  • 7/25/2019 SAP NWT, network

    1/107

    1.

    2.

    3.

    4.

    Every time a network is scheduled, forward and backward scheduling is

    carried out by the system; and if activated it determines float and capacity

    reuirements for activities, reduction level used to schedule the network,

    earliest and latest dates for the relationship.

    !orward scheduling determines the earliest dates.

    "ackward scheduling determines the latest

    dates.

    !loat# $f earliest dates are not same as latest

    dates, then float occurs.%he &cheduling results are#

    &cheduled start and finish for the network.

    Earliest start and finish dates 'earliest dates( and the latest start and finish

    dates 'latest dates( for activities and earliest and latest dates for relationships.

    )eduction levels used to reduce the network and float times 'total and free float(

    for activities. *nd capacity reuirements for activities.

    Every time a network is schedcarried out by the system; and

    reuirements for activities, re

    earliest and latest dates for th

    !orward scheduling determine

    "ackward scheduling determ

    dates.

    !loat# $f earliest dates are not

    dates, then float occurs.

  • 7/25/2019 SAP NWT, network

    2/107

    +ther influencing factors in scheduling#

    $nternal processing# the normal uration maintained in the activity is used by

    the system for scheduling internally processed activity.

    E-ternal processing# lanned delivery time or normal uration 'e-plicitly to

    be activated in control key( will be used by system for scheduling e-ternallyprocessed activity.

    /eneral costs activity# uration

    )elationship# %ime interval# !i-ed or as a percentage.

    %he work centers can be maintained in internally or e-ternally processed activity

    and in relationships, and work centers contains following information0s#

    1. !ormulas for calculating duration of activities

    2. !actory calendar and operating time for each workday.

  • 7/25/2019 SAP NWT, network

    3/107

    * network must and always scheduled forwards and backwards and scheduling type

    specifies whether forward scheduling or backward scheduling is carried out first.

    !orward scheduling calculates the earliest start and finish dates for all activities, and

    the scheduled finish date of the network. * start activity is an activity in a network

    that does not have a predecessor.

    "ackward scheduling calculates the latest start and finish dates for an activity 'latest

    dates( and the scheduled start date of the network. * target activity is an activity in

    a network that does not have a successor.

    hen forward scheduling is performed first, the date from which scheduling starts

    is the basic start date in the network header. hen forward scheduling is

    performed after backwards scheduling the start date is calculated from backward

    scheduling.

    hen backward scheduling is performed first, the base date from which

    scheduling starts is the basic start date in the network header. hen backwards

    scheduling is performed after forward scheduling the finish date is calculated fromforward scheduling.

    &tart dates are at the beginning of the day

    '#(. !inish dates are at the end of the day

    '24#(.

  • 7/25/2019 SAP NWT, network

    4/107

    Scheduling Assembly Networks:

    +verall etwork &cheduling can be performed for a sales order item.

    %his function schedules the network assigned to the sales order item and all

    other networks with relationships to it 'total network scheduling(.

    %he function leads to an update of all items in the sales order with assignmentsto the total network.

    Overall Network Scheduling with Selection Options:

    %his function is used along with selection criteria to specify which network5sub6

    network are to be taken into account as part of overall network scheduling.

    * prereuisite for the use of the +verall network scheduling with selection options

    function is that suitable levels are defined beforehand for the pro7ect system and

    network types and number intervals are assigned to it.

  • 7/25/2019 SAP NWT, network

    5/107

    9egend#

    E& : earliest start

    E! : earliest finish

    9& : latest start

    9! : latest finish

    %! : total float

    !! : free float

    !loats supply information about time reserves available for individual activities and

    one can use floats calculated in scheduling, for e-ample in capacity leveling, to

    shift activities between their earliest and latest dates or to e-tend their duration.

    %otal float# %he amount of time an activity can be shifted from its earliest dates into

    the future without affecting the latest dates of its successor. '%otal float# : 9&6E&

    or 9!6E!(

    !ree float# %he amount of time an activity can be shifted from its earliest datesinto the future without affecting the earliest dates of its successor. '!ree float :

    E& successor E! activity(

  • 7/25/2019 SAP NWT, network

    6/107

    %he slide describes the calculation of total floats and free floats#

    %he total float can be calculated as the difference between the earliest and

    latest start of an activity.

    $n the above e-ample#

    ay 8 '#( 6 ay '#( : 1 ay.

    %he free float of an activity can be calculated as the difference between the

    earliest start of the successor and the earliest finish of the activity.

    $n the above e-ample#

    ay < '#( 6 ay = '24#( : 1 ay.

    2

  • 7/25/2019 SAP NWT, network

    7/107

    )eduction#

    )eduction can be used when the time period within which activities are scheduled

    is not enough for processing all the activities.

    %his reduces the scheduled duration of internally6processed activities and for

    which reduction strategy has been maintained.>p to si- reduction levels can be defined for each reduction strategy. %he

    percentage reduction reuired can be entered for each reduction level.

    2

  • 7/25/2019 SAP NWT, network

    8/107

    ?ou can plan pro7ect costs in two different ways#

    @anual cost planning in the "&

    Aost planning using activities 'network costing(

    @anual planning in the "& involves#

    1. +verall planning is a structure6oriented planning and is the most basic form. $n

    this kind of cost planning you enter costs for each "& element which will be

    broken down by fiscal year if you want.

    2. Aost element planning is a detailed planning of primary costs and activity inputs

    which is cost element based and period based.

    3. $n >nit costing you use a profile to enter uantities like internal activities,

    materials, variable items and e-ternal services etc. for each "& element.

    >nit costing is cost element based.

    4. !rom 4.8A release, you can use Easy Aost lanning which offers you an easy6

    to6use tool for planning costs by cost element in a uantity structure. *nd further

    one can use E-ecution &ervices to enter actual data and commitment for the

    related planned costs.

    %he plan costs can be determined manually as mentioned above and also by creating

    2

  • 7/25/2019 SAP NWT, network

    9/1072

    activities for "& elements, and using these activities to plan costs.

    hen using networks and activities, planned costs are automatically

    calculated based on the resource reuirements identified for activities and

    operations.

    )esources provide a uantity structure that can be dynamically valued by the system.

    %his method has the following advantages#

    a. resulting plan can be copied to new pro7ects

    b. cost planning is shifted automatically along with the activities, if parts of the

    pro7ect are shifted.

    c. lanning using network activities is by cost element and period.

  • 7/25/2019 SAP NWT, network

    10/107

    ?ou can plan pro7ect costs simply by creating activities for "& elements 'for e-ample, in the

    pro7ect planning board or structure planning transactions(.

    lanning in this case is by period and cost element.

    %his process has significant advantages over manual planning of primary costs or activity

    inputs#

    Aost planning can be postponed easily, using a work package.

    ?ou can copy this type of cost planning to new pro7ects.

    Aost planning is integrated with time scheduling and resource

    planning.

    2

  • 7/25/2019 SAP NWT, network

    11/107

    hen you plan dates and resources in network activities, the system determines

    the corresponding planned costs automatically.

    lanned costs are determined for the following

    ob7ects# *ctivity inputs for internally6processed

    activities

    rimary costs for e-ternally6processed activities and services

    rimary costs for general costs activities

    rimary costs for material components

    *ctivity elements are costed as if they were activities.

    &ystem automatically calculates the planned cost based on planned dates and resources in

    network activities.

    Aost elements should be identified by cost relevant items. $dentification in internal activities,

    e-ternal activities is as#

    $nternal activities5 services# etermination is by means of secondary cost element assigned in

    the network type master data

    2

  • 7/25/2019 SAP NWT, network

    12/1072

    E-ternal activities5services #1( on stock6$t is identified by /5l account 2( &tock6 $t is

    determined by automatic account determination

    Aost planning is integrated with time scheduling and resource planning

  • 7/25/2019 SAP NWT, network

    13/107

    $nternally processed activities are used for the work which needs to be e-ecuted in own

    company and assist in planning work.

    $n the activity, you need to maintain the work data and based on same system calculate costs

    for these activities.

    ork is an input for machine or person to e-ecute the activity. *nd work center is place

    where the work is carried out and work output is provided.

    ork centers contains data such as scheduling and capacity, which assists in costing,

    scheduling and capacity planning of activities.

    %he costs can be distributed over the network duration for internally processed activities Bcost activities and controlled via distribution key.

    %he distribution key is determined from the activity or from work center 'only in internally6

    processed activities(, if not maintained in activity. $f distribution key is not maintained or

    determined, costs are distributed evenly 'over the earliest dates( in the activity.

    E-ample# *n activity spread across periods < and 1, with a total work time of 2 hours.

    %he dates and the distribution key used for the activity assign 1 hours to period < and

    1

    2

  • 7/25/2019 SAP NWT, network

    14/1072

    hours to period 1. $f the rate is 1 Euros per hour for period < and C Euros per

    hour for period 1 and valuation per period has been stipulated, the costs are

    1 Euros for period < and 12 Euros for period 1.

    uring e-ecution phase, when you confirm the activities, you consume the capacity

    reuired by the activity and enter the actual date and costs.

    ?ou can distribute work among the employees by assigning persons to the activities

    from a pro7ect team which can be set up from D) organiational units, persons or

    positions.

  • 7/25/2019 SAP NWT, network

    15/107

    hen procuring services e-ternally 'outsourcing(, you can create services or externally-

    processed activities.

    E-ample# ?ou commission a freelance engineer to design and build a machine.

    hen creating a e-ternally processed activity or service activity, a purchase reuisition is

    created based on the settings and further processed in purchasing and the data can be

    accessed from purchasing for e-ternal processing e.g. purchasing info record, which

    contains data for the pricing and delivery times.

    Externally-processed activities give rise to planned costs equivalent to the prices romthe purchasing ino record or the price in the activity! "he valuation variant or the

    network costing variant determines which price is used or the valuation! #hen the

    purchase requisition is activated and converted to a purchase order$ the activity is

    also shown as a purchase requisition commitment or purchase order commitment!

    "he account assignment category in the purchase order determines whether the

    goods%invoice receipt is valued - that is$ whether it gives rise to actual costs! & the

    goods receipt is valuated$ actual costs are posted to the activity and the commitment

    is reduced by the amount o the purchase order! "his means that the invoice receipt

    2

  • 7/25/2019 SAP NWT, network

    16/1072

    may correct the actual costs!

    Service activities are maintained or the purchase o services!

    'reating such an activity establishes the link to (( Services )((-S*+,! nlike

    externally-processed activities$ service activities contain a service

    speciication containing planned activities and value limits or unplanned

    activities!

    "his service speciication is copied to the purchase order where .urchasing

    can then modiy it! Service activities also give rise to planned costs or

    purchase requisition%order commitments! &nstead o goods receipts$ services

    are later entered and accepted!

    %he service activities also initiates the purchasing process but contain the value limits

    for the unplanned services and hierarchy of planned services to be procured. %he

    goods receipt process in &ervices activities involves following steps# service entry

    and service acceptance.

    %he e-ternally processed activity and service activities are differentiated by Aontrol

    keys.

  • 7/25/2019 SAP NWT, network

    17/107

    e can assign a work center and planned work to an e-ternally processed activity.

    %his allows to carry out capacity planning for vendors

    Ahanges in network dates5uantity will trigger workflow for a + change#

    $f changes are made in the network to dates or uantities for material

    components or e-ternal activities for which + has already been created .system

    triggers a workflow automatically. %he only prereuisite is that this workflow has

    been activated in the parameters for the network type table

    %he person responsible in purchasing will receive an information on the reuired

    changes.

    $f only ) is created, changes in the network to dates5uantities will update the

    change in ) automatically

    2

  • 7/25/2019 SAP NWT, network

    18/107

    %he $nternal processed activity, e-ternal processed activity and service activities are

    differentiated by Aontrol keys.

    e can generate urchase reuisition ')( for e-ternally processed activities

    from ro7ect &ystem. %he ) is converted to a urchase order '+( in

    purchasing. * goods receipt and invoice receipt can then be posted for thepurchase order

    e can assign a work center and planned work to an e-ternally processed activity.

    %his allows to carry out capacity planning for vendors

    2

  • 7/25/2019 SAP NWT, network

    19/107

    ?ou can use general costs activities to plan all other costs that cannot be mapped via

    internally6processed activities or e-ternally6processed5service activities.

    $n the general costs activity, you can enter a description, the amount and currency, a cost

    element, a duration and a distribution key for distributing costs.

    %he costs are distributed using the network duration for general costs activities.

    istribution is controlled by means of the distribution key for the activity. $f no distribution

    key is maintained, the costs are distributed evenly over the earliest dates in the activity.

    ?ou can create a unit cost plan for the general costs activity.

    %his means that detailed costing is possible even at an early stage of the pro7ect

    'for e-ample, for sales pricing(.

    %he activities which cannot be tracked though internal5e-ternat activities5services can be

    tracked through general cost activities to plan costs

    Eg travel e-pense for meeting./enral cost activity is assigned to cost ob7ect

    Aosts are distributed as per scheduled duration which is controlled by distribution key

    2

  • 7/25/2019 SAP NWT, network

    20/1072

    .%here are cases where distributionkey has not been maintained,in those cases

    even distribution of cost is done based on the earliest dates in the activity

    etaled costing can be done like during sales pricing phase that is at beggining

    phase of pro7ect

  • 7/25/2019 SAP NWT, network

    21/107

    ?ou can create invoicing plans directly for network activities 'e-ternal, service, or general

    costs( or components procured e-ternally.

    %his means that it is possible to plan costs and outgoing payments on the basis of dates

    entered in the invoicing plan. Aosts are not simply distributed, but are calculated precisely

    at the times specified in the invoicing plan.

    ?ou can create an invoicing plan by copying a reference invoicing plan.

    %he reference invoicing plan fi-es cost and payment times relative to a start date.

    *lternatively, you can copy billing milestones as dates to the invoicing plan of the activity. $f

    you copy the milestones rather than creating them manually, they can be postponed

    along with the dates in the invoicing plan if the activities are rescheduled.

    ?ou cannot create invoicing plans in combination with unit costings 'for general costs

    activities or material components(.

    3

  • 7/25/2019 SAP NWT, network

    22/107

    +n the basis of days, periods or fiscal years one can plan payment flows i.e. revenues

    and e-penditure.

    $n "& elements, manual planning of revenues and e-penditure is by period. *t

    commitment item level 'ro7ect Aash @anagement master data( planning takes place.

    %he uantity structure in the network and the billing plans in the "& or & document

    are valuated in the automatic planning of financial data.

    *utomatic planning will be done by day. lanned line items will be written.

    "ased on assignment to /59 accounts commitment items will be determined. >nlike

    revenue and costs calculation, payment date calculation takes account of the

    customer and vendor payment terms respectively.

    ote# %he credit side payment plan of the network is determined using theasynchronous network costing only.

    %he dates and the payment terms are used in the & billing plan for planning incoming

    payments. &ales order items will also be used in assigning the billing plan data and

    payment terms'of the dates or sales order item(.%he delivery date including the

    payment conditions is used if there is no billing plan for the sales order item.

    3

  • 7/25/2019 SAP NWT, network

    23/1073

    $n the case of activities processed e-ternally and e-ternally procured components,

    invoicing plan including payment conditions are used or, the delivery dates including

    payment conditions are used where there is no invoicing plan

    $f an invoicing plan has been maintained, payment data is only planned for

    general costs activities

  • 7/25/2019 SAP NWT, network

    24/107

    lanned revenues and incoming payments is relevant in billing plan.

    ates for own payments are relevant only for payments 'not revenues(.

    @ilestone billing dates appear as planned incoming payments and planned revenues. %wo

    things are important for dates and amounts i.e. payment terms and payment target

    'e-ample# payment 1 week after invoice issue, with 2F discount(

    +nce the pro7ect is e-ecuted, invoice billing will be generated and appear in the pro7ect as

    actual revenues and customer payment obligations. ith respect to dawn payment date,

    down payment reuests will be generated by the billing program which are recorded inthe payment data for the pro7ect.

    "illing plan can be created for a sales order, a sales order item or for a billing element in the

    "&.

    lanned costs and planned outgoing payments are relevant during the $nvoicing plan.

    3

  • 7/25/2019 SAP NWT, network

    25/1073

    $nvoicing planes can be created for e-ternally6processed activities, e-ternally6

    procured material components, service activities and cost activities.

  • 7/25/2019 SAP NWT, network

    26/107

    epending on the transaction, you can calculate costs for one network 'e-ample# network

    maintenance( or a range of networks 'e-ample# all networks for selected "& elements

    in structure planning or the pro7ect planning board(.

    ?ou can calculate network costs asynchronously. %he advantage of this is that you can select

    and cost broader ranges 'e-ample# * to G( and carry out costing in the background.

    3

  • 7/25/2019 SAP NWT, network

    27/107

    Aosting variant controls calculation of planned and actual cost. Aosting variant

    is assigned to order type. etworks are of order category 2.

    %he valuation procedure is defined by valuation variant which is a component of

    costing variant. "ased on valuation variant prices are determined by the system to

    value componenets material, activity type, processes, subcontracting and e-ternal

    activities. Haluation variant searches for prices in seuence from the price sources.

    rice entered first is selected first

    @aterials#rice is selected either from purchasing date or material master record

    *ctivity type B rocesses# rice is selected either from activity based costing or

    cost center accounting

    E-ternallly processed activity#price is selected either from the activity or from

    purchasing information record

    3

  • 7/25/2019 SAP NWT, network

    28/107

    hen customiing the order value update, you stipulate, for each order category and

    type, whether the order or network is appended 6 that is, whether its planned costs are

    added to the pro7ect cost plan for assigned "& elements.

    %here are two tables for the order type 'network type(. %he first is defined per order type,

    the second 'parameters for network( per order type and plant.

    * third important table is the network profile, containing default values for the network and

    its activities.

    %he costing variants for plan and actual costs are determined at network header level.

    %he costing sheet and overhead key are determined at activity level. %hey control processcost accounting or application of overhead. epending on the creation process, these

    keys are inherited from the network header or the assigned "& element.

    3

  • 7/25/2019 SAP NWT, network

    29/107

    %he costing variant contains the basic control information needed to carry out

    costing. %he valuation variant contains all the information which controls the

    valuation of#

    @aterial components

    $nternal activities

    E-ternal activities

    %his information also

    controls how

    overheads areapplied.

    Haluation can be

    determined plant by plant.

    %he I"y periodI indicator enables you to calculate costs for internally6processed

    activities period by period.

    %he costing type contains further detailed information for controlling costing.

    3

  • 7/25/2019 SAP NWT, network

    30/107

    ?ou can classify the resources in broadly 2 categories from the networks point of

    view# $nternal and e-ternal activities.

    $nternally processed activities# %hese activities 5 work are carried out by

    machines and 5 or persons of own company. ?ou can schedule the activities as

    per reuirement, distribute the work among persons.

    E-ternally processed activities# these activities are e-ecuted 5 processed by other

    companies. %hese are carried out by purchasing department. %he service

    activities are also procured e-ternally however different from e-ternally

    processed activity that you need to define service specification and the limit for

    the unplanned activities which is provided by the service provider.

    3

  • 7/25/2019 SAP NWT, network

    31/107

    /usiness scenario

    %o e-ecute a pro7ect, materials are reuired

    which can be procured e-ternally 'purchasing( or

    manufactured in own company 'roduction(. %hese

    materials are managed in pro7ect6specific stock.

    *s the pro7ect controller, you are interested in#

    %he values in the pro7ect, at the different stages of purchasing or production

    'pro7ect controlling(

    &tocks of raw materials, semi6finished and finished products used for your pro7ect

    3

  • 7/25/2019 SAP NWT, network

    32/1073

    'stock controlling(

    @aterials provide linkage between many other &* functional modules like

    @aterials @anagement 'urchasing and $nventory @anagement(, &ales and

    istribution, plant maintenance and roduction lanning and Aontrol.

    %he materials are assigned to activities which helps in material reuirement and

    planning in a pro7ect.

    The product which is manufactured in your project is in turn made up ofa variety of material components.

    The first step is to plan the procurement and consumption of the requiredcomponents in your project.

    Projects are linked to Materials management, Sales and istri!ution and

    Production Planning via materials.

  • 7/25/2019 SAP NWT, network

    33/107

    $n order to plan the material reuirements of a pro7ect, materials can be assigned to

    activities. +n the basis of stock, the materials are classified as stock or non6stock items.

    %he item category stock items '9( are for such materials which are stored in stock e.g. pro7ect

    stock, sales order stock or warehouse stock and reservations can be created for such

    materials. "ased on the uantity reuired in the pro7ect, the reuirement planning can be

    initiated. %he procurement element for e-ternal procurement is a purchase reuisition and for

    reuirement planning is planned order.

    !or productions of assembled material, material "+@ is e-ploded and the

    reuirement planning is e-ecuted for all the materials mentioned in "+@.

    on6stock items '( are for materials which are to be procured directly for the network which

    is not using @) 'i.e. not procured via pro7ect stock, sales order stock or warehouse stock(.

    !or non6stock items, urchase reuisitions are created which are passed on directly to

    urchasing.

    3

  • 7/25/2019 SAP NWT, network

    34/107

    %he item category Istock itemI '9( is used for materials kept in stock. hen you save

    your data, the system creates a reservation for the reuired material. * purchase

    reuisition 6 which is passed on to urchasing 6 can also be created for components

    procured e-ternally.

    %he main function of material reuirements planning is to ensure material availability

    'in other words, to procure the reuired uantities in time 6 both in6house and for sales

    and distribution(. %his includes monitoring stocks and, above all, creating procurement

    proposals for purchasing and production.

    $ndependent reuirements 6 that is, reuirements for finished products, assemblies or raw

    materials 6 trigger reuirements planning. $n order to cover the reuirements, orderuantities and dates have to be determined, and the corresponding procurement elements

    scheduled. %he procurement element for reuirements planning is a planned order and,

    for e-ternal procurement, a purchase reuisition. !urthermore, the dependent

    reuirements for materials produced in6house 'in other words, the uantity of components

    reuired to manufacture a finished product or assembly( are determined by e-ploding the

    bill of material. lanned orders are created at each "+@ level to cover reuirements

    when a material shortage occurs.

    4

  • 7/25/2019 SAP NWT, network

    35/1074

    +nce uantities and dates have been planned in reuirements planning, these

    planned procurement elements are converted to Ie-actI procurement elements# for

    production, this is the production order and, for e-ternal procurement, the purchase

    order. hen the order or purchase order is being processed, the production order

    is delivered or a goods receipt is posted to stock 'plant stock or pro7ect5sales order

    stock(.

    %he goods issue that takes place as a result of this activity reduces the stock

    and posts actual costs to the IconsumingI network activity.

    $tem Aategory 9 'stock item( is used for components kept in stock .

    Ensuring material availability is the main function of @) which includes monitoring

    stocks and creating procurement proposals for purchasing and production .

    )euirement for finished products, saleable assemblies and spare parts

    trigger reuirement planning.

    +rder uantities and dates have to be determined in order to cover the

    reuirements .

    !or reuirement planning the procurement element is the planned order and

    for e-ternal procurement it is purchase reuisition .

    lanned procurement elements are converted into e-act procurement elements

    once the uantities and dates are planned.

    $t is roduction order for production and purchase order for e-ternal procurement.

  • 7/25/2019 SAP NWT, network

    36/107

    %he item category Inon6stock itemI '( is used for components that are not procured

    by way of warehouse stock or pro7ect5sales order stock, but are procured directly by a

    network activity instead.

    urchase reuisitions are created for these components. %hese reuisitions are passed

    on directly to urchasing. hen the goods are received, they are not placed into stock,

    but posted to the activity.

    on6stock items cannot be managed as pro7ect stock or sales order stock.

    on &tock $tem '( #%hese are the items which are procured directly by network activity and not through

    warehouse stock, pro7ect stock or sale order stock .

    urchase reuisitions are created first and then passed directly to purchasing.

    hen the goods are received they are directly posted to activity .

    on stock items cannot be managed as pro7ect stock or sale order stock .

    %here are two procurement types for direct procurement with item category #

    4

  • 7/25/2019 SAP NWT, network

    37/1074

    urchase )euisition for the network

    %hird party reuisition for the

    network

  • 7/25/2019 SAP NWT, network

    38/107

    Ahanges in network dates5uantity will trigger workflow for a + change#

    $f changes are made in the network to dates or uantities for material

    components or e-ternal activities for which + has already been created .system

    triggers a workflow automatically. %he only prereuisite is that this workflow has

    been activated in the parameters for the network type table

    %he person responsible in purchasing will receive an information on the reuired

    changes.

    $f only ) is created, changes in the network to dates5uantities will update the

    change in ) automatically

    4

  • 7/25/2019 SAP NWT, network

    39/107

    "or instance # $n this case the way in which the material can !e procureddepends on !oth item category and material attri!utes.

    The material master stores the information of

    the material attri!utes.-$t contains information like %

    -&hether the material is purchased orinternally manufactured.

    -&hether the requirements are individualor collective or !oth

    -

    &hether the material can !e procured inadvance.

    The control data of the project definitiondetermines whether stocks can !e !uilt or not

    4

  • 7/25/2019 SAP NWT, network

    40/1074

    The account assignment category of the salesorder determines whether sales order can !e!uilt up

    ' setting within the ()M can !e specified todetermine whether the components can !eprocured independently of the material mastersettings.

  • 7/25/2019 SAP NWT, network

    41/107

    The components can !e assigned to theactivity with the help of the procurementindicator.

    The Procurement indicator contains thedefault values for determining the stock andthe procurement type.

    ' procurement indicator can !e specified inthe network profile. This gets defaulted in thecomponent assignment.

    4

  • 7/25/2019 SAP NWT, network

    42/107

    %he "+@ transfer functionality in &* & helps you to assign the material from "+@ to

    the network activities based on the reference point field which is assigned to the material

    and network activities.

    "& "+@s can be assigned to ro7ect "+@s using the "+@ %ransfer transaction .

    %he corresponding selection parameters must be chosen to perform the same.

    *dvantage of "+@ transfer functionality is that the changes in the "+@ during the course

    of the pro7ect will change in the activities 'you need to run "+@6transfer again every time

    you make changes in "+@(.

    ?ou can also manually assign materials to network activities without reference point fields.

    4

  • 7/25/2019 SAP NWT, network

    43/107

    *eference point % This is the logical link !etween a ()M component and anetwork activity. $t ensures that the automatic assignment of the materialcomponent happens correctly.

    &hile the assignments !y themselves are project specific, they can !e madesimultaneously for a large num!er of networks in the project.

    $ndividual components, individual ()M assem!lies or a multi level ()M can!e assigned.

    These assignments can happen manually without reference points as well.

    rocedure !or "+@ %ransfer#

    "ield in the ()M and the network activity which needs to !e used asthe reference point needs to !e specified.

    These fields must have the same structure in !oth the o!jects. "orinstance % +'*, eight digits .

    Possi!le entries for the reference point can !e defined incustomi-ing.

    *eference points in the ()M +omponents and the network activitiesmust !e defined.

    The ()M PS $nterface must !e started after changing the ()M/

    4

  • 7/25/2019 SAP NWT, network

    44/1074

    ()M +omponents are assigned to activities in this process.

    Purchase requisitions and reservations are created for the assignedcomponents if *eservation0Purchase *eq. indicator is activated.

  • 7/25/2019 SAP NWT, network

    45/107

    * material that you allocate to activities in a network can be kept in various stocks.epending on your pro7ect, you can access different types of stock for materials

    planning#

    &ales order stock and pro7ect stock are important for controlling purposes 'for monitoring

    the stock value in a sales order or pro7ect( and from an @) point of view 'the stocks

    are reserved for the sales order item or "& element; other stock elements cannot

    access them(.

    %he various stock types are managed for each material component using the account

    assignment category. ?ou define the account assignment category when you assign the

    material to the network activity 'popup in manual assignment, strategies in "+@6&

    interface and standard network(.

    %he possible account assignment categories depend on the assignment of the network

    activity to a stock ob7ect '"& element or sales order item(, on the item category for

    the assignment 'direct procurement for non6stock items( on the material master, which

    can e-clude collective or specialist stock management.

    *s of )elease 4.*, you can use @) elements 'grouping( to manage a 7oint pro7ect

    stock for an entire pro7ect or for several pro7ects 'this is a rougher method than managing

    stock per individual "& element(.

    ?ou maintain the account assignment categories possible for network purchase

    4

  • 7/25/2019 SAP NWT, network

    46/1074

    reuisitions in customiing.

  • 7/25/2019 SAP NWT, network

    47/107

    $nstead of managing the material either in a plant stock or for each individual "&

    element and having no control at all over procurement or being fully responsible we

    can go for reuirement grouping. %hrough reuirement grouping we can determine

    the degree of control ourselves.

    rereuisites for using reuirement grouping #

    Haluated group stock

    /rouping "& elements

    @) /roups that allow reuirement grouping

    *ssigned components should have periodic lot sies.

    %he most basic scenario involves grouping the reuirement of all the "&

    elements in the pro7ect into one "& element.

    +r we can create pro7ects which are only meant for grouping reuirement of otherpro7ects.

    4

  • 7/25/2019 SAP NWT, network

    48/1074

  • 7/25/2019 SAP NWT, network

    49/107

    Haluated pro7ect stock must be allowed in the pro7ect definition control data.

    ith the e-ception of automatic reuirement grouping @) element indicator

    must be set for "& elements.

    @) groups involved in reuirement grouping must be determined in customiing

    for the "&.

  • 7/25/2019 SAP NWT, network

    50/107

  • 7/25/2019 SAP NWT, network

    51/107

  • 7/25/2019 SAP NWT, network

    52/107

    $t is common in engineering pro7ects for critical components with long and unreliable

    delivery times to be purchased at an early stage in the pro7ect much before the

    pro7ect activities in which the components will be used are specified. *dvance

    procurement process is used in such situations.

    *dvance procurement can only be used when you are using sales order or pro7ect

    stock .

  • 7/25/2019 SAP NWT, network

    53/107

    Order 'ategories and order types

    ocuments are used to enter business transactions in the )53 &ystem. +rders are

    one type of business transaction. +rders are determined by their order category.

    %he network is an order category. +rder types are prescribed by the system for the

    relevant applications.

    ?ou can define your own order types within an order category. %he order type

    describes how the order is controlled.

    Austomiing includes two tables, one for the order type and another for the

    order type5plant combination.

    %he order category is used to control#

    1. umber assignment

    2. efault value settings

    3. >ser6specific status management

    4. >ser6specific field control$n the case of networks, order types5plants can be header6assigned or activity6

    assigned. ormally, activity6assigned networks are used, where costs are gathered

    in each activity. Deader6assigned networks are only significant for the assignment of

    networks to sales orders 'without "&(.

    .ro0ect 1 Assignment o orders

  • 7/25/2019 SAP NWT, network

    54/107

    ?ou can assign various &* orders to a pro7ect; e-amples include internal orders,

    production orders, and plant maintenance orders. ?ou can then use the pro7ect

    hierarchy reports to evaluate these assigned orders with the "& element.

    Each order is a cost ob7ect with its own costing parameters such as planned costingvariant, actual costing variant, and overhead sheet. %he planned costs of assigned

    orders are used to determine the planned costs of the pro7ect.

    ?ou assign orders to the pro7ect either by assigning a "& element to the order

    header or by assigning the order to a network and activity as a subnetwork. $f the

    assignment is reuired only for cost control and analysis, you need to assign order to

    the relevant "& element. $f the assignment is reuired both for scheduling and

    cost control, you need to assign the order as a subnetwork. %he "& element is

    derived from the network activity. ote that production orders cannot be assigned as

    subnetworks.

    ocuments are used to enter business transactions in the )53

    &ystem. +rders are one type of business transaction.

    +rders are determined by their order category.

    %he network is an order category. +rder types are prescribed by the system for the

    relevant applications.

    ?ou can define your own order types within an order category. %he order type

    describes how the order is controlled.

    Austomiing includes two tables, one for the order type and another for the

    order type5plant combination.

    %he order type is used to control#

    umber assignment

    efault value settings

    >ser6specific status management >ser6

    specific field control

    lant and order type parameters are used to control#

    $f the network is activity6 or header6assigned

    lanned and actual costing variants

    %he settlement rule strategy

  • 7/25/2019 SAP NWT, network

    55/107

    ?ou can use the IappendedI indicator to specify, per order category, whether an

    order is appended 6 that is, whether the planned values for the order are included

    in the planned value of the corresponding "& element#

    1. $f the IappendedI indicator is set, the order planned value increases the

    "& element planned value. %he information system shows the total

    as the pro7ect plan. hen cost planning is taken over as the budget,

    the values from appended orders also contribute to the budget.

    2. $f the IappendedI indicator is not set, the order planned value is not

    added to the "& planned value. $n budgeting, the plan total for such

    orders must be added manually so that these orders can use funds

    later.

  • 7/25/2019 SAP NWT, network

    56/107

    ?ou can use the IappendedI indicator to specify, per order category, whether an

    order is appended 6 that is, whether the planned values for the order are included

    in the planned value of the corresponding "& element#

    +nce released, all orders are apportioned 6 this means that their plan, commitment,

    and actual values are funds assignments against the funds in the pro7ect. %he

    order value table contains an indicator which you can use to make orders

    IapportionedI earlier, at the IcreatedI stage.

    ?ou can set appended and apportioned indicator based on the order category,order

    type, and controlling area

    *n e-ception to apportionment at release is in the case of networks for preliminary

    planning.$n ro7ect &ystem customiing,you can specify network types to be used

    for preliminary planning.reliminary planning networks are never apportioned.%heir

    related plan values do no increase the assigned value for the relevant "&element

    $n the case of networks 'order category 2(, you can use the network type

    parameters to determine whether the network is#

    Deader6assigned or activity6assigned 6 that is, whether costs are managed in

    the network activities or collected in the header

  • 7/25/2019 SAP NWT, network

    57/107

    * preliminary planning network whose plan, commitment, and actual values

    are not apportioned 6 meaning that they do not appear as assigned values

    in the pro7ect.

  • 7/25/2019 SAP NWT, network

    58/107

    2eader-Assigned Networks

    $n a Deader6assigned networks all the costs 'activity and material( are assigned at

    network header level

    *fter assignment of network header to a "& element, *ll costs are transferred to

    "& element. *ssignment of activities to "& elements is only to summarie thedates

    e you have to use header6assigned networks to assign networks to sales order in

    case sales order are not assigned to pro7ects as no assignments can be made to a

    sales order item in the network activity.

    Activity-Assigned Networks

    Aosts are collected on activities in case activites are used as account assigned

    ob7ects.lant5network type parameters deines the condition if the network header

    or network activities are to be used as cost ob7ects.

    *ctivity6 assigned networks are usually used when activities are assigned to various

    "& elements.Dere every activity in the network is an account assignment ob7ect.

    hich implies we can analye planned costs, commitments and actual costs

    for each activity.

    %he costs are aggregated and displayed for the "& elements to which

    the activities are assigned.

  • 7/25/2019 SAP NWT, network

    59/107

    *ctivity account assignment is a special feature of networks. *ll other order types are

    header6assigned. *ctivity account assignment is controlled via the appropriate

    indicator in the table Iarameters for network typeI.

    Deader assigned networks should be used when networks are assigned to salesorders without "&.Deader assigned networks can also be used when the

    enitre network is assigned to a single "& element

  • 7/25/2019 SAP NWT, network

    60/107

    & document item assignment is controlled via the account assignment category.

    %he account assignment category is controlled via & reuirements type

    determination.

    $mportant factors that affect account assignment are the strategy group, the @)

    type and item category group from the material master of the product as well as

    the document type of the & document.

    %he system defaults the item category when you create an order. ?ou can accept

    the default or overwrite it. ermitted item categories are defined in Austomiing.

    %he permitted planning strategies are assigned to the material using the planning

    strategy group. %his is necessary so that you can find the correct reuirements type

    in independent reuirements management and sales order management.

    %he default reuirements type is the main strategy in the planning strategy group.

    $f no planning strategy group is defined in the material master, the system uses the

    item category group 'sales and distribution screen in the material master( and, if

    necessary, the @) characteristic to search for the reuirements type for the salesorder.

  • 7/25/2019 SAP NWT, network

    61/107

    %he account assignment category determines the A+ ob7ect to which document

    uantities and values are assigned. ?ou use it to determine the following#

    >sing the special stock indicator '&&$ above(, that goods movements in 9ogistics use

    plant stock, sales order stock or pro7ect stock.

    >sing the consumption posting indicator 'Aons. above(, the A+ ob7ect to which the

    values of a material document are assigned.

    &ettings#

    ! : Aollective stock, consumption posting to the consumer 'order, activity(

    %he account assignment category is important for procuring components directly.

    E : Juantities and values managed in the sales order item

    %his account assignment category is important for make6to6order production without

    "&.

    : Juantities managed using sales order item, values managed in pro7ects

    %his account assignment category is important for non6valuated pro7ect

    stock, with "& and sales order item

    J : Juantities and values managed in pro7ects

    %his account assignment category is important for pro7ect stock

  • 7/25/2019 SAP NWT, network

    62/107

    / : lant stock, values managed using pro7ect

    %his account assignment category is important for sales order items sold

    from plant stock, with

    value posting to the pro7ect. $t differs from account assignment category I!I in

    the field control

    of the account assignment block.

  • 7/25/2019 SAP NWT, network

    63/107

    *ctivity6"ased Aosting offers a facility for allocating and distributing the overhead to its cause.

    *ctivity6"ased Aosting provides useful information on#

    +verheads reduction by process improvement

    rofitability increase by highlighting unprofitable products or customers

    *ctivity6"ased Aosting is advantageous for having#

    K %ransparent overheadsK arallel uantity and value flows

    K recise assignment of internal activities to consumer

    Leanut butter effectI can be avoided through even distribution of overheads among all

    the cost drivers.

    8

  • 7/25/2019 SAP NWT, network

    64/1078

    $n *ctivity6"ased Aosting, processes are the controlling ob7ects. rices can be either

    maintained manually or using activity and cost input planning in the case of cost

    centers and activity types. %hrough activity based costing, processes are debited to

    cost ob7ects or profitability segments.

  • 7/25/2019 SAP NWT, network

    65/107

    %emplates are created in MAustomiingN and determined by controlling area, costing sheet,overhead key and template environment 'for networks 4; for "& ( for the

    function. $n the ro7ect &ystem, templates can be assigned to "& elements, networks

    'header assigned(, or network activities. rocess costs are allocated to cost ob7ects or

    profitability segments by assigning a process template. rocess costs are calculated based

    on the templates selected for the pro7ect.

    *fter template selection, the calculation program

    determines the following

    rocesses in the template relevant for the

    pro7ect

    K Juantity of each process consumed by

    the8

  • 7/25/2019 SAP NWT, network

    66/1078

    pro7ect

    Aalculated value to be added to the

    pro7ect at the start, end or continuously

    %he price for the process and the allocation cost element are determined by

    entering one process per line in the process template. @ulti6level processes can be

    mapped by referencing another process template in the working template.

    %he uantity used by the cost ob7ect is determined using the cost driver. %his enables

    the allocation of the relevant values to all the levels in the process hierarchy as far

    as cost ob7ects or profitability segments.

    Aost drivers can originate from many different sources in the )53 &ystem or e-ternal

    systems. E-amples # weight 'material master(, number of components, activities of a

    particular category, work center 'network(, number of sales orders for market

    segment '9$&( etc. %he uantities determined by the cost driver are multiplied by the

    price of the process. %he resulting value is charged to the cost ob7ect 'in the

    e-ample, the "& or network5activity(, and the process is credited.

  • 7/25/2019 SAP NWT, network

    67/107

    *ctual prices for activity types and business processes are calculated in +verhead

    cost controlling at the end of the period.

    *ctual prices : *ctual costs 5 Juantities consumed

    %he possibility of revaluation at actual prices and its specification for each

    activity type are controlled in Austomiing in the parameters for the actual

    version depending on the fiscal year.

    %he difference between the actual price and the originally allocated price is

    charged to the cost ob7ects.

    )evaluation at actual prices for activities and business processes can be done

    in the ro7ect &ystem and in the Aost +b7ect Aontrolling.

    )evaluation at actual prices using an activity type is illustrated in the e-ample given

    in the slide

    8

  • 7/25/2019 SAP NWT, network

    68/107

    +verheads calculation is used to allocate overhead costs to cost ob7ects such as activities

    and "& elements. Aalculations are done based on the Aosting sheet entered in

    the cost ob7ect and the overhead key entered on the "& element,network header or network activity. +verheads can be calculated for

    planned, commitment and actual values. +verhead calculations are

    done using the uantity based or percentage allocation rates.

    %he following postings get generated through overheads allocation#

    ebits to cost ob7ect '"& element, etwork header oretwork activity (

    Aredits to cost center ' overhead order or process (

    8

  • 7/25/2019 SAP NWT, network

    69/1078

    +verhead costs are updated using the secondary cost elements

    in the costing sheet credit rows and these can be simulated also.

  • 7/25/2019 SAP NWT, network

    70/107

    Aosting sheet is derived by means of the costing variant from the Iarameters for

    etwork %ypeI table, in the case of networks. %he costing sheet and the overhead key

    can be changed in the network header.

    %he costing sheets to be used in the activities are made a default through this.

    !or "& elements, the costing sheet is derived directly from the pro7ect profile. $n

    the case of Easy Aost lanning and the unit costing for "& elements, the cost

    planning draws on a costing sheet for a costing variant which is assigned to the

    pro7ect profile through the planning profile.

    +verhead keys for activities are inherited from their respective "& elements.

    8

  • 7/25/2019 SAP NWT, network

    71/107

    +verheads are calculated using a costing sheet.

    %he overhead surcharge can either be a percentage if it is value driven or an absolute value

    of measure if it is uantity driven. %he overhead is calculated against a base which is defined

    by the cost elements. Aost elements or cost element areas are collected in base lines.

    !actors such as Aontrolling area, company code, plant, overhead group, network type, time

    period and plan versus actual determine the overhead rate applied. +verhead key assigned

    to the cost ob7ect decides the determination of overhead group in customiing. %hus a single

    costing sheet with fle-ible rates can be made use of different organiational units or

    individual activities.

    8

  • 7/25/2019 SAP NWT, network

    72/107

    *s of )elease 4.8A, the &* &ystem offers an easy6to6use tool for planning costs in

    "& elements. %he tool is called IEasy Aost lanningI.

    Easy Aost lanning for pro7ects can be accessed from the ro7ect "uilder. ?ou can choose

    a "& element from the structure tree and then you create costing items for the selected

    "& element.

    $n Easy Aost lanning, cost planning is cost element based.

    ?ou can use planning templates to enter costing items in which characteristics are valued.

    %he e-ample above shows work in hours being valued at 1.

    %he characteristic values which are linked from the planning template are uantities,

    values, or actions from the costing items. $n the e-ample above, the link is to theuantity for an internal activity.

    hen you accept them, the costing items appear in the structure tree beneath the

    relevant "& element.

    *s an easy way to create a pro7ect preliminary costing, Easy Aost lanning can be very

    useful.

    %he costs so planned are then broken down 6 for e-ample, using a uantity structure of

    8

  • 7/25/2019 SAP NWT, network

    73/1078

    networks5activities.

    Easy Aost lanning can also be used to enter plan data for later pro7ect e-ecution.

    Daving done this, you can later use E-ecution &ervices to enter commitment and

    actual data relating to the planned costs. >se customiing to stipulate in which

    plan version values planned in Easy Aost lanning are stored.

    *s part of the network costing, the system automatically determines planned

    costs when you plan dates and resources for the following ob7ects#

    a. !or internally processed activities# activity inputs

    b. !or e-ternally processed activities B service activities# rimary costs

    c. !or genreal costs activities# primary costs

    d. @aterial componenets# primeary costs.

    ?ou can use planning templates to create uantity structures for Easy Aost

    lanning.?ou can enter uantities and prices in the template, or regulate activation using

    formulas or conditions.

    ?ou can use characteristics assigned to the planning template as variables for the

    formulas5conditions. %he characteristics are valued by the user when the

    planning templates are copied into Easy Aost lanning.

  • 7/25/2019 SAP NWT, network

    74/107

    >nit costing is done to calculate cost plan per "& element. Dere we use

    planned uantities instead of cost.

    $t is not period dependent

    *t cost element level, plan values are displayed

    $nput information related to sources of supply, uantities and prices mark the useof unit costing to generate cost plan per "& element

    8

  • 7/25/2019 SAP NWT, network

    75/107

    Structure Oriented .lanning:

    &implest type of planning is structure based planning. lan values are displayed

    in hierarchy

    %he total cost planned is aggregate

    $t is neither by cost element nor is period specific

    Harious views are used to display the different values in structure6oriented

    planning

    lanned total Hiew6this shows total aggregate at superior "& element '9evel

    1 "& element(

    %he distributable or distributed view6%his view is used to check distribution of

    budget among child "& element

    Aumulative or remainder view6%his view is used to check distribution of budget

    across years

    +rder5network view6%his displays the planned cost od appended orders5networksassigned to "& element

    Cost Element Planning/Activity Input Planning:

    hen more detailed information is reuired, cost element planning is done. $t

    is independent of pro7ect scheduling

    @anual reschedule of cost planning becomes mandatory if a pro7ect or

    individual

    8

  • 7/25/2019 SAP NWT, network

    76/1078

    package schedule is changed

    %his planning is adopted if precise information is available as it becomes sure not

    to reschedule5postpone the pro7ect

  • 7/25/2019 SAP NWT, network

    77/107

    %he plan profile is used to control overall cost5revenue planning. $t contains costing variants

    for the unit costing or Easy Aost lanning.

    $t also contains indicators for updating revenue plan values via customer uotations or sales

    orders.

    ?ou assign the plan profile to the pro7ect by way of the pro7ect profile. ?ou can change it in the

    pro7ect definition.

    Aosts and revenues can be planned in different A+ plan versions.

    ?ou either specify the plan version during planning or, if you are using Easy Aost lanning,

    you assign it to the controlling area.

    lanning layouts are used to plan costs, revenues, payments, and statistical key figures.

    ?ou can use the )eport ainter to create the layouts and can assign them to planner profiles.

    >sers can choose planner profiles and assign them to the user master record.

    lanning profile# >se transaction +&"

    %he lanning profile contains the settings related to planning. $t control overall

    cost5revenue planning. lanning profile is assigned to pro7ect using pro7ect profile. Aosting

    variant are

    8

  • 7/25/2019 SAP NWT, network

    78/1078

    relevant if we are using unit costing and easy cost planning

    A+ plan version is reuired to be specified if we are using easy cost planning.

    lanner profile and planning layouts are specific to use of detailing planning

    using Lcost element5activity inputO

  • 7/25/2019 SAP NWT, network

    79/107

    lanning profile is contains the settings for overall planning, detailed planning

    and unit costing

    etails for each field can be checked using

    !1 $mportant field details are as#

    %otal Halue# efines overall planning without any reference to fiscal year

    *nnual lanning# efines overall planning with reference to fiscal year

    "ottom up lanning# +verall planning values are e-trapolated after saving

    E-change rate type# etermines which e-change rate is to be used for currency

    conversion of overall values

    =

  • 7/25/2019 SAP NWT, network

    80/107

    %ransaction +PP% to edit costing and valuation variant

    Aosting variant is mostly used for unit costing ,easy cost planning and also used for

    costing networks. %he field costing type determines for which "& element

    'costing ob7ect( costing is done

    Haluation variant determines the prices and rates. $n the above mentioned slide,system will first check for Llanned price 1O if it fails, system will check for Lstandard

    priceO and again if it fails it will check for Lmoving average priceO from material

    master. $f system now fails, it will trigger an error message during cost determination

    =

  • 7/25/2019 SAP NWT, network

    81/107

    &nternally-processed activities:

    $f no distribution key or work center is maintained in the activity, the costs are distributed

    evenly over the earliest dates in the activity. Haluation is at the rate in the valuation variant.

    epending on the strategy being used, the system can determine the most current date.

    valuation is determined by the rate maintained in the valuation variant. "ased on the

    strategy adopted, system determines the latest date. $f no work center5distribution key is

    maintained, the system distributes the cost evenly over the earliest dates.

    'osts activity:

    Aase 1#$nvoice plan maintained#the values in periods are as per the values mentioned

    in invoicing plan

    Aase 2#$nvoicing plan not maintained and distribution key maintained#%he activity value

    is

    =

  • 7/25/2019 SAP NWT, network

    82/107=

    distributed to the periods based on the distribution key maintained in the activity

    Aase 3#$nvoicing plan not maintained and distribution key not maintained#%he

    costs are distributed evenly over the earliest dates in the activity

    $f an invoicing plan has been maintained, the values in the periods are set

    as specified in the invoicing plan.

    +therwise, the activity value is distributed to the periods using the distribution key in

    the activity. $f no distribution key is maintained in the activity, the costs are distributed

    evenly over the earliest dates in the activity.

    Service activities or externally-processed activities:

    Aase 1#$nvoice plan maintained#the values in periods are as per the

    values mentioned in invoicing plan

    Aase 2#$nvoicing plan not maintained#%he activity value is set in the period of the

    latest activity start date.*lso the system determines the price from the purchasing info

    record or the activity value.

    $nvoicing plan has priority for the values

    $f an invoicing plan has been maintained, the values in the periods are set

    as specified in the invoicing plan.

    +therwise, the activity value is set in the period of the latest activity start

    date.

    %he invoicing plan has priority for the values. $f no invoicing plan has been

    maintained, the system determines the price from the purchasing info record or

    the activity value.

    (aterial components:

    Aase 1#$nvoice plan maintained#the periods and ,in some cases,values are

    taken from invoicing plan

    Aase 2#$nvoicing plan not maintained#%he system determines the price from the

    purchasing info record or the price is taken from material master as per

    valuation variant.Dere material reuirement date determines the period

    $f an invoicing plan has been maintained, the periods and, in some cases, the

    values are taken from the invoicing plan. $f no invoicing plan has been maintained,

    the values are taken from the purchasing info record or the price is taken from the

  • 7/25/2019 SAP NWT, network

    83/107=

    material master per the valuation variant. $n this case, the period is that from

    the material reuirements date.

  • 7/25/2019 SAP NWT, network

    84/107

    %he customer accepts the uotation. * sales order is created in the system, where

    appropriate using the uotation as a template. %he activities listed in the uotation

    are entered in the sales order as sales order items.

    %he items are assigned to the pro7ect. %hey are used for revenue planning and for

    posting revenues to the pro7ect by means of milestone billing.

    %wo companies are responsible for e-ecuting the pro7ect 6 $E& */ and $E& >P.

    $E& >P creates a sales order for $E& */ and assigns the document item to the

    billing element %61QQ.1.2.

    9ater on, $E& >P bills its services to $E& */ on a resource6related basis.

    * billing reuest is created in the system via resource6related billing. %his is billed and

    results in revenues for $E& >P.

    =

  • 7/25/2019 SAP NWT, network

    85/107

    $n &* where pro7ect is a controlling ob7ect#

    &ales order created and after structuring of pro7ect sales order will account assigned to"&. %hen revenue planned in sales order.

    +nce ork completed in pro7ect, actual cost captured in "& and !inal product will

    be delivered to Alient.

    "illing will be completed and actual revenue generated. *ctual )evenue will

    be transferred to "&.

    hile )esult analysis performed for pro7ect the *ctual )evenue and Aost will settled

    to the profitability segment.

    Sale document structureK &ales ocument type represents the type of business transaction and functions and

    the flow of document with in sale order. rocessing.

    K $tem Aategories are assigned to sales document category. hile creation of &ales order

    it will default the item category but user can change it as per reuirement.

    K &chedule line category is assigned to $tem Aategory. hile creation of document

    system will default the scheduled line category but it can changed according to

    reuirement.

    =

  • 7/25/2019 SAP NWT, network

    86/107=

    &tem 'ategory

    K Item Category is determine by Sales Document type and thematerials Items category group in a sales order.

    K Item Category controls function for Sales Order like Item Type,Pricing, illing Plan, resource related or deli!ery related.

    K It controls if pricing is rele!ance for billing, rele!ance for Deli!erySchedule "ine Item, and contains Incompletion "og and Partner te#t.

  • 7/25/2019 SAP NWT, network

    87/107

    '1()epresents a process of make6to6order production without a work breakdown structure.

    $n this case, the sales order item is the contolling instrument. *ccount assignment category

    E specifies that the sales order item forms a separate A+ ob7ect.

    Aosts and revenues of the sales order item are usually settled to the profitability segment.

    '2(>sing assembly processing, you can generate a network when you create the sales order.

    hen you save your data, the system creates a "& and assigns the sales order item to a

    "& element in this "&. $n this case, the sales order depicts the sales view, the pro7ect is

    the controlling instrument, and logistical processing is represented by the network.

    *ccount assignment categories or J 'Aons. : in each case( specify that revenues

    are assigned to the billing "& element of the pro7ect.'3(*s an alternative to assembly processing, you can assign a sales order item to a "&

    element in a pro7ect. Aontrolling takes place in the pro7ect. ?ou can assign orders or

    documents to the pro7ect. Halue assignment to the pro7ect is controlled via account

    assignment categories /, and J. %hese differ from each other in the way that they

    manage uantities.

    =

  • 7/25/2019 SAP NWT, network

    88/107

    @ethods for plan revenue in a pro7ect are#

    a. @anual revenue planning# this can be based on structure or revenue element

    where the later is a cost element and period based.

    b. & billing plan# this is cost element and period based planning.

    c. & document# this is part of integration with & module where sales order itemor uotation items are used as revenue planning. %his kind of planning is cost

    element and period based.

    =

  • 7/25/2019 SAP NWT, network

    89/107

    )evenues can be planned in pro7ects using the following methods#

    @anual planning in billing elements in the pro7ect structure.

    %his type of planning can follow the same procedure as cost planning, or can be by

    revenue element.

    &ales orders 'all & documents assigned(.

    &ales order items are assigned to "& elements. $n Austomiing, you can stipulate, for a

    combination of sales document category 'uotation, order, and so on(, sales

    document type, controlling area, and system status, whether the billing data 'for

    e-ample, in a billing plan( from a sales order should update the revenue plan for an

    assigned "& element. %he dates and planned revenues concerned originate eitherfrom the billing plan for the sales order items or 'if there is no billing plan( from the

    net value and apportionment data for the item. %he revenue element originates from

    /59 account determination in &.

    "illing plan in pro7ect billing elements.

    %he revenue element is defined in Austomiing.

    =

  • 7/25/2019 SAP NWT, network

    90/107

    %here are different ways of creating billing plans#

    @anually

    "y copying a reference billing plan

    $n & and &, reference billing plans can be

    called upon automatically

    "y copying billing milestones from work

    breakdown structures or networks

    "y copying billing milestones automatically from

    the network in assembly processing

    =

  • 7/25/2019 SAP NWT, network

    91/107

    $n the & document, you can define a detailed billing plan with a number of billing dates

    instead of 7ust a single billing date. * billing plan is a schedule containing individual billing

    data for a particular sales document.

    @ilestone billing is widely used in pro7ects 'for e-ample, construction pro7ects(.

    $f you use milestone billing, the total value to be billed is apportioned to the individual dates

    in the billing plan per defined rules.

    "illing plan dates can be blocked for billing

    ?ou can set billing blocks manually or remove them by activating billing milestones.

    *s of )elease 4., billing plans can also be entered for billing elements in pro7ects. &uch

    billing plans can, if reuired, be copied to the sales order later 'make sure you delete

    any e-isting billing plan in the billing element; if you do not, the planned revenues will be

    determined via the & billing plan and not the & billing plan(.

    * billing plan can contain down payment dates. %hese dates affect payment, but not

    revenue.

    =

  • 7/25/2019 SAP NWT, network

    92/107C

  • 7/25/2019 SAP NWT, network

    93/107

    %he term IVersion" is used in the pro7ect system in different conte-ts. ifferent

    types of versions include simulation versions, pro7ect versions and A+ planning

    versions are available in &* ro7ect &ystem which are discussed below.

    ro7ect versions, are snapshots of a pro7ect at a specific point in time, and are

    used for documenting the progress of a pro7ect over time. "oth uantities and

    values are stored in versions and it can be created either manually, or

    automatically when a status changes. $n the case of status change, the pro7ect

    profile contains a reference to a version profile which specifies the name of

    the pro7ect version to be created when a particular user or system status is

    set.

    &imulation versions# $n the ro7ect &ystem, these are versions that you can

    change. ?ou might, for e-ample, create simulation versions in the following

    situations#

    $n the uotation phase# generally speaking, at this stage there is not yet

    an operative pro7ect.

    %o draw up alternative planning scenarios for e-isting operative pro7ects

    or parts of these.

    A+ plan versions are used to plan revenues and costs. ?ou can copy values

    from one version to another. ?ou can change planned values manually in every

    version and cost values are retained.

    C

  • 7/25/2019 SAP NWT, network

    94/107

    &imulation versions are used to draw up alternative Iwhat ifRI planning

    scenarios. %hey are created manually, can be changed, and, if necessary,

    deleted again which is unlike released operative "&s with activities.

    &imulation versions are useful during the uotation phase of a pro7ect

    and possible to plan several simulation versions.

    ?ou can create simulation versions even at the time of e-ecution of pro7ect,

    where you can copy from operative to simulation versions, compare, analye

    and work with other versions and transfer them back to the operative

    pro7ect.

    hen an operative pro7ect is copied to a simulation version or vice versa, a

    log file is created which contains the ob7ects that were transferred and any

    error messages that were issued in the process.

    &imulation versions can be created either for an entire "&, or for

    sub6 hierarchies of a "&.

    &imulation versions are edited in the pro7ect planning board or in pro7ectplanning board from &* )53 4.8A release.

    %he system performs the test run while transfer to check if the operative

    or simulation version can be transferred.

    @ultiple &imulation version can be created, compared and evaluated.

    C

  • 7/25/2019 SAP NWT, network

    95/107

    &imulation customiation consists of two steps#

    1. Hersion keys# one should work with permissible version keys since these cannot

    be deleted once simulations has been created.

    2. &imulation profile# %his determines which all ob7ects will be copied while creating

    simulations 'in addition to the structure information( from simulation tooperative 'and vice versa(. $f there are no simulation profile, all the te-ts will be

    copied. %he simulation profile will be defaulted in the pro7ect due to assignment

    in pro7ect profile.

    Sust like pro7ect version, simulation versions can be compared with each other in

    information system, whereas the cost element report does not support the

    simulation versions. >nlike operative pro7ects, simulation versions cannot be

    changed in structure info system.

    C

  • 7/25/2019 SAP NWT, network

    96/107

    hen you transfer data from operative pro7ects to simulation versions 'or

    vice versa(, the following ob7ects are copied#

    ork breakdown structure

    etwork with activities, activity elements, relationships, and

    subnetworks @ilestones

    @aterials for the activity

    ocuments, & te-ts and long te-ts 'depending on the simulation profile

    used(

    Aapacity reuirements

    $nvoicing plan for the network, and billing plan for the "& element

    'as of )elease 4.*(

    %he following ob7ects are not copied#

    +ther orders 'e.g. no production orders(

    roduction resources5tools

    C

  • 7/25/2019 SAP NWT, network

    97/107

    ro7ect versions enable you to record a snapshot of a pro7ect at a specific

    moment in time 6 this can be used for future comparison with the

    operative pro7ect.

    ?ou can create a pro7ect version automatically 'i.e. triggered by a system or user

    status(.

    ?ou can also create a pro7ect version manually#

    hile changing the "&

    hile changing the network

    $n the &tructure5ates information system for one or more pro7ects

    ata transfer when Hersion profile settings are used while using these transactions#

    1. &tatus dependent pro7ect versions.

    2. %A network maintenance A22 or "& element maintenance AS2

    ata transfer which is $ndependent of version profile and dependent on

    database profile#

    3. %A A=1 and A=2

    4. &tructure information system

    C

  • 7/25/2019 SAP NWT, network

    98/107C

    %he version profile is maintained in the & customiation and assigned to

    ro7ect profile or network profile.

  • 7/25/2019 SAP NWT, network

    99/107

    ?ou use a version profile to define two different kinds of information. !irst, you

    specify which version is created automatically when a specific system status or

    user status is set. &econd, you specify which data is to be written to the

    versions that are created automatically.

    ?ou need to define a version profile, if you wish to have versions created

    automatically, or if you wish to generate versions directly when editing the "&

    or networks.

    ?ou do not need to define a version profile, if you wish to generate versions

    manually from the &tructure5ates information system.

    %he version profile is entered in the pro7ect profile and network profile.

    C

  • 7/25/2019 SAP NWT, network

    100/107

    ro7ect planning board is a tool in &* & which helps and enable you to

    process 5 edit the entire pro7ect structure which are "& element, activities,

    relationships, milestones, material components, & te-ts, documents and

    assigned ob7ects to them.

    $t is similar to /antt chart based on interactive &* environment.

    %his comprises of hierarchy structure of your pro7ect and the corresponding

    date situation.

    ?ou can custom made the display in pro7ect planning board to suite your

    reuirement.

    ro7ect planning board can also be useful for planning dates and resources

    i.e. work, e-ternal processing, for planning costs using activities.

    C

  • 7/25/2019 SAP NWT, network

    101/107

    ro7ect planning board profile contains default values for the appearance

    of planning board.

    %he settings in this pro7ect planning board profile is valid for both, simulation

    versions and operative pro7ects.

    %he graphical display can be changed and adapt as per user needs inthe planning board and customiation using pro7ect planning board

    assistant.

    C

  • 7/25/2019 SAP NWT, network

    102/107

    ro7ect planning board is a graphical interface based on /antt chart which can

    be used for creating and maintaining data like pro7ect definition, "& element,

    activities, relationships, milestones, documents and & te-ts.

    >seful for &cheduling and monitoring.

    ?ou can view date view, and other overviews of pro7ect at the bottom of /anttchart like capacity overview.

    ?ou can view logs, hierarchal graphic of "& element and etworks and

    network activities.

    %his is the only transaction where we can change simulation versions for

    releases earlier than &* )34.8A, i.e. create of change of "& elements

    in simulation version based on the user specific options.

    %he entire period in the pro7ect planning board screen is called as Evaluation

    period which consists of re6evaluation period, lanning period and ost6

    evaluation period. %hese are defined by time settings and determined by 3

    profiles which are created in customiing and assigned to pro7ect planning boardprofile.

    C

  • 7/25/2019 SAP NWT, network

    103/107

    *ssembly processing will be helpful while one is planning and producing or

    servicing same product for several times with similar constellations. hich means

    the basic structure will be same while data like duration, dates, uantities etc. will be

    changing. $n assembling processing, a network and "& element B ro7ect 'if

    reuired( is automatically created based on the customiation, while a sales

    document is created and saved. %he pro7ect number is derived from &alesdocument and this process generates assignment between sales document B

    pro7ect. %his incurs that the same information will be shared by sales and pro7ect

    team. $f the data is changed in ro7ect will update &ales document 'and vice versa(

    which helps in delays and disagreement between sales and pro7ect department.

    rocess flow#

    $f a sales order is created for a material which has strategy group for assembly

    processing has been assigned, the assembly processing will start.

    %he @) processing is omitted in the assembly processing and creates a operativeorder 'network in case of &( directly from sales order.

    *ssembly processing is carried out statically in & which means only one network

    for one sales document item.

    "ased on the customer reuirements date, backward scheduling is carried out and

    availability check is done for reuired material components. hich enables to

    inform customer about feasibility of reuired date or else system will propose new

    date.

  • 7/25/2019 SAP NWT, network

    104/107