY C BLACK 66

Page 67: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

I also CREATED another LINE ITEM. If you add a LINE ITEM, then you will need to complete the LINE ITEM DETAIL TABS as well.

REVISED 5/22/06 BY C BLACK 67

Page 68: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

You will notice that I used a WBS ELEMENT on this LINE ITEM. You can mix COST CENTERS (K) and WBS ELEMENTS (G) on the same purchase requisition.

IMPORTANT: YOU MUST HAVE SEPARATE LINE ITEMS FOR EACH OF THEM. YOU CAN HAVE MULTIPLE ACCOUNT ASSIGNMENTS WITHIN EACH LINE ITEM BUT YOU CAN NOT MIX GENERAL LEDGER INFORMATION ON EACH LINE.

For example: If I wanted to split WINDOWS XP between 3 different WBS ELEMENTS, then I could by using the MULTIPLE ACCOUNT ASSIGNMENT icon. I would not be able to code 1 or 2 of the WINDOW XP to a COST CENTER.

Also note that you can switch between LINE ITEM DETAIL for LINE 1 and LINE 2 by using the UP and DOWN ARROWS in the middle of the screen.

REVISED 5/22/06 BY C BLACK 68

Page 69: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CHECK your purchase requisition for errors before SAVING.

REVISED 5/22/06 BY C BLACK 69

Page 70: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

SAVE (diskette icon).

REVISED 5/22/06 BY C BLACK 70

Page 71: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

NOTE: The message “PURCHASE REQUISITION # CREATED will be displayed in the STATUS BAR.

REVISED 5/22/06 BY C BLACK 71

Page 72: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER

MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT > GOODS MOVEMENT > MIGO – GOODS MOVEMENT

OR

Type MIGO in the “COMMAND FIELD”

OR

DOUBLE CLICK on MIGO in your SAP FAVORITES folder.

The objective of this manual is to RECEIVE the GOODS ordered on a PURCHASE ORDER.

REVISED 5/22/06 BY C BLACK 72

Page 73: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Make sure MOVEMENT TYPE, REFERENCE DOCUMENT, and MOVEMENT TYPE # are correct. In general they should be as follows: A01 GOODS RECEIPT, R01 PURHCASE ORDER, and 101 GOODS RECEIPT. These fields will need to be changed for RETURNS and SUBSEQUENT DELIVERY.

Enter the PURCHASE ORDER # and CLICK on the EXECUTE icon (clock).

This will bring in the purchase order.

REVISED 5/22/06 BY C BLACK 73

Page 74: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

On the GENERAL TAB of the HEADER SECTION verify accuracy of following fields.

DOCUMENT DATE – Defaults but can be changed

POSTING DATE – Defaults but can be changed. This will need to be changed at fiscal year end depending on when the items were received.

PRINTER ICON - Defaults to INDIVIDUAL SLIP which is used if receiving only one line item. This field can be changed to the following options: DO NOT PRINT SLIP (used when correcting errors) or COLLECTIVE SLIP (used when receiving all items). The COLLECTIVE SLIP will print everything.

Put a CHECK MARK in the box by the PRINTER ICON, if you wish to print a goods receipt/issue slip.

REVISED 5/22/06 BY C BLACK 74

Page 75: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the HIDE OVERVIEW icon to collapse the OVERVIEW TREE area after selecting PO NUMBER.

REVISED 5/22/06 BY C BLACK 75

Page 76: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This is what the screen will look like after CLOSING OVERVIEW TREE.

MATERIAL TAB should look like this and nothing can be changed.

CLICK on the QUANTITY TAB.

REVISED 5/22/06 BY C BLACK 76

Page 77: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

QTY IN UNIT OF ENTRY = Enter quantity received

CLICK on the WHERE TAB.

REVISED 5/22/06 BY C BLACK 77

Page 78: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

NOTE: There are NO REQUIRED fields on the WHERE TAB. You may type something in the GOODS RECIPIENT, UNLOADING POINT, and TEXT fields if you want. If applicable information was entered in the purchase requisition, then these fields would default.

CLICK on the PO DATA TAB.

IMPORTANT UPDATE: THE NOTE ABOVE INDICATES THAT THE “TEXT FIELD” IS AN OPTIONAL FIELD; BUT WE HAVE LEARNED THAT THIS FIELD TRANSFERS TO THE BUDGET REPORTS. IN THE TEXT FIELD, ENTER THE INFORMATION YOU WISH TO SEE WHEN YOU ACCESS YOUR DEPARTMENT’S BUDGET REPORTS. RECOMMENDATION FOR INPUT: PO NUMBER, VENDOR NAME, INVOICE NUMBER.

THE TEXT FIELD MUST BE COMPLETED FOR EACH LINE ITEM. TO SAVE YOU TYPING THE SAME INFORMATION FOR EACH LINE ITEM, REMEMBER TO USE THE “BACK SPACE” FUNCTION WHICH RETRIEVES PREVIOUS INPUT.

REVISED 5/22/06 BY C BLACK 78

Page 79: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

DELIVERY COMPLETED INDICATOR field is defaulted to SET AUTOMATICALLY. This means that the item is complete and the exact quantity is received.

REVISED 5/22/06 BY C BLACK 79

Page 80: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CHECK ITEM OK BOX to indicate all information has been entered for this item.

REVISED 5/22/06 BY C BLACK 80

Page 81: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

This page is for information purposes only. If there are more line items to RELEASE then use the PREVIOUS and NEXT DETAIL ITEM icons to navigate to the other lines.

REVISED 5/22/06 BY C BLACK 81

Page 82: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Once you have RELEASED all items that have been received, then CLICK on the CHECK icon. This will check for any errors.

NOTE: The message “DOCUMENT IS O.K.” will be displayed on the STATUS BAR, if the document is free of errors.

See the STATUS BAR on next page.

REVISED 5/22/06 BY C BLACK 82

Page 83: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the POST button or the SAVE icon (diskette) when all intended items have been received.

NOTE: The message “MATERIAL DOCUMENT # POSTED” will be displayed on the STATUS BAR.

See the STATUS BAR on the next page.

REVISED 5/22/06 BY C BLACK 83

Page 84: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

REVISED 5/22/06 BY C BLACK 84

Page 85: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PROCEDURES FOR RETURN DELIVERY OF MATERIAL

MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT > GOODS MOVEMENT > MIGO – GOODS MOVEMENT

OR

Type MIGO in the “COMMAND FIELD”

OR

DOUBLE CLICK on MIGO in your SAP FAVORITES folder.

The objective of this section is to UNACCEPT the goods that have already been received and need returned due to damage or not meeting specifications.

REVISED 5/22/06 BY C BLACK 85

Page 86: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on MOVEMENT TYPE field and choose A02 RETURN DELIVERY. This will bring in the last MATERIAL DOCUMENT NUMBER that you used. Use the OVERVIEW ON/OFF button to determine the material document that requires the materials to be returned to the vendor if it is not the correct document.

REVISED 5/22/06 BY C BLACK 86

Page 87: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CHANGE the YEAR field if necessary. Such as at year end.

CLICK on the EXECUTE icon (clock). This will bring in the purchase order.

REVISED 5/22/06 BY C BLACK 87

Page 88: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Example of a SAP screen.

REVISED 5/22/06 BY C BLACK 88

Page 89: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

IMPORTANT: Make sure that MOVEMENT TYPE is 122 when returning an item to the vendor.

CLICK on the QUANTITY TAB.

REVISED 5/22/06 BY C BLACK 89

Page 90: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Change QTY IN UNIT OF ENTRY to the correct quantity.

CLICK on the WHERE TAB.

REVISED 5/22/06 BY C BLACK 90

Page 91: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

COMPLETE the following fields:

REASON FOR MOVEMENT - Choose from one of the reasons. HIGHLIGHT the reason for the return and CLICK on the GREEN CHECK MARK in the box.

TEXT – Type a descriptive reason why item is being returned.

See next page for example.

REVISED 5/22/06 BY C BLACK 91

Page 92: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on PO DATA TAB.

REVISED 5/22/06 BY C BLACK 92

Page 93: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Sample of PO DATA TAB.

REVISED 5/22/06 BY C BLACK 93

Page 94: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CHECK ITEM OK BOX to indicate all information has been entered for this item.

REVISED 5/22/06 BY C BLACK 94

Page 95: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Once you have CHANGED all items that need to be then CLICK on the CHECK button. This will check for any errors.

NOTE: The message “DOCUMENT IS O.K.” will be displayed on the STATUS BAR if the document is free of errors.

REVISED 5/22/06 BY C BLACK 95

Page 96: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on the POST button or the SAVE icon (diskette).

NOTE: The message “MATERIAL DOCUMENT # POSTED” will be displayed on the STATUS BAR.

See the STATUS BAR on the next page.

REVISED 5/22/06 BY C BLACK 96

Page 97: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

REVISED 5/22/06 BY C BLACK 97

Page 98: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

PROCEDURE TO ACCEPT SUBSEQUENT DELIVERY OF A PURCHASE ORDER

MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT > GOODS MOVEMENT > MIGO – GOODS MOVEMENT

OR

Type MIGO in the “COMMAND FIELD”

OR

DOUBLE CLICK on MIGO in your SAP FAVORITES folder.

The objective of this section is to ACCEPT SUBSEQUENT goods that have been received.

REVISED 5/22/06 BY C BLACK 98

Page 99: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CLICK on MOVEMENT TYPE field and choose A06 SUBSEQUENT DELIVERY. This will bring in the last MATERIAL DOCUMENT NUMBER that you used. Use the OVERVIEW ON/OFF button to determine the material document that requires subsequent deliveries to be received.

REVISED 5/22/06 BY C BLACK 99

Page 100: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CHANGE the YEAR field if necessary. Such as at year end.

CLICK on the EXECUTE icon (clock). This will bring in the purchase order.

REVISED 5/22/06 BY C BLACK 100

Page 101: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Sample of what SAP screen looks like.

CLICK on the QUANTITY TAB.

REVISED 5/22/06 BY C BLACK 101

Page 102: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

Change QTY IN UNIT OF ENTRY to the quantity received.

CLICK on the WHERE TAB.

REVISED 5/22/06 BY C BLACK 102

Page 103: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

DELETE the description in the TEXT field. You may type something in the GOODS RECEIPIENT, UNLOADING POINT, and TEXT FIELD if you want.

SUGGESTION: If this is last shipment of the item then you may want to type something like “Final shipment” in the TEXT field just for a reference.

IMPORTANT UPDATE: THE NOTE ABOVE INDICATES THAT THE “TEXT FIELD” IS AN OPTIONAL FIELD; BUT WE HAVE LEARNED THAT THIS FIELD TRANSFERS TO THE BUDGET REPORTS. IN THE TEXT FIELD, ENTER THE INFORMATION YOU WISH TO SEE WHEN YOU ACCESS YOUR DEPARTMENT’S BUDGET REPORTS.

THE TEXT FIELD MUST BE COMPLETED FOR EACH LINE ITEM. TO SAVE YOU TYPING THE SAME INFORMATION FOR EACH LINE ITEM, REMEMBER TO USE THE “BACK SPACE” FUNCTION WHICH RETRIEVES PREVIOUS INPUT.

REVISED 5/22/06 BY C BLACK 103

Page 104: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

CHECK ITEM OK BOX to indicate all information has been entered for this item.

Once you have RELEASED all items that need to be then CLICK on the CHECK button. This will check for errors.

NOTE: The message “DOCUMENT IS O.K.” will be displayed on the STATUS BAR if the document is free of errors.

CLICK on the POST button or the SAVE icon (diskette) when all intended items have been received.

NOTE: The message “MATERIAL DOCUMENT # POSTED” will be displayed on the STATUS BAR.

REVISED 5/22/06 BY C BLACK 104

Page 105: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

YEAR END PROCEDURES FOR GOODS RECEIPT - MIGO

Enter the purchase order number and EXECUTE to bring in the purchase order.

REVISED 5/22/06 BY C BLACK 105

Page 106: SAP LOGON PROCEDURES - Mansfield University of ... · Web viewPROCEDURE TO ACCEPT/RELEASE A PURCHASE ORDER MENU PATH TO FOLLOW: LOGISTICS > MATERIALS MANAGEMENT > INVENTORY MANAGEMENT

If the HEADER DATA section is not showing, click on the HEADER DATA icon to view.

POSTING DATE: If you RECEIVED the goods PRIOR TO or ON JUNE 30th, you MUST enter a POSTING DATE PRIOR TO OR EQUAL TO JUNE 30th . If you received the goods ON JULY 1st or LATER, DO NOT do the goods receipt process until we notify you. This notification will probably be mid to late July. Once you receive this email notification then you will be able to proceed with the MIGO transaction for all purchase orders whether they were created in the old Fiscal Year or the new fiscal year.

This is very important for fiscal year end financial statement purposes and the auditors will be reviewing this as well.

Complete the DETAIL DATA section as you would normally for each line item.

CHECK